Topic—Downtime

1) A table has been chosen for ICNV. How are database operations synchronized between the
source and the target table ?

Right Answer:-

Deletes are directly executed in the target table by delete trigger.

2) You are running an SAP ECC System. For which of the following activities does SUM allow
you to use NZDM Capabilities.?

Right Answers:-

Upgrade the system.

Apply support packages.

Apply an Enhancement package.

3) You want to use the downtime-optimized data conversion for your SAP S/4 HANA
conversion. What is the main difference from SAP Standard S/4HANA conversion?

Right Answer:-

Dedicated application tables are migrated in uptime.

4) You are performing an upgrade of an SAP ECC development System with SUM. What is the
earliest point when upgrade is considered complete and you allow all dialog users to log on
the system?

Right Answer:-

During the SUM Roadmap step ‘Postprocessing’,after the post procedure steps are complete.

Topic—Handling of an SAP System Landscape


5) You are upgrading three - system landscape DEV-QAS-PRD. The upgrade project contains a
Unicode conversion. You have already upgraded the DEV and QAS but not yet PRD. What do
you need to consider?

Right Answer:-

The upgrade of the PRD must be finished before you import any transports from the upgraded DEV
system into the PRD.

6) You are planning an S/4HANA conversion. Which conversion specific tasks need to be
performed during the preparation phase ?

Right Answers:-

Check the compatibility of custom code with SAP S/4HANA.

Apply the recommendations of the simplification list.


7) You are performing an SAP S/4HANA conversion for your production system.This conversion
requires that certain business functions are switched on. Following SAP recommendations,
How will you achieve this ?

Right Answers:-

Import the transport request from development system that contains the recording of the
activation.

During conversion, SUM delivers some business functions already activated.

8) You want to execute Unicode conversion only. Which approach do you need to follow?

Right Answer:-

SWPM using the load procedure.

Topic—Manual Activities for SUM


9) Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM
you are using usually contain?
Right Answer:-
An overview about possible upgrade paths.
The corrections to the SUM Guide.
The link to different patch levels to SUM.
10) Which guides contain information about SUM Phases starting with EU_Clone?
Right Answers:-
The SAP S/4HANA conversion Guide.
The DMO Guide.