RMU Checklist.V2
RMU Checklist.V2
Configuration:
Serial No.:
No. CHECKING ITEMS
A. Installation and Erection
1. Panel Level & Alignment Adjustment
2. Panel Grounding Fixing
3. Panel Coupling
4. Conformity of Busbar Installation
5. Busbar Tightening Torque ( Nm )
6. MV Cable Tightening Torque ( Nm )
7. Conformity of Earthing Circuit Installation
8. Earthing Bar Tightening
9. Interrupter Condition of DS/LBS
10. Condition of Pole Circuit Breaker (CB)
11. Condition of Lower Contact Point CB
12. Condition of Upper Contact Point (CB)
B. Operating Mechanism
1. Operating Mechanism Disconnecting Switch
2. Mechanical Switch Close/Open
3. Mechanical Earthing Switch Close/Open
4. Operating Mechanism Circuit Breaker
5. Mechanical Circuit Breaker Close/Open
C. Visual Inspection and Labelling
1. Cleanliness of cubicle/panel
2. Paintwork in good condition
3. "Safety Labels" Symbols Marked
4. Blown fuse Indication for QM/CRM
5. Conformity of Equipment’s
Internal
Life Is On
Substation Name :
Configuration :
Serial No. :
No. CHECKING ITEMS
D. Functional Test
1. Manual Electrical Switch Close/Open
2. Breaker On/Off Indication
3. Remote Switch Close/Open if any
4. Heater Function
5. Current Transformer Ratio
6. Voltage Transformer Ratio
7. Motorized Open/ Close if Any
8. Tripping Coil if Any
9. Closing Coil if Any
10. Voltage Phase Indicator Lamp
11. Mechanical Interlock
12. Electrical Interlock
F. Metering
1. Ammeter if Any
2. Voltmeter if Any
3. SF6 Gauge Meter
G. Protection if Any
1. Overcurrent Relay
2. Ground Fault Relay
3. Under Voltage Relay
4. MV Fuse if Any
Note: N/A = Not Available, N/Ap = Not Applicable.
Internal
Life Is On
Substation Name :
Configuration :
Serial No. :
No. CHECKING ITEMS
Testing
1. Insulation Test, Ir (Megger)
2. Contact Resistance Test if any
3. SF6 Dew Point & Humidity
REMARKS/SPECIAL NOTE:
Internal