Aksum University Aksum Institute of Technology Department of Civil Engineering Sewage Disposal and Treatment Hadush G/yesus
Aksum University Aksum Institute of Technology Department of Civil Engineering Sewage Disposal and Treatment Hadush G/yesus
1
Contents included in this course
Part I: - Sewer system
Part II:- Wastewater treatment
Part III:- Solid waste management
2
Part I:- Sewer system
The main objective:
How to plan, design and construct wastewater conveyance
systems
3
Outline for Part I
4
Part I:- Lecture 1
5
Chapter 1
INTRODUCTION TO SANITATION
&
SANITARY ENGINEERING
⚫ Sanitary engineering is the application of engineering
methods to improve of human communities,
primarily by providing the removal and disposal of human
waste.
⚫ Sanitary engineering is a design and construction specialty
that confronts issues related to public health.
⚫ Professionals in the field build new sanitation systems and
repair existing structures to improve health and safety.
⚫ Like engineers in other specialties, sanitary engineering
professionals draw blueprints, make computer models, and
develop models before initiating a new construction project.
⚫ They run computer simulations and small-scale physical
experiments to test the effectiveness of a system.
⚫ The sanitary engineer job became essential with the rapid
increase of cities and other rural population concentrations.
6
Water Water collection
Supply Ground or surface,
Engineering treatment and distribution
7
Important terms in wastewater collection system
Sewage: It is a broad term that indicates the liquid waste originating from the
uses of water. It includes domestic wastewater (discharge from toilets, urinals,
kitchen, bathrooms etc), wastewater generated from commercial
establishments, institutions, industrial establishments and also the ground water
and storm water that may enter into the sewers.
Infiltration: It is the water which inters the sewers from ground water
through Leaks from loose joints or cracks
Inflow: It is the water which inters the sewers from the manholes during
rainfall events. 8
Important terms in wastewater collection system
Sewer: Sewers are under ground pipes or conduits which carry sewage to
points of disposal.
9
System of Sanitation
Depending upon the type of waste, two systems
10
A. Conservancy System
11
Advantages of conservancy system
1. Initial cost is low, because storm water can
pass through open drains.
2. The quantity of sewage reaching at the
treatment plant is low.
3. The sewer section is small and no deposit
of silting because storm water goes in
open drains.
12
Disadvantages of conservancy system
13
2. Transportation aspect
14
3. Labour aspect
15
4. Building design aspect
16
5. Conditions of drains
17
6. Human Aspect
23
2. Epidemic Aspect
24
3. Pollution Aspect
contamination
25
4. Compactness in design
29
Disadvantages:
1. High initial cost.
2. High Operating & Maintenance costs.
3. During rainy season large volume of
sewage is to be treated compared to
remaining period of year.
Sewage system and
Sewage Quantity Estimation
1
The Session topic objectives
I. To identify types of sewage systems
II. To differentiate the factors which
govern the selection of sewage systems
III. To estimate sanitary sewage and storm
water quantity
2
Sewage System
A. Separate system
B. Combined system
C. Partially Combined system
3
A. Separate system
1. Financial aspects
2. Flat topography
3. Rainfall pattern
4. Outlet conditions
5. Pumping aspect
6. Subsoil conditions
7. Development pattern
6
Advantages of separate sewer system
7
Disadvantages of separate sewer system
8
B.Combined system
1. Space restriction
2. Integrated development
3. Even rainfall pattern
4. Conversion of existing storm water drains
5. Pumping requirements
11
Advantages of combined sewer system
13
C. Partially combined system
14
Advantages of partially combined
1. The sewers are of reasonable size. Their cleaning is
therefore not very difficult.
2. It combines the advantage of both the separate as well as
the combined systems.
3. The storm water permitted in the sewers eliminates its
chances of chocking. The sewers are completely cleaned
during rainy season.
4. The problem of disposing off storm water from homes
is simplified.
15
Disadvantages of partially combined
16
Sanitary Sewage estimation
Before designing the sewer, it is necessary to know the discharge i.e.,
quantity of sewage, which will flow in because;-
far lower estimation than reality will soon lead to inadequate sewer size
after commissioning and the sewers may not remain adequate for the entire
design period.
Similarly, very high discharge estimated will lead to larger sewer size
affecting economy of the sewerage scheme, and
the lower discharge may not meet the criteria of the self cleansing velocity
and hence leading to deposition in the sewers.
Since sewers are designed to serve for some more future years, engineering
skills have to be used to accurately estimate the sewage discharge.
17
Sanitary Sewage estimation
Dry weather flow is the flow that occurs in sewers in
separate sewerage system or the flow that occurs during
dry seasons in combined system.
This flow indicates the flow of sanitary sewage which
depends up on;-
1) the rate of water supply,
2) type of area served,
3) economic conditions of the people,
4) weather conditions and
5) infiltration of groundwater in the sewers, if sewers
are laid below groundwater table.
18
Sanitary Sewage estimation
Two Parameters:
Both of these
quantities depend
1. The contributing population, on the design
and period
2. Per capita (per person)
flowrate of sewage
19
Sanitary Sewage estimation
Prospective population of the project area (may be a city, town or a
metropolitan area) can be projected by one of the methods below.
Methods:
• Demographic population projection
• Arithmetical increase method
• Incremental Increase method As you have learnt
• Geometrical Increase method previously in
• Growth rate water supply &
• Graphical method treatment classes
• Logistic method
20
Floor-Space Index Based Calculation
1. FSI is the ratio of the total floor area of buildings on a
certain location to the size of the land of that location.
2. From the city-plan find out the % of the total area available
for residential development
3. Actual total floor area = Area for residential development X
Floor Space Index (FSI)
4. Find out floor area required for one person or assume it
depending on the available data from the city. Normally it is
9 sqm/person.
6. Multiply the density with the total area of the city to find
out the total population
This total population can be used for estimating the quantity of
total sewage flow.
21
Sanitary Sewage estimation
Theoretically speaking, the quantity of should be equal to the
quantity of water supplied to the contributing area, from the
water-works.
But in actual practice, this is not the precise quantity, certain
additions and subtractions do take place from it, as explained
below:
i. Additions due to unaccounted private water Supplies
ii. Additions due to infiltration and inflow.
iii. Subtractions due to water losses.
iv. Subtraction due to water not entering the sewerage 'system
The net quantity of sewage = the accounted quantity of water supplied +
factors (i) and (ii) - factors (iii) and (iv), described above.
Generally, 75 to 80% of accounted water supplied is considered as quantity of
sewage produced. .
22
Variations in Flow and Peak Factor
Water consumption varies from hour
to hour. Along with daily variations,
Flow rate
there are also seasonal variations.
Average
For design purpose, sewers are always
designed to carry maximum or peak flow
rates, rather than designing it for average
flowrate. 4 8 12 16 20 24
Time of the day
Maximum wastewater flow rate
Peak Factor (PF) =
Average wastewater flow rate
and
Where: - P = population in thousands
Q peak= peak sewage flow
Qmin & Qave = minimum & average sewage flow respectively.
24
Estimation of Storm Water
The quantity of storm water (runoff) reaching to the sewers or
drains is very large as compared with sanitary sewage.
Runoff quantity depends on:
Rainfall Characteristics (Intensity, Duration and space- time
distributions)
Characteristics of the watershed surface (nature,permeability, slope, and
landscaping)
Time of concentration (time required for flow to reach the
sewer)
Storm sewers are designed for a rainfall with particular frequency or return
period.The design rainfall is fixed after economic considerations involving the
Intensity-duration and frequency (IDF) curves in an area.
tC
Maximum run-off is obtained from a rain having
a duration equal to the time of concentration. SEWER
OUTFALL
The duration of such a rainfall is called critical rainfall duration and the intensity of
such rainfall is known as critical rainfall intensity.
Sub-basin
tc te t f
te
te= time of entry
tf= time of flow tf
SEWER
OUTFALL 26
Time of entry : is the longest time required for a water droplet in an urban sub-basin
to travel to a street inlet.
L= maximum distance travelled by the water
Kirpich’s model:
on the surface
0.0195L0.77F
te S= average slope of the route travelled
s0.385 by water
F = Ground surface friction factor
Surface type F
Rural watershed (flat ground) 1.0
Grass surface 2.0
Concrete or Asphalt surface 0.4
Concrete channel 0.2
Time of flow : is the time required for water to travel to a sewage outfall from the street
inlet in the urban sub-basin. It is always computed considering that the pipe is running
1 2 1
full. v R 3 2 s L
n t f
v
27
Estimation of Storm Water
Q =C.I.A/360
Where,
Q = Quantity of storm water, m3/sec
C = Coefficient of runoff
I = intensity of rainfall, mm/hour,and
A = Drainage area in hectares
Or
Q = 0.278 C.I.A
Where, Q is m3/sec; I is mm/hour, and A is area in square kilometer
28
Estimation of Storm Water Contd.
Runoff Coefficient: can be defined as a fraction, which is multiplied with the
quantity of total rainfall to determine the quantity of rain water, which will reach the
sewers.
The runoff coefficient depends upon the porosity of soil cover, wetness and ground
cover.
The overall runoff coefficient for the catchment area can be worked out as follows:
C = [A1.C1 + A2.C2 + ….+ An.Cn] / [ A1 + A2 + …+ An]
Where, A1, A2, …. Are types of area with C1, C2, …. as their coefficient
of runoff, respectively.
Part I:- Lecture 3
Hydraulic Design
of Sewer
1
Session topic objectives
At the end of this session students were able;-
1) To have an understanding how design &
construction of sewerage differs from water supply
2) To Identify empirical formula which the best suits
flow in sewer lines
3) To know how to design non scouring and silting
velocity of flow
4) To Characterize hydraulic elements of circular
sewer section
2
Difference between Sewers and Treated Water Conduits
4
Requirements of Design and Planning of
Sewerage system
The sewers should be laid at least 2 to 3 m deep to
carry sewage from basement.
The sewage should flow under gravity with 0.5 to 0.8
full at designed discharge, i.e. at the maximum
estimated discharge.
The sewage is conveyed to the point usually located at
low lying area, where the treatment plant is located.
Treatment plant should be designed taking into
consideration the quality of raw sewage expected and
to meet the discharge standards.
5
HYDRAULIC DESIGN OF SEWERS
Where,
V = velocity of flow in the sewer, m/sec
R = Hydraulic mean depth of flow, m, R = A/P
A = Cross section area of flow, m2 &
P = Wetted perimeter, m
9
Hydraulic Formulae cont’d…
n = Manning’s coefficient depends upon the type of the channel surface i.e.,
material and lies between 0.011 to 0.015 for brick sewer
it could be 0.017 to 0.03 for stone facing sewers.
S = Hydraulic gradient, equal to invert slope for uniform flows.
2. Chezy’s Formula
11
Maximum Velocity in sewers
The smooth interior surface of a sewer pipe gets scoured
due to continuous abrasion caused by the suspended solids
present in sewage.
It is therefore, necessary to limit the maximum velocity in the
sewer pipe.
This limiting will mainly depend upon the material of the sewer.
Moreover, care should be taken to see that at the time of
maximum flow, the velocity generated does not exceed the
scouring value.
12
Minimum Velocity in a Sewer
The velocity should be such that:
The generation of Self-cleansing velocity should occur within the sewer for
at least once in a day.
13
Self Cleansing Velocity
1 61
VS R k(S S 1)Dp
n
n = roughness coefficient
R = Hydraulic Mean Radius = A
P
A= Area of the channel
P= Wetted perimeter of the channel
d
Depth proportionate
Depth at partial flow
[1cos ]
D D d 1
d [ cos ]
2 2 2 D 2 2
Area proportionate
A D2 Area at partial flow
2
a D [ sin
a = sin 4
4 360 2 ]
A [ ]
360 2
15
Perimeter at full flow
P D
Perimeter at partial flow
D p D *
α/2 α/2 360
D *
Perimeter proportionate
d
p 360
Hydraulic radius at full flow P D 360
D2 Hydraulic radius at partial flow
A 4 D
R r a D [1 360sin ]
P D 4 p 4 2
Mean hydraulic radius proportionate
r [1 360sin ]
R 2
16
Velocity at full flow
V 1 R2 / 3S1/ 2
n
α/2 α/2 D Velocity at partial flow
v 1 r 2 / 3s1/ 2
d n
Velocity proportionate
360sin
2 /3
r 1
2/3 2 /3
v r
V R2 / 3 R 2
Discharge proportionate
Q A.V A V 360 2 2
17
Summary d 1
[1cos ] ,Depth proportionate
D 2 2
r [1 360sin ] ,H.radius proportionate
α/2 α/2 D R 2 2 / 3
360sin
v 1
,Velocity proportionate
d
V 2
q sin 360sin
2 /3
1
Q 360 2 2
Discharge proportionate,
18
d/D a/A v/V q/Q
1.00 1.00 1.00 1.00
0.9 0.949 1.124 1.066
0.8 0.858 1.140 0.988
0.7 0.748 1.120 0.838
0.5 0.5 1.000 0.500
0.4 0.373 0.902 0.337
19
v 1 r 2 / 3s1/ 2
n
r a D [1 360sin ]
p 4 2
s
1000
360sin
2/ 3
V 1 2
Velocity at partially full flow v
Velocity at full flow
After finding the minimum slope required, the pipe size is decided on the
basis of ultimate design peak flow rate and the permissible depth of flow.
Adoption of the above slopes would ensure minimum flow velocity of 0.6
m/s
1
Objectives of the session
⚫ Identify constraints of sewerage line construction
and engineering considerations
3
Forces Acting on Sewer Pipes
4
Cont…
1. For pipes resting on or projecting above
undisturbed ground in cohesion less soils and
covered with fills, such as in a high way culvert
◦ the external load likely to come per unit length of
pipe (W) is given by:
Where
🞄 Cp - a coefficient whose value depends upon the
type of pipe and character of foundation backfill.
Typical values of Cp are given in table below
🞄 - Sp.Wt. of fill material
🞄 D - the external diameter of the pipe
5
6
2. For flexible pipes (such as steel pipes) buried in
narrow trenches and with thoroughly compacted
side fills, such as shown in Fig. below,
◦ the external load per unit length of the pipe
is given by:
⚫ Where
🞄 C = a coefficient, characterizing the fill material
and the ratio H/B. Typical values are given in table
below.
7
3. For rigid pipes (such as concrete, cast iron, vitrified clay, etc.)
buried in narrow trenches and thoroughly compacted with
cohesion less fills, the external load per unit length of the pipe is
given by:
8
4. The amount of superimposed loads (such as traffic
load, etc.) which is transmitted to the pipe can be
evaluated by using Boussinesq's equation. Assuming
the fill surface to be horizontal, the equation is:
⚫ Where
🞄 Pt - unit pressure developed at any point in the fill at a
depth H below the surface due to traffic load
🞄 P - Load superimposed
🞄 H - Distance of the top of pipe below the surface of the fill
🞄 Z - the slant height of the considered point from the load P.
9
⚫ The following are the various materials, which
are used for sewers.
i. Asbestos cement sewers
ii. Cast-Iron sewers
iii. Cement concrete sewers
iv. Stoneware sewers
v. Brick sewers
vi. Corrugated iron sewers
vii. Plastic sewers
viii. Steel sewers
10
Asbestos Cement Pipes
⚫ These sewers are made from a mixture of
asbestos fibers, cement and silica.
⚫ They are available up to sizes of 900mm and 3 to
4m in length.
Advantages:
i. Easy to cut and join.
ii. Durable and good resistance to corrosion.
iii. The inside surface is smooth.
iv. Light in weight and hence easy to handle.
11
Disadvantages:
1. Brittle and cannot stand impact forces during handling
operations.
12
Cement Concrete Sewers
13
Disadvantages:
1. They easily get corroded and pitted by the
action of sulphuric acid produced from H2S
gas.
2. They are also susceptible to erosion by sewage
containing too much silt and grit
3. Heavy weight, transportation and handling is
difficult.
4. Joints should be carefully filled.
14
Stoneware Sewers
⚫ The stoneware sewers are also known as the
vitrified clay sewers or salt-glazed sewers
17
Laying of Sewers
20
Preparation of Bedding
22
Back-filling of Trenches
◦ The trenches are back filled with excavated soil after
removal of pebbles and stone-pieces by ramming the soil in
layers using with water.
◦ When the height reaches to 60cm above the crown of the
pipe, back filling is stopped for at least one weak for
weathering.
◦ After a week, again backfilling is started in layers and the
trench is filled 15cm above the ground level.
◦ During the course of time the back filled soil gets
compacted and the filled soil comes to the ground level.
◦ Back filling will be after 7 days for precast pipes and 14 days
after in the case of cast-in-site sewers.
25
26
27
Testing of sewer
The testing of sewers is necessary as any leakage,
improper joints, straightness or obstruction of sewers
may occur during laying of sewers.
These defects may be removed or repaired after
detection.
So there are various tests by which these defects may
be detected. These tests are :-
Water Test.
Smoke Test.
Test For Obstruction
Testing of sewer
Water Test: for leakage
◦ Each section of the sewer is tested for water
tightness preferably between the manholes.
◦ Testing of sewers done by plugging the lower end of
the sewer and fill water in the manhole in the
upper end.
◦ The depth of the water in the manhole is
maintained to the testing head of about 1.5m.
◦ The sewer line is watched by moving along the
trench.
29
Smoke Test
The purpose of smoke testing is to find potential
points of inflow and infiltration in the sanitary sewer
system that could lead to high flows during a storm.
⚫ Maintenance of Sewers
◦ Sewer maintenance generally involves their
cleaning to keep them free from any clogging
and to carry out the repairs to the damaged
portions if any, so as to prolong their life and to
ensure efficient functioning.
◦ The proper maintenance of sewers is therefore
absolutely necessary in order to make a sewerage
system function efficiently.
◦ The sewer maintenance generally includes:
a) Their frequent inspection and supervision,
b) Measuring the rate of flow,
c) Cleaning and flushing,
d) Repairing the leaking joints or any other damaged
portions.
45
Cleaning of Sewers
⚫ Sewers should be periodically cleaned so as
to avoid their complete clogging.
⚫ For cleaning small sewers which cannot be
entered into by manual labour, flushing
operations are essential.
⚫ Large sized sewers which can be entered into by
men are generally cleaned by manual labour.
⚫ Precautions to be taken while entering sewers
various poisonous and explosive gases which are
generally found in sewers are: hydrogen
sulphide (H2S), carbon dioxide (CO2), and (CH4)
along with petrol vapors.
46
Ventilation of Sewers
⚫ The sewers must be properly ventilated for the
following reasons:
i. The decomposition of sewage inside the sewers
may result in the production of various sewer
gases, such as, CO2, CO, CH4, H2S, NH3, N2, etc.
🞄 These gases, if not removed, may cause serious
problems, and prove hazardous to the workers
entering the sewers.
🞄 Methane gas being highly explosive, if not
removed, may even blow off the manhole
covers.
47
ii. To ensure a continuous flow of sewage
inside the sewer.
🞄 This is achieved by ventilation by keeping the
surface of sewage in contact with free air and thus
preventing the formation of air-locks in the sewage.
⚫ Methods of Ventilation
i. Use of ventilating columns (placed at intervals of 150 to
300m along the sewer lines)
ii. Use of ventilating manhole covers (provided with
perforations)
iii. Proper Design of Sewers (designed partially full)
iv. House vent and Soil pipes (ventilating house drains and
public sewers) Example: -1 Finding out population density
based on Floor Space Index method
1. A well-planned city has following areas earmarked for its development in the planning
stage: Roads- 20%; Gardens- 15%; Schools – 5%; markets and Commerical places –
2%; Hospital and medical facilities – 2% and rest is residential area. The Floor Space
Index (FSI) for the city is fixed at 2. If the floor area is 9 sqm/ person, find out the
projected population density of the city in numbers/ hecatare.
Solution:
1
Example:-2
1. Determine designed discharge for a combined system serving population of 50000 with rate of
water supply of 135 LPCD. The catchment area is 100 hectares and the average coefficient of runoff
is 0.60. The time of concentration for the design rainfall is 30 min and the relation between intensity of
rainfall and duration is : I = 1000/(t + 20).
Solution
Estimation of sewage quantity
Considering 80% of the water supplied will result in wastewater generation,
the quantity of sanitary sewage = 50000 x 135 x 0.80/1000 = 5400 m3/day = 0.0625m3/sec
Considering peak factor of 2.5, the design Q for sanitary sewage = 0.0625 x 2.5 = 0.156 m3/sec
Estimation of storm water discharge Intensity of rainfall, I = 1000/(t + 20)
Therefore, I = 1000/(30 + 20) = 20 mm/h
Hence, storm water runoff, Q = C.I.A/360
= 0.6 x 20 x 100/(360) = 3.33 m3/sec
Therefore, design discharge for combined sewer = 3.33 + 0.156 = 3.49 m3/sec
2
2. The catchment area is 300 hectares. The surface cover in the catchment can
be classified as given below:
Calculate the runoff coefficient and quantity of storm water runoff, if intensity of rainfall
is 30 mm/h for rain with duration equal to time of concentration. If population density
in the area is 350 persons per hectare and rate of water supply is 200 LPCD, calculate
design discharge for separate systems and combined system.
3
Solution for #2
4
3. Find out the maximum design runoff at the
/1.2 ha discharge point
Assume: C = 0.3 (Entire area), 5-year frequency, vel. In
sewers = 0.6 m/s
110 mm/hr
200
/120 m
175
100
75
50
/180 m 25
/1.8 ha
5
Solution:-
Flow time in sewer from MH 1 MH 2
= (120 m)/ (0.6 m/s) (60 s/ min) = 3.3 min
7
Solution:
Step 1:- The residential area will be 60% of 2,500 ha = 1,500 ha. The flow rates
for each residential area will be:
Type Area (ha) Density Population Flow (m3/s)
(person/ha)
Large lots 0.40*1500 = 600 6 600*6 = 3,600 9.26*10-6*3600
= 0.03
Small lots, 0.55*1500 = 825 75 825*75 = 61, 875 9.26*10-6*61,875
single family = 0.57
Multistory 0.05*1500 = 75 2,500 75*2,500 = 187,500 9.26*10-6*187,500
apartments = 1.74
Total 252975 2.34
Step 2:- The commercial area will be 30% of 2,500 ha, 0.3*2,500 = 750 ha, with a
flow rate of 2.89x10-4 m3/sec/ha, the average flow for commercial areas will
therefore be
= 2.89x10-4 m3/sec/ha *750 ha
= 0.22m3/sec.
8
Step 3:- The industrial area covers 10% of 2,500 ha then, 0.1*2,500 = 250 ha,
with a flow rate of 4.63x10-4m3/sec/ha, the average flow for industrial
areas will therefore be
= 4.63x10-4m3/sec/ha *250 ha
= 0.12 m3/sec.
Step 4:- The Inflow & Infiltration (I & I) for the entire area is:
(1,000 L/ha)*(2500 ha) = 2.5x106L/day = 0.03m3/sec
The total city flow, excluding I&I, will therefore be:
2.34 + 0.22+ 0.12 = 2.68 m3/sec.
The total city population will be 252,975 (or 252.975 thousands of
people).
Step 5:- The peak and minimum flow rates can therefore be estimated:
Q peak/Q av = 5.5/ P 0.18 = 2.0, and Q min/Q av = 0.2*P 0.16 = 0.48 then,
The peak flow is therefore estimated to be, = 2.0 (2.68 m3/sec) + 0.03 m3/sec
= 5.39 m3/sec
The minimum flow is estimated to be, = 0.48 (2.68 m3/sec) + 0.03 m3/sec
= 1.32 m3/sec
9
Example :4
1
1.1 Preliminary Treatment
Preliminary treatment consists in separating the floating
materials (like dead animals, tree branches, papers, pieces of
rags, wood, etc.), and also the heavy settle able inorganic solids.
It also helps in removing the oils and greases, etc. from the
sewage.
This treatment reduces the BOD of the wastewater, by about 15
to 30%.
The processes used are:
Screening for removing floating papers, rags, clothes, etc
Grit chambers or Detritus tanks for removing grit and sand
Skimming tanks for removing oils and greases
2
3.1.1 Screening
Screening is the very first operation carried out at a sewage
treatment plant.
It consists of passing the sewage through different types of
screens, so as to trap and remove the floating materials.
The main idea of providing screens is to protect the pumps and
other equipments from the possible damages due to the floating
matter of the sewage.
Screens should preferably be placed before the grit chambers.
They may sometimes be accommodated in the body of the grit
chambers themselves.
3
Types of Screens, their Designs and Cleaning
Depending upon the size of the openings, screens may be classified as
coarse screens, medium screens, and fine screens.
A) Coarse screens:
They are also known as Racks, and the spacing between the bars (i.e.
opening size) is about 50 mm or more.
These screens do help in removing large floating objects from sewage.
They will collect about 6 liters of solids per million liter of sewage.
The material separated by coarse screens, usually consists of rags,
wood, paper, etc., which will not putrefy, and may be disposed of by
incineration, burial, or dumping.
4
5
Coarse Screen
9
The fine screens may be disc or drum type, and are operated continuously by
electric motors.
Flow direction
10
3.1.2 Grit Removal Basins
The grit chamber remove the inorganic particles (specific gravity
about 2.65 and nominal diameter of 0.15 to 0.20mm or larger)
such as sand, gravel, grit,..etc
Other non putresible materials that may clog channels or damage
pumps due to abrasion, and to prevent their accumulation in
sludge digesters.
Grit chambers are, nothing but like sedimentation tanks, designed
to separate the intended heavier inorganic materials by the process
of sedimentation due to gravitational forces.
And to pass forward the lighter organic materials. They causing
septicity of sewage and requiring unnecessary labor and expenses
11 for disposal of removal.
Divide wall
Grit chamber
12
Screening
The grit quantity may vary between 0.004 - 0.037m3/1000m3 of
sewage for separate sewage system;
While this may range between 0.004 - 0.180 m3/1000 m3 for
combined sewage system.
Generally, grit chambers are designed to remove all particles with a
nominal diameter of 0.02mm having settling velocity of about
2.3cm/s (at 10ºc).
Although some grit removal devices are designed to remove 0.15mm
sand particles having settling velocity of about 1.3cm/s (at 10°c).
They are designed to have constant velocity horizontal flow at varying
discharges.
The constant velocity is achieved by providing a velocity control
section; such as a proportional flow weir at the effluent end of a
rectangular chamber.
13
I. Constant Velocity Horizontal Flow Grit Chambers
Such a grit channel is an enlarged channel to:
increase the cross-section then,
reduce the flow velocity of sewage then,
to settle down the heavy inorganic materials do by
gravity, and
the lighter organic materials remain in suspension, and,
then
go out along with the effluent of the grit basin.
14
the flow velocity should neither be too low as to cause the
settling of lighter organic matter, nor should it be so high as
not to cause the settlement of the entire silt and grit present
in sewage.
The flow velocity should also be enough to scour out the settled
organic matter, and reintroduce it into the flow stream.
Such a critical scouring velocity is, given by the modified Shield's
formula, which states that horizontal velocity.
Critical scour velocity
NB:
In practice, a flow velocity of about 0.25 to 0.3m/sec is
adopted for the design of grit basins..
15
3.1.3 Tanks for Removing Oils and Grease
1. Skimming Tanks
Skimming tanks are sometimes employed for removing oils and
grease from the sewage, and placed before the sedimentation-tanks.
They are used where sewage contains too much of grease or oils
which include fats, waxes, soaps, fatty acids, etc.
These materials may enter into the sewage from the kitchens of
restaurants and, houses, from motor garages, oil refineries, soap and
candle factories, etc.
They are, thus, normally present in large amounts in the industrial
wastewaters.
It interfere with the activated sludge treatment process, and prevent
biological growth on the trickling filters.
A detention period of about 3 to 5 minutes is usually sufficient.
16
The amount of compressed air required is about 300 to 6000m3
per million liters of sewage.
The surface area required for the tank can be found out by using the
formula:
This causes the air bubbles to expand and move upward through the
sewage to the surface.
The rising bubbles lift the grease and the lighter waste solids to the
surface, where they are removed through skimming troughs.
Heavier solids settle to the tank bottom, where they are collected and
carried away for sludge treatment and disposal.
3. Disposal of Skimming's
The oil and greasy material removed as skimmings from the skimming
tanks or vacuators can be disposed of either by burning or burial.
It is generally too polluted to be of any economic use.
Part II Lecture 4
SECONDARY & TERTIARY WASTEWATER TREATMENT
1
The Role of Microorganisms in Wastewater Treatment
5
Microbial Growth Kinetics
Growth of a microbial population is defined as an increase in
numbers or an increase in microbial mass.
Growth rate is the increase in microbial cell numbers or mass per
unit time.
Microbial populations can grow as:
1. Batch cultures (closed systems) or
2. Continuous cultures (open systems)
6
Microbial Growth Kinetics
1. Batch Cultures
When a suitable medium is inoculated with cells, the growth of
the microbial population shows four distinct phases.
The lag phase is a period of cell
adjustment to the new environment
At log/exponential phase the
number of cells increases exponentially
At stationary phase microorganisms
cannot grow indefinitely, mainly
because of lack of nutrients and
electron acceptors, and the production
and the accumulation of toxic
metabolites.
During death phase, the death
(decay)
7
rate of the microbial
population is higher than the growth Figure of Microbial growth curve
Microbial Growth Kinetics
2. Continuous Culture of Microorganisms
the exponential growth phase over a long period of time can be
achieved by growing continuously the cells in a completely
mixed reactor in which a constant volume is maintained.
The most commonly used device is the chemostat
8
Microbial Growth Kinetics
Physical and Chemical Factors Affecting Microbial
Growth are :-
1. Substrate Concentration
2. Temperature
3. pH
4. Oxygen Level
9
Biological Wastewater Treatment
To introduce WW contact with bacteria (cells) which feed organic
matter in WW.
The purpose of biological treatment is BOD reduction.
Principle:
→ Simple bacteria (cells) eat the organic material.
→ Through their metabolism, the organic material is transformed into
cellular mass,
→ This cellular mass can be precipitated at the bottom of a settling tank
or retained as slime on solid surfaces or vegetation in the system.
→ Then, the WW exiting the system is much clearer than it entered.
→ Cells need oxygen to breath, so adequate supply of oxygen should be
for the operational biological WWT.
10
Biological Wastewater Treatment
The common methods of biological wastewater treatment are:
a) Aerobic processes such as trickling filters, rotating biological
11
Biological Wastewater Treatment
1. TRICKLING FILTERS
consist of tanks of coarser filtering media(see figure-next page).
I. Principles of operation
over tanks of coarser filtering media the WW is allowed to sprinkle
or trickle down, by means of spray nozzles or rotary distributors.
The percolating sewage is collected at the bottom of the tank through
a well designed under-drainage system.
sufficient quantity of oxygen is supplied by providing suitable
ventilation facilities in the body of the filter
The purification is done mainly by the aerobic bacteria, which form a
bacterial film around the particles of the filtering media.
The effluent must be taken to the secondary sedimentation tank for
12 settling out the organic matter oxidized while passing down the filter.
Biological Wastewater Treatment
Solid Waste Management
1
Contents
A general Overview of SW
Solid Waste Management
2
General Overview
Solid wastes are the wastes arising from
human activities which are solid and discarded as
useless or unwanted.
The term municipal solid waste, refers to
solid wastes from houses, streets and public
places, shops, offices, and hospitals.
A society receives energy and raw material as
inputs from the environment and gives solid waste
as output to the environment. Fig. below.
In the long-term perspective, such an input-output
imbalance degrades the environment.
3
Fig. 1 Materials flow and the generation of solid waste in a
technological society
4
I. Environmental Impact of Solid Waste
Disposal on Land
When solid waste is disposed off on land in open
dumps or in improperly designed landfills, it causes
the following impact on the environment.
a. ground water contamination
- by the leachate generated from the waste dump
b. surface water contamination
- by the run-off from the waste dump
c. bad odour, pests, rodents and wind-blown litter in and
around the waste dump
d. generation of inflammable gas (e.g. methane) within
the waste dump
e. bird menace above the waste dump which affects flight of
aircraft
f. release of green house gas
g. fires within the waste dump
5
Solid Waste Management
Solid waste management may be defined as:
a) the discipline associated with the control of generation,
storage, collection, transfer and transport, processing
and disposal of solid waste.
b) It is one among the basic essential services
provided by municipal authorities in the country to
keep urban centersclean.
6
Objective of Solid Waste Management
1) To protect the health of the population
2) To promote environmental quality and sustainability,
3) To support economic productivity and employment generation
4) To reduce the quantity of solid waste disposed off on land by
recovery of materials and energy from solid waste
The scope of SWM encompasses
◦ planning and management systems, waste generation
processes, and organizations, procedures and facilities
for waste handling
7
ii. Functional elements of SWM
Means activities associated with the management of solid wastes
from the point of generation to the final disposal point.
Waste Generation
Collection
Disposal
8
Cont…
1. Waste generation
🞄 activities in which materials are identified as no longer
useful and are either thrown away or gathered together for
disposal
2. Waste handling, separation, storage and processing at source
🞄 activities related to management of waste until they are put
in storage containers for collection
◦ Handling
🞄 Movement of loaded containers
to point of collection
9
Cont…
⚫ Separation
this is grouping the waste into
various categories depending on
the nature of SW e.g.
🞄 Organics
🞄 Paper
🞄 Bottles
🞄 Cans etc
Important step in recovering
materials for recycling and
reuse, and storage at source
10
Cont…
⚫ Storage
On site storage important
for the following reasons:
🞄 Public health concerns
🞄 Aesthetic considerations
⚫ Processing at source
involves activities such as
compacting and yard
composting
11
Cont…
3. Collection
includes gathering of solid wastes and recyclable
materials, transport of these to the location where
collection vehicle is emptied
🞄 location could be
processing facility
transfer station
landfill site
12
Cont…
4. Separation, Processing and Transformation
Occurs primarily in locations away from the source
of waste generation.
Sorting of commingled (mixed) wastes usually
occurs at a materials recovery facility, transfer
stations, combustion facilities, and disposal sites.
Sorting often includes
🞄 the separation of bulky items,
🞄 separation of waste components by size using screens,
🞄 manual separation of waste components,
🞄 separation of ferrous and non-ferrous metals
13
Cont…
Waste processing is undertaken:
◦ to recover conversion products and energy
🞄 transform organic fraction by
🞄 biological process – aerobic composting
🞄 chemical process – combustion/incineration
Transformation processes are used
◦ to reduce the volume, weight, size of waste requiring
disposal without resource recovery.
🞄 size reduction by shredding
🞄 volume reduction by compaction and combustion
14
Cont…
5. Transfer and Transport
The functional element of transfer and transport
involves two steps:
i. the transfer of wastes from the smaller collection
vehicle to the larger transport equipment and
ii. the subsequent transport of the wastes, usually over
long distances, to a processing or disposal site. (i.e
when disposal sites are far from point of collection)
15
Transfer station
16
Cont…
6. Disposal
Land filling or Dumping
Incineration/combustion
🞄 Combustion is the controlled burning of waste in a
designated facility to reduce its volume and, in some
cases, to generate electricity.
🞄 These activities are used to manage waste that cannot
be prevented or recycled.
17
iii. Integrated Solid Waste Management
ISWM is the selection and application of suitable
techniques, technologies and management programs
covering all types of solid wastes from all sources to
achieve the twin objectives of:
◦ waste reduction (produce ‘more with less’)
◦ effective management of waste still produced after waste
reduction
⚫ ISWM
refers to the strategic approach to sustainable
management of solid wastes covering all sources and all
aspects covering generation, segregation, transfer,
sorting, treatment, recovery and disposal in an
integrated manner, with an emphasis on maximizing
resource use efficiency
18
Cont…
Aneffective ISWM System considers how to prevent,
recycle, and manage solid waste in ways that most
effectively protect human health and the
environment
ISWM activities and hierarchy are:
1. Waste prevention/ Source reduction
2. Recycling
3. Waste transformation(composting/ combustion)
4. Landfilling
19
ISWM hierarchy
20
ISWM: Waste Prevention
Prevent waste from being generated through the
following Strategies:
🞄 less packaging
🞄 packaging with minimum toxic content
🞄 design products to last longer
🞄 reuse products and materials, repair broken items
◦ The modern concept of waste minimization is based
on the three ‘R’s are:
◦ Reduce, Reuse and Recycle.
21
ISWM: Recycling
Involves collecting, reprocessing and/or recovering
certain waste materials (e.g. glass, paper, metals,
plastics) to make new materials or products.
Environmental and economic benefits
🞄 jobs and income
🞄 supply raw material to industry
🞄 reduce demand on resources and amount of waste
requiring disposal by landfilling
22
ISWM: Waste transformation
Involves physical, chemical, or biological alteration of
waste, techniques are applied to:
Improve efficiency of SWM systems and operations
recover conversion products (e.g. compost) and energy (heat
and combustible biogas)
results in reduced use of landfill capacity
23
ISWM: Landfilling
Activities
used to manage waste that cannot be
prevented or recycled
◦ Waste is placed in properly designed, constructed
and managed land fills
🞄 Methane recovery (biogas)
Represents the least desirable means of dealing with
society’s wastes
24
iv. Need for ISWM
Cities are facing an increasing growth in population,
◦ increasing quantities of waste being generated
Due to changing lifestyles and consumption patterns,
◦ the quantity of waste generated has increased with quality and
composition of waste becoming more varied and changing
Industrializationand economic growth has produced more
amounts of waste, including hazardous and toxic wastes
LocalGovernments are now looking at waste as a business
opportunity:
a. to extract valuable resources contained within it that can still be
used and
b. to safely process and dispose wastes with a minimum impact on
the environment
25
v. Planning for ISWM
Planningis the first step in designing or improving a
waste management system.
Waste management planners should take into
consideration the following factors;
Institutional,
Social,
Financial /Economic,
Technical, and
Environmental factors.
26
Technical Factors
location and equipment
Proper collection systems
Separation at the source/Disposal
Properly designed and operating
sanitary land fills
Economic/Financial Factors
Institutional Factors Initial investment cost
Clear authorities and Long term OM costs
sanitation rules Public’s ability and
IMSWM
Organizational capacity willingness to pay
Potential for job creation
Funding
Social Factors
Environmental Factors
local customs
natural resources
religious practices,
human health
public education
27
Source, Composition and Properties of
Solid Waste
22 April, 2020 28
1. Sources of municipal solid wastes
Solid waste can be categorized based on the source:
🞄 Residential • Municipal services
🞄 Commercial • Treatment plant sites
🞄 Institutional
• Industrial
🞄 Construction and demolition
• Agricultural
Municipal solid waste (MSW) is normally assumed to include all
community wastes with the exception of industrial and
agricultural wastes.
Residential and commercial
◦ Organic and inorganic solid wastes from residential and
commercial areas
🞄 Food waste, paper of all types, card board, plastics of all types,
textiles, rubber, leather, wood and yard wastes, glass, ceramics, tin
cans, aluminum, ferrous metals, and dirt
22 April, 2020 29
1. Composition of solid wastes
22 April, 2020 30
II. Physical, chemical, and biological properties
of municipal solid waste
⚫ These properties must be known to develop and design integrated
solid waste management of MSW.
1. Physical properties:
a. Specific weight
b. Moisture content
c. Particle size and size distribution
d. Field capacity
e. Permeability of compacted waste
2. Chemical properties of MSW
i. Proximate analysis
ii. Fusing point of ash
iii. Ultimate analysis (elemental analysis) (major elements)
iv. Energy content
3. Biological properties of MSW
⚫ The production of odours and the generation of flies are related to
the putrescible nature of the organic materials.
22 April, 2020 31
Hazardous Waste (HW)
Wastes or combinations of wastes that pose potential
hazard to humans or other living organisms since such
wastes:
- are non-degradable or persist in nature
- Can be biologically magnified
- Can be lethal
- May otherwise cause or tend to cause detrimental cumulative
effect
Any substance or mixture of substances having properties
capable of producing adverse effects on health and safety
of a human beings and environment.
22 April, 2020 32
Properties of Hazardous Waste
22 April, 2020 33
Sources and Types of Hazardous Waste
22 April, 2020 34
Mismanagement of HW causes;
Ground water pollution
Pollution of streams, rivers, lakes, and other surface
waters
Killing aquatic life
Destroy wildlife
Cause respiratory illness, skin diseases, elevated levels of
toxic materials on the blood and tissue of human and
domestic livestock.
Resulted in fires, explosives, the generation of toxic
gases that have killed or seriously injured workers and
firefighters.
22 April, 2020 35
Engineering Principles of solid waste management
36
Measures and Methods Used to Assess Quantities
37
Factors that affect generation rates
Factors that influence the quantity of municipal wastes
generated include:
1. Source reduction (rate of generation)
2. Extent of recycling (rate of collection)
3. Geographic location
4. Season of the year
5. Collection frequency (affects amount of waste)
6. Use of kitchen food waste grinders
7. Public attitudes
8. Legislation
38
Collection System Types
The collection systems have been classified according to
their mode of operation into two categories
39
Recovery of Materials in MSW
Materials separated from MSW can be used directly as:
• raw material for remanufacturing and reprocessing
• feedstock for production of biological and chemical
conversion products
• fuel source for the production of energy
• land reclamation
In assessing the opportunities for recycling
• the available options for separation and processing of
waste materials
• the economics of material recovery and
• material specifications
40
Development and Implementation of MRFs
Engineering considerations:
i. Definition of the function of the MRF
ii. Selection of the material to be separated
iii. Identification of the material specification
iv. Development of separation process flow diagrams
v. Determination of process loading rate
vi. Layout and design of the physical facilities
vii. Selection of equipment & facilities used
viii. Environmental studies
ix. Aesthetic considerations
x. Adaptability of the facility to potential changes
41
Need for transfer operations
Factors that make the use of transfer operations
attractive and a necessity :When;
1) Direct hauling is not economically feasible.
42
Types of Transfer Stations
Depending on the method used to load the transport
vehicles, transfer stations may be classified into three
general types:
◦ Direct-load
◦ Storage-load
43
Direct-load transfer stations
44
Transfer Station Design
Important factors in the design of transfer stations:
i. Type of transfer operation
◦ An adequate area is necessary in case of waste recovery
ii. Storage and throughput capacity requirements
◦ Collection vehicles do not have to wait too long to unload
iii. Equipment and accessory requirements
◦ Depends on the capacity of the station
iv. Sanitation requirements
45
Location of Transfer Stations
Transfer stations should be located:
As near as possible to the solid waste production areas to be
served
Within easy access of major arterial highway routes as well
as near secondary or supplemental means of transportation
Where there will be a minimum of public and environmental
objection to the transfer operations
Where construction and operation will be most economical
46
Biological and Chemical
Conversion Technologies
47
Biological conversion of MSW
The two common biological processes used to transform
organic materials into gaseous, liquid and solid conversion
products are:
◦ Aerobic Composting
48
Comparison of composting and AD
Table: Comparison of aerobic composting and AD for processing the of MSW
49
Process description
Composting operations consist of three basic steps:
1. Pre-processing of the MSW
◦ Receiving
◦ Removal of recoverable materials
◦ Size reduction
◦ Adjustment of waste properties (C/N ratio, addition of
moisture and nutrients and etc.)
2. Decomposition of the of MSW
3. Preparation and marketing of the final compost product
50
Anaerobic Digestion (AD)
Anaerobic digestion of organic material is basically a 3-
stage process: large organic polymers are first hydrolyzed
and then fermented into short-chain volatile fatty acids
These acids are then converted into CH4 and CO2.
51
Chemical processes for the recovery of
conversion products from SW
52
Disposal of Solid Wastes and Residual
Material
Landfill
53
Landfilling Process
⚫ Cell is the volume of material placed in a landfill during one operating period,
usually one day.
⚫ Lift is a complete layer of cells over the active area of landfill.
55
Landfilling terms
⚫ Daily cover is the soil or alternative materials such as compost that are applied
to the working faces of the landfill at the end of each operating period. usually
consists of 15 to 30 cm of native soil
⚫ Intermediate covers are placed at the end of each phase (series of lifts); these
are thicker than daily covers, typically 45 cm
⚫ Final cover is applied to the entire landfill surface after all landfilling operations
are complete. 56
Landfilling terms
⚫ Bench (or terrace) is used to maintain the slope stability of the landfill, for
placement of surface water drainage channels and for the location of landfill gas
recovery piping.
⚫ Landfill gas is mixture of gases found within landfill. It mainly consists of CH4 &
CO2
57
Landfilling terms
58
Landfilling terms
59
Landfill planning, design and operation
Management of leachate
Environmental monitoring
60
Landfill operations and processes
61
Preparation of site for landfilling
Existing site drainage is modified to route any runoff away
from the intended landfill area
Access roads and weighing facilities are constructed and
fences are installed
Landfill bottom and subsurface sides are excavated and
prepared. Excavations are carried out over time, rather
than preparing the entire landfill bottom at once
The bottom is shaped to provide drainage of leachate and
a low-permeability (clay, geo-membrane) liner is installed.
Leachate collection and extraction facilities are placed
within or top of the liner.
62
Preparation of site for landfilling
63
Solid Waste Placement and Compaction
64
Placement of wastes
65
Reactions occurring in landfills
I. Biological reactions
Organic material in MSW leads to the evolution of landfill
gases and leachate.
66
Reactions occurring in landfills
III. Chemical reactions
Dissolution and suspension of landfill material and biological
conversion products in leachate
Evaporation and vaporization of chemical compounds into
landfill gas
Sorption of volatile and semi-volatile organic compounds into
landfilled material
Dehalogenetaion and decomposition of organic compounds
Oxidation-reduction reactions affecting metals and solubility of
metal salts
67
Concerns with landfilling
The goal for the design and operation of a modern landfill
is to eliminate or minimize:
1. uncontrolled release of landfill gases might cause odor and
other potential dangerous conditions
2. impact of uncontrolled discharge of landfill gases on
greenhouse effect in the atmosphere
3. uncontrolled release of leachate might migrate down to
underlying groundwater or to surface water
4. breeding and harboring of disease vectors in improperly
managed landfills
5. health and environmental impacts associated with the
release of the trace gases arising from hazardous materials
placed in the landfills in the past
68
Landfilling Methods
1. Excavated cell/trench Method
It is ideally suited to areas where an adequate depth of
cover material is available at the site and where water
table is not near the surface.
2. Area Method
It is used when the terrain is unsuitable for excavation.
High-groundwater conditions necessitate the use of this
type.
3. Canyon/depression Method
Dry borrow pits and quarries are used.
Control of surface drainage often is critical factor in
the development of depression sites.
69
Landfill Siting Considerations
Haul distance Pond/Lake > 200m
River > 100m
Location restrictions Flood plain > 100 year flood
Highway > 200m
Habitated area > 500m
Available land area Public parks > 300m
Airports Aviation Authorities
Site access Ground Water Table > 2m
70
Control of Landfill Gases
72
Leachate collection systems
74
Surface Water Management
⚫ Surface water control systems:
Surface water drainage facilities
76
Layout & Preliminary Design of Landfills
Important topics that must be considered in a
landfill design:
Layout of landfill site
Types of wastes that must be handled
The need for a convenience transfer station
Estimation of landfill capacity
Evaluation of the geology and hydrology of the site
Selection of landfill gas and leachate control facilities
Layout of surface drainage facilities
Aesthetic design considerations
Monitoring facilities
Determination of equipment requirements
Development of an operations plan
77
Layout of Landfill Sites
In planning the layout of a landfill site, the location of the
following must be determined:
Access roads, office space and plantings
Drainage facilities
79
Design of Landfills
⚫ Important factors to consider in the design of landfills:
Access (roads to landfill site, temporary roads to unloading
area)
Land area (large enough for 10 - 25 years)
Landfilling method (excavated cell/trench, area, canyon)
Completed landfill characteristics (slope of final cover: 3 -6%)
Surface drainage (to divert surface water runoff)
Intermediate cover material (waste to cover ratio: 5 – 10: 1)
Final cover (multilayer design)
Landfill liner (multilayer design, leachate collection system)
Cell design and construction
80
Waste Volume and Landfill Capacity
The total landfill area should be approximately 15% more
than the area required for landfilling to accommodate all
infrastructure and support facilities.
Thereis no standard method for classifying landfills by their
capacity.
However, the following nomenclature is often observed in
literature:
◦ Small size landfill : less than 5 hectare area
◦ Medium size landfill : 5 to 20 hectare area
◦ Large size landfill : greater than 20 hectare area.
81
Landfill Closure and Post closure Care
They are the terms used to describe what is to happen to
a completed landfill in the future.
Development of Long-Term Closure Plan
Cover and landscape design
Control of landfill gases
Collection and treatment of leachate
Environmental monitoring systems
Post closure Care
Routine inspections
Infrastructure maintenance
Environmental monitoring systems
82