Risk Assessment For Painting Works
Risk Assessment For Painting Works
handling.
allowed.
from obstruction.
avoid fatigue.
Page 1 of 8
Risk Assessment for Painting Works
battery/electrical room.
work on-site.
manufacturer recommendations when
using hydraulic trolley/pallet jack, shall be The surrounding area of equipment
Trained personnel shall be operated, and other equipment in the material handling
hydraulic system shall be ensured load shall be kept close to the ground as
The load shall be secured and are unable reasonably practicable.
to become dislodged, move or fall when The load shall be secured with sling/rope
while lifting, loading and unloading the kept free from obstruction.
Page 2 of 8
Risk Assessment for Painting Works
Only trained workers shall be allowed to Drill bits and grinding/cutting disk
Smoking area shall be provided away from protect abrasion and cut due to sharp
the spray paint area edges.
Application of Paint Fire 4 2 8 3 1 3
Fuel operated equipment shall not be Fit for work PPE shall be worn.
operated in painting area Emergency Response Plan
Smoking shall not be allowed near the Safety Equipment (First aid kit, stretcher)
spray paint area First Aider
MSDS shall be discussed along with RAMS PPE (Helmet, safety boots, safety glasses,
Page 3 of 8
Risk Assessment for Painting Works
Training for safe use of power tools shall competent electrician periodically and
be conducted for workers involved in daily regular visual inspection by the users
Battery driven power tools shall be used tool shall be removed from the site.
Electrocution, electric shock or damaged electrical plugs shall not be only industrial extension boards with built-
Application of Paint while mixing chemical and 4 2 8 in ELCB breaker shall be used. 3 1 3
allowed at the site.
sanding activity
Only Industrial plugs (male/female) with IP Only double insulated and spark-proof
66 rated shall be used at the site. power tools shall be used at the site.
Power tools (mixing drills, sanding Only power tools with dead man switch
machines) shall be fitted with a handle to shall be allowed to use at the site.
control drill/sanding machine during Mixing bit, sanding disc shall be replaced
Page 4 of 8
Risk Assessment for Painting Works
Page 5 of 8
Risk Assessment for Painting Works
do spray painting.
Air compressor shall be inspected, and
Equipment hose connection shall be A suitable air compressor spray gun shall
Spray gun shall be inspected before every avoided during spray painting.
use. Only breaded hose connections shall be
Pressure from chemical pots shall be allowed to use with air compressors.
Page 6 of 8
Risk Assessment for Painting Works
trained for work at height requirements. For the mobile scaffold, castor wheels shall
Correct use of full body harness shall be be locked before using it.
each use of full body harness While shifting the mobile scaffold from one
Top rail height shall be maintained as per place to another, workers working on top
OSHA standards (105 cm/42 inch from the of it shall come down.
Monthly inspection and color coding shall body harness with 2 lanyards shall be
Scaffold working platform shall be Work at height log shall be maintained for
Men and materials fall from provided and trained; those workers who shall perform work at
supervisor/inspector
be used
edges
Page 7 of 8
Risk Assessment for Painting Works
Likelihood
Very Low Low Medium High Very High
Severity
Unlikely Possible Likely Very Likely 1 2-3 4-6 8-18 24
1 2 3 4
Major - 4 4 8 12 16
Moderate - 2 2 4 6 8
Minor - 1 1 2 3 4
Page 8 of 8