0% found this document useful (0 votes)
181 views60 pages

ProposedLineClearOutagesRequestforthemonthofJUNE 2024ofBengaluruTransmissionZonepertainingtoBMAZNORTH, SOUTH, BRAZandCTAZZone, BESCOM

Uploaded by

bondamaster360
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views60 pages

ProposedLineClearOutagesRequestforthemonthofJUNE 2024ofBengaluruTransmissionZonepertainingtoBMAZNORTH, SOUTH, BRAZandCTAZZone, BESCOM

Uploaded by

bondamaster360
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 60

Line Clear Request for the month of June-2024 of Bengaluru Transmission Zone pertaining to BMAZ SOUTH, BMAZ NORTH

,BRAZ and CTAZ Zone , BESCOM


Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

TL&SS
For carrying out periodical maintenance works as per
Somanahalli 66/11kV, 20 MVA Power
maintenance schedule for 1st quarter of FY 2024-25.
and O&M Transformer-1 at 220/66/11kV No load will be
1 BMAZ South TL & SS Somanahalli BMAZ South South Circle - - - 6/5/2024 6/5/2024 10:00 15:00 5:00 Load on the 20 MVA Power Transformer-1 can be 14.03.2024 Nil
Division, R/S, KPTCL, Somanahalli, affected.
taken over Power 12.5 MVA Transformer-2 through
BESCOM, Bengaluru.
11kV Bus coupler. No load will be affected.
Kengeri
TL&SS
For carrying out periodical maintenance works as per
Somanahalli 66/11kV, 12.5 MVA Power
maintenance schedule for 1st quarter of FY 2024-25.
and O&M Transformer-2 at 220/66/11kV No load will be
2 BMAZ South TL & SS Somanahalli BMAZ South South Circle - - - 6/6/2024 6/6/2024 10:00 15:00 5:00 Load on the 12.5 MVA Power Transformer-2 can be 14.03.2024 NIL
Division, R/S, KPTCL, Somanahalli, affected.
taken over Power 20 MVA Transformer-1 through
BESCOM, Bengaluru.
11kV Bus coupler. No load will be affected.
Kengeri
For erection of towers and replacement of conductor
Transmission Major Works Bengaluru in the existing line corridor in the work of line
3 BRAZ Nelamangala - - -Existing 66kV NRS DB Pura –Vijayapura SC line
6/7/2024 6/16/2024 10:00 17:00 7:00 - Devanahalli, Vijayapura 19MW
(Works)Circle Division, North Rural strenthening of Existing 66kV NRS DB Pura –
Vijayapura SC line
1. Quarterly mainteance works on all power
Transformer
Dommasandra, attibele,
4 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 220/66/11kV R/s Sarjapura 6/8/2024 6/8/2024 9:00 15:00 6:00 2. Attending hotline observations 16.12.2023 45 MW
surrounding areas of Sarjapura
3. To conduct Tan delta tests on 100MVA power
Transformers
Dommasandra and sarajapura surrounding
5 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11kV S/s Dommasandra 6/8/2024 6/8/2024 9:00 15:00 6:00 Quarter mentainance 1/21/2024 24 MW
area

1) 10MW Load
affected from
10:00 to 12.00hrs
Vidhana Soudha, Ganesh Temple R.M.U,Miller Trf-2 LC
Shivajinagar Road.,Jaymahal, M.K Street., Cunningham 2) 26MW Load
1. To carry out Maintenance work of incoming line, outgoing line, Transformer Bays, 66kV bus Gos,11kV bus and breaker maintenance.
Division/Vidha Road,Kemp Road,Benson Town,Spencer Road, affected from
BMAZ 2. For attending Hotspot works.
6 BMAZ North Hebbal BMAZ North nasoudha - - - 66/11kV C station 6/8/2024 6/8/2024 10:00 16:00 6:00 10.02.2024 S.G.Road, R.M.Z. Millenia,B& LC Hospital, 12:00 to 13:00
NORTH 3. For carrying out IR test of all equipements like CT's, PT's, LA's, Transformers, 66kV Breakers, 11kV Breakers, Wall entry bushings and 11kV Bus.
Division/Indira Chikkabazar Road, Geneva House, Thimmaiah Bus LC complete
4. For conducting Tan-Delta on all 66kV CT's
nagar Road, Tasker town, P.G Halli, Hains Road, Shut down .
Chandraia, Muneshwara nagar, shivajinagar. 3) 12MW Load
affected from
13:00 to 16:00 .
Trf-1 LC

150 MW
(220/66kV
2nd Quarterly Maintenance work of Station,
Malur R/S)
220kV R/S Malur along with its 100MVA PTR-2 OVERHAULING, Replacement of
1. 220/66kV Malur R/S,66/11kV 160
connected 66kV downstream PTR-2 66kV Strung Bus & To attend critical
7 BRAZ MALUR BRAZ KOLAR KGF - - - 6/9/2024 6/9/2024 9:00 17:00 8:00 17.12.2023 Downstream Stations of MW(220/66kV
sub-stations and 220kV Bus- hotspots in 220kV Bus-1&2 selector isolators and
2. 220/66kV Sarjapura R/S & 3. Sarjapura, VTP,
1&2 also for re-conditioining of 220kV Bus-1&2 selector
220/66kV VTP, Cessna and Exora R/S Cessna and
isolators of 220kV Bus coupler Bay.
Exora R/S )
Total=300MW

Dodderi, CK Tandya, Byalalu,


Chikkanahalli, Lakkayyanapalya,
8 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 66/11kV Chandrappa circle 6/9/2024 6/9/2024 10:00 15:00 5:00 1st Quarterly Maintenance 10.12.2023 Kurubarahalli, Gollahalli, 22MW
Chunchanakuppe, Uddandanahalli and
Sulivara
mayasandra, chikkeluru, BBMP
venkatapura, gopalanagara,
9 Ramanagara Nelamangala BRAZ Ramanagara MAGADI - - - 66/11KV DODDERI 6/9/2024 6/9/2024 10:00 15:00 5:00 1st Quarterly Maintenance 10.12.2023 gurubhavipalya, sheshgurupalya, 4MW
subrayanapalya, vaishnavi layout,
kundalpura.

LC request for 31.5MAV Tr-4 ,Bank-4 and respective Grujalkshmi Appartment, Peenya 3rd stage,
BMAZ
10 BMAZ North SRS Peenya Bangalore North SRS Peenya - - - 220/66/11kV SRS Peenya 6/9/2024 6/9/2024 10:00 16:00 6:00 feeders. For carrying out Quaterly maintenance works 15.10.2023 Dynamatic, Narayanapura, Rajgopal nagar, 23MW
NORTH
for attending maintenance Vidhana Soudha, ISRO, GoraguntePalya

Hosakote Konadasapura, Battrahalli,medahalli,


11 BRAZ BIAL Division BRAZ BRC - - - 66/11kV Konadsapura 6/10/2024 6/10/2024 10:00 16:00 6:00 Quarterly maintenance 24.11.2023 28
Division Kanmangala

Additional Rajankunte, Marasandra Vilage ,Bytha


12 BRAZ BIAL Division BMAZ NORTH North Central - - - 66/11kV Rajankunte 6/10/2024 6/10/2024 10:00 16:00 6:00 Quarterly maintennace 14.12.2023 vilage,Adivishwanthapura village, 15
Yelahanka C7 Gatinaganahalli village, KMF industry

Kaveri Nagar, Hulimavu, Akshaya Nagar,


Hongasandra, BTS layout, Virat Nagar, Kalena
220kV HSR(S10, S12, 11KV Bus, Tr-1 and Tr-2, Banks, 11KV Bus Agrahara, Vega city, Arakere, BDA,
13 BMAZ South BMAZ South BMAZ South - - - 66/11KV BTM 6/10/2024 6/10/2024 10:00 15:00 5:00 27.01.2024 20
Subramanyapura S8 Sub division maintenance of Bank-1,Bank-1A and Bank2 Nyanappanahalli, Satyasai BDA,
Kodichikkanahalli, Vijaya Bank layour,
Vishwapriya layout surrounding Area

14 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 66/11kV S/s Kanaswadi 6/11/2024 6/11/2024 10:00 18:00 8:00 Quarterly maintenance works of the station. 09.12.2023 Kanaswadi areas 15
66/11 kV Bevoor, Sankalagere Bevoor, Sankalagere and Dashavara
15 Ramanagara TKHalli BRAZ Ramanagara Ramanagara - - - 6/11/2024 6/11/2024 10:00 15:00 5:00 Station Quarterly maintenance work 15.12.2023 16MW
and Dashavara (surrounding villages)
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

No load will be
affected for 3
Hour while
1. To carry out Maintenance work of Incoming line,
carrying out
Outgoing line, Transformer Bays, 66kV bus Gos, 11kV
maintainance
bus and breaker maintenance.
E8,E9 sub works on
2. For attending Hotspot works.
division Purvankara apartment, gavigudi, kalkere Transformer 1
3. For carrying out IR test of all equipments like
,Additional
Shivajinagar & Hoskote division road, poorna pragnya, maragondanahalli, and transformer
16 BMAZ North Hebbal BMAZ NORTH - - - 66/11kV Purvankara MUSS 6/11/2024 6/11/2024 10:30 15:30 5:00 CT's, PT's, LA's, Transformers, 66kV Breakers, 11kV 22.11.2023
East Division halehalli, byrathi village, byrathi 2
Breakers and 11kV Bus.
Shivajinagar bande,kanakashree layout, kyalasanahalli 10MW load to be
division changed over for
13:30hrs to 15:30
by BESCOM for
carrying out 11kV
& 66kV Bus
maintenance
Adugodi,Salapuria Tower,Big
Bazar,Accenture,KMF Godown,Nanjappa
Layout,New mico road,Chikkalakshmi
Layout,Mahalingeshwara badavane,bangalore
dairy,Forum,Rangadasappa layout,
Lakkasandra,Wilson Garden,Chinnayyana
Palya,Chandrappa Nagara,Nimhans
Administrative block,Bande slum,Sunnakal Peak load-33MW,
Jayanagara Forum,Brundavana Slum, NDRI-police Load change
17 BMAZ South HSR Layout BMAZ South South and - - - 66/11kV Adugodi Sub-Station 6/11/2024 6/11/2024 10:00 15:00 5:00 1st Quarterly maintenance of Transformer-2&3 17.01.2024 quarters, 8th block, 7th block adugodi, NDRI over-18MW,
Koramangala NIANP, St Johj Hospital, 5th block industrial Load affected-
layout, Mico Bosch, JNC Sorronding, 5th 15MW
Block KHB colony, Industrial Area 5th block,
7th block khb colony, Industrial Area 3rd
block, 8th to 11th main, Industrial area 5th
block, Koramangala 3rd, 4th, 5th, 6th Block,
Maruthi nagara, Dabas colony, OLd Madivala,,
Oracle, Madivala, Chikka Adugodi, Krishna
5.66/11kV S/s D palya 6.66/11kV S/s
nagara Industrial Area, Davanam Jewellers.
Vidhurashwatha(30 MW Greenergy solar, 20
MW AFTL, 7.66/11kV S/s Ramapura 8.
66/11kV S/s Mandikal , 9. Alipura S/s
10. Kudumulakunte(a1 steel EHT) 220Kv
R/s Mittemari R/s and connected stations
1.66/11kV S/s Somanathapura, 2.66/11kV
S/s peresandra,3.66/11kV S/s 150-
Chikkaballapu somenahalli, 4.66/11kV S/s sadali 160MW(GBDR)
18 BRAZ Gowribidanur BRAZ KOLAR - - - 220/66/11kV R/s Gowribidanur 6/12/2024 6/12/2024 10:00 17:00 7:00 For quarterly maintenance work. 21.01.2024
ra 5,julpalya,6.66/11kV S/s +140-150
chelur(Solar),7.66/11kV S/s chakavelu, MW(Mittemari)
8.66/11kV S/s pathapalya, 9.66/11kV S/s
thimmampalli,,10.66/11kV S/s
bagepalli,11.66/11kV S/s Vatadahosahalli.
12. 66/11kV
Kodigenahalli(alternate supply can be
arranged from 220kV R/s Madhugiri) 13.
Dibburahalli 14. Yenigadhale 15.66/11kV
100MVA Power Transformer-1 Devanahalli,Kundana, Brigade Orchade ,D
19 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 6/12/2024 6/12/2024 9:00 18:00 9:00 Quarterly maintenance works of the station. 24.01.2024 76MW
NRS DBPura, cross, Doddaballapura Local areas,

66/11kV S/s Devnahalli & Devanahalli,Kundana, Brigade Orchade ,D


20 BRAZ DBPura BRAZ BRC Kengeri Hoskotte - - - 6/12/2024 6/12/2024 9:00 18:00 9:00 Quarterly maintenance works of the station. 24.01.2024 76MW
Brigade Orchade cross, Doddaballapura Local areas,

Devanahalli,Kundana, Brigade Orchade ,D


21 BRAZ DBPura BRAZ BRC Kengeri Hoskotte - - - 66/11kV S/s Kundanna 6/12/2024 6/12/2024 9:00 18:00 9:00 Quarterly maintenance works of the station. 24.01.2024 76MW
cross, Doddaballapura Local areas,

Devanahalli,Kundana, Brigade Orchade ,D


22 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 66/11kV S/s D.Cross 6/12/2024 6/12/2024 9:00 18:00 9:00 Quarterly maintenance works of the station. 24.01.2024 76MW
cross, Doddaballapura Local areas,

11kV feeders Evacuating from 66/11kV


Kudur Substation coming under Kudur
Subdivisions, BESCOM such as Kannur,
Biskur, Kagimadu, Srigiripura, Veerasagara,
23 Ramanagara Nelamangala BRAZ Ramanagara MAGADI - - - 66/11KV Kudur 6/12/2024 6/12/2024 10:00 15:00 5:00 1st Quarterly Maintenance - -
Byrapura, Maruru, Madigondanahalli,
Maruru, Kudur, Hullical, Tippasandra,
Narasandra, Arasinakunte, Adrangi,
Hoojenahally

11kV feeders Evacuating from 66/11kV


Srigiriupra Substation coming under Kudur
24 Ramanagara Nelamangala BRAZ Ramanagara MAGADI - - - 66/11KV Srigiriupra 6/12/2024 6/12/2024 10:00 15:00 5:00 1st Quarterly Maintenance - Subdivisions, BESCOM as Srigiriupra, -
Acharpalya, Marasandra, Hosahalli,
Betthalli, Dollenahalli, Chikkamaskal

BESCOM Kudur subdivision area feeding


from Hullenahalli substation , Neralekere,
Gangonahalli, Tippasandra, Hullenahalli,
25 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 66/11KV Hullenahalli 6/12/2024 6/12/2024 10:00 15:00 5:00 LC availed for Quartely maintenance 26.11.2023 10
Tavarekere, Sankigatta, Honnapura,
Virupapura, Sugganahalli, Hebalalu,
Beechanahalli and Chikkanahalli

For carrying out Yearly maintenance works for Bagalagunte, Tumkur Road, Dasarahalli,
Jalahalli &
attending maintenance and alignment of Bus GOS-8 Shetty halli, Acharaya collage Road, PIPE line
BMAZ Peenya
26 BMAZ North SRS Peenya Bangalore North - - - 66/11kV MEI Layout 6/12/2024 6/12/2024 10:00 16:00 6:00 Nos, 11kV Switchgear, 66kV CT & PT, 66kV 11.11.2022 road, kirloshekar layout, Garrisson, AGBG 15MW
NORTH Division(N5,N9
Breakers,Auxillary Transformer and 11KV Capacitor Layout, Mallasandra, chikkasandra,
Subdivision)
Bank maintenance. Sapathagiri hospital, Dasarahalli, MEI Layout

66kV Kaggalipura-Somanahalli line


TL&SS
bay, 66kV Kaggalipura-Shobha For carrying out periodical maintenance works as per
Somanahalli
Forest view line bay, 66kV Bus, maintenance schedule for 1st quarter of FY 2024-25.
and O&M No load will be
27 BMAZ South TL & SS Somanahalli BMAZ South South Circle - - - 66/11kV 12.5MVA Power 6/12/2024 6/12/2024 10:00 15:00 5:00 Load of 66/11kV Kaggalipura, Shobha Forest View 15.03.2024 NIL
Division, affected.
Transformer-1 and 2 at 66/11kV Sub-stations may be changed over to 220kV
BESCOM,
Sub-station, Kaggalipura [Brigade Subramanyapura station. No load will be affected.
Kengeri
Meadows], Bengaluru.
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

Srinagara , hosakerehalli , pes engg college ,


veerbhadranagara , Bank colony ,
Jayanagar and Hanumanthnagara , girinagara , seetha
RR nagara 1) Attendending Hotspot and maintenance of 66KV circle , vidhyapeeta circle , pramod layout ,
220kV
28 BMAZ South BMAZ South (W1,W2,W6, W7 BMAZ South - - - 66/11kV Banashanakari 6/12/2024 6/12/2024 10:00 15:00 5:00 Bus and 11KV Bus 22.11.2023 muneshwara block ,nagendra block , Bull 40
Subramanyapura
& S15 2) Maintenance of all equipments temple Road , kathriguppe ,
Subdivisions) Avalahalli ,Sterling apartment ,NTY Layout ,
Thyagarajanagara , Basavangudi , BSK 3rd
stage

Maintenanace of 220kV Bus, 220kV Somanahalli-


220kV HSR and 220/66/11kV Khodays glass
29 BMAZ South BMAZ South BMAZ South - - - 6/12/2024 6/12/2024 10:00 15:00 5:00 Khodays-Subramanyapura Lines and 220kV 07.01.2024 No Load affected No Load affected )
Subramanyapura Jayanagara factory station
Transformers (150MVA TR-1)

Wilson Garden, Hombegowda Nagara,


Sampagi Nagara, J.C. road, Shanti Nagar, BTS Peak load-21MW,
Road, Richmond Circle,Residency Load changeover-
Jayanagar & Quarterly maintenance work of 66kV PT, 66kV Main
30 BMAZ South HSR Layout BMAZ South South - - - 66/11kV BMTC S/s 6/12/2024 6/12/2024 10:00 15:00 5:00 18.10.2023 Road,sudhamanagara, K.H. Road, 14.3 MW
Indiranagar BUS, 66kV Breakers and Maintenance of 11kV BUS.
Shantinagar,wilson Garden,Double Load affected-
Road,subbaiah Circle,siddayya Road, Lalbagh 6.7MW
Road

66KV Kanakapura-T.K Halli-3 &


Honniganahalli, Acchalu, Sathnur Town &
31 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - 66/11kV Honniganahalli & 6/13/2024 6/13/2024 10:00 16:00 6:00 Quaterly maintenance work of Substation 28.08.2023 25.7
sorrounding villages
Acchalu S/s

Manjunathnagara, Shivanagara,
Gayithrinagara, Prakash nagara, LN pura
BMAZ
Subramanyanagara, Vijayanagara,
NORTH &
32 BMAZ North NRS West and North Rajajinagara - - - 220/66/11 kV NRS R/s station 6/13/2024 6/13/2024 10:00 17:00 7:00 Quarterly maintenance 23.01.2024 Rajajinagara 2nd block, 6th Block 35
BMAZ
Rajajinagar, Amarjyothi |Nagara, Saraswati
SOUTH
Nagara, Vinayaka layout, Agrahara,
dasarahali, Indranagara, Sankarmata

BMAZ
Rajajinagara,
NORTH & Haminagar, Vijayanagara, Telecom Layout,
33 BMAZ North NRS West and North Vidhana - - - 66/11 kV Telecom Layout station 6/13/2024 6/13/2024 10:00 17:00 7:00 Quarterly maintenance 23.01.2024 20
BMAZ Agrahara, dasarahali, Indranagara,
Soudha
SOUTH

1. To carry out Maintenance work of Incoming line,


Maruthi Sevanagar, Jai Bharath nagar, Frazer
Outgoing line, Transformer Bays, 66kV bus Gos, 11kV
Town , Cox Town, Benson town, Richards
bus and breaker maintenance.
BMAZ town, Davis Road, Mosque Road, Biyappana
34 BMAZ North Hebbal North Hebbal Division - - - 66/11kV Pottery Road MUSS 6/13/2024 6/13/2024 11:00 16:00 5:00 2. For carrying out IR test of all equipments like CT's, 18.01.2024 Full load affected
NORTH Halli, Nagena Palya, Lingaraj Puram, Halsoor,
PT's, LA's, Transformers, 66kV Breakers, 11kV
Jeevana halli, R K Road, Coles Road Tanery
Breakers and 11kV Bus.
Road, and ITC, etc..
3. For conducting Tan-Delta test.

Manjunathnagara, Shivanagara,
Gayithrinagara, Prakash nagara, LN pura
BMAZ
Subramanyanagara, Vijayanagara,
NORTH &
35 BMAZ North NRS West and North Rajajinagara - - - 220/66/11 kV NRS R/s station 6/13/2024 6/13/2024 10:00 17:00 7:00 Quarterly maintenance 23.01.2024 Rajajinagara 2nd block, 6th Block 35
BMAZ
Rajajinagar, Amarjyothi |Nagara, Saraswati
SOUTH
Nagara, Vinayaka layout, Agrahara,
dasarahali, Indranagara, Sankarmata

BMAZ
Rajajinagara,
NORTH & Haminagar, Vijayanagara, Telecom Layout,
36 BMAZ North NRS West and North Vidhana - - - 66/11 kV Telecom Layout station 6/13/2024 6/13/2024 10:00 17:00 7:00 Quarterly maintenance 23.01.2024 20
BMAZ Agrahara, dasarahali, Indranagara,
Soudha
SOUTH

TL&SS
For carrying out periodical maintenance works as per
Somanahalli
220kV Somanahalli-BWSSB maintenance schedule for 1st quarter of FY 2024-25.
and O&M No load will be
37 BMAZ South TL & SS Somanahalli BMAZ South South Circle - - - Harohalli line bay at 220/66/11kV 6/13/2024 6/13/2024 10:00 15:00 5:00 Load of 220kV BWSSB Harohalli, 220kV KIADB 03.07.2023 NIL
Division, affected.
R/S, Somanahalli, Bengaluru. Harohalli, 220kV Kanakapura stations may be fed
BESCOM,
from 220kV TK Halli station. No load will be affected.
Kengeri

RBI layout,Kottanur,J.P Nagar 5th


phase,Shreyas colony,Gaurav nagara,Nataraja
220kV HSR and layout,Nrupathunga nagar,Jambusavare
38 BMAZ South BMAZ South BMAZ South - - - 66/11kV RBI 6/13/2024 6/13/2024 10:00 15:00 5:00 Periodic maintainance works 13.12.2024 20
Subramanyapura Jayanagara dinne,Chunchughatta,Brigade Millenium &
Briagde Gardenia appartments and areas
surrounding the sub-station.

Banagirinagar, Jayanagar 7th block, BSK2nd


stage,BDA Complex,Channamanakere
66KV and 11KV Bus maintenance including
220kV Achhakatu, Saroja Complex, Rajivnagar,
39 BMAZ South BMAZ South HSR BMAZ South - - - 66/11kV Padmanabhanagara 6/13/2024 6/13/2024 10:30 15:30 5:00 determination of IR values of Bus and replacement of 18.12.2023 19
Subramanyapura Padmanabhanagar, Yarabnagar, TATA
week insulators (if any) and attending Hotspots
Silkfarm, Shastrinagar, S9 Subdivision
premises, 9th Main Batashowroom.
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

Bank-1 - 23 MW
buscoupler will
be used and load
will be affected
partially.
* Attending oil Leakage
220/66/11kV Naganathpura R/s Bank-2 & Bank-3
* Hotline Observations
load will be
40 BMAZ South HSR Layout BMAZ South South HSR - - - 66kV/11kV Transformer Bays 6/13/2024 6/13/2024 10:00 17:00 7:00 20.01.2024 NIL affected partially
* Quarterly maintenance of 66kV/11kV Transformer
" 31.5MVA TRF-1,31.5MVA Trf- buscoupler will
Bays
2,20MVA Trf-3 be used during
Line clear period
one by one. Load
will be affected for
5MW for each
Bank.-1 & 2

BTM 1st stage, Majestic


apartment,Gurappana palya,AXA,Jai bheem
nagar,Chocolate factory road, old
1)Quarterly Maintenance work of 66/11kV Peak load-24MW,
madiwala,BTM Layout,Asis Bhavan,Bismilah
Jayanagara Transformers, 66kV Isolators,66kV CT's & PT's Load change
66/11kV St John Wood Sub- nagar, Bharathi layout,St John
41 BMAZ South HSR Layout BMAZ South South and - - - 6/13/2024 6/13/2024 10:00 15:00 5:00 2)11kV Switchgears maintenance 18.01.2024 over-18MW,
Station hostel,koramangala 2nd block,kudre mukha
Koramangala Load affected-
colony,CPWD Quarters, siddartha colony,
6MW
tavarekere, SG palya, Accenture, St john wood
apartment,Oracle,Maruthinagar,Venkateshwa
ra College road,Brundavana nagara.

Peak load-53MW,
Bommanahalli, HSR Layout, Kudulu, Load change
220/66/11kV HSR Layout R/s 1 st Quarterly maintenance work of 31.5MVA
42 BMAZ South HSR Layout BMAZ South South HSR Layout - - - 6/13/2024 6/13/2024 10:00 15:00 5:00 08.01.2024 Jakkasandra, Kaikondanahalli, over-20MW,
(66/11kV side only) Transformer-1, 2 & 3,
Somasundarapalya, Hosapalya, Koramanagala Load affected-
33MW

66/11 kV Akkurmole substation


43 Ramanagara TKHalli BRAZ Ramanagara Ramanagara - - - and 66 kV T K Halli- Akkurmole 6/14/2024 6/14/2024 10:00 15:00 5:00 Station Quarterly maintenance work 12.12.2023 Akkurmole (surrounding villages) 16 MW
line

Magadi subdivision areas feeding from V.G


44 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 66/11kV V.G Doddi 6/14/2024 6/14/2024 10:00 15:00 5:00 1st Quarterly Maintenance 26.11.2023 4MW
Doddi Substation

220kV HSR Layout: 66/11 kV Sobha Forest View Maintenanace of 11kV Bus, bank 1 and Power
45 BMAZ South BMAZ South BMAZ South - - - 6/14/2024 6/14/2024 10:00 15:00 5:00 08.12.2023 Sobha Forest Apartments, Talaghattapura 4
Subramanyapura S12 O&M-1 & 2 Substation transformer

Peak load-7MW,
Load change
1) Quarterely Maintenance work of 66/11kV
over-3MW,
Transformers, 66kV Hybrid Breakers,66kV CT's & Devarabisanahalli,Adarsha,Sai
HSR Layout, Load affected-
46 BMAZ South HSR Layout BMAZ South South - - - 66/11kV Global Tech Park 6/14/2024 6/14/2024 10:00 15:00 5:00 PT's. 45240 Shrustii,Sterling Ascentia,Samvi J V Hotel
Koramangala 4MW
2) 11kV Breaker maintanance.

Hosakote town, Mandur, Gattiganbi,


Hosakote
47 BRAZ BIAL Division BRAZ BRC - - - 66/11kV Hosakote 6/15/2024 6/15/2024 10:00 16:00 6:00 Quarterly Maintenance work 24.11.2023 Lakkondanali,Allapanahalli and other 35
Division
surounding areas

2nd Quarterly maintenance works of the station.


220kV R/S T.Gollahalli along with its
R&D routine calibration and Hotline
220kV R/S T-Gollahalli along connected 66kV downstream sub-stations
observations.To attend critical hotspots in 220kV
with its connected 66kV T-gollahalli,Andersonpet,Nangli,H-
48 BRAZ MALUR BRAZ KOLAR KGF - - - 6/15/2024 6/15/2024 9:00 17:00 8:00 Bus-1&2 selector isolators and also for re- 10/12/23 160MW
downstream sub-stations and Gollahalli,Tayaluru, Avni,NG Hulkur,KGF 1
conditioining of 220kV Bus-1&2 selector isolators of
220kV Bus-1&2 &2 ,Doddakari,Kyasamballi,BEML
220kV Bus coupler Bay and to carry out 2nd
EHT,Kamasamudra substations
Quarterly Maintenance.

66/11kV S/s Chokkasandra station sarrounding


49 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 6/15/2024 6/15/2024 10:00 16:00 6:00 planned to carry Quarterly maintenance work 16/12/2023 10 MW
Chokkasandra(Huskur) area(Avalahalli, Gopasandra, Gattahalli)

66kV Kanakapura- Somanahalli


line-1(partial) & 66/11kV Quaterly maintenance work of Transmission line & Chathra, Maralawadi, Godur &
50 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - 6/15/2024 6/15/2024 10:00 16:00 6:00 23.11.2023 35.23
Chathra, Maralawadi & Substations Surrouding villages
GodurS/s.
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

BMAZ
RR Nagara
NORTH & Areas feeding from 66/11kV REMCO GIS
51 BMAZ North NRS West Division, - - - 66/11 kV REMCO GIS station 6/15/2024 6/15/2024 10:00 17:00 7:00 Quarterly maintenance 20.01.2024 20
BMAZ station
Rajajinagara
SOUTH

Fidelity, Philips, Icubator, IBM D4 Block, IBM


D1 & D2 Block, IBM D3 Block, F2 Block, L6
Siemens, Manyatha Residency, B.T.S Loucent,
1. To carry out Maintenance work of Incoming line, Anz H Block, C4 Block, Godrej apartment,
Outgoing line, Transformer Bays, 66kV bus Gos, 11kV Hebbal Kempapura, Vinyaka Layout,
22 MW of load
bus and breaker maintenance. Chirranjeevi Layout, Venkategowda Layout,
Shivajinagar will be effected for
BMAZ 2. For attending Hotspot works. JNC, L5 Nokia Block, G1 Block, MFAR,
52 BMAZ North Hebbal North and Hebbal - - - 66/11kV Manyatha Tech Park 6/15/2024 6/15/2024 11:00 16:00 5:00 23.01.2024 3hrs during
NORTH 3. For carrying out IR test of all equipments like CT's, Madhuvana M2 Block, Rachenahalli,
division 66,11kVbus & PT
PT's, LA's, Transformers, 66kV Breakers, 11kV Srirampura, Chamundeshwari Layout, Rayal
maintainence
Breakers and 11kV Bus. Enclave, Mestri Palya, Thanisandra, SNN
4. For conducting Tan-Delta test. Clermont apartment, karle, B.Narayanapura
Cross, BDS Layout, Mantri Lithos, Coffee
Board layout, fathima layout, Amarjhothi
layout, Mariyanna Palya,umiya velocity.

TL&SS
For carrying out periodical maintenance works as per
Somanahalli
150MVA Power Transformer-1 at maintenance schedule for 1st quarter of FY 2024-25.
and O&M No load will be
53 BMAZ South TL & SS Somanahalli BMAZ South South Circle - - - 220/66/11kV R/S, Somanahalli, 6/15/2024 6/15/2024 10:00 15:00 5:00 Load on the Power Transformer will be changed over 16.03.2024 Nil
Division, affected.
Bengaluru. to 150MVA Transformer-3 and other 220kV Stations.
BESCOM,
No load will be affected.
Kengeri

Kengeri K1
54 BMAZ South Subramanyapura BMAZ South BMAZ South - - - 66/11kV Provident 6/15/2024 6/15/2024 10:00 15:00 5:00 11kV Bus maintenance works 16.01.2024 Provident Sunworth apartment No
Subdivision

1.220kV BUS:
220kV Bus Isolators maintenance and replacement of Arehalli, Ittamadu, AGS Layout,
Jayanagara( S5
220kV deterioted clamps of BUS and Bus Isolators. Chikalsandra, TG Layout, Bhuvneshwarinagar
55 BMAZ South BMAZ South and S18 BMAZ South - - - 220/66kV Subramanyapura 6/15/2024 6/15/2024 11:00 16:00 6:00 18.11.2023 40
Subramanyapura For attending hot spots, and areas surrounding the sub-station.
subdivision)
Maintenance of 220kV Bus Potential transformer.
2.Battery charger and DCDB maintenance.

* 66kV BUS: - 66kV BUS GOS maintenance


Jayanagara(S15 ISRO Layout, ISRO layout Ind. Area,
220kV * Maintenance of 66kV PT
56 BMAZ South BMAZ South , S18 BMAZ South - - - 66/11kV Arehalli 6/15/2024 6/15/2024 11:00 16:00 6:00 18.11.2023 Kumarswamy layout, Vittal nagara, Vikram 16
Subramanyapura * Bank1 & Bank-2 -11kV Bus maintenance of Bank-1
subdivision) nagar, Yelchenahalli, surrounding area.
& Bank2

Laxmi Layout, Southcity appartments,


66kV BUS: Kammanahalli, Shanthinikethana,
220kV Bank1 & Bank2 Doddamma Layout, Panduranganagara
57 BMAZ South BMAZ South HSR BMAZ South - - - 66/11kv South City muss 6/15/2024 6/15/2024 10:00 15:00 5:00 23.01.2024 20
Subramanyapura -11kV Bus maintenance of Bank-1 and Bank-2. Layout, BWSSB Kothanoor, Motappa
compound, Mahendra homes, Good homes,
surrounding area of S12 & S14 sub Division.

Peak load-
225MW,
load changeover-
220/66/11kV Naganathpura R/s
10MW,
220kV Mylasandra Line,220kV 220kV Line Quarterly maintenance ,150MVA Trf-1 &
58 BMAZ South HSR Layout BMAZ South South HSR - - - 6/15/2024 6/15/2024 10:00 15:00 5:00 22.10.2023 NIL load affected-
HSR Line,150MVA TRF-1& 150MVA Trf-2 Quarterly maintenance work
6MW
150MVA TRF-2
(Downstream
station 90MW will
be removed)

S1-Nimhans, KIDWAI, Rajiv Gandhi, Sanjay


Gandhi, Indira Gandhi, Jayanagar-
1st,2nd,3rd,4th ,9th T block
Peak load-24MW,
Someshwaranagar
Jayanagara Load change
Quarterly maintenance work of 66kV PT, 66kV Main S2- Wilson Garden
59 BMAZ South HSR Layout BMAZ South South and - - - 220/66/11kV NIMHANS R/S 6/15/2024 6/15/2024 10:00 15:00 5:00 21.10.2023 over-18MW,
BUS and 66kV Isolators S16-Accenture IBC Tech park, Bannerghatta
Koramangala Load affected-
road
6MW
W2- RV road, MNK park, Gandhi bazar
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

village,Bilekahalli main road,4th T block


Jaynagar,9th block Jayngar,East end ABCD
road,BHEL layout,SRK gardens,NAL
layout,Tilak nagar,9th block Jayanagar,partial
4th T block,Shanthi park and
apartment,Jayadeva hospital,Ranka colony
road and surrounding,NS palya main
Peak load-35MW,
Jayanagar, road,GRB main road,Jain temple road,some
1)Periodical Quarterly-4 Maintenance work of Load change
Koramangala,B parts of BTM 4th stage, Vaishya bank
60 BMAZ South HSR Layout BMAZ South South - - - 66/11kV Jayadeva S/s 6/15/2024 6/15/2024 10:00 16:00 6:00 66/11kV Transformers, 66kV Isolators,66kV CT's & 20.01.2024 over-8MW,
TM & colony,BTM 2nd stage,MCHS layout,BHCS
PT's 2)11kV Switchgears maintenance Load affected-
Hulimaavu layout,Shantiniketan school,Mico layout,7th
27MW
main, Mantri apartment, & surrounding
areas,Oracle,IBM & SPAR, Gurappanapalya
full area,Timber galli road,Bismillah
nagar,SHOBHA apartments,Divyashree
towers,Vega city mall,Airtel
office,Bannerghatta main road &
surrounding,KEB colony, ne

Peak load-25MW,
Load changeover-
66/11kV Shoba Apartment Sub-station for: Sarjapura,Cessana garden,Outer ring 12 MW
HSR Layout & 1)Quarterely Maintenance work of 66/11kV road,Central mall,Exora Business Load affected-13
61 BMAZ South HSR Layout BMAZ South South - - - 66/11kV Shoba Apartment S/s 6/15/2024 6/15/2024 10:00 15:00 5:00 24.11.2023
Koramangala Transformers, 66kV Breakers,66kV CT's & PT's. park,Shobha Apartments,Salarpuria MW
2)11kV Breaker maintanance Softzone,Thakshasheela Health care.

* Attending Hotline Observations of 66kV Bus*


* Quarterly maintenance of 66/11kV, 20MVA Power Peak load-32MW,
66/11kV Electronic City S/s Transformers. load changeover-
Electronic City Ph-1, Neeladri Road, Hebgodi,
HSR Layout & (66/11kV Hulimangala S/s since it * Quarterly Maintenance of Bus Isolators and 66kV 10MW,
62 BMAZ South HSR Layout BMAZ South South - - - 6/15/2024 6/15/2024 10:00 17:00 7:00 17.12.2023 Veersandra, Golahalli,EHT Infosys, 66/11kV
Chandapura is radially fed from 66/11kV Drake conductor Bus. load affected-
Hulimangala station feeding areas.
Electronic City S/s) * Quarterly maintenance of 66kV Bays & 38Nos 11kV 22MW
Switchgears

* Attending Hotline Observations of 66kV Bus Peak load-25MW,


* Quarterly Maintenance of Bus Isolators Electronic City Ph-1, Doddathagur, load changeover-
66/11kV Electronic City Ph-2 Sec-
63 BMAZ South HSR Layout BMAZ South South HSR Layout - - - 6/15/2024 6/15/2024 10:00 15:00 5:00 * Quarterly maintenance of 66kV Velankani, Keonics 17.12.2023 Bommanahalli, NJR Layout, Chikkthogur, 16MW,
1 (Velankani) S/s
Bay & Transformer Bays Hongsandra, Konnappana Agrahara. load affected-
9MW

66kV Electronic City Ph2 sec2 * Attending Hotline Observations of 66kV Bus Electronic City ph-2, Veersandra, Peak load-40MW,
(Malgudi) S/s & 66/11kV * Quarterly Maintenance of Bus Isolators Doddanagamangla, Ananthanagara, load changeover-
HSR Layout,
64 BMAZ South HSR Layout BMAZ South South - - - Chokkasandra S/s since it is 6/15/2024 6/15/2024 10:00 15:00 5:00 * Quarterly maintenance of 66kV Naganathapura 16.12.2023 Shantipura, EHT Biocon, EHT Techmahendra, 17MW,
Chandapura
radially fed from 66/11kV Line-1&2, 66kV Chokkasandra Bays, EHT Biocon & EHT Tata BP Solar, 66/11kV Chokkasandra load affected-
Electronic City ph2 sec2 S/s Techmahindra Bays, Transformer Bays S/s 23MW.

Whitefield and 31.5MVA power transformer -03 of For carrying 1st quarterly maintenance and periodical
65 BMAZ South Hoody BMAZ South East - - - 6/15/2024 6/15/2024 10:00 15:00 5:00 25.11.2023 Nil Nil
indirangara 220/66/11kV ITI GIS station tan delta test.

66/11kV Transformer-1 (66/11KV Periodic maintenance, Tan delta test, attending


66 BMAZ South TL and SS Div Hoody BMAZ South East Indiranagar - - - 6/15/2024 6/15/2024 10:00 16:00 6:00 15.06.2023 Nill 0
B station MUSS) Hotline observations of transformer 1

Indiranagar & 66/11kV Transformer-2 (66/11KV Periodic maintenance, Tan delta test, attending
67 BMAZ South TL and SS Div Hoody BMAZ South East - - - 6/15/2024 6/15/2024 10:00 16:00 6:00 02.09.2023 Nill 0
Shivaji Nagar B station MUSS) Hotline observations of transformer 2

66kV Bus, ITI line, DRDO line,


BMRCL line, 2x31.5MVA power For carrying 1st quarterly maintenance, CT's Tan
68 BMAZ South Hoody BMAZ South East Indirangara - - - 6/15/2024 6/15/2024 10:00 17:00 7:00 30.12.2023 Nil Nil
transformers at 66/11kV NGEF Delta from RT staff and to attend hotline observations.
station

Chikkaballapura Town, Chikkabalapura


100MVA Power Transformer-2
69 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 6/16/2024 6/16/2024 10:00 17:00 7:00 Quarterly maintenance works of the station. 18.01.2024 Industrial Area, Nallimaradhaalli,Tubagere 65MW
NRS DBPura,
and AFTL Solar IPP.

Chikkaballapura Town, Chikkabalapura


70 BRAZ DBPura BRAZ Kolar CBPura - - - 66/11kV S/s CBPura IA 6/16/2024 6/16/2024 10:00 17:00 7:00 Quarterly maintenance works of the station. 04.02.2024 Industrial Area, Nallimaradhaalli,Tubagere 65MW
and AFTL Solar IPP.
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

Chikkaballapura Town, Chikkabalapura


71 BRAZ DBPura BRAZ Kolar CBPura - - - 66/11kV S/s CBPura U 6/16/2024 6/16/2024 10:00 17:00 7:00 Quarterly maintenance works of the station. 04.02.2024 Industrial Area, Nallimaradhaalli,Tubagere 65MW
and AFTL Solar IPP.

Chikkaballapura Town, Chikkabalapura


72 BRAZ DBPura BRAZ Kolar CBPura - - - 66/11kV S/s Nallimaradahalli 6/16/2024 6/16/2024 10:00 17:00 7:00 Quarterly maintenance works of the station. 04.02.2024 Industrial Area, Nallimaradhaalli,Tubagere 65MW
and AFTL Solar IPP.

Chikkaballapura Town, Chikkabalapura


73 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 66/11kV S/s Tubagere 6/16/2024 6/16/2024 10:00 17:00 7:00 Quarterly maintenance works of the station. 04.02.2024 Industrial Area, Nallimaradhaalli,Tubagere 65MW
and AFTL Solar IPP.
Bommasandra Industrial Area and
74 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11 kV S/s Bommasandra I/A 6/16/2024 6/16/2024 10:00 15:00 5:00 1st quarterly maintainance 1/21/2024 24 MW
surrounding area
75 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11kV S/s Suryanagara 6/16/2024 6/16/2024 10:00 15:00 5:00 Maintenance work 17.12.2023 Suryanagar surrounding areas 9.3 MW

Bommasandra Industrial Area ,


1.For carrying out Quarterly maintenance work and
Veerasandra, Yarndanahalli &
220/66/11kV Receiving-station to attend hot line observations.
76 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 6/16/2024 6/16/2024 10:00 15:00 5:00 23.12.2023 Ananthnagara and 11kV Feeders of Bank-2, 30 MW
Yarandanahalli 2. For replacing of 66kV
2A, 3 & 3A from 220/66/11kV RS
CT's of 31.5 MVA Tr-3. 3. For OLTC
Yarandanahalli
Overhauling of 31.5MVA Transformer-2

66kV Bagganadoddi line, Areas feeding from


For station maintenance works and other
Kumbaranahalli S/S such as Haragadde,
77 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11 kV S/s Kumbaranahalli 6/16/2024 6/16/2024 10:00 15:00 5:00 scheduled works at 66/11kV S/s Kumbaranahalli 17.12.2023 15 MW
Kumbaranahalli, Jigani and its surrounding
areas.

Areas feeding from Bagganadoddi S/S such


For station maintenance works, and other
as Indlawadi, Bagganadoddi,
78 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11 kV S/s Bagganadoddi 6/16/2024 6/16/2024 10:00 15:00 5:00 scheduled works at at 66/11kV S/S Bagganadoddi 17.12.2023 3 MW
Kadujakkanahalli and its surrounding
areas

For station maintenance works, and other 66kV Kumbaranahalli & Bagganadoddi S/s,
79 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 220/66/11kV R/s Jigani 6/16/2024 6/16/2024 10:00 18:00 8:00 17.12.2023 35 MW
scheduled works at 220/66/11kV R/s Jigani Areas feeding from Jigani 220Kv R/S
MACHOHALLI COLONY JANAPRIYA, KG
Lakkenhalli KACHOHALLI (LM CHIKKA
GOLLARAHATTI, VADDARAHALLI
BYNAHOLENAHALLI BYYANDAHALLI
GIDDENAHALLI, varma layout Seegehalli
gate Forest gate , GURAPPANAPALYA
hulluramma temple vinayaka narar
Ramanagara & kadabagere ramohalli kere vinayaka l/o,
Magadi &
80 Ramanagara Nelamangala BRAZ Bangalore - - - 66/11kV Kodigehalli 6/16/2024 6/16/2024 10:00 15:00 5:00 1st Quarterly Maintenance 10.12.2023 Ibrahim L\O Ragavendra l/o ESWARA 20MW
Kengeri
South FARM kamadenu VADDARAHALLI Agro
test commodities, chikkagollarahatti,
Machohalli, Kachohalli, Gangondanahalli
UDDANDAYYA LAYOUT Dasappa Layout
Bylakonahalli, Mymannanapalya,
machohalli colony, kamath layout]
Chikkagollarahatti Eshwara form(belongs to
K2) belongs to south Shivani greens, Balaji
11kV feeders Evacuating from 66/11kV
81 Ramanagara Nelamangala BRAZ Ramanagara Nelamangala - - - 66/11KV Nelamangala 6/16/2024 6/16/2024 10:00 15:00 5:00 For carrying out preventive quarterly maintenance 10.12.2023 Nelamangala Substation coming under 40MW
Nelamangala Subdivisions, BESCOM

11kV feeders Evacuating from 66/11kV


Gudemaranahalli Substation coming under
Kudur Subdivisions, Solur O and M, Solur,
82 Ramanagara Nelamangala BRAZ Ramanagara MAGADI - - - 66/11KV Gudemaranahalli 6/16/2024 6/16/2024 10:00 15:00 5:00 1st Quarterly Maintenance - -
Gudemaranahalli, Lakkenahalli, Marrigupe,
Banavadi, Chanuvalli, Yennegere,
Koramangala, Mottaganahalli,

66kV Kanakapura-Somanahalli
Line 1(Partial) 66/11kV Line maintenance work & Quaterly maintenance 10.01.2023 Hanumanthanagara & Yedamadu
83 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - 6/16/2024 6/16/2024 10:00 16:00 6:00 23.3
Hanumanthanagara & Yedamadu work &30.05.2023 sorrounding villages &connected Industries̤
S/s

WONDERALLA, HEJJALLA, BANNIKUPPE,


To carry out 4th quarterly maintenance works of GOMTHI, KADUMANE,
84 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 66/11kV Hejjala 6/16/2024 6/16/2024 10:00 16:00 6:00 10.12.2023 12MW
substation and Lines from TLI staff MANCHANAYAKANAHALLI, HOSSADODDI,
AVAREGERE, KHB HAMPAPURA

To carry out 4th quarterly maintenance works of


85 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 220/66/11kV Bidadi 6/16/2024 6/16/2024 10:00 18:00 8:00 - PGCIL1 & 2 220kV Lines 0MW
Railway Bay
Newly
To carry out 4th quarterly maintenance works of Commissioned
86 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 220/66/11kV Bidadi 6/16/2024 6/16/2024 9:00 13:00 5:00 220kV Bidadi-Kothipura Line-1 0MW
specific bays lIne.Commissioned
on 29.11.2023
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

Newly
To carry out 4th quarterly maintenance works of Commissioned
87 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 220/66/11kV Bidadi 6/16/2024 6/16/2024 13:00 19:00 6:00 220kV Bidadi-Kothipura Line-2 0MW
specific bays lIne.Commissioned
on 29.11.2023

BMAZ
RR Nagara
NORTH & Areas feeding from 66/11kV Kanteerava GIS
88 BMAZ North NRS West Division, - - - 66/11 kV Kanteerav GIS station 6/16/2024 6/16/2024 10:00 17:00 7:00 Quarterly maintenance 13.01.2024 0
BMAZ station
Rajajinagara
SOUTH

LC request for 31.5MAV Tr-3 ,Bank-3 and respective ESI, Peenya 3rd stage, Laggere, Hegganahalli,
BMAZ
89 BMAZ North SRS Peenya Bangalore North SRS Peenya - - - 220/66/11kV SRS Peenya 6/16/2024 6/16/2024 10:00 16:00 6:00 feeders. For carrying out Quaterly maintenance works 05.02.2023 JK Garments, HITTCO, Welcast steels, 12MW
NORTH
for attending maintenance Reliance

BMAZ
RR Nagara
NORTH & Areas feeding from 66/11kV Kanteerava GIS
90 BMAZ North NRS West Division, - - - 66/11 kV Kanteerav GIS station 6/16/2024 6/16/2024 10:00 17:00 7:00 Quarterly maintenance 13.01.2024 0
BMAZ station
Rajajinagara
SOUTH

load change over


- 140MW from
220/66/11kV HSR R/s 220kV Quarterly maintenance work of 66kV PT, 66kV Main
91 BMAZ South HSR Layout BMAZ South South HSR Layout - - - 6/16/2024 6/16/2024 10:00 17:00 7:00 21.01.2024 NIL existing 220kV
HSR Mylasandra Line 1 BUS, 66kV Breakers and Maintenance of 11kV BUS.
Hsr-Mylasandra
line -2

Doddaballapura town, Rajgatta, Tippuru,


Raghunathapura, Talagwara,
For erection of towers in the existing line corridor in
Transmission Major Works Bengaluru Gandrajapura, Konagatta,
92 BRAZ Nelamangala - - -Existing 66kV NRS DB Pura –Devanahalli DC line
6/17/2024 6/26/2024 10:00 17:00 7:00 the work of line strenthening of Existing 66kV NRS - 25MW
(Works)Circle Division, North Rural Muddanayakanapalya, Hanabe, SS Ghati,
DB Pura –Devanahalli DC line
Antharahalli, Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

1. To carry out Maintenance work of Incoming line,


Outgoing line, Transformer Bays, 66kV bus Gos, 11kV
bus and breaker maintenance.
2. For attending Hotspot works.
5MW load to be
3. For carrying out IR test of all equipments like Vidyaranyapura, Yelahanka New Old Town,
changed over by
BMAZ HEBBAL & CT's, PT's, LA's, Transformers, 66kV Breakers, 11kV KMF, Maruthi Nagar, M.S.Palya, L&T , NCBS,
93 BMAZ North Hebbal C7,C8,C9 - - - 66/11kV AtturYelaanka 6/17/2024 6/17/2024 10:30 18:00 5:30 15.12.2023 BESCOM to to
NORTH JalahalliDivision Breakers and 11kV Bus. Byatarayanapura, Purvankara Block-1,2,3&4,
the neighbouring
RMZ, GKVK, Judical Layout
station.
4. For OLTC Overhauling of Trf-2

66kV Kanakapura-Chikkenahalli
Quaterly maintenance work of Transmission line & Allimaranahalli, Chikkenahalli S/s &
94 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - Line & 66/11kV Allimaranahalli 6/18/2024 6/18/2024 10:00 16:00 6:00 13.12.2023 17.4
Substations surounding Villages.
& Chikkenahalli S/s.

BANNIKUPPE, ANKANHALLI,
To carry out 4th quarterly maintenance works of
95 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 66/11kV SHIVANAHALLI 6/18/2024 6/18/2024 10:00 16:00 6:00 13.12.2023 DODDANAHALLI, KADANAKUPPE AND 9MW
substation and Lines from TLI staff
SOURROUNDING AREAS

Byrohalli, Ramohalli, Kengeri Town, Bidadi


Rural, Devikiran, Deccan Herrald, KAIDB 1st
phase,KAIDB 2nd phase, Geruplaya industrial
Kengeri(K1
96 BMAZ South Subramanyapura BMAZ South BMAZ South - - - 66/11kV Kumbalagodu 6/18/2024 6/18/2024 10:00 15:00 5:00 Periodic maintainance works 09.11.2023 area, ISRO, Gonipura,BGS, Kengeri,Brigade 30
subdivision) Balance portion of works for
ponorama,Srirama badavane,
Construction of 220/66kV Multi Kanminike,Sandeep thota, Chalghatta, MLC
circuit Multi voltage line in the compound.
existing 66kV SC line corridor
Major Works from 220kV Bidadi station to the For stringing of Second circuiot from melehalli
Transmission
97 Division, BRAZ Ramanagara Ramanagara - - - 220/66/11kV Kothipura sub- 6/19/2024 6/19/2024 9:00 17:00 8:00 tappoint to 66/11kV Melehalli station for a distance - No Load affected -
(Works)Circle
Ramanagara station for a distance of of 11Km 66KV Chintamani,
18.188Kms Shettimadamanagala,Talagawra,
Cheemangala, Y.Hunasenahalli, K
66kV Melehalli Tap Point to Raguttahalli, Bommepalli cross, Yenigadale,
Melehalli Station Shidlagatta, Melur, Jangamakote,
Nandhiganahalli,G.Kodihalli, Srinivasapura
220KV Station and it's downstrem station,
Iragampalli, M.Gollahallli, Ganjigunte,
220KV PGCIL Kolar-Chintamani Line-1 & 220KV
Burudugunte, Pallicherlu, Sadali &
98 BRAZ Chintamani BRAZ Kolar Chintamani - - - 220KV RS Chintamani 6/19/2024 6/19/2024 9:00 17:00 8:00 PGCIL Kolar-Chintamani Line-2 17.01.2024 190 MW
Dibburahalli Substations.
To carryout quarterly maintenance work
& RTSS Chintamani
Solar IPPs:
1. ACME Solar IPP-20MW at 66/11kV
Pallicherlu.
2. AFTL 5MW Solar IPP- 66/11kV
Iragampalli.
3. TATA Power solar-20MW at 66/11kV
Somayajalahalli

99 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11kV S/s Chandapura 6/19/2024 6/19/2024 10:00 15:00 5:00 Maintenance work 17.12.2023 Chandapura Surrounding areas 23 MW
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

220/66/11 kV R/S
Channapatna & vandaraguppe(surrounding
100 Ramanagara TKHalli BRAZ Ramanagara Ramanagara - - - Channapattana & 66/11 kV 6/19/2024 6/19/2024 10:00 15:00 5:00 Station Quarterly maintenance work 13.12.2023 20MW
villages)
vandaraguppe substation

Magadi Sub Division Area feeding from


Agalkote substation, Hulikatte,
101 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 66/11KV Agalkote 6/19/2024 6/19/2024 10:00 15:00 5:00 Quarterly Maintenance 13.12.2023 Kalludevanahalli, Seegekuppe, 8MW
Byranahally,koramangala,Chakrabhavi,
Agalkote, Dandigepura, Jodi Hosahalli

1)VIRUPASANDRA, B.S.DODDI, AKKURU,


66kV Kothipura-Melehalli- CHIKKAGANGAWADI,
Chikkangagawadi-Kootgallu DODDAGANGAWADI, TALAWADI, 66kV
Outgoing line at Melehalli sub 14.12.2023(Chikkag Solar IPP AND SORROUDING AREAS
station. angawadi) feeding from Chikkangangwadi Sub station
Affected Station are:- To carry out 1ST quarterly maintenance works of 12.12.2023(Jalama 2) Jalamangala, Akkuru, Tadikavagilu,
102 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 6/19/2024 6/19/2024 10:00 16:00 6:00 15MW
1. Chikkagangawadi substation and Lines from TLI staff ngala) Kysapurua, Solar IPP feeding form
2.Jalamangala 08.12.2023(Kootaga Jalamangala Sub station.
3.Kootgallu llu) 3) Yerehalli, Kootgallu,
4.Melehalli Danayankanapura, Shyanaboganahalli
and Kunamoodanahalli feeding from
Kutgallu Sub station.

3MW load will be


1. To carry out periodic maintenance work of incoming
Yelahanka old Town, Yelahanka Newtown, affected for
C7 Yelahanka line, Transformer Bays & 66kV bus maintenance.
Yelahanka Industrial Layout, Yelahanka 4th& 2:30hrs from
BMAZ new town,OLD 2.For carrying out IR test of all equipements like CT's,
103 BMAZ North Hebbal North - - - 66/11kV KHB COLONY 6/19/2024 6/19/2024 10:00 15:00 5:00 12/12/2024 5th Phase, chikka bommasandra, Anantha 12:30 to 15:00
NORTH TOWN and C9 PT's, LA's, Transformers, 66kV Breakers, 11kV
pura, Puttenahalli, Ramagondanahalli, while carrying out
sub-division Breakers, Wall entry bushings and 11kV Bus.
Kempanahalli etc 66kV BUS
3. For attending Hotspot works.
maintainance

66/11kV Prestige Falcon City Maintenanace of 11kV Bus, bank 1, bank 2 and
104 BMAZ South Subramanyapura BMAZ South Jayanagara : S6 BMAZ South - - - 6/19/2024 6/19/2024 10:00 15:00 5:00 03.02.2024 Prestige falcon city apartment 5
Substation Power transformers

Vishwapriya Layout , Begur koppa Road,


220kV HSR(S10,S12 11KV Bus, Tr-1 and Tr-2, Banks, 11KV Bus devarachikkanahalli, Akshyanagara, Prestige
105 BMAZ South BMAZ South BMAZ South - - - 66/11kV Soudella 6/19/2024 6/19/2024 10:00 15:00 5:00 19.01.2024 15
Subramanyapura subdivision) maintenance of Bank-1,Bank-1A and Bank2 Song of South, tejaswini Nagara, Hirnadani
Aparatent and surrounding Areas

Maintenanace of 220kV Bus, 220kV Somanahalli-


220kV HSR and 220/66/11kV Khodays glass
106 BMAZ South BMAZ South BMAZ South - - - 6/19/2024 6/19/2024 10:00 15:00 5:00 Khodays-Subramanyapura Lines and 220kV 24.01.2024 No Load affected No Load affected )
Subramanyapura Jayanagara factory station
Transformers( 150MVA Tr-2)

surroundings, 24th main, Behined LIC office ,


LIC colony, K R Layout, Venkatadri Layout, JP
nagar 5th Phase, Sai narsary Road, JP nagar
6th phase, 15th cross, 16th & 12th
cross ,Adarsha residency apt,Adarsha
garden,Sindhura convention hall &
surround,JP nagar Metro and Peak
1st Quarterly/Half Yearly maintenance work of 66kV surrounding,Indira Gandhi circle,Aster load=34.0MW
Bays, 66kV PT, 66kV Main BUS,31.5MVA hospital,15th cross underpass road,Actor Load Change
Jayanagar /
107 BMAZ South HSR Layout BMAZ South South - - - 66/11kV Sarakki S/s 6/19/2024 6/19/2024 10:00 17:00 7:00 Transformer-1 & 3, 20MVA Transformer-2 and 19.01.2024 Sudeep house surrounding,24th main Nandini over= 23MW
Koramangala
Maintenance of 11kV Switchgears and BUS coupler hotel signal junction,Green city Load affected=
work at 66/11kV Sarakki S/s hospital.Central mall, KR layout,Venkatadri 11MW
layout,Kalyani Magnum road,DS
palya,Vaishnavi Terrace apt, JP nagar-
2nd,3rd,4th,5th
phase,Marenahalli,Manjunath colony,Tank
Bund road,Bannerghatta road,Dollars
layout,Kalyani magnum apt, Kalyani Krishna
magnum.
Hosakote 220kV BIAL and downstream 220kV BIAL BEGUR , 66kV Vidyangara,
108 BRAZ BIAL Division BRAZ BRC - - - 6/20/2024 6/20/2024 10:00 16:00 6:00 Quarterly maintenance 26.11.2023 80
Division stations 66kV Budigere, BIAL-1&2 EHT, ITC EHT

220kV KIADB HP, 220kv Ekarajapura,


Devanahalli 220KV Devanahalli Hardware
109 BRAZ BRAZ BRC HOSKOTE - - - 6/20/2024 6/20/2024 10:00 17:00 7:00 To carryout quarterly maintenance 26.11.2023 220KV BIAL Begur, 220kV Doddaballapura, 500MW
Hardware Park park-1&2 lines
220kV Hoody

220KV BAIL BEGUR Quarterly maintenance works of 220kV bay at


110 BRAZ DBPura BRAZ BRC Kengeri Hoskotte - - - 6/20/2024 6/20/2024 11:00 16:00 5:00 26.11.2023 No load affected . NO Load affected
(220KV NRS Dbpura) station

100MVA Power Transformer-3 Vijaypura and Jangamkotte ,Gundamgerre ,


111 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 6/20/2024 6/20/2024 10:00 18:00 8:00 Quarterly maintenance works of the station. 31.03.2024 62MW
NRS DBPura, saslu .Doddabelavangala and EHT AIR

66/11kV S/s Vijaypura & Vijaypura and Jangamkotte ,Gundamgerre ,


112 BRAZ DBPura BRAZ BRC Kengeri Hoskotte - - - 6/20/2024 6/20/2024 10:00 18:00 8:00 Quarterly maintenance works of the station. 18.01.2024 62MW
Jangamkotte saslu .Doddabelavangala and EHT AIR

Vijaypura and Jangamkotte ,Gundamgerre ,


113 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 66/11kV S/s Doddabelavangala 6/20/2024 6/20/2024 10:00 18:00 8:00 Quarterly maintenance works of the station. 23.01.2024 62MW
saslu .Doddabelavangala and EHT AIR

Vijaypura and Jangamkotte ,Gundamgerre ,


114 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 66/11kV S/s Gundamgerre 6/20/2024 6/20/2024 10:00 18:00 8:00 Quarterly maintenance works of the station. 23.01.2024 62MW
saslu .Doddabelavangala and EHT AIR
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

Vijaypura and Jangamkotte ,Gundamgerre ,


115 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 66/11kV S/s Saslu 6/20/2024 6/20/2024 10:00 18:00 8:00 Quarterly maintenance works of the station. 23.01.2024 62MW
saslu .Doddabelavangala and EHT AIR
220/66kV Kanakapura 100MVA
116 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - 6/20/2024 6/20/2024 10:00 16:00 6:00 100MVA TR1 Quaterly maintenance work 13.10.2023 No load affeted 0
TR1

66kV Kempanahalli-Uragahalli 1) Namdaari, Myganahalli, ABM Build tech,


Line 16.12.2023 Heggadagere and sourrounding areas
Affected Stations are To carry out 4th quarterly maintenance works of (Kempanahalli) feeding from Kempanahalli sub station
117 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 6/20/2024 6/20/2024 10:00 16:00 6:00 12.5MW
1. Uragahalli sub station substation and Lines from TLI staff 20.12.2023 2) H.M.doddi, Annahalli, M.G.palya and
2. Kempanahalli sub station. (Uragahalli) sourrounding areas feeding from Uragahalli
Sub station.

For carrying out Yearly maintenance works for


attending maintenance and alignment of Bus GOS-8 Hesaraghata , Soladevanhalli,
BMAZ Jalahalli (N9
118 BMAZ North SRS Peenya Bangalore North - - - 66/11kV Soladevanhalli 6/20/2024 6/20/2024 10:00 16:00 6:00 Nos, 11kV Switchgear, 66kV CT & PT, 66kV 01.02.2023 Hullichikanahalli, Krishna collage , 16MW
NORTH Subdivision)
Breakers,Auxillary Transformer and 11KV Capacitor Sasavaghata, Silvepura, chikabanavara,
Bank maintenance. Service road, K. K. Halli Village, CMR Road,
Kamanahalli Main Road, Ramaiah Layout,
Lingarajapuram, Janakiram Layout,
1. To carry out Maintenance work of Incoming line, Kanakadasa Layout, Govindpura main raod,
Outgoing line, Transformer Bays, 66kV bus Gos, 11kV Rashad nagar, Farida Shoe factory, Arabic
bus and breaker maintenance. college, K.G.Halli, Govindpura Village,
2. For attending Hotspot works. Vinobhanagar, BM layout, Arogyamma layout,
3. For carrying out IR test of all equipments like Kaveri garden and surrounding areas HBR L/O, 1. 25MW load will
4th Block, yasin Nagar, 5th Block, HBR
CT's, PT's, LA's, Transformers, 66kV Breakers, 11kV be effected for
BMAZ East Division & E1, E5, E8, E9, Nagawara main road, Nagawara, N.J.K
119 BMAZ North Hebbal - - - 66/11kV HBR Layout MUSS 6/20/2024 6/20/2024 10:30 16:00 5:30 Breakers and 11kV Bus. 28.11.2023 3hrs during bus
NORTH Hebbal Division C5 Garments, Byrankunte, Kuppuswamy L/O,
HKBK College 4th & 5th of HBRL/O,Vidya
& PT
Sagar, Thanisandra, R.K.Hegde nagar, maintainence
4. For connecting 11kV Buscopler-1 fish plate K.Narayan pura, N.N.Halli, Balaji L/O, PHASE 1
between Bank-1 & Bank-2. TO 3, Railway mens L/O, BDS L/O, Central
Excise, K. K. Halli, Hennur Main Road, HRBR
3rd block, Oil Mill Road, Aravind Nagara, Nehru
Road. KAMMANAHALLI MAIN ROAD, BETHAL
STREET, AK COLONY, HRBR 1ST BLOCK,
BMAZ 80FEET ROAD, CMR ROAD, KARLE, Hegde
RR Nagara
NORTH & Areas feeding from 66/11kV REMCO GIS
120 BMAZ North NRS West Division, - - - 66/11 kV REMCO GIS station 6/20/2024 6/20/2024 10:00 17:00 7:00 Quarterly maintenance 20.01.2024 20
BMAZ station
Rajajinagara
SOUTH

Weavers coloney, Gottigere, Mantapa,


For carrying out maintenance work on 66kV BUS, Purvankara, AMC College, Ragihalli,
220kV HSR and Ramanagara
121 BMAZ South BMAZ South - - - 66/11kV Bannerghatta station 6/20/2024 6/20/2024 10:00 15:00 5:00 66kV BUS GOS, 66kV Transformer Isolators, 11kV 18.01.2024 Kasaraguppe, National Park, Basavanapura, 17
Subramanyapura Chandapura Circle
Switchgear maintenance work. Mylasandra, Bytarayandoddi, Lakshmipura,
Shivanahalli and surrounding Areas

Mylasandra , Ideal homes ,Uttarahalli ,


66kV BUS: sachidanandanagar,Vaddarapalya ,Gaanakalu
RR Nagar/ 1) Maintenance of Bus isolators & 66kV Bus, , BEML Layout, Rajarajeshwari temple ,
220kV Kengeri 66/11kV Substation, 2) 66kV PT Maintenance. Pattanagere , Global village, BGS Hospital,
122 BMAZ South BMAZ South BMAZ South - - - 6/20/2024 6/20/2024 10:00 15:00 5:00 16.11.2023 35
Subramanyapura division/ Rajarajeshwarinagar 3) 11kV Bus maintenance of Bank-1, Bank-2 and part of kengeri,
Jayangar Bank2A. Channasandra,Vaddarapalya,Uttarahalli,
4) Battery charger and DCDB maintenance. Poorna Prajna Layout, BHCS Layout and
surrounding areas

Gubbalala, Part of Uttarahalli, ISRO layout


66kV BUS: Ind. Area, Adarsha aprtments I & II, Mantri
1) Maintenance of Bus isolators & 66kV Bus, Tranquill apartments, Maruthi layout,
220kV Jayanagar(S5,S
123 BMAZ South BMAZ South BMAZ South - - - 66/11kV Subramanyapura 6/20/2024 6/20/2024 10:00 15:00 5:00 2) 66kV PT Maintenance. 21.11.2023 Bharath layout, Doddakallasandra Ind,area, 12
Subramanyapura 18 subdivision)
3) 11kV Bus maintenance of Bank-1 and Bank-2. Agara and connected areas, Kuamraswamy
4) Battery charger and DCDB maintenance. lyt, Vittal nagara, Yadalam nagar, Maruthi
nagar.
Brenton Road, Shobha pearl, ICICI bank, 1. Tr- 1 load
Embassy heights, Abharan jewells, Herban taken on Tr-2
life, RMZ, Ashok nagar, Garudamall, Air Force through
Hosp. ,Dommaluru, Austin Town, Vivek Buscoupler from
nagar, Trinity Church, Vijaj bank, Hotel 10:00 to 11:25
Taj,Victoria layout, Museum Road, Albert Hrs - No load
1. Periodical Maintenance work( 1st Quarterly) of street, king street, Museum cross road, Lavelle affected
66kV EDC line, 3x20MVA Tr's, Bus GOS, line GOS, road, St. mark road, Y.G.Palya, KSRP, ITC 2. Tr-2 load taken
Koramangala, 66kV Breakers, 66kV CT's and 66kV PT's. hotel, Richmond road, Vannerpet, Life Style, on Tr-1 through
124 BMAZ South HSR Layout BMAZ South South & East Indiranagar - - - 66/11kV Austin Town S/s 6/20/2024 6/20/2024 10:00 15:00 5:00 2. Periodical Maintenance work of 11kV switchgears 18.11.2023 M.G.Road, Hayes Road, Convent Road, Buscoupler from
and Jayanagar 3. Tan Delta test on 66kV EDC line bay and CRM test S.L.Apartment, Richmond Town, Najappa 11:30 Hrs to
on 66kV EDC line breaker circle, Stain garden, Richmond Park, Longford 01:00 Hrs- No
Road, Braight street, Foodworld road, load affected.
Johnson market, BWSSB water supply, 3. 66kV Incoming
longford road, Ashoknagar, Shopper stop, line L.C required
Markam road, brigade road, commerce college, from 01:05 Hrs to
, Richmond circle, Vittal malya road, Siddaiah 02:45 Hrs-10MW
road, wood street, castle strreet, Neelasandra, load affected for
Anepalya, BMRCL. 01:40 Hrs.
Kodambahalli sub division of
66/11 kV Guruvinapura and Channapattana Taluk area feeding from
66/11 kV B V Halli substations 66/11 kV B V Halli/ Guruvinapura
125 Ramanagara TKHalli BRAZ Ramanagara Ramanagara - - - 6/21/2024 6/21/2024 10:00 15:00 5:00 Station Quarterly maintenance work 14.12.2023 13 MW
and 66 kV T K Halli- Harohalli-2 substation and Sathnur subdivision area of
line at T K Halli Kanakapura Taluk feeding from 66/11 kV
Guruvinapura.

ISRO Layout, ISRO layout Ind. Area,


220kV Jayanagara(S5 Kumarswamy layout, Vittal nagara, Vikram
126 BMAZ South BMAZ South BMAZ South - - - 66/11kV ISRO Layout 6/21/2024 6/21/2024 10:00 15:00 5:00 Periodic maintainance works 45245 15
Subramanyapura Subdivision) nagar, Ilyaznagar, Yelchenahalli, surrounding
area.

Jayanagara : S6
O&M-1 & 2 Konanakunte, Thalaghattapura,
220kV 66/11kV Khodays Glass Factory
127 BMAZ South BMAZ South and HSR BMAZ South - - - 6/21/2024 6/21/2024 10:00 15:00 5:00 Periodic maintainance works 24.11.2023 Doddakallasandra, Shreenidhi layout, 12 MW
Subramanyapura station
Layout: S12 Avalahalli.
O&M-1 & 2
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

Peak load-22MW,
load changeover-
66/11kV Devarabisanahalli sub-station for:
10MW,
Bellandur,RMZ,Devarabisanahalli,Kariyamma load affected-12
HSR Layout & 1)Quarterely Maintenance work of 66/11kV
128 BMAZ South HSR Layout BMAZ South South - - - 66/11kV Devarabisanahalli S/s 6/21/2024 6/21/2024 10:00 15:00 5:00 23.11.2023 napalya,Akme projects,Anupama,Total MW
Koramangala Transformers, 66kV Isolators,66kV CT's & PT's.
Mall,Shobha IRIS
2)11kV Breaker maintanance
3)CRM & Timer Test of 66kV Breakers by RT

Balance portion of works for


Construction of 220/66kV Multi
circuit Multi voltage line in the
existing 66kV SC line corridor
Major Works from 220kV Bidadi station to the For stringing of Second circuiot from melehalli
Transmission
129 Division, BRAZ Ramanagara Ramanagara - - - 220/66/11kV Kothipura sub- 6/22/2024 6/22/2024 9:00 17:00 8:00 tappoint to 66/11kV Melehalli station for a distance - No Load affected -
(Works)Circle
Ramanagara station for a distance of of 11Km
18.188Kms

66kV Melehalli Tap Point to


Melehalli Station

To carry out the 1st Quarterly Maintenance work at All the 11kV feeders evacuvating from
130 Ramanagara Nelamangala BRAZ BRC Nelamangala - - - 66/11kV S/s Alur 6/22/2024 6/22/2024 10:00 17:00 7:00 09.12.2023 15MW
66/11kV S/s Alur 66/11kV S/s Alur
66kV Kothipura-Ramanagara Ramanagara Town, Hunsenahalli Village,
line. To carry out 1ST quarterly maintenance works of Bilagumba Village, Janapadaloka,
131 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 6/22/2024 6/22/2024 10:00 16:00 6:00 09.12.2023 19MW
Affected Stations are: substation and Lines from TLI staff Basavanapura, K.P.Doddi, Vaderahalli
1. Ramanagara Villages

1. During LC on
Tr-1, 18MW load
Horamavu, HRBR 1st, 2nd and 3rd block,
will be affected
service road, Kammanhalli main road, CMR
2. During LC on
1. To carry out quaterly/half yearly maintenance road, Babusabpalya, NRI Layout,
Tr-2, 66kV ITI
BMAZ works of Transformer Bays, 66kV Line Bays, 11kV Subbaiyanpalya, Nandanam Colony, Hennur,
132 BMAZ North Hebbal North Hebbal Division - - - 66/11kV Banaswadi Sub-station 6/22/2024 6/22/2024 10:00 17:00 7:00 13/12/2023 Line Bay, 15MW
NORTH Bus maintenance. Dodda Gubbi, Bilishivale, Lingarajpuram,
load will be
2. For carrying out IR test of all equipments. AFNHB, ADMC, Canopy Apartment, Doctor's
affected.
Layout, Pillareddy Nagar, OMBR Layout,
3. During LC on
Banjara Layout
Tr-3, 13MW load
will be affected.

Kengeri(K1 150MVA Tr-1 and respective BUS Periodic


133 BMAZ South Subramanyapura BMAZ South BMAZ South - - - 220kV Kumbalagodu GIS 6/22/2024 6/22/2024 10:00 15:00 5:00 23.01.2024 (No Load affected ) No Load affected )
subdivision) maintainance works

All areas feeding from following station will


be effected:
1)66/11kV Volvo
2)66/11kV Pillagumpa
3)66/11kV Sulibele
Hosakote ,Nan 220kV KIADB HP & Downstream For quarterly maintenance work of 220kV R/s
4)66/11kV Channarayaptna
134 BRAZ BIAL Division BRAZ BRC dagudi,Devanh - - - stations 6/23/2024 6/23/2024 10:00 16:00 6:00 KIADB HP and its down stream 220kV 26.11.2023 150
5)66/11kV Nandagudi
alli Ekarajapura, & 66/11kV stations .
EHT- Grindwell Nortan,Orient Bell
ceramics,SHELL ,BPH minor
irigation,BOEING.
220kV Ekarajapura & 220kV aerospace are
downstream stations for 220kV HP .

KIADB industrial areas, 66kV Indo MIM,


135 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 220/66/11kV KIADB R/S 6/23/2024 6/23/2024 10:00 17:00 7:00 Quarterly maintenance works of the station. 28.01.2024 62.6
66kV HSS
136 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 220kV NRS-KIADB Line 6/23/2024 6/23/2024 10:00 17:00 7:00 Quarterly maintenance works of the bay. 28.01.2024 No Loadd will be affected -
137 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 66/11kV Apparel park S/S 6/23/2024 6/23/2024 10:00 17:00 7:00 Quarterly maintenance works of the station. 28.01.2024 Apparel park areas 22.1

138 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11kV S/s Jigani Link Road 6/23/2024 6/23/2024 10:00 15:00 5:00 to carryout 1st quarterly maintenance works 26.11.2023 Jigani link road and surrounding areas 18 MW
for carrying out Quarterly maintenance in 66/11 Attibele industrial area, Attibele and
139 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11 kV S/s Attibele 6/23/2024 6/23/2024 10:00 15:00 5:00 17.12.2024 37 MW
kV Attibele station surrounding areas
Jigani, madapatna, haragadde, Nisarga
140 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11 kV S/s Jigani old 6/23/2024 6/23/2024 10:00 16:00 6:00 For qurterly manitenace work 26.11.2023 23 MW
layout.
1 st Quarterly and Annual maintenance of
220/66/11kv R/S Dabaspet for FY-2024-25..
1. 220kv and 66kv bus-preventive Maintenance
and attending critical hotspots. A. Areas feeding from Down streams of
2. 100MVA TR1 & 150 MVA TR2- 1st Quaterly and 220/66/11kv R/s Dabaspet.
Annual preventive maintenance and attending 1.66/11 kv Nelamangala
critical hotspot observation. 2. 66/11 kv Thyamagondlu
3. 31.5MVA TR1 & TR2- 1 st Quaterly and Annual 3. 66/11 kv T Begur
141 Ramanagara Nelamangala BRAZ BRC Nelamangala - - - 220/66/11 kv R/S Dabaspet 6/23/2024 6/23/2024 10:00 17:00 7:00 preventive maintenance and attending critical 10.12.2023 4. 66/11 kv Hirehalli 190MW
hotspot observation. 5. 66/11 kv Averahalli
4. 220kv and 66kv Line bays-1 st Quaterly and 5. 66/11 kv S K Steel(EHT)
Annual preventive maintenance and attending 6. 66/11 kv Jindal(EHT).
critical hotspot observation. B. Dabaspet Sub Division Area feeding from
5. 11kv GOS- 1 st Quaterly and Annual preventive 1.220/66/11kv R/s Dabaspet
maintenance and attending critical hotspots,
replacement of 11kv feeders GOS contacts, weaken
jumps and pothead repair work.
11kV feeders Evacuating from 66/11kV T
Begur Substation coming under
142 Ramanagara Nelamangala BRAZ BRC Nelamangala - - - 66/11kv Substation T Begur 6/23/2024 6/23/2024 10:00 17:00 7:00 1 st Quarterly maintenance work 10.12.2023 22MW
Nelamangala and Dabaspet Subdivisions,
BESCOM

11kV feeders Evacuating from


66/11kv Substation 66/11kVThyamagondlu Substation coming
143 Ramanagara Nelamangala BRAZ BRC Nelamangala - - - 6/23/2024 6/23/2024 10:00 17:00 7:00 To carry out the 1st Quarterly Maintenance work 10.12.2023 33MW
Thyamagondlu under Dabaspet Subdivisions, BESCOM
and 66kV Doddabele EHT Railways
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

11kV feeders Evacuating from 66/11kV


144 Ramanagara Nelamangala BRAZ BRC Nelamangala - - - 66/11kv Substation Averahalli 6/23/2024 6/23/2024 10:00 17:00 7:00 To carry out the 1st Quarterly Maintenance work 10.12.2023 Averahalli Substation coming under 16MW
Dabaspet Subdivisions, BESCOM
Cholanayakanahalli Chennenahalli
Peddanapalya jogarehalli
Hallubhavi palya Baiseguppe village
Bychaguppe Devamachohalli Basawanpalya
village Metipalya magadi road Varthur ( HT )
Gankallu , kurubarahalli
Jaladasipalya Deva manchanahalli
MAGADI AND Muddayyana Palya Gulganji halli
145 Ramanagara Nelamangala BRAZ Ramanagara NELAMANGAL - - - 66/11kV Tavarekere 6/23/2024 6/23/2024 10:00 15:00 5:00 1st Quarterly Maintenance 26.11.2023 Thippagondanahalli yarappa industrial area 16MW
A Gangappanahalli Kempgondanahalli
Guruvebavi
palya Dodda gollarahatti nangenahalli
Manjunath nagar YALACHAGUPPE
Basavana Palya,Gangenahalli
channenahalli puttayyana palya, Lakkuppe,
kurrubaa
halli Thimmabovipalya belongs to
Gangappanaphalli, varadenahalli
motaganahalli, thippagondanahalli,
marenahalli, cholanayakanahalli,
146 Ramanagara Nelamangala BRAZ Ramanagara MAGADI - - - 66/11KV T G HALLI 6/23/2024 6/23/2024 10:00 15:00 5:00 1st Quarterly Maintenance 26.11.2023 6MW
yellapanapalya, peddanapalya,
kemogondnahalli, jogerahalli, karekallu
cross.

Magadi and Kudur subdivision areas


147 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 66/11kV Hosapalya circle 6/23/2024 6/23/2024 10:00 15:00 5:00 1st Quarterly Maintenance 26.11.2023 7MW
feeding from Hosapalya Circle Substation
Quarterly maintenance of 220/66/11kv R/S
Magadi for FY-2024-25..
1. 220kv and 66kv bus-preventive Maintenance
and attending critical hotspots. A. Areas feeding from Down streams of
2. 100MVA TR1 & 100 MVA TR2- 1st Quaterly and 220/66/11kv R/s Magadi.
Annual preventive maintenance and attending 1.66/11 kv Magadi
critical hotspot observation. 2. 66/11 kv Hosapalya Circle
3. 12.5MVA TR1 st Quaterly and Annual preventive 3. 66/11 kv VG Doddi
148 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 220/66/11 kv R/S Magadi 6/23/2024 6/23/2024 10:00 17:00 7:00 maintenance and attending critical hotspot 26.11.2023 4. 66/11 kv TG Halli 80MW
observation. 5. 66/11 kv Tavarekere
4. 220kv and 66kv Line bays-1 st Quaterly and 5. 66/11 kv GM Halli
Annual preventive maintenance and attending B. Magadi Sub Division Area feeding from
critical hotspot observation. 1.220/66/11kv R/s Magadi Like
5. 11kv GOS- 1 st Quaterly and Annual preventive Sathanur,Mathikere,Managal,Kempasagara
maintenance and attending critical hotspots,
replacement of 11kv feeders GOS contacts, weaken
jumps and pothead repair work.
Magadi Subdivision Areas like Magadi
Town, Kalya Gate,Thaggikuppe,
Madbal,Belagumba,Kalya Nethenahhallu,
149 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 66/11 KV S/S Magadi 6/23/2024 6/23/2024 10:00 17:00 7:00 1st Quarterly Maintenance works 26.11.2023 18MW
Jodagatte, Savanadurga,
Chandurayanahalli, Kenchanahalli,
Mayanayakanahalli, Managal

66kV Somanahalli line-2 Harohalli Town, Harohalli Industrial area &


150 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - 6/23/2024 6/23/2024 10:00 16:00 6:00 Quaterly maintenance work 15.09.2023 23.6
&66/11kV Ranganadoddi S/s surounding villages.

2*31.5MVA, 20MVA, 100MVA TR-1&2, 66Kv


BOSCH, 66KV TTIPL, 66KV COCOCOLA.
Areas Affected are
1.Hittamadu, byramangala, Hposuru,
Bananduru, Medanahalli, Bidadi Town,
To carry out 4th quarterly maintenance works of
151 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 220/66/11kV Bidadi 6/23/2024 6/23/2024 10:00 16:00 6:00 17.12.2023 Shanamangala, Kodiyala. 50MW
substation and Lines from TLI staff
Industriral feeders affected are
Ingersollrand, MEI, KIADB, MTPL, Lumax,
Hightemp, Nextgen, KIADB-3, Coco Cola
green, Toyoto Techno park, Eagleton,TKAP,
Manjushree, Renewsour(IPP),

To carry out 4th quarterly maintenance works of 12.5MVA Tr-1 and Its associated Bay
152 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 220/66/11KV KOTHIPURA 6/23/2024 6/23/2024 10:00 15:00 5:00 10.12.2023 4MW
specific bays equipments

Vidhana
Soudha
Division (W-4 &
W-5 Sub-
BMAZ East and North To carry out quarterly maintenance work of attending
153 BMAZ North NRS division) and - - - 66/11 kV 'A' Station 6/23/2024 6/23/2024 10:00 17:00 7:00 21.01.2024 Areas feeding from 66/11kV A station 20
NORTH Circle hotspots at 66/11kV A Station
Malleshwaram
Division (C-1 &
C-2 Sub-
division)

LC request for 31.5MAV Tr-2 ,Bank-2 and respective Peenya 4th stage, Part Load on Peenya, TVS
BMAZ
154 BMAZ North SRS Peenya Bangalore North SRS Peenya - - - 220/66/11kV SRS Peenya 6/23/2024 6/23/2024 10:00 16:00 6:00 feeders. For carrying out Quaterly maintenance works 05.02.2023 Cross, JP Exports, Yeshwanthpura, 16MW
NORTH
for attending maintenance Vaishnavi, Gen Metals.

load change over


- 140MW from
220/66/11kV HSR R/s 220kV Quarterly maintenance work of 66kV PT, 66kV Main
155 BMAZ South HSR Layout BMAZ South South HSR - - - 6/23/2024 6/23/2024 10:00 17:00 7:00 22.10.2023 NIL existing 220kV
HSR Mylasandra Line 2 BUS, 66kV Breakers and Maintenance of 11kV BUS.
Hsr-Mylasandra
line -2
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

1.No load will be


gardenChrist jayanthi collegeBilishivale, Asha
affected for 3
township, Aishwarya L/O, Maruthi Township,
Hour while
Nagaragiri townshipK Narayanapura cross,
carrying out
BDS garden, Kothnoor, Patel ramaiah L/O,
maintainance
Anjanappa L/o, CSI GateByrathi Cross,
works on
1.For Attending the Hotspots. Byrathi Village, Evergreen L/O Kanakashree
Transformer 1
2.To carry out Tan-Delta Test of Transformer-1 and L/OGeddalahalli, Blessing garden, Mantri
and transformer
Transformer-2. Appt, heremath L/O, Trinity Fortune, Mycle
Additional East 2 as the 7MW
BMAZ 3. To carry out quaterly/half yearly maintenance SchoolBHK Industries, janakiram L/O,
156 BMAZ North Hebbal East Shivajinagar - - - 66/11kV Hennur MUSS 6/24/2024 6/24/2024 10:30 16:00 5:30 12/01/2023 load change over
NORTH works of 66kV Line Bays and 11kV Bus maintenance. vaddarapalya, Anugraha L/O, Cauvery
division to be done by
4. For carrying out IR test of all equipements like CT's, L/OAtma Vidhya Nagar Byrathi Village, KRC,
BESCOM.
PT's, LA's, Transformers, 66kV Breakers, 11kV Doddagubbi Cross, Kuvempu L/O, Sangam
2.24 MW load
Breakers, Wall entry bushings and 11kV Bus. Encleve, Byrathi Bande, Nakshatra L/O,
will be affected for
Thimme Gowda L/ONRI, Richs Garden, Andra
2 Hours during
Colony, manjunatha Nagar, Hormavu BBMP
11kv Bus and
GOSAgara Grama, Agara Panchayithi, AKR
66kv Bus GOS
School new Millenium School, Patalamma
maintenance
Temple Road, Raju l/O, prakash Garedn,
work.

220kV HSR(S10,S12s 11KV Bus, Tr-1 and Tr-2, Banks, 11KV Bus
157 BMAZ South BMAZ South BMAZ South - - - 66/11kV DLF(Annabel) 6/24/2024 6/24/2024 10:00 15:00 5:00 21.12.2024 DLF Apartment 5
Subramanyapura subdivision) maintenance of Bank-1,Bank-1A and Bank2

220KV Nelamangala Line-2 Bay


158 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 6/25/2024 6/25/2024 9:00 13:00 4:00 Tan Delta Testing of the 220kV CT's 24.02.2024 No load affected . NO Load affected
(220KV NRS Dbpura)

220KV Nelamangala Line-1 Bay


159 BRAZ DBPura BRAZ BRC Kengeri Nelamangala - - - 6/25/2024 6/25/2024 13:00 17:00 4:00 Tan Delta Testing of the 220kV CT's 24.02.2024 No load affected . NO Load affected
(220KV NRS Dbpura)

66/11 kV Iggalur substation and


160 Ramanagara TKHalli BRAZ Ramanagara Ramanagara - - - 6/25/2024 6/25/2024 10:00 15:00 5:00 Station Quarterly maintenance work 19.12.2023 Iggaluru (surrounding villages) 15 MW
66 kV T K Halli- Iggalur line

BMAZ
RR Nagara
NORTH & Areas feeding from 66/11kV Chandra layout
161 BMAZ North NRS West Division, - - - 66/11 kV Chandralayout MUSS 6/25/2024 6/25/2024 10:00 17:00 7:00 Quarterly maintenance 12.12.2023 15
BMAZ S/s
Rajajinagara
SOUTH

1. To carry out Maintenance work of Incoming line,


Outgoing line, Transformer Bays, 66kV bus Gos, 11kV
bus and breaker maintenance.
2. For attending Hotspot works.
L&T Phase I & 2,L&T Tech Park, Spark One
HEBBAL & 3. For carrying out IR test of all equipments like
BMAZ Mall, Parvathamma Layout, Telecom
162 BMAZ North Hebbal Jalahalli C8,C9 - - - 66/11kV Byatarayanapura 6/25/2024 6/25/2024 10:30 16:00 5:30 CT's, PT's, LA's, Transformers, 66kV Breakers, 11kV 22.3.2024 No Load Effected.
NORTH Layout,Thindlu
Division Breakers and 11kV Bus.
Village ,Amruthahalli,Shabharinagar, Century

BMAZ
RR Nagara
NORTH & Areas feeding from 66/11kV Chandra layout
163 BMAZ North NRS West Division, - - - 66/11 kV Chandralayout MUSS 6/25/2024 6/25/2024 10:00 17:00 7:00 Quarterly maintenance 12.12.2023 15
BMAZ S/s
Rajajinagara
SOUTH

KSIT College,8th Block Anjanapura,weavers


1) Maintenance work of line bay equipments such as coloney,Purvankara
220kV
164 BMAZ South BMAZ South HSR (S12), BMAZ South - - - 66/11kv Anjanapura 6/25/2024 6/25/2024 10:00 15:00 5:00 66kV LA, GOS, CT, PTs etc 16.01.2024 Apartment,Amruthnagara,SP 10
Subramanyapura
2) 66kV BUS Isolators maintenance/alignment work. thota,Vaddarapalya,Kembathahalli and area
3) 66kV & 11kV Bus maintenance. surronding sub-station.

Kengeri(K1 150MVA Tr-2 respective BUS Periodic maintainance


165 BMAZ South Subramanyapura BMAZ South BMAZ South - - - 220kV Kumbalagodu GIS 6/25/2024 6/25/2024 10:00 15:00 5:00 24.01.2024 (No Load affected ) No
subdivision) works

Peak load-
1. Periodical Maintenance work (1st Quarterly) of 10.0MW,
1x20MVA Tr's, Bus GOS, line GOS, 66kV Breakers, Load change
BWSSB STP, Jakkasandra, HSR 5th Sector
HSR Layout & 66kV CT's and 66kV PT's. over-9.0MW,
166 BMAZ South HSR Layout BMAZ South South - - - 66/11kV Jakkasandra S/s 6/25/2024 6/25/2024 10:00 15:00 5:00 24.01.2024 teachers colony, part of Venkatapura,
Koramangala 2. Periodical Maintenance work of 11kV switchgears Load affected-
Greenage Apartment, Koramangala extention
1MW

Balance portion of works for


Construction of 220/66kV Multi
circuit Multi voltage line in the
existing 66kV SC line corridor
Major Works from 220kV Bidadi station to the For stringing of Second circuiot from melehalli
Transmission
167 Division, BRAZ Ramanagara Ramanagara - - - 220/66/11kV Kothipura sub- 6/26/2024 6/26/2024 9:00 17:00 8:00 tappoint to 66/11kV Melehalli station for a distance - No Load affected -
(Works)Circle
Ramanagara station for a distance of of 11Km
18.188Kms

66kV Melehalli Tap Point to


Melehalli Station

Magadi Sub Division Area feeding from


168 Ramanagara Nelamangala BRAZ Ramanagara Magadi - - - 66/11KV Mathikere(Heligehalli) 6/26/2024 6/26/2024 10:00 15:00 5:00 Quarterly Maintenance 20.12.2023 Mathikere(Heligehalli) substation,Basapana 4MW
Doddi, Yeligehalli ,Gejjagaraguppe
220/66/11kV KIADB Harohalli
169 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - 6/26/2024 6/26/2024 10:00 16:00 6:00 100MVA TR1 Quaterly maintenance work 29.11.2023 No load affeted 0
100MVA TR1
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

220/66/11kV KIADB Harohalli


170 Ramanagara Kanakapura BRAZ Ramanagara Kanakapura - - - 6/26/2024 6/26/2024 10:00 16:00 6:00 20MVA TR1 Quaterly maintenance work - No load affeted 0
20MVA TR1
To carry out 4th quarterly maintenance works of 100TR-1 and 100MVA Tr-2, 220kV Bidadi
171 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 220/66/11KV KOTHIPURA 6/26/2024 6/26/2024 10:00 15:00 5:00 14.12.2023 0MW
specific bays Line-1, Thubnkinere Line-2

RT nagar, ganga nagar,cholanagar, outer ring


13 MW will be
road,kariyappalayout,ashram road, 1st block
1.For attending the hot spots affected during
anandnagar guddappareddy layout, hebbal,
2.To carry out Tan-Delta Test of 2X20MVA LC period of
jayamahal 1st block, nandidurga road,
BMAZ C4,C5,C2,E1(b Transformer-1 & Transformer-2 and 31.5MVA 20MVA Tr-1 & 2
172 BMAZ North Hebbal North - - - 220/66/11 kv Hebbal 6/26/2024 6/26/2024 10:30 16:00 5:30 9/26/2023 marappa garden, jcnagar,millers road ganga
NORTH enson down) transformer-3. 19MW will be
nagar ,CHAMundhi nagar,dinnur,P&T
3.CRM test for 66kv breaker 4) tan delta test for 66 affected during
colony ,EX service men colony ,Mla
kcv CT LC period of
layout,Gananagar extension ,RBI colony,HMT
31.5MVA Tr-3
layout ,Vasanthappa block etc

To carry out 4th quarterly maintenance works of 220kV Bidadi Line-2, Thubinkere Line-1
173 Ramanagara Somanahalli BRAZ Ramanagara Ramanagara - - - 220/66/11KV KOTHIPURA 6/27/2024 6/27/2024 10:00 15:00 5:00 15.9.2023 0MW
specific bays and 220kV associated BUS Equipments

1. 6MW of load
will be affected for
A.K.Ashram Road, Devagowda Road,
2 Hrs while
R.T.Nagar 1st Block, Thimmaiah Garden,
1. To carry out Maintenance work of incoming line, carrying out
Modi Garden, Military Area, Veerannapalya,
outgoing line, Transformer-1, Transformer-2 Bay, transformer- 2
BMAZ East Division & Lumbini Garden, BWSSB Sewage plant,
174 BMAZ North Hebbal E1, E9, C5 - - - 66/11kV Yellarbande MUSS 6/27/2024 6/27/2024 10:30 16:00 5:30 66kV bus Gos, 11kV bus and breaker maintenance. 14.12.2023 maintenance
NORTH Hebbal Division Mariyannaplaya, Coffee board L/O,
2. For attending Hotspot 2. 22MW of load
Kempapura,Dasarahalli, Maruthi L/O,
works. will be effected for
Buvaneshwari nagar, Byrappa L/O and
3 Hrs during bus
surrounding areas.
& PT
maintainence

66kV BUS:
1) Maintenance of Bus isolators & 66kV Bus, Manthri apartment, Thalaghattapura,
220kV
175 BMAZ South BMAZ South Jayanagara BMAZ South - - - 66/11kV ISKCON 6/27/2024 6/27/2024 10:00 14:00 4:00 2) 66kV PT Maintenance. 22.12.2024 Raghuvanagalli, Gublala, kuvempu nagar, VV 4
Subramanyapura
3) 11kV Bus maintenance of Bank-1 and Bank-2. nagar; VV layout, Balaji Layout, Royal form
4) Battery charger and DCDB maintenance.

Elita Promenade Appartments,K.R


220kV 11KV Bus, Tr-1 Bank, 11KV Bus maintenance of
176 BMAZ South BMAZ South Jayanagar BMAZ South - - - 66/11kv Elita Promonade muss 6/27/2024 6/27/2024 10:00 15:00 5:00 20.12.2024 layout ,Sharadanagar, chunchughatta and 3
Subramanyapura Bank-
area surronding sub-station.

Balance portion of works for


Construction of 220/66kV Multi
circuit Multi voltage line in the
existing 66kV SC line corridor
Major Works from 220kV Bidadi station to the For stringing of Second circuiot from melehalli
Transmission
177 Division, BRAZ Ramanagara Ramanagara - - - 220/66/11kV Kothipura sub- 6/29/2024 6/29/2024 9:00 17:00 8:00 tappoint to 66/11kV Melehalli station for a distance - No Load affected -
(Works)Circle
Ramanagara station for a distance of of 11Km
18.188Kms

66kV Melehalli Tap Point to


Melehalli Station

Kempapura,Agrahara L/o,Defence
5MW load will be
L/o,Fortune,A block ,Pai house,
1. To carry out Maintenance work of Transformer-1, affected while
Byatrayanapura , UAS layout , Telecom layout
Transformer-2 & Transformer-3 Bay, 66kV bus Gos, carrying out 3*20
,Milstone and hiranandani appartement, L&T ,
BMAZ C8,C9,C4 sub 11kV bus and breaker maintenance. MVA Transformer
178 BMAZ North Hebbal North - - - 66/11kv Sahakarnagar muss 6/29/2024 6/29/2024 10:00 16:00 6:00 24.08.2024 UIDIA, Sahakarnagar , Kodigehalli , Canara
NORTH division Bays
Bank L/o , KB Park , MLA House ,
maintenance
Virupakshapura , Godrej , Shanthivana,
2. For attending Hotspot works. from 10:30 to
Fortune , Kempapura, Defence L/o, Agrahara
15:30
L/o , Kogilu L/o

TL&SS
For carrying out periodical maintenance works as per
Somanahalli
220kV Somanahalli-BWSSB maintenance schedule for 1st quarter of FY 2024-25.
and O&M No load will be
179 BMAZ South TL & SS Somanahalli BMAZ South South Circle - - - Tataguni line bay at 220/66/11kV 6/29/2024 6/29/2024 10:00 15:00 5:00 Load of 220kV BWSSB Tataguni station may be fed 03.12.2023 NIL
Division, affected.
R/S, Somanahalli, Bengaluru. from 220kV Vrushabhavathi through PGCIL Bidadi -
BESCOM,
Kumabalagodu station. No load will be affected.
Kengeri

Krishna teple Govt school road, apremeya


layout, anchepalya, handiform, kambipura,
220kV karubele, yechgolahalli, katanayakanpura,
180 BMAZ South BMAZ South Kengeri BMAZ South - - - 66/11KV kambipura 6/29/2024 6/29/2024 10:00 15:00 5:00 Periodic maintainance works _ 6
Subramanyapura horasandra, swamiji nagar, provident appt,
vbse appt, acs collage road, good earth,
srinidhi green layout, devgere, anepalya
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

66/11kV Primal Tech Park Sub-station for:


Peak load-20MW,
12th block,7thBlock,11th Block,RGA Load change
HSR Layout & 1)1st Quarterely Maintenance work of 66/11kV
181 BMAZ South HSR Layout BMAZ South South - - - 66/11kV Primal Tech Park S/s 6/29/2024 6/29/2024 10:00 15:00 5:00 45314 Infrastructure 1 & 2,9th A block,9Th B over-2MW,
Koramangala Transformers, 66kV Breakers,66kV CT's & PT's.
block,Intel,Station auxillary. Load affected-
2)11kV Breaker maintanance
18MW

Whitefield and 31.5MVA power transformer -01 of For carrying 1st quarterly maintenance and periodical
182 BMAZ South Hoody BMAZ South East - - - 6/29/2024 6/29/2024 10:00 13:00 3:00 11.11.2023 Nil Nil
indirangara 220/66/11kV ITI GIS station tan delta test.

Whitefield and 31.5MVA power transformer -02 of For carrying 1st quarterly maintenance and periodical
183 BMAZ South Hoody BMAZ South East - - - 6/29/2024 6/29/2024 13:00 17:00 4:00 17.11.2023 Nil Nil
indirangara 220/66/11kV ITI GIS station tan delta test.

220kV R/S Malur, Railway traction-1 &2,


Kembodi, Tamaka, Yeldur, Dalsanur,
DRDO, T.D.Halli, Sugutur, S M Mangala,
184 BRAZ Kolar BRAZ Kolar Kolar - - - 220 kV R/S Kolar 6/30/2024 6/30/2024 9:00 17:00 8:00 Second quarterly maintenance works 8/10/2023 444 MW
Vemgal, Talgunda, Kyalanur, Narsapura,
Vokkaleri, Bangarpet, Kolar urban and
rural areas

66kV Attibele Line, 66kV Samandur line,


For station maintenance works, and other Areas feeding from Anekal S/S such as
185 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11kV S/s Anekal 6/30/2024 6/30/2024 10:00 15:00 5:00 06.08.2023 25 MW
scheduled works at 66/11kV S/s Anekal Anekal Town and its surrounding rural
areas
for carrying out Quarterly maintenance in 66/11 samanduru, Gandhinagar, Halehalli and
186 Ramanagara Yarandanahalli BRAZ Ramanagara Chandapura - - - 66/11 kV S/s Samanduru 6/30/2024 6/30/2024 10:00 15:00 5:00 10.12.2024 5 MW
kV Samanduru station other surrounding areas

LC request for 31.5MAV Tr-1 ,Bank-1 and respective Kempegowda nagar, Yeshwanthapura,
BMAZ
187 BMAZ North SRS Peenya Bangalore North SRS Peenya - - - 220/66/11kV SRS Peenya 6/30/2024 6/30/2024 10:00 16:00 6:00 feeders. For carrying out Quaterly maintenance works 24.09.2023 Laggere, Welcast, Peenya 1st stage, Jindal, 17MW
NORTH
for attending maintenance ISRO

Chikkammanni Layout, Jeevan-Bheema


188 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 F10-Saraswathi Davanagere 220 kV Station 6/11/2024 6/11/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Nagara, Saraswathi Nagara, Jayanagara & its 1.2 MW
surrounding Areas.
Chikkammanni Layout, Jeevan-Bheema
189 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 F10-Saraswathi Davanagere 220 kV Station 6/18/2024 6/18/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Nagara, Saraswathi Nagara, Jayanagara & its 1.2 MW
surrounding Areas.
Chikkammanni Layout, Jeevan-Bheema
190 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 F10-Saraswathi Davanagere 220 kV Station 6/24/2024 6/24/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Nagara, Saraswathi Nagara, Jayanagara & its 1.2 MW
surrounding Areas.

F05- Mouneshwara Badavane, Jayanagara & its


191 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 Davanagere 66/11 kV Substation 6/13/2024 6/13/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 1.2 MW
Mouneshwara surrounding Areas.

F05- Mouneshwara Badavane, Jayanagara & its


192 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 Davanagere 66/11 kV Substation 6/15/2024 6/15/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 1.2 MW
Mouneshwara surrounding Areas.

Durgambika Temple, Nituvalli, Rasthrothana


School-in-&-arround, Manikanta Circle, Sri-
F14-
193 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 & Unit-2 Davanagere 66/11 kV Substation 6/19/2024 6/19/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Ram Badavane, Kariyamma Temple, 1.1 MW
Jayanagara
Jayanagara-A-&-B Block, Nituvahalli
Anjaneya Temple,

Durgambika Temple, Nituvalli, Rasthrothana


F14- School-in-&-arround, Manikanta Circle, Sri-
194 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 & Unit-2 Davanagere 66/11 kV Substation 6/25/2024 6/25/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 1.1 MW
Jayanagara Ram Badavane, Bhagiratha Circle,
Jayanagara Church & its surrounding areas.

195 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-2 F06-DCM Davanagere 66/11 kV Substation 6/20/2024 6/20/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder Areas & its surrounding areas. 1.1 MW

196 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-2 F07-G&S Davanagere 66/11 kV Substation 6/20/2024 6/20/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder Areas & its surrounding areas. 0.9 MW

197 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-2 F06-DCM Davanagere 66/11 kV Substation 6/26/2024 6/26/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder Areas & its surrounding areas. 1.1 MW

198 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-2 F07-G&S Davanagere 66/11 kV Substation 6/26/2024 6/26/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder Areas & its surrounding areas. 0.9 MW

199 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-2 F06-DCM Davanagere 66/11 kV Substation 6/29/2024 6/29/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder Areas & its surrounding areas. 1.1 MW

200 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-2 F07-G&S Davanagere 66/11 kV Substation 6/29/2024 6/29/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder Areas & its surrounding areas. 0.9 MW

F13-
Subramanya Nagara, Lokikere Road,
201 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 INDUSTRIAL- Davanagere 220 kV Station 6/16/2024 6/16/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 1.0 MW
Industrial Area & its surrounding areas.
SRS
F13-
Subramanya Nagara, Lokikere Road,
202 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 INDUSTRIAL- Davanagere 220 kV Station 6/23/2024 6/23/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 1.0 MW
Industrial Area & its surrounding areas.
SRS
F22-SS HIGH SS High Tech Hospital & its surrounding
203 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 Davanagere 220 kV Station 6/21/2024 6/21/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 1.1 MW
TECH areas.
F22-SS HIGH SS High Tech Hospital & its surrounding
204 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-1 Davanagere 220 kV Station 6/28/2024 6/28/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 1.1 MW
TECH areas.
F16-
205 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-6 Davanagere 66/11 kV Substation 6/13/2024 6/13/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder areas & its surrounding areas. 1.1 MW
Nijalingappa
F17-
206 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 Mahanagarapal Davanagere 66/11 kV Substation 6/13/2024 6/13/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder areas & its surrounding areas. 1.2 MW
ike

207 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 F10-CGH Davanagere 66/11 kV Substation 6/13/2024 6/13/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder areas & its surrounding areas. 1.1 MW

208 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 F09-PJ Davanagere 66/11 kV Substation 6/13/2024 6/13/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder areas & its surrounding areas. 0.9 MW

F17-
209 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 Mahanagarapal Davanagere 66/11 kV Substation 6/27/2024 6/27/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder areas & its surrounding areas. 1.2 MW
ike

210 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 F10-CGH Davanagere 66/11 kV Substation 6/27/2024 6/27/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder areas & its surrounding areas. 1.1 MW

211 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 F09-PJ Davanagere 66/11 kV Substation 6/27/2024 6/27/2024 10:00 16:00 6:00 Jalasiri 24*7 Water Supply Work 23.05.2024 Feeder areas & its surrounding areas. 0.9 MW
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

Jalasiri 24*7 Water Supply Work, Straightening of Angavikala Ashakirana Trust, SS Layout A
F12-
212 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 Davanagere 66/11 kV Substation 6/24/2024 6/24/2024 10:00 16:00 6:00 Slanted Poles/Jungle Clear/Shifting of 11 kV/LT lines 23.05.2024 Block, Basavanagudi, Feeder areas & its 1.5 MW
Basaveshwara
under Self Execution Scheme. surrounding areas.

Jalasiri 24*7 Water Supply Work, Straightening of Angavikala Ashakirana Trust, SS Layout A
F09-
213 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-5 Yaragunta 66/11 kV Substation 6/25/2024 6/25/2024 10:00 16:00 6:00 Slanted Poles/Jungle Clear/Shifting of 11 kV/LT lines 23.05.2024 Block, Basavanagudi, Feeder areas & its 1.5 MW
Shaneshwara
under Self Execution Scheme. surrounding areas.

SS Layout A Block, SS Mall, Glass House


Jalasiri 24*7 Water Supply Work, UG Cable Damage
Area, Shamanur Road, Lakshmi Floor Mill,
214 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-4 F02-MCCB Davanagere 66/11 kV Substation 6/7/2024 6/7/2024 10:00 16:00 6:00 rectification Work, Gas Pipe Line Work & Corporation 23.05.2024 2.2 MW
Siddaveerappa Badavane, Kuvempu Nagara,
Works
Mavina Topu, GH-Park & Surrounding Areas

SS Layout A Block, SS Mall, Glass House


Jalasiri 24*7 Water Supply Work, UG Cable Damage
Area, Shamanur Road, Lakshmi Floor Mill,
215 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-4 F02-MCCB Davanagere 66/11 kV Substation 6/14/2024 6/14/2024 10:00 16:00 6:00 rectification Work, Gas Pipe Line Work & Corporation 23.05.2024 2.2 MW
Siddaveerappa Badavane, Kuvempu Nagara,
Works
Mavina Topu, GH-Park & Surrounding Areas

SS Layout A Block, SS Mall, Glass House


Jalasiri 24*7 Water Supply Work, UG Cable Damage
Area, Shamanur Road, Lakshmi Floor Mill,
216 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-4 F02-MCCB Davanagere 66/11 kV Substation 6/20/2024 6/20/2024 10:00 16:00 6:00 rectification Work, Gas Pipe Line Work & Corporation 23.05.2024 2.2 MW
Siddaveerappa Badavane, Kuvempu Nagara,
Works
Mavina Topu, GH-Park & Surrounding Areas

SS Layout A Block, SS Mall, Glass House


Jalasiri 24*7 Water Supply Work, UG Cable Damage
Area, Shamanur Road, Lakshmi Floor Mill,
217 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-4 F02-MCCB Davanagere 66/11 kV Substation 6/27/2024 6/27/2024 10:00 16:00 6:00 rectification Work, Gas Pipe Line Work & Corporation 23.05.2024 2.2 MW
Siddaveerappa Badavane, Kuvempu Nagara,
Works
Mavina Topu, GH-Park & Surrounding Areas

Jalasiri 24*7 Water Supply Work, UG Cable Damage


218 DAVANAGERE DAVANAGERE - - - CSD-1 Unit-3 F01-SVT Davanagere 66/11 kV Substation 6/29/2024 6/29/2024 10:00 16:00 6:00 rectification Work, Gas Pipe Line Work & Corporation 23.05.2024 Feeder areas & its surrounding areas. 1.2 MW
Works

SHEKARAPPA NAGARA, GUJJARI LINE, TC


LAYOU, BT LAYOUT,BAMBOOBAZAR,
F13- ANEKONDA,CHOUDESWARI
219 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-1 ANEKONDA,F1 66KV AVARAGERE 6/8/2024 6/8/2024 10:00 16:00 6:00 DEPARTMENT 24.05.2024 TEMPLE,MAHAVEERA BHAVANA,BT 2.2 MW
4-MAHAVEERA Layout,KR ROAD.IMAM NAGARA .ARLI MARA
CIRCLE, MAGANAHALLI ROAD,BETHUR
ROAD.

Mandakki batti karl marx nagar


F15-RAVI,F16- siddarameshwar nagar indira nagar koli
220 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-1 66KV AVARAGERE 6/22/2024 6/22/2024 10:00 16:00 6:00 DEPARTMENT 24.05.2024 1.2MW
GOSHALE channappa,GOSHALA , RUDRAPPA RICE
MILL, MAHINDRA SHOW ROOM

Mandakki batti karl marx nagar


siddarameshwar nagar indira nagar koli
F04-BT,F11-
221 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-2 66KV Davanagere 6/8/2024 6/8/2024 10:00 16:00 6:00 JALASIRI 24.05.2024 channappa,Mandipete, binny company road, 1.2MW
LF1
chamaraj pete circle, clock tower, mahaveer
road

SJM NAGARA, SMK NAGARA, BABU


F16-SJM, F8- JAGAJIVANA NAGARA ,AND OTHERS
222 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-4 VIJAYANAGAR 66KV Yaragunte 6/8/2024 6/8/2024 10:00 16:00 6:00 JALASIRI 24.05.2024 AREA.Devaraj Aras Badavane, Vijayanagara 1.2MW
A Badavane, Rajiv Gandhi Badavane, SP Office,
RTO Office, SMK Nagara.

SJM NAGARA, SMK NAGARA, BABU


F16-SJM, F8- JAGAJIVANA NAGARA ,AND OTHERS
223 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-4 VIJAYANAGAR 66KV Yaragunte 6/16/2024 6/16/2024 10:00 16:00 6:00 JALASIRI 24.05.2024 AREA.Devaraj Aras Badavane, Vijayanagara 1.2MW
A Badavane, Rajiv Gandhi Badavane, SP Office,
RTO Office, SMK Nagara.

SJM NAGARA, SMK NAGARA, BABU


F18- JAGAJIVANA NAGARA ,AND OTHERS
224 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-4 DURAGAMBIK 66KV Yaragunte 6/19/2024 6/19/2024 10:00 16:00 6:00 JALASIRI 24.05.2024 AREA.Devaraj Aras Badavane, Vijayanagara 1.2MW
A Badavane, Rajiv Gandhi Badavane, SP Office,
RTO Office, SMK Nagara.

SJM NAGARA, SMK NAGARA, BABU


F18- JAGAJIVANA NAGARA ,AND OTHERS
225 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-4 DURAGAMBIK 66KV Yaragunte 6/22/2024 6/22/2024 10:00 16:00 6:00 JALASIRI 24.05.2024 AREA.Devaraj Aras Badavane, Vijayanagara 1.2MW
A Badavane, Rajiv Gandhi Badavane, SP Office,
RTO Office, SMK Nagara.

Mandakki batti karl marx nagar


siddarameshwar nagar indira nagar koli
F04-BT,F11-
226 DAVANAGERE Davanagere - - - CSD-2 DVG Unit-2 66KV Davanagere 6/22/2024 6/22/2024 10:00 16:00 6:00 JALASIRI 24.05.2024 channappa,Mandipete, binny company road, 1.2MW
LF1
chamaraj pete circle, clock tower, mahaveer
road

SHIRAMAGONDANAHALLI, NAGANUR,
F21-NJ NKBADAVANE, 6TH &7TH MILESTONE,
227 DAVANAGERE DAVANAGERE - - - RSD UNIT-1 SRS DAVANAGERE_220 6/12/2024 6/12/2024 10:00 18:00 8:00 Periodical Maintenance work 12.06.2024 1
TARALABALU HOSA &HALE BISLERI, JAVALAGATTA,
BANASHANKARI 2ND BLOCK

F-09
Shamanur,JH Patel Badavane, Jarikatte and
SHAMANURU,
228 DAVANAGERE DAVANAGERE - - - RSD UNIT-1 SRS DAVANAGERE_220 6/15/2024 6/15/2024 10:00 18:00 8:00 Periodical Maintenance work 15.06.2024 Mudahadadi, Hale Kundawada and Hosa 1,1.1 & 0.5
F-16 JHP2,
Kundawada
F17-JHP1

F21-NJ Bathi Industries, Guddada Camp,Chuch


229 DAVANAGERE DAVANAGERE - - - RSD UNIT-1 NEELANAHALL SRS DAVANAGERE_220 6/19/2024 6/19/2024 10:00 18:00 8:00 Periodical Maintenance work 19.06.2024 Camp, Hale Bathi and Doddabathi villaeg 1
I Limit

F3- Hosa Belavanur, Hale Belavanur and


230 DAVANAGERE DAVANAGERE - - - RSD UNIT-2 SRS DAVANAGERE_220 6/24/2024 6/24/2024 10:00 18:00 8:00 Periodical Maintenance work 24.06.2024 1
KUKKUWADA Turchagatta ip limit

F5- Belavanur village+Industries, Thurchagatta,


231 DAVANAGERE DAVANAGERE - - - RSD UNIT-2 SRS DAVANAGERE_220 6/28/2024 6/28/2024 10:00 18:00 8:00 Periodical Maintenance work 28.06.2024 1.1
BELAVANUR Belavanur IP Limit
Basapura , hale chikkanahalli & Hosa
232 DAVANAGERE DAVANAGERE - - - RSD UNIT-2 F6-KADAJJI,I AVARAGERE-66 6/12/2024 6/12/2024 10:00 18:00 8:00 Periodical Maintenance work 12.06.2024 0.5
Chikkanahalli

F10-
PUTAGANALU,
Igoor , hosa chikkanahalli IP
233 DAVANAGERE DAVANAGERE - - - RSD UNIT-2 F12- AVARAGERE-66 6/15/2024 6/15/2024 10:00 18:00 8:00 Periodical Maintenance work 15.06.2024 1.1 & 0.5
limit,Chikkanhalli and Vaddinahalli IP LIMIT
CHIKKANAHAL
LI

Igoor , igoor
234 DAVANAGERE DAVANAGERE - - - RSD UNIT-2 F18-RAMPURA AVARAGERE-66 6/19/2024 6/19/2024 10:00 18:00 8:00 Periodical Maintenance work 19.06.2024 1.1 & 0.5
golarahatti ,lingadahalli,Oddinahalli
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F14-
Yaragunta, Ashokanagara and Karur CMC
YARAGUNTA,
Limit, Chittanahalli, B.Kalapanahalli,
235 DAVANAGERE DAVANAGERE - - - RSD ELEBETHUR F17- YARAGUNTA_66 6/24/2024 6/24/2024 10:00 17:00 7:00 Periodical Maintenance work 24.06.2024 0.7 & 0.8
Doddabudihall , Chikkabudihal , Devaratti
AMRUTHANAG
and Amruthnagara village
ARA

F20-
Avaragolla,Kakkaragolla, Kakkaragolla camp,
236 DAVANAGERE DAVANAGERE - - - RSD ELEBETHUR KODIHALLI YARAGUNTA_66 6/28/2024 6/28/2024 10:00 17:00 7:00 Periodical Maintenance work 28.06.2024 0.6
Kodihalli & Kodihalli camp village limit
NJY

F05- WATER Obbajihalli,Hosa Kadalebalu and Hale


237 DAVANAGERE DAVANAGERE - - - RSD ELEBETHUR OBAJJIHALLI-66 6/15/2024 6/15/2024 10:00 17:00 7:00 Periodical Maintenance work 15.06.2024 0.6
SUPPLY Kadalebalu village

Kadajji, Nagarakatte, Rampura, Pyarappana


camp, Basavanal, Basavanal-Gollarahatti,
238 DAVANAGERE DAVANAGERE - - - RSD ELEBETHUR F04-SRIRAM KADAJJI_66 6/17/2024 6/17/2024 10:00 17:00 7:00 Periodical Maintenance work 17.05.2024 0.9
Bethur, Bethur Camp, Putuganal, Putuganal
Camp

F10-MATTHI,
F12-
Mathi,Anjaneya nagara ,Gonivada ,Gonivada
HOOVINMADU,
239 DAVANAGERE DAVANAGERE - - - RSD KUKKAWADA KUKKKAWADA-66 6/12/2024 6/12/2024 10:00 17:00 7:00 Periodical Maintenance work 12.06.2024 camp, Hoovinamadu and Thimmappa camp . 2.7, 3.1, 0.55
F11
Nagarasahalli and Jadaganalli village.
NAGARASANA
HALLI

F01-
Yaravanagathihalli and Yaravanagathihalli
KOLKUNTE,
camp village, Kaidal and Kaidal Camp, Hadadi
F03- KAIDALE,
240 DAVANAGERE DAVANAGERE - - - RSD KUKKAWADA KUKKKAWADA-66 6/15/2024 6/15/2024 10:00 17:00 7:00 Periodical Maintenance work 15.06.2024 , Bhattalakatte , Hosa nayakanalli and 1.5,2.6,2.4,0.5
F04-HADADI,
Vadenahalli village,
F05-
Kukkawada,Nagarasanahalli
KALBANDE

F01- Yaravanagathihalli and Yaravanagathihalli


241 DAVANAGERE DAVANAGERE - - - RSD KUKKAWADA KUKKKAWADA-66 6/19/2024 6/19/2024 10:00 17:00 7:00 Periodical Maintenance work 19.06.2024 1.5
KOLKUNTE, camp village,

F02-
KODIHALLI,
F03- Kodihalli,kodihalli camp , Lokikere , Shyagale
242 DAVANAGERE DAVANAGERE - - - RSD KUKKAWADA SHYAGALE-66 6/28/2024 6/28/2024 10:00 17:00 7:00 Periodical Maintenance work 28.06.2024 2.7,2.4,0.6
GONIWADA, IP, Lokikere , Shyagale village
F04-NJ
SHYAGALE

F08
CHALLAKERE ROAD SURROUNDING,
243 DAVANAGERE CHITRADURGA - - - CSD O&M-1 INDUSTRIAL CHITRADURGA_220 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 0.8
INDUSTRIAL AREA SURROUNGS
AREA
F08
CHALLAKERE ROAD SURROUNDING,
244 DAVANAGERE CHITRADURGA - - - CSD O&M-1 INDUSTRIAL CHITRADURGA_220 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 0.8
INDUSTRIAL AREA SURROUNGS
AREA
KAMANABAVI BADAVANE, JOGIMATTI
245 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F09 KOTE CHITRADURGA_220 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 1.2
ROAD, KOTE ROAD SURROUNDINGS
KAMANABAVI BADAVANE, JOGIMATTI
246 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F09 KOTE CHITRADURGA_220 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 1.2
ROAD, KOTE ROAD SURROUNDINGS

ZP OFFICE SURROUNDING AREAS,


247 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F10 ZP CHITRADURGA_220 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.1
TEACHERS COLONY, IUDP LAYOUT AREA

ZP OFFICE SURROUNDING AREAS,


248 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F10 ZP CHITRADURGA_220 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.1
TEACHERS COLONY, IUDP LAYOUT AREA

DS HALLI, KUNCHIGNAHALL, INGALDHALL,


F01 COPPER
249 DAVANAGERE CHITRADURGA - - - CSD O&M-3 CHITRADURGA_220 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 INGALADHAL LAMBANI HATTI, 1.1
MINES
KENNEDELAU & SURROUNDING AREAS

DS HALLI, KUNCHIGNAHALL, INGALDHALL,


F01 COPPER
250 DAVANAGERE CHITRADURGA - - - CSD O&M-3 CHITRADURGA_220 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 INGALADHAL LAMBANI HATTI, 1.1
MINES
KENNEDELAU & SURROUNDING AREAS

ARTICULTURE OFFICE ROAD, GAYTHRI


CIRCLE, SBM MAIN CIRCLE, DHARMASHALA
251 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F01 NAGARA CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.1
ROAD, GANDHI CIRCLE SURROUNDING
AREAS
ARTICULTURE OFFICE ROAD, GAYTHRI
CIRCLE, SBM MAIN CIRCLE, DHARMASHALA
252 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F01 NAGARA CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.1
ROAD, GANDHI CIRCLE SURROUNDING
AREAS
F02 THIPPAJI CIRCLE, KELAGOTE AREAS, CHIEF
253 DAVANAGERE CHITRADURGA - - - CSD O&M-1 CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.13
KELAGOTE OFFICE SURROUNDINGS
F02 THIPPAJI CIRCLE, KELAGOTE AREAS, CHIEF
254 DAVANAGERE CHITRADURGA - - - CSD O&M-1 CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.13
KELAGOTE OFFICE SURROUNDINGS

BANK COLONY SURROUNDING AREAS,


F03 BANK
255 DAVANAGERE CHITRADURGA - - - CSD O&M-1 CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 CHALLAKERE ROAD, MADAKARIPURA 2.18
COLONY
SURROUNDING AREAS

BANK COLONY SURROUNDING AREAS,


F03 BANK
256 DAVANAGERE CHITRADURGA - - - CSD O&M-1 CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 CHALLAKERE ROAD, MADAKARIPURA 2.18
COLONY
SURROUNDING AREAS

JCR MAIN ROAD & SURROUNDINGS,


257 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F12 JCR CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 PRIVATE BUSTAND ROAD, GOPALPURA 2.5
ROAD SURROUNDINGS
JCR MAIN ROAD & SURROUNDINGS,
258 DAVANAGERE CHITRADURGA - - - CSD O&M-1 F12 JCR CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 PRIVATE BUSTAND ROAD, GOPALPURA 2.5
ROAD SURROUNDINGS
NEAR NELAKANTESHWARA TEMPLE,
F13
BURUJANHATTI CIRCLE, MARAMMA
259 DAVANAGERE CHITRADURGA - - - CSD O&M-2 CHANDRAVALL CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.8
TEMPLE SURROUNDINGS, NEHARU NAGARA
I
SURROUNDING AREAS
NEAR NELAKANTESHWARA TEMPLE,
F13
BURUJANHATTI CIRCLE, MARAMMA
260 DAVANAGERE CHITRADURGA - - - CSD O&M-2 CHANDRAVALL CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.8
TEMPLE SURROUNDINGS, NEHARU NAGARA
I
SURROUNDING AREAS
VIDYANAGARA, KANAKA CIRCLE,
F08
261 DAVANAGERE CHITRADURGA - - - CSD O&M-2 CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 DAVALAGIRI BADAVANE, SJM COLLAGE 2.24
VIDYANAGARA
SURROUNDING AREAS
VIDYANAGARA, KANAKA CIRCLE,
F08
262 DAVANAGERE CHITRADURGA - - - CSD O&M-2 CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 DAVALAGIRI BADAVANE, SJM COLLAGE 2.24
VIDYANAGARA
SURROUNDING AREAS
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

HEADPOST OFFICE ROAD, PB ROAD,


INDUSTRIAL AREA ROAD, SJMIT CIRCLE,
263 DAVANAGERE CHITRADURGA - - - CSD O&M-2 F15 MILL AREA CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.6
PRIVATE BUSTAND ROAD, KSRTC BUSTAND
ROAD AND SURROUNDING AREAS

HEADPOST OFFICE ROAD, PB ROAD,


INDUSTRIAL AREA ROAD, SJMIT CIRCLE,
264 DAVANAGERE CHITRADURGA - - - CSD O&M-2 F15 MILL AREA CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.6
PRIVATE BUSTAND ROAD, KSRTC BUSTAND
ROAD AND SURROUNDING AREAS

BAPUJI NAGARA, TAMATAKALLU,


265 DAVANAGERE CHITRADURGA - - - CSD O&M-4 F14 PK HALLI CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 MEDEHALLI, KANAKA NAGARA , POLICE 2.01
QUATRAS SURROUNDING AREAS

BAPUJI NAGARA, TAMATAKALLU,


266 DAVANAGERE CHITRADURGA - - - CSD O&M-4 F14 PK HALLI CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 MEDEHALLI, KANAKA NAGARA , POLICE 2.01
QUATRAS SURROUNDING AREAS

UNIVERSITY AREA, GR HALLI,


F18
267 DAVANAGERE CHITRADURGA - - - CSD O&M-4 CHITRADURGA_66 6/8/2024 6/8/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 CHIKKAPANAHALLI,CHIPPINAKERE,CHIKKA 1.25
UNIVERSITY
GONDANAHALLI SURROUNDING AREAS

UNIVERSITY AREA, GR HALLI,


F18
268 DAVANAGERE CHITRADURGA - - - CSD O&M-4 CHITRADURGA_66 6/16/2024 6/16/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 CHIKKAPANAHALLI,CHIPPINAKERE,CHIKKA 1.25
UNIVERSITY
GONDANAHALLI SURROUNDING AREAS

INHALLI, SEEBARA,INHALLI
F0 NJY
269 DAVANAGERE CHITRADURGA - - - CSD O&M-4 MADANAYAKANAHLLI_66 6/9/2024 6/9/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 KURUBARAHTT,SIDDAVANADURGA 2.5
INHALLI
SURROUNDING AREAS
INHALLI, SEEBARA,INHALLI
F0 NJY
270 DAVANAGERE CHITRADURGA - - - CSD O&M-4 MADANAYAKANAHLLI_66 6/22/2024 6/22/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 KURUBARAHTT,SIDDAVANADURGA 2.5
INHALLI
SURROUNDING AREAS

F03 NJY MADANAYAKANAHALLI, YELAVERTHY


271 DAVANAGERE CHITRADURGA - - - CSD O&M-4 MADANAYAKANAHLLI_66 6/9/2024 6/9/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.24
YELAVERTHY SURROUNDING AREAS

F03 NJY MADANAYAKANAHALLI, YELAVERTHY


272 DAVANAGERE CHITRADURGA - - - CSD O&M-4 MADANAYAKANAHLLI_66 6/22/2024 6/22/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 2.24
YELAVERTHY SURROUNDING AREAS

KALLAHALLI, DYAMAVANHALLI,
F01
273 DAVANAGERE CHITRADURGA - - - CSD O&M-3 BALENAHALI_66 6/9/2024 6/9/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 TOPURAMALIGE,DK HATTI SURROUNDING 1.6
KALLAHALLI
AREAS
KALLAHALLI, DYAMAVANHALLI,
F01
274 DAVANAGERE CHITRADURGA - - - CSD O&M-3 BALENAHALI_66 6/22/2024 6/22/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 TOPURAMALIGE,DK HATTI SURROUNDING 1.6
KALLAHALLI
AREAS
JN KOTE,
275 DAVANAGERE CHITRADURGA - - - CSD O&M-3 F04 JC HALLI J N KOTE_66 6/9/2024 6/9/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 NERENAHALL,KALLIROPA,SAJJANAKERE, 0.4
SURROUNDING AREAS
JN KOTE,
276 DAVANAGERE CHITRADURGA - - - CSD O&M-3 F04 JC HALLI J N KOTE_66 6/22/2024 6/22/2024 10:00 16:00 6:00 MAINTAINANCE WORK 20.5.2024 NERENAHALL,KALLIROPA,SAJJANAKERE, 0.4
SURROUNDING AREAS

F1 Heggere, F2
Heggere, Yemmehatti, Hampanuru, Kolal,
277 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Yemmehatti, F4 Bharamasagara 6/18/2024 6/18/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 2.1
Kolal Gollarahatti
Kolala

F1 Heggere, F2
Heggere, Yemmehatti, Hampanuru, Kolal,
278 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Yemmehatti, F4 Bharamasagara 6/19/2024 6/19/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 2.1
Kolal Gollarahatti
Kolala

F1 Heggere, F2
Heggere, Yemmehatti, Hampanuru, Kolal,
279 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Yemmehatti, F4 Bharamasagara 6/20/2024 6/20/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 2.1
Kolal Gollarahatti
Kolala

F3 Nallikatte,
Isamudra, nallikatte, Hegdehal,
280 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara F5 Hegdehal, Bharamasagara 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 2
Kodirangavanhalli
F5 Esamudra

F3 Nallikatte,
Isamudra, nallikatte, Hegdehal,
281 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara F5 Hegdehal, Bharamasagara 6/18/2024 6/18/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 2
Kodirangavanhalli
F5 Esamudra

F3 Nallikatte,
Isamudra, nallikatte, Hegdehal,
282 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara F5 Hegdehal, Bharamasagara 6/19/2024 6/19/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 2
Kodirangavanhalli
F5 Esamudra

F3 Hosahatti,
283 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara F4 Nallikatte, Bidrikere 6/10/2024 6/10/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 Nallikatte, Gollarahalli, Isamudra, hosahatti 2.1
F5 Esamudra

F3 Hosahatti,
284 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara F4 Nallikatte, Bidrikere 6/11/2024 6/11/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 Nallikatte, Gollarahalli, Isamudra, hosahatti 2.1
F5 Esamudra

F3 Hosahatti,
285 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara F4 Nallikatte, Bidrikere 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 20.5.2024 Nallikatte, Gollarahalli, Isamudra, hosahatti 2.1
F5 Esamudra

F1 Bastihalli,
286 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Bidrikere 6/19/2024 6/19/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Hullehal, Bastihalli, yalgodu 2
F2 Yalagodu

F1 Bastihalli,
287 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Bidrikere 6/20/2024 6/20/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Hullehal, Bastihalli, yalgodu 2
F2 Yalagodu
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F1 Bastihalli,
288 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Bidrikere 6/21/2024 6/21/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Hullehal, Bastihalli, yalgodu 2
F2 Yalagodu

F7
Shivanakere,
F6 Vijapura, adavigollarahalli, Byalhal, Shivanakere,
289 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Bharamasagara 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.2
F10 Hirekabbigere, N Baligatte
Adavigollarahal
li

F7
Shivanakere,
F6 Vijapura, adavigollarahalli, Byalhal, Shivanakere,
290 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Bharamasagara 6/13/2024 6/13/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.2
F10 Hirekabbigere, N Baligatte
Adavigollarahal
li

F7
Shivanakere,
F6 Vijapura, adavigollarahalli, Byalhal, Shivanakere,
291 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Bharamasagara 6/14/2024 6/14/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.2
F10 Hirekabbigere, N Baligatte
Adavigollarahal
li

F8 Nandihalli,
F9 Bevinhalli, Nandihalli, Bahadurghatta,
292 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Bharamasagara 6/16/2024 6/16/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.8
Bahadurghatta, Kogunde
f13 Kogunde

F8 Nandihalli,
F9 Bevinhalli, Nandihalli, Bahadurghatta,
293 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Bharamasagara 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.8
Bahadurghatta, Kogunde
f13 Kogunde

F8 Nandihalli,
F9 Bevinhalli, Nandihalli, Bahadurghatta,
294 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Bharamasagara 6/18/2024 6/18/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.8
Bahadurghatta, Kogunde
f13 Kogunde

F8 Nandihalli,
F9 Bevinhalli, Nandihalli, Bahadurghatta,
295 DAVANAGERE Chitradurga - - - RSD CTA Bharamasagara Bharamasagara 6/19/2024 6/19/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.8
Bahadurghatta, Kogunde
f13 Kogunde

F2 Hullur, F9
Singapura, Hullur, Kurubarahalli,
296 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Kurubarahalli, Pandarahalli 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.1
thirumalapura
F11 Singapura

F2 Hullur, F9
Singapura, Hullur, Kurubarahalli,
297 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Kurubarahalli, Pandarahalli 6/13/2024 6/13/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.1
thirumalapura
F11 Singapura

F2 Hullur, F9
Singapura, Hullur, Kurubarahalli,
298 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Kurubarahalli, Pandarahalli 6/14/2024 6/14/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.1
thirumalapura
F11 Singapura

F8 Sollapura,
Siddapura, Malappanahatti, Janukonda,
299 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli F4 Janukonda, Pandarahalli 6/15/2024 6/15/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
Jalikatte
F5A Siddapura

F8 Sollapura,
Siddapura, Malappanahatti, Janukonda,
300 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli F4 Janukonda, Pandarahalli 6/16/2024 6/16/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
Jalikatte
F5A Siddapura

F8 Sollapura,
Siddapura, Malappanahatti, Janukonda,
301 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli F4 Janukonda, Pandarahalli 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
Jalikatte
F5A Siddapura

F13 Kakkeru,
F1 Annehal, F3
Pandarahalli, Annehal, Godabnahal, Nandipura, Sondekola,
302 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Pandarahalli 6/10/2024 6/10/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.2
F5B Kakkeru, Mahadevanakatte
Mahadevanaka
tte,

F13 Kakkeru,
F1 Annehal, F3
Pandarahalli, Annehal, Godabnahal, Nandipura, Sondekola,
303 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Pandarahalli 6/11/2024 6/11/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.2
F5B Kakkeru, Mahadevanakatte
Mahadevanaka
tte,

F13 Kakkeru,
F1 Annehal, F3
Pandarahalli, Annehal, Godabnahal, Nandipura, Sondekola,
304 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Pandarahalli 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.2
F5B Kakkeru, Mahadevanakatte
Mahadevanaka
tte,
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F13
Kakkeru,F6 Annehal, Godabnahal, Nandipura, Sondekola,
305 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Pandarahalli 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.9
Godabnhal, F7 Kakkeru, Mahadevanakatte
Sondekola

F13
Kakkeru,F6 Annehal, Godabnahal, Nandipura, Sondekola,
306 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Pandarahalli 6/18/2024 6/18/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.9
Godabnhal, F7 Kakkeru, Mahadevanakatte
Sondekola

F13
Kakkeru,F6 Annehal, Godabnahal, Nandipura, Sondekola,
307 DAVANAGERE Chitradurga - - - RSD CTA Pandarahalli Pandarahalli 6/19/2024 6/19/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.9
Godabnhal, F7 Kakkeru, Mahadevanakatte
Sondekola

F1 Konanuru,
F3 Obalapura,
308 DAVANAGERE Chitradurga - - - RSD CTA Sirigere F10 Sirigere 6/23/2024 6/23/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Konanuru, Alghatta, Chikkenhalli, 2
Chikkenhalli,
F11 Alghatta

F1 Konanuru,
F3 Obalapura,
309 DAVANAGERE Chitradurga - - - RSD CTA Sirigere F10 Sirigere 6/24/2024 6/24/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Konanuru, Alghatta, Chikkenhalli, 2
Chikkenhalli,
F11 Alghatta

F1 Konanuru,
F3 Obalapura,
310 DAVANAGERE Chitradurga - - - RSD CTA Sirigere F10 Sirigere 6/25/2024 6/25/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Konanuru, Alghatta, Chikkenhalli, 2
Chikkenhalli,
F11 Alghatta

F5 Palkihalli,
F2 Halavudara,
F4 Alagavadi, Alagavai, Halavudara, Obalapura, Siddapura,
311 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Sirigere 6/16/2024 6/16/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
F6 D Madakaripura, Doddiganal
Madakaripura,
f7 Siddapura

F5 Palkihalli,
F2 Halavudara,
F4 Alagavadi, Alagavai, Halavudara, Obalapura, Siddapura,
312 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Sirigere 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
F6 D Madakaripura, Doddiganal
Madakaripura,
f7 Siddapura

F5 Palkihalli,
F2 Halavudara,
F4 Alagavadi, Alagavai, Halavudara, Obalapura, Siddapura,
313 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Sirigere 6/18/2024 6/18/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
F6 D Madakaripura, Doddiganal
Madakaripura,
f7 Siddapura

F4 Vijapura, F3
314 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Sirigere 6/10/2024 6/10/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Vijapura, Laxmisagara, Kittadahatti 2
Laxmisagara

F4 Vijapura, F3
315 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Sirigere 6/11/2024 6/11/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Vijapura, Laxmisagara, Kittadahatti 2
Laxmisagara

F4 Vijapura, F3
316 DAVANAGERE Chitradurga - - - RSD CTA Sirigere Sirigere 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Vijapura, Laxmisagara, Kittadahatti 2
Laxmisagara

F10
Adavigollarahal
317 DAVANAGERE Chitradurga - - - RSD CTA Sirigere li, F7 Sirigere 6/15/2024 6/15/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Basavanashivakere, hirekabbigere 2.1
Shivanakere,
F6 Vijapura
F10
Adavigollarahal
318 DAVANAGERE Chitradurga - - - RSD CTA Sirigere li, F7 Sirigere 6/16/2024 6/16/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Basavanashivakere, hirekabbigere 2.1
Shivanakere,
F6 Vijapura
F10
Adavigollarahal
319 DAVANAGERE Chitradurga - - - RSD CTA Sirigere li, F7 Sirigere 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Basavanashivakere, hirekabbigere 2.1
Shivanakere,
F6 Vijapura

F9 Seebara, F3
Seebara, Guttinadu, Gulaiyanhatti,
320 DAVANAGERE Chitradurga - - - RSD CTA Hireguntanuru Chickpura, F4 Hireguntanuru 6/19/2024 6/19/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
Chikkaguntanuru
Hireguntanuru
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F9 Seebara, F3
Seebara, Guttinadu, Gulaiyanhatti,
321 DAVANAGERE Chitradurga - - - RSD CTA Hireguntanuru Chickpura, F4 Hireguntanuru 6/20/2024 6/20/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
Chikkaguntanuru
Hireguntanuru

F9 Seebara, F3
Seebara, Guttinadu, Gulaiyanhatti,
322 DAVANAGERE Chitradurga - - - RSD CTA Hireguntanuru Chickpura, F4 Hireguntanuru 6/21/2024 6/21/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
Chikkaguntanuru
Hireguntanuru

F12 Hosahalli,
323 DAVANAGERE Chitradurga - - - RSD CTA Hireguntanuru F4 Hireguntanuru 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Hireguntanuru 2.2
Hireguntanuru

F12 Hosahalli,
324 DAVANAGERE Chitradurga - - - RSD CTA Hireguntanuru F4 Hireguntanuru 6/13/2024 6/13/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Hireguntanuru 2.2
Hireguntanuru

F12 Hosahalli,
325 DAVANAGERE Chitradurga - - - RSD CTA Hireguntanuru F4 Hireguntanuru 6/14/2024 6/14/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Hireguntanuru 2.2
Hireguntanuru

F10 Beravara,
Beravara, Kodagavalli, Hunsekatte,
326 DAVANAGERE Chitradurga - - - RSD CTA Bheemsamudra F2 Kodagavalli, Hireguntanuru 6/15/2024 6/15/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
Gollarahatti, Sadarahalli, Neelaiyanhatti
F1 Hunsekatte

F10 Beravara,
Beravara, Kodagavalli, Hunsekatte,
327 DAVANAGERE Chitradurga - - - RSD CTA Bheemsamudra F2 Kodagavalli, Hireguntanuru 6/16/2024 6/16/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
Gollarahatti, Sadarahalli, Neelaiyanhatti
F1 Hunsekatte

F10 Beravara,
Beravara, Kodagavalli, Hunsekatte,
328 DAVANAGERE Chitradurga - - - RSD CTA Bheemsamudra F2 Kodagavalli, Hireguntanuru 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.3
Gollarahatti, Sadarahalli, Neelaiyanhatti
F1 Hunsekatte

F13 Malali, F5
Bheemsamudra, Nallikatte, Malali,
329 DAVANAGERE Chitradurga - - - RSD CTA Bheemsamudra Bheemsamudra Hireguntanuru 6/10/2024 6/10/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.9
Kadleguddu, Palya
, F6 vadraplaay

F13 Malali, F5
Bheemsamudra, Nallikatte, Malali,
330 DAVANAGERE Chitradurga - - - RSD CTA Bheemsamudra Bheemsamudra Hireguntanuru 6/11/2024 6/11/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.9
Kadleguddu, Palya
, F6 vadraplaay

F13 Malali, F5
Bheemsamudra, Nallikatte, Malali,
331 DAVANAGERE Chitradurga - - - RSD CTA Bheemsamudra Bheemsamudra Hireguntanuru 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 1.9
Kadleguddu, Palya
, F6 vadraplaay

F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
332 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/8/2024 6/8/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
333 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/9/2024 6/9/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
334 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/10/2024 6/10/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta

F9 Pelurhatti,
F8 Hunsekatte,
F7 Kotehatti, Kunabevu, Kotehatti, Kariyamanhatti,
335 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.1
F6 Bommakanhalli, Hunsekatte, bagenhal
Kariyamanahat
ti

F9 Pelurhatti,
F8 Hunsekatte,
F7 Kotehatti, Kunabevu, Kotehatti, Kariyamanhatti,
336 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/18/2024 6/18/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.1
F6 Bommakanhalli, Hunsekatte, bagenhal
Kariyamanahat
ti

F9 Pelurhatti,
F8 Hunsekatte,
F7 Kotehatti, Kunabevu, Kotehatti, Kariyamanhatti,
337 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/19/2024 6/19/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2.1
F6 Bommakanhalli, Hunsekatte, bagenhal
Kariyamanahat
ti

F9 Pelarhatti,
338 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru F4 Gonur, F5 Turuvanuru 6/10/2024 6/10/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Gonur, Mutaiyanhatti, Belaghatta, Haykal, 2.3
Belaghatta
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F9 Pelarhatti,
339 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru F4 Gonur, F5 Turuvanuru 6/11/2024 6/11/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Gonur, Mutaiyanhatti, Belaghatta, Haykal, 2.3
Belaghatta

F9 Pelarhatti,
340 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru F4 Gonur, F5 Turuvanuru 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 Gonur, Mutaiyanhatti, Belaghatta, Haykal, 2.3
Belaghatta

F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
341 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/12/2024 6/12/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
342 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/13/2024 6/13/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
343 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/14/2024 6/14/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
344 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/15/2024 6/15/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
345 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/16/2024 6/16/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
346 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/17/2024 6/17/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta
F5
Turuvanuru, Turuvanuru, Kadabanakatte, Doddaghtta,
347 DAVANAGERE Chitradurga - - - RSD CTA Turuvanuru Turuvanuru 6/18/2024 6/18/2024 10:00 16:00 6:00 Jungle clearance 21.5.2024 2
F4 Upparhatti
Doddaghatta

348 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Thekalavatti HD PURA 6/10/2024 6/10/2024 10:00 16:00 6:00 Replacement of HT Overhead conductor 21.5.2024 Thekalavatti, Kolalu, Kereyagalahalli 4 MW

349 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Thekalavatti HD PURA 6/11/2024 6/11/2024 10:00 16:00 6:00 Replacement of HT Overhead conductor 21.5.2024 Thekalavatti, Kolalu, Kereyagalahalli 4 MW

350 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Thekalavatti HD PURA 6/12/2024 6/12/2024 10:00 16:00 6:00 Replacement of HT Overhead conductor 21.5.2024 Thekalavatti, Kolalu, Kereyagalahalli 4 MW

351 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Thekalavatti HD PURA 6/13/2024 6/13/2024 10:00 16:00 6:00 Replacement of HT Overhead conductor 21.5.2024 Thekalavatti, Kolalu, Kereyagalahalli 4 MW

352 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Thekalavatti HD PURA 6/14/2024 6/14/2024 10:00 16:00 6:00 Replacement of HT Overhead conductor 21.5.2024 Thekalavatti, Kolalu, Kereyagalahalli 4 MW

353 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Thekalavatti HD PURA 6/15/2024 6/15/2024 10:00 16:00 6:00 Replacement of HT Overhead conductor 21.5.2024 Thekalavatti, Kolalu, Kereyagalahalli 4 MW

354 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Thekalavatti HD PURA 6/16/2024 6/16/2024 10:00 16:00 6:00 Replacement of HT Overhead conductor 21.5.2024 Thekalavatti, Kolalu, Kereyagalahalli 4 MW

355 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Chitrahalli Chitrahalli 6/5/2024 6/5/2024 10:00 16:00 6:00 11 KV Link Line Chitrahalli MUSS To Kondapura 21.5.2024 Chitrahalli, Kondapura 3 MW

356 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Chitrahalli Chitrahalli 6/6/2024 6/6/2024 10:00 16:00 6:00 11 KV Link Line Chitrahalli MUSS To Kondapura 21.5.2024 Chitrahalli, Kondapura 3 MW

357 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Chitrahalli Chitrahalli 6/7/2024 6/7/2024 10:00 16:00 6:00 11 KV Link Line Chitrahalli MUSS To Kondapura 21.5.2024 Chitrahalli, Kondapura 3 MW

358 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Chitrahalli Chitrahalli 6/8/2024 6/8/2024 10:00 16:00 6:00 11 KV Link Line Chitrahalli MUSS To Kondapura 21.5.2024 Chitrahalli, Kondapura 3 MW

359 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Chitrahalli Chitrahalli 6/9/2024 6/9/2024 10:00 16:00 6:00 11 KV Link Line Chitrahalli MUSS To Kondapura 21.5.2024 Chitrahalli, Kondapura 3 MW

360 DAVANAGERE CHITRADURGA - - - HOLALKERE SHIVAGANGA F9-Chitrahalli Chitrahalli 6/10/2024 6/10/2024 10:00 16:00 6:00 11 KV Link Line Chitrahalli MUSS To Kondapura 21.5.2024 Chitrahalli, Kondapura 3 MW

361 DAVANAGERE CHITRADURGA - - - HOLALKERE Holalkere F4-Arenahalli Holalkere 6/2/2024 6/2/2024 10:00 16:00 6:00 11 KV Link Line Adanuru To Arenahalli Crusher 21.5.2024 Adanuru, Chiranahalli, Arenahalli 3 MW

362 DAVANAGERE CHITRADURGA - - - HOLALKERE Holalkere F4-Arenahalli Holalkere 6/3/2024 6/3/2024 10:00 16:00 6:00 11 KV Link Line Adanuru To Arenahalli Crusher 21.5.2024 Adanuru, Chiranahalli, Arenahalli 3 MW

363 DAVANAGERE CHITRADURGA - - - HOLALKERE Holalkere F4-Arenahalli Holalkere 6/4/2024 6/4/2024 10:00 16:00 6:00 11 KV Link Line Adanuru To Arenahalli Crusher 21.5.2024 Adanuru, Chiranahalli, Arenahalli 3 MW

364 DAVANAGERE CHITRADURGA - - - HOLALKERE Holalkere F4-Arenahalli Holalkere 6/5/2024 6/5/2024 10:00 16:00 6:00 11 KV Link Line Adanuru To Arenahalli Crusher 21.5.2024 Adanuru, Chiranahalli, Arenahalli 3 MW

365 DAVANAGERE CHITRADURGA - - - HOLALKERE Holalkere F4-Arenahalli Holalkere 6/6/2024 6/6/2024 10:00 16:00 6:00 11 KV Link Line Adanuru To Arenahalli Crusher 21.5.2024 Adanuru, Chiranahalli, Arenahalli 3 MW

366 DAVANAGERE CHITRADURGA - - - HOLALKERE Holalkere F4-Arenahalli Holalkere 6/7/2024 6/7/2024 10:00 16:00 6:00 11 KV Link Line Adanuru To Arenahalli Crusher 21.5.2024 Adanuru, Chiranahalli, Arenahalli 3 MW

367 DAVANAGERE CHITRADURGA - - - HOLALKERE Holalkere F4-Arenahalli Holalkere 6/8/2024 6/8/2024 10:00 16:00 6:00 11 KV Link Line Adanuru To Arenahalli Crusher 21.5.2024 Adanuru, Chiranahalli, Arenahalli 3 MW

F2- Vedavathi
water supply,
F3- kappagere,
F12-
Rangavvanahall
i, F-15 Road Widening and undergound drainage plant Hosadurga Town, Kellodu Panchayath,
368 DAVANAGERE Chitradurga - - - Hosadurga O& M-1 Hosadurga 66/11 KV 6/7/2024 6/7/2024 9:00 18:00 9:00 21.5.2024 6MW
Kobbaripete, electrification Hunavinodu Panchayath all villages
F18- Attigatta
NJY,F-11
KelloduF6-
Koratigere, F4
Vidyanagara
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F6-Koratigere,
F7-
Sankayyanahat
ti,F8-
Sidramanagara
,F9-
Lingadahalli, Road Widening and undergound drainage plant Hosadurga Town,Bokikere,Madure Kanguvalli
369 DAVANAGERE Chitradurga - - - Hosadurga O& M-1 Hosadurga 66/11 KV 6/8/2024 6/8/2024 9:00 18:00 9:00 21.5.2024 6MW
F10-Kanguvalli, electrification Panchayath all villages
F13-Bokikere,
F14-Peelapura,
F16-B V
Nagara and
F17-
Nagenahalli.

F2- Vedavathi
water supply,
F3- kappagere,
F12-
Rangavvanahall
i, F-15 Road Widening and undergound drainage plant Hosadurga Town, Kellodu Panchayath,
370 DAVANAGERE Chitradurga - - - Hosadurga O& M-1 Hosadurga 66/11 KV 6/13/2024 6/13/2024 9:00 18:00 9:00 21.5.2024 6MW
Kobbaripete, electrification Hunavinodu Panchayath all villages
F18- Attigatta
NJY,F-11
KelloduF6-
Koratigere, F4
Vidyanagara

F6-Koratigere,
F7-
Sankayyanahat
ti,F8-
Sidramanagara
,F9-
Lingadahalli, Road Widening and undergound drainage plant Hosadurga Town,Bokikere,Madure Kanguvalli
371 DAVANAGERE Chitradurga - - - Hosadurga O& M-1 Hosadurga 66/11 KV 6/14/2024 6/14/2024 9:00 18:00 9:00 21.5.2024 6MW
F10-Kanguvalli, electrification Panchayath all villages
F13-Bokikere,
F14-Peelapura,
F16-B V
Nagara and
F17-
Nagenahalli.

372 DAVANAGERE Chitradurga - - - Srirampura Mathodu F2 F8 F5 F9 Mathod 66/11KV 6/2/2024 6/2/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 Mathod G.P , KAREHALLI G.P 0.15

373 DAVANAGERE Chitradurga - - - Srirampura Mathodu F7 F2 Kanchipura 66/11 6/2/2024 6/2/2024 11:00 15:00 4:00 Maintainance & Jungle cutting 21.5.2024 KANCHIPURA G.P , Kainodu G.P 0.18
S.Neralkere G.P, Kainodyu G.P, Srirampura
374 DAVANAGERE Chitradurga - - - Srirampura Mathodu F1 F7 F11 Mathod 66/11KV 6/3/2024 6/3/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 0.12
G.P
375 DAVANAGERE Chitradurga - - - Srirampura Mathodu F1 F7 F11 Mathod 66/11KV 6/9/2024 6/9/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 BELAGUR GP, BALLASAMUDRA GP 0.126

376 DAVANAGERE Chitradurga - - - Srirampura Mathodu F7 F2 Kanchipura 66/11 6/10/2024 6/10/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 DT Vatti GP, Kainodu GP,Heggere GP 0.12

377 DAVANAGERE Chitradurga - - - Srirampura Mathodu F2 F8 F5 F9 Mathod 66/11KV 6/10/2024 6/10/2024 11:00 15:00 4:00 Maintainance & Jungle cutting 21.5.2024 Mathod G.P , KAREHALLI G.P 0.144

378 DAVANAGERE Chitradurga - - - Srirampura Mathodu F1 F7 F11 Mathod 66/11KV 6/18/2024 6/18/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 Thandaga GP, Kabbala GP 0.18

379 DAVANAGERE Chitradurga - - - Srirampura Mathodu F2 F8 F5 F9 Mathod 66/11KV 6/19/2024 6/19/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 Mathod G.P , GN Kere G.P 0.12

380 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA F8 F9 F10 KANCHIPURA 66/11KV 6/6/2024 6/6/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 C B KERE G.P , 0.15

381 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA F2 F7 KANCHIPURA 66/11KV 6/8/2024 6/8/2024 11:00 15:00 4:00 Maintainance & Jungle cutting 21.5.2024 KANCHIPURA G.P ,G N KERE GP 0.18

F1 F3 F4 F6 KANCHIPURA G.P, Kainodyu G.P, HEGGERE


382 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA KANCHIPURA 66/11KV 6/10/2024 6/10/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 0.12
F11 F12 G.P DT VATTI GP, S NERELAKERE GP

383 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA F1 F2 F6 F7 KANCHIPURA 66/11KV 6/12/2024 6/12/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 KANCHIPURA GP G N KERE GP 0.126

384 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA F8 F9 F10 KANCHIPURA 66/11KV 6/13/2024 6/13/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 C B KERE GP 0.12
F2 F8 F5 F9 Mathod G.P , KAREHALLI G.P DT VATTI GP,
385 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA MATHODU 66/11KV 6/15/2024 6/15/2024 11:00 15:00 4:00 Maintainance & Jungle cutting 21.5.2024 0.144
F10 KAINODU GP ,
HEGGERE GP, KANCHIPURA GP, G N
386 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA F6 F7 KANCHIPURA 66/11KV 6/18/2024 6/18/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 0.18
KERE GP
387 DAVANAGERE Chitradurga - - - Srirampura KANCHIPURA F2 F3 MATHODU66/11KV 6/20/2024 6/20/2024 10:00 15:00 5:00 Maintainance & Jungle cutting 21.5.2024 Mathod G.P , DT VATTI G.P KAREHALLI GP 0.12

388 DAVANAGERE Chitradurga - - - Srirampura SRIRAMPURA F5 F3 KANCHIPURA 66/11KV 6/2/2024 6/2/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 HEGGERE GP,S.NERALAKERE GP 0.15

SRIRAMPURA GP,KURUBARAHALLI
389 DAVANAGERE Chitradurga - - - Srirampura SRIRAMPURA F2 F3 GARAGA 66/11KV 6/4/2024 6/4/2024 10:00 16:00 6:00 Maintainance & Jungle cutting 21.5.2024 GP,TANDAGA GP,S.NERALAKERE 0.35
GP,KAINODU GP
KURUBARAHALLI GP,SRIRAMPURA
390 DAVANAGERE Chitradurga - - - Srirampura SRIRAMPURA F11 F5 GARAGA 66/11KV 6/6/2024 6/6/2024 10:00 17:00 7:00 Maintainance & Jungle cutting 21.5.2024 0.3
GP,HEGGERE GP
GARAGA 66/11KV, KURUBARAHALLI GP,SRIRAMPURA
391 DAVANAGERE Chitradurga - - - Srirampura SRIRAMPURA F6 F6 6/8/2024 6/8/2024 10:00 17:30 7:30 Maintainance & Jungle cutting 21.5.2024 0.4
PANCHANAHALLI 66/11KV GP,HEGGERE GP
F1 F4 F7 F8 F9 GARAGA 66/11KV, BALLALASAMUDRA GP,KABBALA
392 DAVANAGERE Chitradurga - - - Srirampura BELAGURU 6/3/2024 6/3/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.9
F10 F12 PANCHANAHALLI 66/11KV GP,BELAGURU GP,TANDAGA GP
F1 F4 F7 F8 F9 GARAGA 66/11KV, BALLALASAMUDRA GP,KABBALA
393 DAVANAGERE Chitradurga - - - Srirampura BELAGURU 6/4/2024 6/4/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.9
F10 F13 PANCHANAHALLI 66/11KV GP,BELAGURU GP,TANDAGA GP
F1 F4 F7 F8 F9 GARAGA 66/11KV, BALLALASAMUDRA GP,KABBALA
394 DAVANAGERE Chitradurga - - - Srirampura BELAGURU 6/5/2024 6/5/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.9
F10 F14 PANCHANAHALLI 66/11KV GP,BELAGURU GP,TANDAGA GP
F1 F4 F7 F8 F9 GARAGA 66/11KV, BALLALASAMUDRA GP,KABBALA
395 DAVANAGERE Chitradurga - - - Srirampura BELAGURU 6/6/2024 6/6/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.9
F10 F15 PANCHANAHALLI 66/11KV GP,BELAGURU GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
396 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/7/2024 6/7/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
397 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/8/2024 6/8/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
398 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/10/2024 6/10/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
399 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/11/2024 6/11/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU


400 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/12/2024 6/12/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
401 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/13/2024 6/13/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
402 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/13/2024 6/13/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
403 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/14/2024 6/14/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP
GARAGA 66/11KV, BALLALASAMUDRA GP, BELAGURU
404 DAVANAGERE Chitradurga - - - Srirampura BELAGURU F1 F7 F8 F12 6/15/2024 6/15/2024 10:00 18:00 8:00 Maintainance & Jungle cutting 21.5.2024 0.3
PANCHANAHALLI 66/11KV GP,TANDAGA GP

TF- CAPEX WORKS, Self Execution works &Local


405 Tumkur Tumkur - - - CSD-1 central section Tumkur 6/8/2024 6/8/2024 10:00 14:00 4:00 - Belagumba kundur -
07(Belagumba) Planning Works MANSOON MAINTAINCE

CAPEX WORKS, Self Execution works &Local


406 Tumkur Tumkur - - - CSD-1 central section TF-09 (NJY) Tumkur 6/22/2024 6/22/2024 10:00 14:00 4:00 - Jothipura -
Planning Works MANSOON MAINTAINCE

Antharasanaha
lli(AF-06) Rangapura, Lingapura,
407 Tumkur Tumkur - - - CSD-1 North Section Antharasanahalli 6/9/2024 6/9/2024 10:00 14:00 4:00 Self Execution works MANSOON MAINTAINCE - -
Urukere &AF- Thimmalapura,Urukere Hebbaka
08 Hebbaka

Antharasanaha
lli ( AF-12
KIADB, AF-13
408 Tumkur Tumkur - - - CSD-1 North Section Antharasanahalli 6/16/2024 6/16/2024 10:00 14:00 4:00 Self Execution works MANSOON MAINTAINCE - KIADB Industrial area, Antharasanahalli -
Mico, & AF-17
Indo Auto
Fillter)

AF-03
409 Tumkur Tumkur - - - CSD-1 North Section Yallapura, (AF- Antharasanahalli 6/23/2024 6/23/2024 10:00 14:00 4:00 Self Execution works MANSOON MAINTAINCE - Antharasanahalli, Yallapura, Arakere -
04) Hand Tools

AF-21 CAPEX WORKS, Self Execution works &Local


410 Tumkur Tumkur - - - CSD-1 West section Antharasanahalli 6/8/2024 6/8/2024 10:00 14:00 4:00 - Siragate,A.M.Palya,S.N.Palya Honnenahalli -
TUDALAY OUT Planning Works MANSOON MAINTAINCE

AF-09 CAPEX WORKS, Self Execution works MANSOON


411 Tumkur Tumkur - - - CSD-1 West section Antharasanahalli 6/16/2024 6/16/2024 10:00 14:00 4:00 - Bugudanahalli -
Bugudanahalli MAINTAINCE

CAPEX WORKS, Self Execution works MANSOON


412 Tumkur Tumkur - - - CSD-1 West section F-10 G.V.R Melekote 6/23/2024 6/23/2024 10:00 13:00 3:00 - Siragate,A.M.Palya,S.N.Palya Honnenahalli -
MAINTAINCE,Smart city Works

F04-INCAP,
F08- Hirehalli Ind Area, Hirehalli, B M Palya,
HIREHALLI, Karekallu palya, Basavapatna, Basaveshwara
F10- For shifting of existing poles for national high way Badavane, S S Mutt, Chikkahalli,
413 TUMKUR TUMKUR - - - Kyatsandra Kyatsandra Hirehalli 66/11kV 6/3/2024 6/3/2024 10:00 17:00 7:00 - -
SIDDAGANGA- road widening work under self execution scheme Sannappana Palya, Sangapura, Kolihalli,
MATA, F12- Nandihalli, Pemmanahalli, Bandihalli,
NANDIHALLI- Kolihalli
NJY

F04-INCAP,
F08- Hirehalli Ind Area, Hirehalli, B M Palya,
HIREHALLI, Karekallu palya, Basavapatna, Basaveshwara
F10- For shifting of existing poles for national high way Badavane, S S Mutt, Chikkahalli,
414 TUMKUR TUMKUR - - - Kyatsandra Kyatsandra Hirehalli 66/11kV 6/6/2024 6/6/2024 10:00 17:00 7:00 - -
SIDDAGANGA- road widening work under self execution scheme Sannappana Palya, Sangapura, Kolihalli,
MATA, F12- Nandihalli, Pemmanahalli, Bandihalli,
NANDIHALLI- Kolihalli
NJY

F04-INCAP,
F08- Hirehalli Ind Area, Hirehalli, B M Palya,
HIREHALLI, Karekallu palya, Basavapatna, Basaveshwara
F10- For shifting of existing poles for national high way Badavane, S S Mutt, Chikkahalli,
415 TUMKUR TUMKUR - - - Kyatsandra Kyatsandra Hirehalli 66/11kV 6/9/2024 6/9/2024 10:00 17:00 7:00 - -
SIDDAGANGA- road widening work under self execution scheme Sannappana Palya, Sangapura, Kolihalli,
MATA, F12- Nandihalli, Pemmanahalli, Bandihalli,
NANDIHALLI- Kolihalli
NJY

F04-INCAP,
F08- Hirehalli Ind Area, Hirehalli, B M Palya,
HIREHALLI, Karekallu palya, Basavapatna, Basaveshwara
F10- For shifting of existing poles for national high way Badavane, S S Mutt, Chikkahalli,
416 TUMKUR TUMKUR - - - Kyatsandra Kyatsandra Hirehalli 66/11kV 6/13/2024 6/13/2024 10:00 17:00 7:00 - -
SIDDAGANGA- road widening work under self execution scheme Sannappana Palya, Sangapura, Kolihalli,
MATA, F12- Nandihalli, Pemmanahalli, Bandihalli,
NANDIHALLI- Kolihalli
NJY

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
417 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/2/2024 6/2/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
418 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/3/2024 6/3/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
419 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/4/2024 6/4/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
420 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/5/2024 6/5/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
421 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/6/2024 6/6/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
422 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/7/2024 6/7/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
423 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/8/2024 6/8/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
424 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/9/2024 6/9/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
425 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/10/2024 6/10/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
426 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/11/2024 6/11/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
427 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/12/2024 6/12/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
428 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/13/2024 6/13/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
429 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/14/2024 6/14/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
430 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/15/2024 6/15/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F06-C S
Temple
11KV link line from Hebbur muss to Garagadakuppe
F03-C S Pura
Village limits F03 CS PURA IP and F06 CS Temple IP Hebbur, Basavangudi, D G Halli, Kanakuppe,
431 TUMKUR Tumkur - - - RSD-2 Hebbur F16-Hebbur Hebbur 66/11 kv 6/16/2024 6/16/2024 10:00 17:00 7:00 - -
& F09 Basavanagudi IP feeders reduce to over load C S Pura, Chikkannaswamy Temple
F09-
above feeders in Hebbur section RSD-2 Tumakur
Basavanagudi

Estimate for new link line From F 8 Huthri IP Feeder


Haluvagilu to F9 Haluvagilu IP Feeder near V R Palya
432 Tumkur Kunigal - - - Kunigal Kempanahalli F9 Haluvagilu KEMPANAHALLI_ 66/11 KV 6/5/2024 6/5/2024 10:00 17:00 7:00 - Huthri, Huhri kopplu ,Vodagatta -
Gate REDUCE OVER LOAD OF f8 Huthri Feeder in
Kempanahalli Section,Kunigal S/D

Estimate for new link line From F 8 Huthri IP Feeder


Haluvagilu to F9 Haluvagilu IP Feeder near V R Palya
433 Tumkur Kunigal - - - Kunigal Kempanahalli F9 Haluvagilu KEMPANAHALLI_ 66/11 KV 6/6/2024 6/6/2024 10:00 17:00 7:00 - Huthri, Huhri kopplu ,Vodagatta -
Gate REDUCE OVER LOAD OF f8 Huthri Feeder in
Kempanahalli Section,Kunigal S/D

F-4 Estimate for new link line From 66/11 KV Bhaktaralli


434 Tumkur Kunigal - - - Kunigal O&M-2 Kamanahalli Bhaktharahalli 66/11 KV 6/7/2024 6/7/2024 10:00 17:00 7:00 MUSS to F-4 Kamanahalli feeder in O&M-2 - Baktharahalli,Kamanahalli,Guddanapalya -
feeder Section,Kunigal S/D
F-4 Estimate for new link line From 66/11 KV Bhaktaralli
435 Tumkur Kunigal - - - Kunigal O&M-2 Kamanahalli Bhaktharahalli 66/11 KV 6/8/2024 6/8/2024 10:00 17:00 7:00 MUSS to F-4 Kamanahalli feeder in O&M-2 - Baktharahalli,Kamanahalli,Guddanapalya -
feeder Section,Kunigal S/D

Estimate for new link line From F11 Bidanagere Town


F11 Bidanagere feeder to F4 Begure IP feeder by Shifting of existing Bidanagere,Thopegowdanapalya,Mallagatta
436 Tumkur Kunigal - - - Kunigal O&M-1 KEMPANAHALLI_ 66/11 KV 6/10/2024 6/10/2024 10:00 17:00 7:00 - -
Town feeder Thopegowdana palya 63KVA Transformer@ Channathimmanapalya,gottikere,kapanipalya.
Thopegowdanapalya in O&M-1 Section,Kunigal S/D

Estimate for new link line From F11 Bidanagere Town


F11 Bidanagere feeder to F4 Begure IP feeder by Shifting of existing Bidanagere,Thopegowdanapalya,Mallagatta
437 Tumkur Kunigal - - - Kunigal O&M-1 KEMPANAHALLI_ 66/11 KV 6/11/2024 6/11/2024 10:00 17:00 7:00 - -
Town feeder Thopegowdana palya 63KVA Transformer@ Channathimmanapalya,gottikere,kapanipalya.
Thopegowdanapalya in O&M-1 Section,Kunigal S/D

Estimate for HT Re-conductoring of 2/4 acsr


Conductor By Rabbit ACSR Conductor from
F-1 Kaggere
438 Tumkur Kunigal - - - Yediyuru Amruthur Amruthur_ 66/11 KV 6/15/2024 6/15/2024 10:00 17:00 7:00 Huraliborsandra Village to Yogavana betta Village - Huraliborsandra ,Yogavana Village limits -
Feeder,
limits F-1 Kaggere Feeder, Amruthur O&M, Yadiyur
S/D.
Estimate for HT Re-conductoring of 2/4 acsr
F1 Conductor By Rabbit ACSR Conductor from F1
439 Tumkur Kunigal - - - Yediyuru Amruthur Boralingaiahna Kunigal 66/11 KV 6/18/2024 6/18/2024 10:00 17:00 7:00 Boralingaiahnapalya Feeder from Avaragere Factory - Boralingaiahnapalya ,Avaragere -
palya Feeder Back Village Limits in Amruthur Section, Yadiyur
S/D.
Estimate for HT Re-conductoring of 2/4 acsr
Conductor By Rabbit ACSR Conductor & Providing
F4 Kundur IP
440 Tumkur Kunigal - - - Kunigal Kempanahalli KEMPANAHALLI_ 66/11 KV 6/20/2024 6/20/2024 10:30 16:30 6:00 I/M Pole of F4 Kundur IP Feeders @ Kundur Village - Kundur, Sondalagere -
Feeders
to Sondalagere Village in Kempanahalli Section,
Kunigal S/D.
Estimate for LT Reconductoring of 4 ACSR wire by
F11- Rabbit ACSR Conductor & Providing intermediate pole
441 Tumkur Kunigal - - - Kunigal O&M-1 Bidanakere Kunigal 66/11 KV 6/22/2024 6/22/2024 10:30 16:30 6:00 of existing 63KVA DTC of F11- Bidanakere NJY - Mallagatta Village Limits -
NJY Feeder Feeder @ Mallagatta Village in O&M-1 Section Kunigal
S/D

Estimate for LT Reconductoring of 4 ACSR wire by


F11- Rabbit ACSR Conductor & Providing intermediate pole
442 Tumkur Kunigal - - - Kunigal O&M-1 Bidanakere Kunigal 66/11 KV 6/28/2024 6/28/2024 10:30 16:30 6:00 of existing 63KVA DTC of F11- Bidanakere NJY - Thimmegowdana palya Village Limits -
NJY Feeder Feeder @ Thimmegowdana palya Village in O&M-1
Section Kunigal S/D

Estimate for HT Re-conductoring of 2/4 acsr


Conductor By Rabbit ACSR Conductor from
F-1 Kaggere
443 Tumkur Kunigal - - - Yediyuru Amruthur Amruthur_ 66/11 KV 6/16/2024 6/16/2024 10:00 17:00 7:00 Huraliborsandra Village to Yogavana betta Village - Huraliborsandra ,Yogavana Village limits -
Feeder,
limits F-1 Kaggere Feeder, Amruthur O&M, Yadiyur
S/D.

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
444 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Bandihalli MUSS 6/7/2024 6/7/2024 10:00 14:00 4:00 - Doddapete, Madiastra, Sante -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
445 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Bandihalli MUSS 6/8/2024 6/8/2024 10:00 14:00 4:00 - Doddapete, Madiastra, Sante -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
446 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Bandihalli MUSS 6/9/2024 6/9/2024 10:00 14:00 4:00 - Doddapete, Madiastra, Sante -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town Vidyanagara, Kanchagatta, Shadaksharamata,
447 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/11/2024 6/11/2024 10:00 14:00 4:00 - -
Under Self Exuecution by CMC Manjunathanagara,
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town Vidyanagara, Kanchagatta, Shadaksharamata,
448 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/12/2024 6/12/2024 10:00 14:00 4:00 - -
Under Self Exuecution by CMC Manjunathanagara,
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town Vidyanagara, Kanchagatta, Shadaksharamata,
449 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/13/2024 6/13/2024 10:00 14:00 4:00 - -
Under Self Exuecution by CMC Manjunathanagara,
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
450 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Bandihalli MUSS 6/15/2024 6/15/2024 10:00 14:00 4:00 - Gandhinagara,Rangpura Road -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
451 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Bandihalli MUSS 6/16/2024 6/16/2024 10:00 14:00 4:00 - Gandhinagara,Rangpura Road -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
452 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Bandihalli MUSS 6/17/2024 6/17/2024 10:00 14:00 4:00 - Gandhinagara,Rangpura Road -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13 Halepalya, Annapura, Sarthavalli,
Stringing Street Light Circuit Wire in Tiptur Town
453 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/19/2024 6/19/2024 10:00 14:00 4:00 - Nelagondanahalli, Alur, Byranayakanahalli, -
Under Self Exuecution by CMC
A,F1 Halepalya Harisamudra,
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

F2
Doddapete,F3
Manjunatha
nagara,F13 Halepalya, Annapura, Sarthavalli,
Stringing Street Light Circuit Wire in Tiptur Town
454 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/20/2024 6/20/2024 10:00 14:00 4:00 - Nelagondanahalli, Alur, Byranayakanahalli, -
Under Self Exuecution by CMC
A,F1 Halepalya Harisamudra,
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13 Halepalya, Annapura, Sarthavalli,
Stringing Street Light Circuit Wire in Tiptur Town
455 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/21/2024 6/21/2024 10:00 14:00 4:00 - Nelagondanahalli, Alur, Byranayakanahalli, -
Under Self Exuecution by CMC
A,F1 Halepalya Harisamudra,
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town Tiptur Town, B.H.Road, Busstand,
456 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/24/2024 6/24/2024 10:00 14:00 4:00 - -
Under Self Exuecution by CMC Shankarappa Lay out
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town Tiptur Town, B.H.Road, Busstand,
457 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/25/2024 6/25/2024 10:00 14:00 4:00 - -
Under Self Exuecution by CMC Shankarappa Lay out
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town Tiptur Town, B.H.Road, Busstand,
458 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/26/2024 6/26/2024 10:00 14:00 4:00 - -
Under Self Exuecution by CMC Shankarappa Lay out
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town Tiptur Town, B.H.Road, Busstand,
459 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/27/2024 6/27/2024 10:00 14:00 4:00 - -
Under Self Exuecution by CMC Shankarappa Lay out
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
460 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/29/2024 6/29/2024 10:00 14:00 4:00 - Vidhyanagara, madhihalli, -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

For 11kv Link line for new 66/11 kv kv Sankenahalli


muss for Evacution 11kv lines 2 Nos ip feeder 3&4
Koratagere town,
All 11 kv from Sankenahalli new muss Sankenahalli road O&M-
461 Tumkur Madugiri - - - Koratagere O&M-1 Koratagere 6/8/2024 6/8/2024 10:00 16:00 6:00 - Hanchihalli,Hulikunte,Agrahara,Bukkapatna -
feeders 1 sec. GOS maintenance, Jungle clearing, DTC
GP limits.
maintenance works and routine maintenance works of
11 kv feeders.

For running of 11kv Link line for redusing of over


All 11 kv loaded existing F-5 Thovinakere rural F-10 Boodgavi,Thovinakere and kuram kote GP
462 Tumkur Madugiri - - - Koratagere Thovinakere Thovinakere 6/8/2024 6/8/2024 10:00 16:00 6:00 - -
feeders Siddarabetta feeders from near Thovinakere muss to limits
bandehalli gate village limits, Tovinakere sec

GOS maintenance, Jungle clearing, DTC maintenance


463 Tumkur Madugiri - - - Koratagere O&M-2 F2,F6 and F7 Koratagere 6/8/2024 6/8/2024 10:00 16:00 6:00 works and routine maintenance works of 11 kv - Hulikunte,Agrahara,Bukkapatna GP limits. -
feeders.
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

GOS maintenance, Jungle clearing, DTC maintenance


All 11 kv Kolala,Vajjanakurike,Pathaganahalli,Chinnah
464 Tumkur Madugiri - - - Koratagere Kolala Kolala 6/23/2024 6/23/2024 10:00 16:00 6:00 works and routine maintenance works of 11 kv - -
feeders alli, Mavatahur, Doddasagere GP limits
feeders.

NAGALAMADIK F02
465 Tumkur Madugiri - - - PAVAGADA NAGALAMADIKE 66 6/12/2024 6/12/2024 10:00 17:00 7:00 FEEDER MAINTAINCE - KODAMADAGU PALAVALLI -
E KODAMADAGU

MANGALAWAD F03
466 Tumkur Madugiri - - - PAVAGADA MANGALAWADA 66 6/14/2024 6/14/2024 10:00 17:00 7:00 FEEDER MAINTAINCE - ARASIKERE, KONDAPUE .KADIREHALLI -
A ARASIKERE
NYAYADAGUNTE.CHIKKATHIMMANAHATTI
467 Tumkur Madugiri - - - PAVAGADA KOTAGUDDA F02 S R PALYA LINGADAHALLLI 66 6/12/2024 6/12/2024 10:00 17:00 7:00 FEEDER MAINTAINCE - -
KODIGEHALLI
F02
468 Tumkur Madugiri - - - PAVAGADA VENKATAPURA KANAVENAHAL VEMKATAPURA 66 6/14/2024 6/14/2024 10:00 17:00 7:00 FEEDER MAINTAINCE - KANIVENAHALLI RAJAVANTHI -
LI

F2
Doddapete,F3
Manjunatha
nagara,F13
Stringing Street Light Circuit Wire in Tiptur Town
469 Tumkur Tiptur - - - Tiptur O&M-1 GANDHINAGAR Tiptur MUSS 6/30/2024 6/30/2024 10:00 14:00 4:00 - Vidhyanagara, madhihalli, -
Under Self Exuecution by CMC
A,F1 Halepalya
,F7 TOWN,F05
VIDHYANAGAR
A,F9 Bus Stand

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
470 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/1/2024 6/1/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
471 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/2/2024 6/2/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
472 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/3/2024 6/3/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
473 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/4/2024 6/4/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
474 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/5/2024 6/5/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
475 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/6/2024 6/6/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
476 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/7/2024 6/7/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
477 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/8/2024 6/8/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
478 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/9/2024 6/9/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F2
SANKAPURA IMMADAGONDANAHALLI
KODIGENAHAL IMMADAGOND
479 Tumkur Madugiri - - - BYALYA 66/11 KV PURAVARA 6/10/2024 6/10/2024 - - 10DAYS LINK LINE WORK - KODLAPURA ,TALAKERE KODLAURA -
LI ANAHALLI , F7
GAMKARANAHALLI SANKAPURA PURAVARA
TALAKERE

F12 REALISING OF F12 11 KV GIREGOWDANAHALLI DODDADALAVATA CHIKKADALAVATA


KODIGENAHAL
480 Tumkur Madugiri - - - O&M1 GIREGOWDAN 66/11 KV KODIGENAHALLI 6/5/2024 6/5/2024 - - 5DAYS FEEDER RABBIT CONDUCTOR BY PROVIDING F16 - TERIYUR KODIGENAHALLI MAVINATOPU -
LI
AHALLI DODDADALAVATA FEEDER DEVARA TOPU

F12 REALISING OF F12 11 KV GIREGOWDANAHALLI DODDADALAVATA CHIKKADALAVATA


KODIGENAHAL
481 Tumkur Madugiri - - - O&M1 GIREGOWDAN 66/11 KV KODIGENAHALLI 6/6/2024 6/6/2024 - - 5DAYS FEEDER RABBIT CONDUCTOR BY PROVIDING F16 - TERIYUR KODIGENAHALLI MAVINATOPU -
LI
AHALLI DODDADALAVATA FEEDER DEVARA TOPU

F12 REALISING OF F12 11 KV GIREGOWDANAHALLI DODDADALAVATA CHIKKADALAVATA


KODIGENAHAL
482 Tumkur Madugiri - - - O&M1 GIREGOWDAN 66/11 KV KODIGENAHALLI 6/7/2024 6/7/2024 - - 5DAYS FEEDER RABBIT CONDUCTOR BY PROVIDING F16 - TERIYUR KODIGENAHALLI MAVINATOPU -
LI
AHALLI DODDADALAVATA FEEDER DEVARA TOPU

F12 REALISING OF F12 11 KV GIREGOWDANAHALLI DODDADALAVATA CHIKKADALAVATA


KODIGENAHAL
483 Tumkur Madugiri - - - O&M1 GIREGOWDAN 66/11 KV KODIGENAHALLI 6/8/2024 6/8/2024 - - 5DAYS FEEDER RABBIT CONDUCTOR BY PROVIDING F16 - TERIYUR KODIGENAHALLI MAVINATOPU -
LI
AHALLI DODDADALAVATA FEEDER DEVARA TOPU

F12 REALISING OF F12 11 KV GIREGOWDANAHALLI DODDADALAVATA CHIKKADALAVATA


KODIGENAHAL
484 Tumkur Madugiri - - - O&M1 GIREGOWDAN 66/11 KV KODIGENAHALLI 6/9/2024 6/9/2024 - - 5DAYS FEEDER RABBIT CONDUCTOR BY PROVIDING F16 - TERIYUR KODIGENAHALLI MAVINATOPU -
LI
AHALLI DODDADALAVATA FEEDER DEVARA TOPU

MADHUGIRI
485 Tumkur Madugiri - - - Madugiri F1-RMC 220/66/11 kV R/S Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 JUNGLE CUTTING - THIS FEEDER RELATED ALL VILLAGES -
O&M-1

Estimate for providing Intermediate poles on


F-9
MADHUGIRI Hazardous Varoius Loaction L.T.line 11kv F-9
486 Tumkur Madugiri - - - Madugiri SHAMBONAHA 220/66/11 kV R/S Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
O&M-2 SHAMBONAHALLI Feeder in O&M-1 section of
LLI
Madhugiri sub division Madhugiri.
Duration of LC request
Date Time
Name of Name of Name of
Name of Name of the Date on which Load
Sl the the the Subdivisio Name of the
the KPTCL KPTCL O&M Feeder Reason for availing LC last LC was Areas Affected Affected
No BESCOM BESCOM BESCOM n station/Line
Circle Division From To From To Duration availed (MW)
Zone Circle Division

For HT Recnductoring Of F-10 Amaravathi Feeder


MADHUGIRI F-10
487 Tumkur Madugiri - - - Madugiri 220/66/11 kV R/S Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 from Maruvekere GOS to Narayanappa 63KVA DTC - THIS FEEDER RELATED ALL VILLAGES -
O&M-2 AMARAVATHI
in O&M-2 Section

F02- Estimate for replacement of LT OH Rabbit/ Weasel


MADHUGIRI
488 Tumkur Madugiri - - - Madugiri MADHUGIRI- 66/11 kV MUSS Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 conductor to LT AB cable in Hazardous location - THIS FEEDER RELATED ALL VILLAGES -
O&M-1
TOWN Madhugiri KPTCL Quarters 250 KVA Dtc limits

Estimate for providing 200 Amps single break GOS


F04-
MADHUGIRI on F-12 Thimmalapura NJY feeder in Various
489 Tumkur Madugiri - - - Madugiri BHOOTHANAH 66/11 kV MUSS Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
O&M-1 Location on the feeder in Badavanahalli O & M 1
ALLY
Section of Madhugiri sub division.

MADHUGIRI For Ht Reconductoring Of F06 Dvhally Feeder From


490 Tumkur Madugiri - - - Madugiri F06-D.V.HALLY 66/11 kV MUSS Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
O&M-1 Tungoti To Hosahally Limits In O&M-1 Section

F08- To Bifuregate F08 Kambthanahally feeder to F08


MADHUGIRI
491 Tumkur Madugiri - - - Madugiri KAMBATHANA 66/11 kV MUSS Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 Bandrehally feeder from 220kv Madhugiri MUSS to - THIS FEEDER RELATED ALL VILLAGES -
O&M-1
HALLY Ring road near to Utilize Idle Braekere

F10- For 11KV Line from Marathimmanahalli to


BADAVANAHAL
492 Tumkur Madugiri - - - Madugiri DABBEGHATT 66/11 kV MUSS Madhugiri 6/22/2024 6/22/2024 10:00 17:00 7:00 vajradahalli village Limits, to reduse the over loaded - THIS FEEDER RELATED ALL VILLAGES -
LI-1
A F10 Dabbegatta feeder BDh-1 sec

For 11kv link line from Badavanahalli muss to


BADAVANAHAL F01-
493 Tumkur Madugiri - - - Madugiri 66/11 kV MUSS Badavanahalli 6/22/2024 6/22/2024 10:00 17:00 7:00 Avinamadagu village limits to reduce the over loaded - THIS FEEDER RELATED ALL VILLAGES -
LI-1 RANGAPURA
of F-1 Rangapua feeder BDH-1 sec

Estimate for providing 200 Amps single break GOS


F05-
BADAVANAHAL on F-05 KARPENAHALLI feeder in Varius Location on
494 Tumkur Madugiri - - - Madugiri KARPENAHALL 66/11 kV MUSS Badavanahalli 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
LI-1 the feeder in O&M-2 Badavanahalli Section of
Y
Madhugiri sub division.

For Ht Recnductoring of F06 Chandragiri Feeder


BADAVANAHAL F06- From Mallenahalli Lake To Mallanahalli Gollarahatti
495 Tumkur Madugiri - - - Madugiri 66/11 kV MUSS Badavanahalli 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
LI-1 CHANDRAGIRI 63Kva Echlamarada Dtc Limits In Badavanahlli
O&M-2 Badavanahalli Section

For HT Recnductoring Of F-7 Badavanahalli Feeder


F07-
BADAVANAHAL From First Grade College Bheemarajappa 25Kva Dtc
496 Tumkur Madugiri - - - Madugiri BADAVANAHAL 66/11 kV MUSS Badavanahalli 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
LI-1 To Lok Pal College 100Kva Dtc Limits In BDH
LY
O&M-1 Section

F09- For 11kv link line from Dandinadibba Dairy to


BADAVANAHAL
497 Tumkur Madugiri - - - Madugiri BANAGARAHA 66/11 kV MUSS Badavanahalli 6/22/2024 6/22/2024 10:00 17:00 7:00 anagarahalli DP limits feeding from F-9 Banagarahalli - THIS FEEDER RELATED ALL VILLAGES -
LI-1
LLY feeder BDH-1 sec

F04- For HT Recnductoring Of F-4 Mallanaykanahalli


498 Tumkur Madugiri - - - Madugiri MIDIGESHI MALLANAYAKA 66/11 kV MUSS Medigeshi 6/22/2024 6/22/2024 10:00 17:00 7:00 Feeder From Lakshmipura Gate To Iyanahalli - THIS FEEDER RELATED ALL VILLAGES -
NAHALLY 63Kva Dtc Limits In Midigeshi Section

Estimate for providing Intermediate poles on


F07- Hazardous Varoius Loaction L.T.line 11kv F-7
499 Tumkur Madugiri - - - Madugiri MIDIGESHI 66/11 kV MUSS Medigeshi 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
CHANDRABAVI CHANDRABHAVI Feeder in MIDIGESHI section of
Madhugiri sub division Madhugiri.

F01- Estimate for providing 200 Amps single break GOS


500 Tumkur Madugiri - - - Madugiri I D HALLI 66/11 KV MUSS I D Halli 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
THONDOOTY on F-1 Thondoty feeder in ID Halli o&m section

For HT Recnductoring Of F-2 Yaragunte Feeder from


F02-
501 Tumkur Madugiri - - - Madugiri I D HALLI 66/11 KV MUSS I D Halli 6/22/2024 6/22/2024 10:00 17:00 7:00 Yaragunte to Govinda Shetty DP Structure in ID Halli - THIS FEEDER RELATED ALL VILLAGES -
YARAGUNTE
o&m section
To Bifuregate over load F-3 pulamchi feeder to F-7 I
F03- D HALLI Feeder From durgappa 25kva to
502 Tumkur Madugiri - - - Madugiri I D HALLI 66/11 KV MUSS I D Halli 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
PULAMACHI Malagondanahalli Vishnu Poultry farm 25kva Limits
in I D Halli section
For providing 11kv link line from Garani kere
maruthi DTC to Garani old water supply DTC limits
503 Tumkur Madugiri - - - Madugiri I D HALLI F06-GARANI 66/11 KV MUSS I D Halli 6/22/2024 6/22/2024 10:00 17:00 7:00 and Garani srinivasapura Road to Vaddarahatti ip - THIS FEEDER RELATED ALL VILLAGES -
limits In II D HALLI section for reduce the over load
of f6 Garani feeder

For HT Recnductoring of F-1 Dasenahalli Feeder


F01-
504 Tumkur Madugiri - - - Madugiri HOSAKERE 66/11 KV MUSS Hosakere 6/22/2024 6/22/2024 10:00 17:00 7:00 From Dasenahalli to Javaranayakanapalya in - THIS FEEDER RELATED ALL VILLAGES -
DASENAHALLY
Hosakere o&m section

Estimate for providing Intermediate poles on


F06-
Hazardous Varoius Loaction L.T.line 11kv F-6
505 Tumkur Madugiri - - - Madugiri HOSAKERE BRAHMASAMU 66/11 KV MUSS Hosakere 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
BRAMHASANDRA Feeder in O&M HOSAKERE
DRA
section of Madhugiri sub division Madhugiri.

To Bifuregate over load From F11Kattarajanahalli


F11-
Feeder To F03 Chinnenahalli Fedder From Neelihalli
506 Tumkur Madugiri - - - Madugiri HOSAKERE KATTHIRAJAN 66/11 KV MUSS Hosakere 6/22/2024 6/22/2024 10:00 17:00 7:00 - THIS FEEDER RELATED ALL VILLAGES -
Eranna 25kva dtc to 63kva sathish dtc hoasahalli
AHALLI
limits in midigeshi section
sion Zone pertaining to BMAZ SOUTH, BMAZ NORTH ,BRAZ and CTAZ Zone , BESCOM
Wheather
alteranate
Remarks
Power Supply
Arranged or not

Load on the 20 MVA


Power Transformer-1
can be taken over
-
Power 12.5 MVA
Transformer-2 through
11kV Bus coupler

Load of 66/11kV Sub-


station, ISCKON can be
changed over to 220kV -
Station,
Subramanyapura.

No -

NO -

NO -
change over of 6MW
can be done by
BESCOM ., Tr-1 will be
charged from 66kV A
station line and No load
affected on Bank 1 ,
1A& 1B.
2. Complete shutdown
From 12.00 to 13.00,
66kV Bus mainteance -
will be carried, 12MW
of load to be changed
over by BESCOM and
26MW will be affected
for 1 Hr
3. From 13:00 to
16:00(3hr), 66kV A
station line, Tr-1 ,
Bank-1 & 1A

Alternate power
supply can be
arranged for
downstream stations
of 220/66kV -
Sarjapura, Cessna,
Exora & VTP R/S from
Yerandahally & HSR
Layout Stations

No -

NO -

Alternative power
supply arranged as per
-
BESCOM confirmation
and on other stations.

- -

No -

Note:LC proposal
has been sent in
7MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of Line clear.
consider in June-
24

No -
No alternate power
-
supply
Wheather
alteranate
Remarks
Power Supply
Peak load of station is
Arranged or not
10MW,peak load of Tr1
is 4MW, Tr-2 is 6.4MW.
1) During LC period of
Tr-1(12.5MVA) from
10:30 to 12:00, load of
Tr-1 will be catered on
Tr-2 through
buscoupler and during
this period no load will
be affected.
2)During LC period of
Tr-2(12.5MVA) from -
12:00 to 13:30, load of
Tr-2 will be catered on
Tr-1 through
buscoupler and during
this period no load will
be affected.
3) From 13:30 to 15:30
complete shutdown for
66kV bus maintenance,
10MW load to be
changed over by
BESCOM

1st Quarterly
Load Changeover-
maintenance of
18MW
Transformer-2&3

Alternate power
supply will not be
arranged as the
maintenance of the -
above mentioned 66kV
Sub stations will be
carried out.

No -

No -

No -

No -

- -

- -

NO -

Alternative power
supply arranged as per -
BESCOM confirmation

Load of 66/11kV
Kaggalipura, Shobha
Forest View Sub-
stations may be
-
changed over to 220kV
Subramanyapura
station. No load will be
affected.
Wheather
alteranate
Remarks
Power Supply
Arranged or not

Note:LC proposal
has been sent in
08 MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of Line clear.
consider in June-
24
Note:LC proposal
has been sent in
May-24 if not
- approved in May-
24 please
divison to
consider in
postpone theJune-
L.C,
24
due to constraints
in field and
maintaining
uninterrupted
Load Changeover- power supply
14.3MW, 66kV National due to Lalbhag
college loads (Load of flower show via
16MW) to be change E-Mail Date:
over to 220kV 17.01.24. hence
NIMHANS R/S or to L.C. not availed
66kV Victoria S/s on 18.01.2024.
LC was not
approved in the
month of
February &
March-2024
"Periodical 1ST

NO -

During LC Period
35MW 1oad will be 35MW load will be
affecte affected after
after rearranging of changeover of
loads on other stations loads to ot
as per concern= stations
BESCOM officials.

During LC Period
20MW 1oad will be
affecte
after rearranging of -
loads on other stations
as per concern=
BESCOM officials.

No -

During LC Period
35MW 1oad will be 35MW load will be
affecte affected after
after rearranging of changeover of
loads on other stations loads to ot
as per concern= stations
BESCOM officials.

During LC Period
20MW 1oad will be
affecte
after rearranging of -
loads on other stations
as per concern=
BESCOM officials.

Load of 220kV BWSSB


Harohalli, 220kV
KIADB Harohalli,
220kV Kanakapura
-
stations may be fed
from 220kV TK Halli
station. No load will be
affected.

Note:LC proposal
has been sent in
07 MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of Line clear.
consider in June-
24

6 MW load can be Note:LC proposal


shifted on nearby has been sent in
stations 66/11kV May-24 if not
Sarakki, Nimhans, approved in May-
Banashankari, ISRO 24 please
Layout, by Bescom at consider in June-
the time of line clear. 24
Wheather
alteranate
Remarks
Power Supply
Arranged or not

* Attending
Hotline
Observations of
220kV Bus
* Quarterly
Load will not be
Maintenance of
affected as the load will
Bus Isolators
be change over on
"Periodical 1ST
220kV HSR -
Quarterly
Mylasandra Line 1
maintenance
work 2024-25"

1ST Quarterly
Maintenance
work of 66/11kV
Transformers,
66kV
Isolators,66kV
Load Changeover-
CT's & PT's
18MW
2)11kV
Switchgears
maintenance

1) 1ST Quarterly
maintenance-on
31.5MVA TR-
1,TR-2 & TR-3

2)Megging of
Load Changeover-
transformers HV
20MW
to LV,Circuit
breakers and
current
transformers.
3)Hot-spots were
attended

66 kv iggaluru line
load arranged by 220
kv Tubinakere -
receiving station with
restricted load.

No -

Note:LC proposal
has been sent in
May-24 if not
Load will be changed
approved in May-
over by BESCOM.
24 please
consider in June-
24

Most of the
feeders are
feeding for IT
installations there
will be DG back
up for IT
industries . There
Load Changeover-3MW is no change over
option from
BESCOM side
except for rural
feeders."Periodical
1ST Quarterly
maintenance
work 2024-25

- -

No alternate power
supply.
66kV downstream
sub-stations T-
gollahalli,Andersonpet
,Nangli,H-
Gollahalli,Tayaluru,
Avni,NG Hulkur,KGF
1 -
&2 ,Doddakari,Kyasa
mballi,BEML
EHT,Kamasamudra
substations (Due to
2nd Quarterly
maintenance works at
all above said
substations)

NO -

NO -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

Load changeover will be


done by BESCOM
charge condition load of
Tr-1: will be shifted on
Tr-2 using Bus
Coupler.
2)While carrying out
Tr-2
maintenance ,Transfor
mer1 will be in charge LC was not
condition load of Tr-2 availed since the
will be shifted on Tr-1 approval was
using Bus Coupler. withdrawn by
3) While carrying out BESCOM
Tr-3 maintenance,
Transformer2 will be in
charge condition, load
of Tr-3 will be shifted
on Tr-2 using Bus
coupler
4)During LC period
Load on the Power
Transformer will be
changed over to
150MVA Transformer-3 -
and other 220kV
Stations. No load will
be affected.

Note:LC proposal
has been sent in
May-24 if not
- approved in May-
24 please
consider in June-
24

Note:LC proposal
has been sent in
08 MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of Line clear.
consider in June-
24

Note:LC proposal
has been sent in
04-05 MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of Line clear.
consider in June-
24

Note:LC proposal
has been sent in
5MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of line clear
consider in June-
24
* Attending
Hotline
Observations of
220kV Bus
* Quarterly
Maintenance of
Bus Isolators
Load will not be
"Periodical 1ST
affected partially as
Quarterly
the load will be change
maintenance
over on 66kV HSR
work 2024-25
Layout Line 2
Line Clear will be
taken only 66kV
Velankanni Line
L.C. clear
Line was
approved on
20.01.2024,
20.04.2024 but
BESCOM EE
Jayanagar
divison to
postpone the L.C,
due to constraints
in field and
maintaining
uninterrupted
power supply
Load Changeover-
due to Lalbhag
18MW
flower show via
E-Mail Date:
17.01.24. hence
L.C. not availed
on 20.01.2024.
"Periodical 1ST
Quarterly
maintenance
work 2024-25

"
Wheather
alteranate
Remarks
Power Supply
Arranged or not

Arrangement can be
Periodical 1ST
done from BESCOM
Quarterly
end through
maintenance
changeovers for load of
work 2024-25
about 8MW

Periodical 1ST
Quarterly
maintenance
Load changeover-12
work 2024-25
MW

"Periodical 1ST
Load Changeover- Quarterly
10MW maintenance
work 2024-25

"Periodical 1ST
Load Changeover- Quarterly
16MW by bescom maintenance
work 2024-25

"Periodical 1ST
Load Changeover- Quarterly
17MW by BESCOM maintenance
work 2024-25

Alternative power
BESCOM MOM
suplly arranged for all
attached.
feeders from BESCOM

Alternate supply BESCOM MOM


arranged attached.

Alternate supply BESCOM MOM


arranged attached.

Alternative power
BESCOM MOM
suplly arranged for all
attached.
feeders from BESCOM

No -

No -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

No -

No -

No -

NO -

NO -

NO -

NO -

NO -

NO -

No -

No -

- -

NO -

No -

YES -

YES -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

YES -

Load changeover will be LC was cancelled


done by BESCOM by BESCOM

Alternative power
supply arranged as per
-
BESCOM confirmation
and on other stations.

Load changeover will be LC was cancelled


done by BESCOM by BESCOM

* Attending
Hotline
Observations of
220kV Bus
* Quarterly
Load will not be
Maintenance of
affected as the load will
Bus Isolators
be change over on
"Periodical 1ST
220kV HSR -
Quarterly
Mylasandra Line 1
maintenance
work 2024-25

"

No -

Peak load of station is


22MW,peak load of Tr1
is 9MW, Tr-2 is 13MW.
1) During LC period of
Tr-1 from 10:00 to
11:30, load of Tr-1 will
be catered on Tr-2
through buscoupler
and during this period
-
no load will be affected.
2)During LC period of
Tr-2 from 11:30 to
13:00, load of Tr-2 will
be catered on Tr-1
through buscoupler
and during this period
no load will be affected.

NO -

NO -

Note:LC proposal
has been
During LCsent in
period
May-24 if not
66/11kV
No approved in May-
Melehalli
24 please
Jalmangla
consider ,
in June-
Kutugallu,
24
Chikkgangawadi,
20MW solar
Yes plant at Melehalli
and
Chikkganagwadi
S/s will be feed
from 220kV
Anchepalya S/s
during LC period
To carry out
quarterly
maintenance
No,due to Quarterly
works at 220kV
maintenance works at
R/S Chintamani
all stations
and its
downstreams
stations

Partial load can be


shifted on Attibele, -
Y'halli, Chokkasandra
Wheather
alteranate
Remarks
Power Supply
Arranged or not

No alternate power
-
supply

NO -

No -

7.6MW , TR2 is
13.1MW ,
2)During LC of Tr-1,
from 10:00 to 11:15,
load of Tr-1 will be
changed over to Tr-2
through buscoupler, no
load affected
3) During LC of Tr-2,
from 11:15 to 12:30, -
load of Tr-2 will be
changed over to Tr-1
through buscoupler, no
load affected 4) During
66kV Bus LC from
12:30 to 15:00hrs,
8MW load will be
affected ,12MW load
will be changed over by
Note:LC proposal
has been sent in
May-24 if not
load can be changed
approved in May-
over by BESCOM.
24 please
consider in June-
24

Note:LC proposal
has been sent in
May-24 if not
No approved in May-
24 please
consider in June-
24

Note:LC proposal
has been sent in
May-24 if not
- approved in May-
24 please
consider in June-
24

"Periodical 1ST
Quarterly
Load Change over=
maintenance
23MW can be done
work 2024-25
from BESCOM end.
"

- -

Alternate supply can


be arranged only to -
220kV Hoody

Load to be cattered on
220kV Nelamangala -1
& 2 Line and also -
220kV KIADB R/S
line.

No -

No -

No -

No -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

No -

Yes -

No -

Alternative power
supply arranged as per -
BESCOM confirmation
Transformer- 3 (20
MVA) will be in charge
condition and the load
of transformer- 1 will
be catered on
transformer-3 by using
bus coupler-2 and
during this period no
load will be effected.
2. During LC period of -
Transformer- 3 (1:30
Hrs)
Transformer- 1 (20
MVA) will be in charge
condition and the load
of transformer- 3 will
be catered on
transformer-1 by using
bus coupler-2 and
Load changeover will be
done by BESCOM

Note:LC proposal
has been sent in
BESCOM to make May-24 if not
alternate arrangements approved in May-
at 11kV side. 24 please
consider in June-
24

Note:LC proposal
has been sent in
05 MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of Line clear.
consider in June-
24

Note:LC proposal
04 MW load (out of 16 has been sent in
MW) can be shifted on May-24 if not
nearby stations by approved in May-
BESCOM at the time of 24 please
Line clear. consider in June-
24

Periodical 1st
Load Change
Quarterly
over=14MW by
maintenance
BESCOM
work.

No alternate power
-
supply

Note:LC proposal
has been sent in
04 MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of Line clear.
consider in June-
24

Note:LC proposal
has been sent in
02 MW load can be May-24 if not
changed over by approved in May-
BESCOM. 24 please
consider in June-
24
Wheather
alteranate
Remarks
Power Supply
Arranged or not

Periodical 1ST
Quarterly
Load Changeover- maintenance
10MW work 2024-25

During LC period
66/11kV
Melehalli
Jalmangla ,
Kutugallu,
Chikkgangawadi,
20MW solar
Yes plant at Melehalli
and
Chikkganagwadi
S/s will be feed
from 220kV
Anchepalya S/s
during LC period

No -

No -

- -

Note:LC proposal
has been sent in
May-24 if not
- approved in May-
24 please
consider in June-
24

- -

No -

- -
No -

NO -

NO -

NO -

No -

No -

No -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

No -

No -

NO -

No -

No -

No -

NO -

No -

Partial Load can be


arranged from -
Ramanagara MUSS

During LC Period
20MW load will be 20MW load will be
affected after affected after
rearranging of loads on changeover of
other stations as per loads to other
concerned BESCOM stations.
officials.

Alternative power
supply arranged as per
-
BESCOM confirmation
and on other stations.

* Attending
Hotline
Observations of
220kV Bus
Load will not be * Quarterly
affected as the load will Maintenance of
be change over on Bus Isolators
220kV HSR - "Periodical 1ST
Mylasandra Line 1 Quarterly
maintenance
work 2024-25
Wheather
alteranate
Remarks
Power Supply
Arranged or not

condition and the 6Mw


load of transformer 1
will be catered on
transformer-2 by using
bus coupler and 7MW
load change over shall
be done by BESCOM to
neighboring stations,
no load affecetd .
b) During LC peroid of -
Transformer 2 (2 Hrs)
Transformer 1 (20
MVA) will be in charge
condition and the 6MW
load of transformer 2
will be catered on
transformer-1 by using
bus coupler and 7MW
load change over shall
Note:LC proposal
has been sent in
May-24 if not
- approved in May-
24 please
consider in June-
24

Load will be cattered


on 220kV -
Nelamangala -1 Line.

Load to be cattered on
220kV Nelamangala -2 -
Line.

No alternate power
-
supply

Load changeover will be


-
done by BESCOM

1. Peak Load of Station


is 15 MW, Tr-1:2MW
TR-2 7.5MW, TR-3
5MW
2. Maintenanance of
transformer will be
carried out one after
-
the other and load will
be managed using
buscoupler and also
change over by
BESCOM on other
stations

Load changeover will be


-
done by BESCOM

Note:LC proposal
has been sent in
May-24 if not
No approved in May-
24 please
consider in June-
24

Note:LC proposal
has been sent in
May-24 if not
- approved in May-
24 please
consider in June-
24

Periodical 1st
Load Change Over-9.0 Quarterly
MW by BESCOM maintenance
work.

During LC period
66/11kV
Melehalli
Jalmangla ,
Kutugallu,
Chikkgangawadi,
20MW solar
Yes plant at Melehalli
and
Chikkganagwadi
S/s will be feed
from 220kV
Anchepalya S/s
during LC period

NO -

Yes -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

Yes -

YES -
lc shall be availed from
11:00hrs to 12:30 hrs
during this lc period
load 13 mw load will
be affected and
Trasformer-2 and
Transformer-3 will be
in charge condition 2)
The Transformer 2 lc
shall be availed from -
12:30 to 14:00 hrs and
13 mw load shall be
affected , transfomer 1
and transformer 3 will
be in charge condition
3) Transformer-3 lc
shall be availed from
14:00 hrs to 16:00 hrs
and 19mw will be
YES -

MVA) will be in charge


condition and the load
of transformer-1 will be
catered on transformer-
2 by using bus coupler.
No load will be effected.
2. During LC
period of Transformer-2
(2 Hrs)- Peak load is 17
-
Transformer -1 (20
MVA) will be in charge
condition and the load
of transformer-2 will be
catered on transformer-
1 by using bus coupler.
During this period
around 6 MW of load
shedding will be carried
Note:LC proposal
03 MW load (out of 7 has been sent in
MW) can be shifted on May-24 if not
nearby stations by approved in May-
BESCOM at the time of 24 please
Line clear. consider in June-
24

Note:LC proposal
has been sent in
3MW load can be
May-24 if not
shifted on nearby
approved in May-
stations by BESCOM at
24 please
the time of line clear
consider in June-
24

During LC period
66/11kV
Melehalli
Jalmangla ,
Kutugallu,
Chikkgangawadi,
20MW solar
Yes plant at Melehalli
and
Chikkganagwadi
S/s will be feed
from 220kV
Anchepalya S/s
during LC period

1. During Transformer-
1 LC, load will be
catered through bus-
coupler on
Transformer-2 with
5MW load affected.
2. During
Transformer-2 LC , load
will be catered through
bus-coupler on -
Transformer-3 with
with 5MW load affected.
3.During Transformer-
3 LC , load will be
catered through bus-
coupler on
Transformer-2 withwith
5MW load affected.

Load of 220kV
BWSSB Tataguni
station may be fed from
220kV Vrushabhavathi -
through PGCIL Bidadi -
Kumabalagodu station.
No load will be affected.

6MW load can be


shifted on nearby
-
stations by BESCOM at
the time of line clear
Wheather
alteranate
Remarks
Power Supply
Arranged or not

All feeders are


feeding for IT
installations there
will be DG back
up for IT
industries . There
is no change over
Load Changeover-2MW
option from
BESCOM side
except F4 feeder.
For carrying 1 st
quarter
maintanance year
24-25

Alternative power
BESCOM MOM
suplly arranged for all
attached.
feeders from BESCOM

Alternative power
BESCOM MOM
suplly arranged for all
attached.
feeders from BESCOM

No -

NO -

NO -

Alternative power
supply arranged as per
-
BESCOM confirmation
and on other stations.

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _

- _
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- _

- _

- _

- _

- _

- _

- _

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

Maximum Man power will be utilised to complete thework and only


- portion of spur line will be kept off to complete the work and for remaining portion power will be supplied.

- -

- -

- -

- -

- -

- -

- -

- -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- -

- -

- -

- -

- -

- -

- -

- -

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT

- NOT
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- NOT

- NOT

- NOT

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- Partially arranged

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- -

- -

- -

- -

- -

- -

- -

- -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
Wheather
alteranate
Remarks
Power Supply
Arranged or not

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

You might also like