ICSE and ISC Project Format
ICSE and ISC Project Format
MATHEMATICS
MARCH 2024
11-A
7141
SUBMITTED TO:
● CERTIFICATE
● ACKNOWLEDGEMENT
● NAME OF THE PROJECT
● INTRODUCTION
● Add headings if your project has any
● CONCLUSION
● BIBLIOGRAPHY
CERTIFICATE
This is to certify that Kevin Joseph of class XI-A has successfully
completed this mathematics project on the topics mentioned
prescribed by MRS. MILI JAY, during the academic session 2023-
2024 as per the guidelines issued by ISC.
Moving Average
Moving averages are a common way for technical traders to
begin the process of price analysis. It is often one of the first
indicators that traders will add to their charts and will serve as a
measure on its own or in comparison with other indicators.
Purpose
In other words, the first average is the mean of the first m terms.
The second average is the mean of the m terms starting from the
second data up to (m + 1)th term. Similarly, the third average is
the mean of the m terms from the third to (m + 2) th term and so
on.
https://www.cmegroup.com/education/courses/technical-
analysis/understanding-moving-averages.html
https://groww.in/p/moving-averages#:~:text=Merits%20of
%20Moving%20Average%20Method,measure%20the
%20momentum%20as%20well.
http://www.ilovemaths.in/wp-content/uploads/maths-content/
classes11th12th/isc12c-index-numbers-and-moving-averages.pdf
https://www.toppr.com/guides/business-mathematics-and-
statistics/time-series-analysis/moving-average-method/
#:~:text=When%20the%20period%20of%20the,the%20two
%20successive%20moving%20averages.