S.N Description unit Nos Length Breadth Height Volume
A Brick Masonary Walls
a Under the plinth (Toe Walls) nos
1 Total walls area from cad cft 147.30 4.75 699.68
Summary
Brick
S.N Description Masonary (cft) Plaster Paint
1 Toe Wall 699.68 8920.25 8920.25
2 Ground floor 949.68
3 First Floor 767.73
4 Second Floor 0.00
5 Top Floor 360.29
6 Parapet walls 147.12
8 Deduction from opening schedule 336.5733333 1040.64 1040.64
Total 2,587.92 7879.61 7879.61
External
L H A(Sqft)
GF 172.70 9.33 1611.87
FF 152.50 9.33 1423.33
SF 0.00 9.33 0.00
Top Floor 57.67 9.33 538.25
Lower Parapet 113.70 2 227.40
Upper Parapet 53.20 3 159.60
Varahanda 6.00 2 12.00
Deduction in zero side 28.90 18.66 539.27
Total 3433.18
Internal RFF
Walls Celling Beam
L H A(Sqft) A(Sqft) A(Sqft)
GF 172.70 8.33 1439.17 777 927.5
FF 152.50 8.33 1270.83 0
SF 0.00 8.33 0.00 0
Top Floor 57.67 8.33 115.34 280.31
Staircase 47.5 8.33 142.50 135.42
Lower Parapet 113.70 2 227.40
Upper Parapet 53.20 3 159.60
Varahanda 6.00 2 12.00
Total 3366.84
TOTAL 6800.01933 1192.73 927.5