Test Plan Performance Test Weclever
Test Plan Performance Test Weclever
weClever v2.0.5
EWOOSOFT
Author : Sandy
2024-09-05
Table of Contents
1. Test overview......................................................................................................................................................................... 3
Details Remarks
Make sure the product performance meets requirement or not.
2. Test scope
- All the reviewed Non-functional requirements (Refer to 4. Performance test requirements).
NFR Type /
No Category NFR Description Customer expectation
Performance - User Peak Load: The system must be able to support
1 Current avg concurrent users: 1400
load 1400 active users.
Status
Items Remarks
(O/X/-)
Test is requested from stakeholders O
Test schedule, test scope, out of scope, test environments, test
O
strategy, test resource are defined and confirmed.
Non-functional requirements (NFRs) are defined and confirmed O
Test Pass/Fail Criteria is defined and confirmed. O
Test data, test scripts, test tool and test environment are prepared. O
Information of most recent development output from project (SRS,
O
VTS issues, etc.) is provided.
Product is deployed for testing from development team. O Link
Items Remarks
If "Not Test, N/A" item exists,
When prepared test items are all proceeded corresponding reason will be
informed to test process task
When test was requested to stop by PM, Test Manager
When test cannot be progressed due to unexpected problems.
7. Acceptance criteria
8. Test schedule
9. Test strategy
Remarks
URL
https://test.weclever-dental.com/ Preproduction
Tool Version
JMeter 5.6.3
11. R&R
Role Contact Person Responsibility
Manage product.
Product Support product requirements.
Planner Wonbin Review schedule/cost, documents, defects, decide on major
(VDV) issues of project unit, and monitor the detailed activity of
project.
Project Manage project, schedule/cost.
manager Snow Review test output (Plan, Result), decide on major issues of
(EVN) project unit, and monitor the detailed activity of test
Developer
LTS team Develop product.
(LTS)
Test Test plan, test result approval, technical support for test,
Manager Kelly support for test process, monitor/manage the entire activity
(EVN) of test
Test Leader
Sandy Create NFRs and plan, run, create test report
(EVN)
Automation
Team Kent Review NFRs and plan, support to testers finish test