Gathampur Qap

Uploaded by

aceengineering08
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views3 pages

Gathampur Qap

Uploaded by

aceengineering08
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

DESEIN PRIVATE LIMITED

CONSULTING ENGINEERS
Cat. I Approved √

I
Cat. II Approved as noted
Commented - to be submitted along
Cat. III
with compliance report

Cat.
Cat. IV Received for Information

Letter No. D4033/MOM Dated 6 APRIL 2018


Reviewed By Vipin Patil for DESEIN
The Company's approval conveyed herein neither relieves the
Vendor/Contractor of his contractual obligation and his
responsibility for correctness of dimension, material of
construction, weights, quantities, design details, assembly fits, all
conforming to the relevant codes & standard as per specification
and performance requirement, nor does it limits the Owner's /
Owner's Engineers' right under the contract.
Document

BGR-PPD-0253-QA-MQP-ME-0286,Rev.
Title

02 - MQP FOR TANKS


MANUFACTURING QUALITY PLAN Project : 3X660 MW GHATAMPUR THERMAL POWER PROJECT

BGR ENERGY SYSTEM LTD., 443, ITEM: - MS/MSRL/CS/CSRL/SS TANKS QP. No : BGR-PPD-0253-QA-MQP-ME-0286 Package: BALANCE OF PLANT PACKAGE (GA3-BOP)
ANNA SALAI,
TEYNAMPET, CHENNAI - 600 018. 053598/CO CONTS/026A/NUPPL/GA3-BOP /CONTRACT-
Rev No: 02 Contract No.:
MAIN SYSTEM : PTP,UF,RO,MB(WTS) & ETP 1 /SUPPLIES/2013 ; Dt:24.04.2017
Date : 31.03.2018 Main Supplier M/s BGR ENERGY SYSTEMS LIMITED

Componenet/ Class of AGENCY


S.NO Characteristic / Test Type of check Quantum of check Reference Documents Acceptance Norms Format of Record Remarks
Operation Check
D* M C L

1 2 3 4 5 6 7 8 9 ** 10 11

1.0 Raw Materials/Bought out Items

As per Approved As per Approved


Chemical Composition & Mechanical Chemical Analysis &
Major 1/Heat Drawings/Relevent Material Drawings/Relevent Material MTC √ P R R
Properties Mechanical Properties
1.1 Plates & Pipes Standard Standard

Soundness Major # U.T 100% ASTM A 435 ASTM A 435 MTC/UT Report √ P R R # UT for Plate THk. > 25mm

Chemical Composition & Mechanical Chemical Analysis & Material Test certicate
1.2 Flanges & Fittings Major 1/Heat/lot IS2062 / ASTM A234 WPB Relevant Material code √ P R R
Properties Mechanical testing / Lab TC

As per Approved As per Approved


1.3 Rubber Mechanical Properties Major Mechanical Testings 1/Batch Drawings/Relevent Material Drawings/Relevent Material MTC √ P R R
Standard Standard

2.0 In Process Inspection

Welding Procedure Specification,Procedure


Third party approved WPS,PQR
2.1 Welding Control Qualitfiaction Test & Welder Performance Major Review 100% ASME SEC-IX ASME SEC-IX WPS,PQR,WPQ. √ P R R
submission for NUPPL review
Qualification

Cutting/Shearing of Plates/Sheets/Coils for


Major Visual 100% Manufacturer's Standard Manufacturer's Standard √ P R R
forming
2.2 Shell Forming Inspection Report

Diameter,Outer Circumference & Ovality Major Visual & Measurement 100% Manufacturer's Standard Manufacturer's Standard √ P R R

Ovality, Circumference, Height, Thickness &


Major Visual & Measurement 100% App Drawing / Relevant Code App Drawing / Relevant Code Inspection Report √ P R R
Surface Condition

2.3 Dish End Forming Crown Radius,Knuckle Radius & Straight face Major As per Template 100% App Drawing / Relevant Code App Drawing / Relevant Code Inspection Report √ P R R

ASME-VIII,Div-1 Mandatory
Surface Defects Major DPT 100% ASME-V, Article-6 Inspection Report √ P R R
appd-8

2.4 Assembly of Fittings Fit up & Dimensions Major Visual & Measurement 100% As per Approved Drawings As per Approved Drawings Inspection Report √ P R R

100% on butt weld joints & ASME SEC-VIII, Div-


2.5 Root Weld Soundness Major DPT ASME SEC-V,Article-6 DPT report √ P R R
10% on fillet weld joints 1,Mandatory appendix-8

Based on Joint Efficiency # 100% RT on Weld seam where


Approved Drawing / data Approved Drawing / data sheet /
2.6 Finished Weld Soundness Major # RT mentioned in Approved RT Report √ P R R Reinforcement Pad is placed. RT Flims
sheet / IS 803 IS 803
Drawing shall be Reviewed by BGRESL.

Reinforcement pad Approved Drawing / data


2.7 Air Tightness Major Pnematic Test 100% Approved Drawing / data sheet Inspection Report √ P W R Bubble Test @ 1.05 kg/cm2 (g)
welded with shell sheet

Doc.No : BGR-PPD-0253- REV…02


LEGENDS: * Records Identified with "Tick"(√) shall be essentially included by supplier in QA Documentation. QA-MQP-ME-0286 . CAT…..
** M: Manufacturer/Sub-Supplier C: Main Supplier, L: NUPPL/Desein : P-Perform, R-Review, W-Witness ;
COC;Certificate Of Compliance, IR;Inspection report, MTC;Manufacturer Test certificate, RTC;Routine Test certificate,
Manufacturer / Sub-Supplier Main-Supplier WPS;Welding Procedure specification, PQR;Performance Qualification Record,
WPQ;Welder Qualification Record

Signature Approval Seal


For NUPPL Use Approved By
MANUFACTURING QUALITY PLAN Project : 3X660 MW GHATAMPUR THERMAL POWER PROJECT

BGR ENERGY SYSTEM LTD., 443, ITEM: - MS/MSRL/CS/CSRL/SS TANKS QP. No : BGR-PPD-0253-QA-MQP-ME-0286 Package: BALANCE OF PLANT PACKAGE (GA3-BOP)
ANNA SALAI,
TEYNAMPET, CHENNAI - 600 018. 053598/CO CONTS/026A/NUPPL/GA3-BOP /CONTRACT-
Rev No: 02 Contract No.:
MAIN SYSTEM : PTP,UF,RO,MB(WTS) & ETP 1 /SUPPLIES/2013 ; Dt:24.04.2017
Date : 31.03.2018 Main Supplier M/s BGR ENERGY SYSTEMS LIMITED

Componenet/ Class of AGENCY


S.NO Characteristic / Test Type of check Quantum of check Reference Documents Acceptance Norms Format of Record Remarks
Operation Check
D* M C L

1 2 3 4 5 6 7 8 9 ** 10 11

3.0 Final Inspection

As per Approved
Completeness & Dimensions Major Visual & Dimensions 100% As per Approved Drawings Inspection Report √ P W R
Drawings/Relevent standard
3.1 Complete Tank
Water Fill Test - Prior to Rubber lining As per Approved
Major Leak Tightness 100% As per Approved Drawings Inspection Report √ P W R
(If applicable) Drawings/Relevent standard

Rubber Lining - Inside Spark Test, Hardness Check, Thickness Visual , Measurement & IS 4682 Part - 1 & As Per IS 4682 Part - 1 & As Per
3.2 Major 100% Inspection Report/TC √ P W R
(If applicable) Check, Peel of Test for adhesion Testing Drawing Drawing

As per Approved
Pickling & Passivation (Only for SS Tanks) Major Visual 100% As per Approved Drawings Inspection Report √ P R R
Drawings/Relevent standard
Surface Preparation &
3.3
Painting
Approved Drawing / data Approved Drawing / data sheet
Profile roughness, Finish, Shade & DFT Major Visual & Measurement Random Inspection Report √ P W R
sheet / Mfr.Standard / Mfr.Standard

3.4 Final Documentation Compiling of quality documents Major Review 100% As Per MQP Dossier √ P R R

LEGENDS: * Records Identified with "Tick"(√) shall be essentially included by supplier in QA Documentation. Doc.No : BGR-PPD-0253- REV…02
** M: Manufacturer/Sub-Supplier C: Main Supplier, L: NUPPL/Desein : P-Perform, R-Review, W-Witness ; QA-MQP-ME-0286
. CAT…..
COC;Certificate Of Compliance, IR;Inspection report, MTC;Manufacturer Test certificate, RTC;Routine Test certificate,
Manufacturer / Sub-Supplier Main-Supplier WPS;Welding Procedure specification, PQR;Performance Qualification Record,
WPQ;Welder Qualification Record

Signature Approved By Approval Seal


For NUPPL Use

Note : The list of tanks will be as per approved process calculations (DBR).