Topic Downtime
Topic Downtime
1) A table has been chosen for ICNV. How are database operations synchronized between the
source and the target table ?
Right Answer:-
2) You are running an SAP ECC System. For which of the following activities does SUM allow
you to use NZDM Capabilities.?
Right Answers:-
3) You want to use the downtime-optimized data conversion for your SAP S/4 HANA
conversion. What is the main difference from SAP Standard S/4HANA conversion?
Right Answer:-
4) You are performing an upgrade of an SAP ECC development System with SUM. What is the
earliest point when upgrade is considered complete and you allow all dialog users to log on
the system?
Right Answer:-
During the SUM Roadmap step ‘Postprocessing’,after the post procedure steps are complete.
Right Answer:-
The upgrade of the PRD must be finished before you import any transports from the upgraded DEV
system into the PRD.
6) You are planning an S/4HANA conversion. Which conversion specific tasks need to be
performed during the preparation phase ?
Right Answers:-
Right Answers:-
Import the transport request from development system that contains the recording of the
activation.
8) You want to execute Unicode conversion only. Which approach do you need to follow?
Right Answer:-