Failure Root Cause Analysis Tesla Transformer
Failure Root Cause Analysis Tesla Transformer
03.12.12
Transformer- Vaspet Site
Active Part of the Transformer after Dismantling : (No Failure of winding &
Core Coil Assembly)
Failure Root cause Analysis for 1700 KVA –M/s Tesla
03.12.12
Transformer- Vaspet Site
1. Manufactring Defect
2. Transport Defect
3. Handling & Erection Defect
1. Manufacturing Defect:
2. Transport Defect :
• If Air Release was not done on the Inspection Cover of the Tank, If any
Air Block occurs between Live Part (H.V Lead, Tap Switch Lead) and
Tank Cover Plate, an high arc will be produced due to High Pressure. In
this Case, Air Block was not occurred between Live Part and Tank Cover
Plate since there is no Carbon occurred inside of the Tank.
• If Air Release was not done on the Bushing, if any Air Block occurs
between Live Part (H.V Lead) and nearby Earthing Point, an high arc
will be produced due to high pressure. This might be the cause of the
Blasted Transformer (Air Crack may be happened in Bushing as photos
shown above)
If Air Release was not done on the Inspection Cover of the Tank, If
any Air Block occurs between Live Part (H.V Lead, Tap Switch Lead)
and Tank Cover Plate, an high arc will be produced due to High
Pressure. In this Case, Air Block was not occurred between Live Part
and Tank Cover Plate since there is no Carbon occurred inside of the
Tank.
If Air Release was not done on the Bushing, if any Air Block occurs
between Live Part (H.V Lead) and nearby Earthing Point, an high arc
will be produced due to high pressure. This might be the cause of the
Blasted Transformer since there might be the chance of the Air Crack
in the Bushing.
Reason for Blast due to arc produced between Bushing and Earthing
Point :