0% found this document useful (0 votes)
20 views115 pages

Prism Surface Coatings (P) LTD

Uploaded by

rxrdacchu46
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views115 pages

Prism Surface Coatings (P) LTD

Uploaded by

rxrdacchu46
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 115

0 1 2 3 4 5 6 7 8 9

Prism Surface Coatings (P) Ltd.

#89, 3rd Cross Road, 4th Phase,


Bommasandra Industrial Area,
B
Bommasandra, Bangalore,
Karnataka - 560 099, India.
Tel No: +91-8110-417999.
Website: www.prismsurface.com

C
CUSTOMER SHIRDI SAI ELECTRICALS LTD

PROJECT SRIDHI SAI KADAPA

D
APPLICATION ----

JOB NO. V2400

E
DRAWINGS NO. ''V''

P.O.NO. -----------------

F
REVISION NO. 01

Created on 13.04.2023
Edit date 21.07.2023 Number of pages 115

Drg.Approved By. Title: COVER SHEET P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 1
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

REVISION DETAILS
PAGE NO. PAGE DESCRIPTION
A 0 1 2 3 4 5 6 7 ASBUILT

1 COVER SHEET 21.07.2023

2 INDEX SHEET 21.07.2023

2.a INDEX SHEET 21.07.2023

6 GENERAL SPECIFICATION 21.07.2023

B 7 GENERAL ARRANGMENT DRAWINGS 21.07.2023

8 POWER WIRING DIAGRAM 18.07.2023

9 POWER WIRING DIAGRAM 19.07.2023

10 POWER WIRING DIAGRAM 19.07.2023

11 POWER WIRING DIAGRAM 19.07.2023

12 POWER WIRING DIAGRAM 19.07.2023


C
13 POWER WIRING DIAGRAM 19.07.2023

14 POWER WIRING DIAGRAM 19.07.2023

15 POWER WIRING DIAGRAM 21.07.2023

16 POWER WIRING DIAGRAM 21.07.2023

17 POWER WIRING DIAGRAM 21.07.2023


D POWER WIRING DIAGRAM
19 21.07.2023

21 POWER WIRING DIAGRAM 21.07.2023

22 POWER WIRING DIAGRAM 21.07.2023

24 POWER WIRING DIAGRAM 21.07.2023

25 POWER WIRING DIAGRAM 21.07.2023

E 26 POWER WIRING DIAGRAM 21.07.2023

27 POWER WIRING DIAGRAM 21.07.2023

28 POWER WIRING DIAGRAM 21.07.2023

29 CONTROL WIRING DIAGRAM 21.07.2023

30 PID CONTROLLER WIRING 21.07.2023

31 PID CONTROLLER WIRING 21.07.2023


F
32 PID CONTROLLER WIRING 21.07.2023

33 CONTROL WIRING DIAGRAM 21.07.2023

34 CONTROL WIRING DIAGRAM 21.07.2023

35 CONTROL WIRING DIAGRAM 21.07.2023

36 CONTROL WIRING DIAGRAM 21.07.2023


G
37 CONTROL WIRING DIAGRAM 21.07.2023

38 CONTROL WIRING DIAGRAM 21.07.2023

Drg.Approved By. Title: INDEX SHEET P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 2
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

REVISION DETAILS
PAGE NO. PAGE DESCRIPTION
A 0 1 2 3 4 5 6 7 ASBUILT

39 CONTROL WIRING DIAGRAM 21.07.2023

40 CONTROL WIRING DIAGRAM 21.07.2023

41 CONTROL WIRING DIAGRAM 21.07.2023

42 CONTROL WIRING DIAGRAM 21.07.2023

B 43 CONTROL WIRING DIAGRAM 21.07.2023

44 CONTROL WIRING DIAGRAM 21.07.2023

45 CONTROL WIRING DIAGRAM 21.07.2023

46 CONTROL WIRING DIAGRAM 18.07.2023

47 CONTROL WIRING DIAGRAM 19.07.2023

48 CONTROL WIRING DIAGRAM 21.07.2023


C
49 CONTROL WIRING DIAGRAM 21.07.2023

50 CONTROL WIRING DIAGRAM 21.07.2023

51 CONTROL WIRING DIAGRAM 21.07.2023

52 CONTROL WIRING DIAGRAM 21.07.2023

53 CONTROL WIRING DIAGRAM 21.07.2023


D CONTROL WIRING DIAGRAM
54 21.07.2023

55 CONTROL WIRING DIAGRAM 21.07.2023

Drg.Approved By. Title: INDEX SHEET P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 2.a
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

Drg.Approved By. Title: GENERAL SPECIFICATION P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 6
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

TOP VIEW
A

GP GP GP GP GP

500
600 800 800 800 600
B LHS VIEW
FRONT VIEW RHS VIEW
INCOMER SPRAY PRETREATMENT WATER DRYING OVEN POWER COATING BOOTH POWER CURING OVEN
AIRFILTER +FAN
R Y B

AIRFILTER +FAN
R-PHASE Y-PHASE B-PHASE

MFM
122 MFM MFM MFM MFM
122 MFM MFM MFM MFM 122 MFM MFM MFM MFM
122

PAINT DRYING OVEN

HWR +DEGREASING BLOWER IRON PHOSPHATING BLOWER HWR FUME EXHAUST BLOWER IRON PHOSPHATING PUMP 2 WATER RINSE 3 PUMP CIRCULATION PUMP PHOSPHATING TANK MSB BLOWER 2 PCB-1 BLOWER 1 PCB-1 BLOWER 2 PCO-1 BLOWER 2 POC1 BURNER -1
ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP BURNER BURNER
OFF ON OFF ON

C BURNER -1 BURNER -2 BURNER -3 CIRCULATION PUMP ( HOT WATER TANK TO PHE) BOOSTER PUMP 1 BOOSTER PUMP 2 PCB-2 BLOWER 1 PCB-2 BLOWER 2 PCO-1 BLOWER 1 PCO-2 BLOWER 1 PCO-2 BLOWER 2

BURNER BURNER BURNER BURNER BURNER BURNER ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP ON OFF TRIP FWD.ON REV..ON TRIP FWD.ON REV..ON TRIP
OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON

DEGREASING FUME EXHAUST BLOWER IRON PHOSPHATING HWR PUMP BOOSTER PUMP 3 WDO BLOWER 1 WDO BLOWER 2 POC2 BURNER -2
FUME EXHAUST BLOWER
ON OFF TRIP ON OFF TRIP ON OFF TRIP FWD.ON REV..ON TRIP ON OFF TRIP ON OFF TRIP
SW2 SW3 SW4 SW5 BURNER
OFF ON
BURNER
OFF ON

DEGREASING PUMP 1 DEGREASING PUMP 2 WATER RINSE 1 PUMP WDO BURNER -4 MSB BLOWER 1 PCO-2 BLOWER 2 POC2 BURNER -2 CONVEYOR DRIVE UNIT
EMG4
FWD.ON REV..ON TRIP FWD.ON REV..ON TRIP ON OFF TRIP BURNER BURNER FWD.ON REV..ON TRIP Solenoid Valve-4 Solenoid Valve-5 Solenoid Valve-6 Solenoid Valve-7 FWD.ON REV..ON TRIP BURNER BURNER FWD.ON REV..ON TRIP
OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON EMERGENCY OFF ON OFF ON

STOP

WATER RINSE 2 PUMP IRON PHOSPHATING PUMP 1


SW1 SW2 SW3 SW4 SW5
FWD.ON REV..ON TRIP FWD.ON REV..ON TRIP Solenoid Valve-1 Solenoid Valve-2 Solenoid Valve-3

Q1
OFF ON OFF ON OFF ON

MCCB,800A
2000

2000

2000
D DRAWING POCKET

AIRFILTER
AIRFILTER

E
100

100
500
500
100

600 800 800 800 600

F 3600

BOTTOM VIEW
500

G 600 800 800 800 600

Drg.Approved By. Title: GENERAL ARRANGMENT DRAWINGS P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 7
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Q0 CT1-CT3
MCCB 800A,3P CURRENT
50KA TRANSFORMER
800/5A,
CL.1.5VA

1 2

I>>
L1 / 9.0:A
3 4 S1 S2

I>>
L2 / 9.0:A
5 6 S1 S2

I>>
B L3 / 9.0:A
S1 S2
N / 9.0:B

R1

Y1
A11 A21 A31
2.5SQMM Black

1-CTTB
1 1 1
1 3 5
M1 1 3
C 6A,TP M2
2 4 6 2 2 2
MCB MCB
PE
A41 10A,DP
2 4

A12 A22 A32

R2
BLACK

Y2
1.5Sq.mm
1 2
V1 V2 V3 N
TR1
1 2 3 4 5 6 415/230VAC
MFM RATING:2KVA
D S1 S2 S1 S2 S1 S2
3 4
A1 A2 A3

8 9 10 EM6436H
SPP
/33.1:A V1 V2 V3 VN L+ N-
V1 V2 V3

8 9 10 11 12 13
C NO

E 1 3
M3
16A,DP
2 4
MCB

R Y B
R Y B N
x1 x1 x1

I/C 1 2 3 4 x2 x2 x2 1Sq mm Grey


SPP.13 SPP.14
33.1:A 33.2:A
R

100

101
27.3:B /

27.3:B /
INCOMING SUPPLY
415V AC,3PHASE,
4WIRE,50Hz
G

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 8
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 8.9:B / L1 L1 / 10.0:A

8.9:B / L2 L2 / 10.0:A

8.9:B / L3 L3 / 10.0:A

8.9:B / N N / 10.0:B

2R1

2B1
2Y1

3N1

4N1
3R1

4R1

6R1

6B1
6Y1
2.5Sq.mm Black 2.5Sq mm Black 2.5Sq mm Black 4Sq.mm Black
B

1 3 5 13 21 1 3 5 13 21 1 3 5 1 3 5 13 21

Q1 Q2 Q3 Q4
7-10A 14 22 MPCB 14 22 MPCB MPCB 14 22
MPCB 0.9-1.1A 0.9-1.1A 9-12.5A

/33.2:B

/33.4:C

/33.5:B

/33.8:C

/34.1:C

/34.4:C
I> I> I> I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6 2 4 6

3R2

4R2
4Sq mm Black

6R2

6B2
6Y2
C
2R2

2B2
2Y2

3N2

4N2
3R3

4R3
2.5Sq.mm Black

2.5Sq mm Black 2.5Sq mm Black


6R5

C2 1 3 5 C3 1 3 5 C4 1 3 5 C5 1 3 5 C6 1 3 5
/33.5:F /33.6:F /34.1:F /34.2:F /34.3:F
POWER POWER POWER POWER POWER
C1 3 5 CONTACTOR 2 CONTACTOR 2 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6
1 4 6 4 6 25A,TP 25A,TP 12A,TP
D /33.2:F 7A,TP 7A,TP
POWER 3R4

4R4
CONTACTOR 2 4 6
12A,TP

2.5Sq.mm Black 4Sq.mm Black 4Sq.mm Black


2.5Sq mm Black A2 2.5Sq mm Black A2
RL1 RL2
3N3

5N3
3R5

5R5
E
3R6

5R6
A1 A1

6R3

6B3
6Y3
PE

PE

6R4

6B4
6Y4

PE
X2 1 2 3 4 X3 1 2 3 4
PE PE
X4
2R3

1 2 3 4 5 6 7
2B3
2Y3

PE

PE

PE
X1 1 2 3 4
W1 U2

F
U V W PE V1 M V2
BURNER-1 BURNER-2 3~
M 230V AC,2.2A 230V AC,2.2A U1 W2
3

MOTOR-1
MOTOR-2
FLUE GAS EXHAUST BLOWER 13 14 /54.7:D
(HWR +DEGREASING) HWR TANK BURNER 21 22 /55.2:D DEGREASING TANK FLUE GAS EXHAUST BLOWER (IRON PHOSPHATING)
SUPPLY 0.18KW 21 22 /54.9:C
4KW, 3Ph, 415VAC,50Hz BURNER 0.18KW
1PHASE,230VAC,50Hz
1Rx4Cx2.5Sq mm 1PHASE,230VAC,50Hz 5.5KW,3Ph, 415VAC,50Hz
G
1Rx6Cx1.5Sq mm 2Rx4Cx4Sq mm
1Rx6Cx1.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 9
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

9.9:A / L1 L1 / 11.0:A
A
9.9:A / L2 L2 / 11.0:A

9.9:A / L3 L3 / 11.0:A

9.9:B / N N / 11.0:B

10R1

10B1
10Y1
8R1

9R1
8B1

9B1
8Y1

9Y1
7N1
7R1
2.5Sq mm Black 2.5Sq.mm Black 2.5Sq.mm Black 2.5Sq.mm Black

B
1 3 5 13 21 1 3 5 13 21 1 3 5 13 21 1 3 5 13 21

Q5 Q6 Q7 Q8
MPCB 14 22 2.2-3.2A 14 22 2.8-4A 14 22 1.4-2A 14 22
0.9-1.1A MPCB MPCB MPCB

/34.5:C

/34.6:B

/35.1:B

/35.3:C

/35.4:B

/35.5:C

/35.6:B

/35.8:C
I> I> I> I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6 2 4 6

7R2

8R2

8B2
8Y2

10R2

10B2
10Y2
9R2

9B2
9Y2
7N2
7R3

C
2.5Sq.mm Black 2.5Sq.mm Black 2.5Sq.mm Black

2.5Sq mm Black

C7 1 3 5
/34.5:F
POWER
CONTACTOR 2 4 6
C8 1 3 5 C9 1 3 5 C10 1 3 5
7A,TP /35.1:F /35.4:F /35.6:F
POWER POWER POWER
7R4

D CONTACTOR 2 CONTACTOR 2 CONTACTOR 2


4 6 4 6 4 6
9A,TP 9A,TP 9A,TP

2.5Sq mm Black A2 2.5Sq.mm Black


RL3
7N3
7R5

7R6

A1
PE

E 2.5Sq.mm Black 2.5Sq.mm Black


X5 1 2 3 4
PE
8R3

8B3
8Y3

10R3

10B3
10Y3
9R3

9B3
9Y3
PE

PE

PE
PE PE PE
X6 1 2 3 4 X7 1 2 3 4 X8 1 2 3 4

BURNER-3
F U V W PE U V W PE U V W PE
230V AC,2.2A
M M M
3 3 3

MOTOR-3 MOTOR-4 MOTOR-5


IRON PHOSPHATING
HWR FUME EXHAUST BLOWER DEGREASING FUME EXHAUST IRON PHOSPHATING FUME EXHAUST
TANK BURNER 0.18KW BLOWER BLOWER
1PHASE,230VAC,50Hz 1.1KW, 3Ph, 415VAC,50Hz 1.5KW, 3Ph, 415VAC,50Hz 1.5KW, 3Ph, 415VAC,50Hz

G 1Rx6Cx1.5Sq mm 1Rx4Cx2.5Sq mm 1Rx4Cx2.5Sq mm 1Rx4Cx2.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 10
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

10.8:A / L1 L1 / 12.0:A
A
10.8:A / L2 L2 / 12.0:A

10.8:A / L3 L3 / 12.0:A

10.8:B / N N / 12.0:B
11R1

12R1

13R1
11B1

12B1

13B1
11Y1

12Y1

13Y1
4Sq.mm Black 4Sq.mm Black 4Sq.mm Black

B
1 3 5 13 21 1 3 5 13 21 1 3 5 13

Q9 Q10 Q11
MPCB 14 22 MPCB 14 22 MPCB 14
10-16A 10-16A 10-16A
/36.1:C

/36.3:C

/36.5:C

/36.8:C

/37.1:C
I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6

4Sq mm Black 4Sq mm Black 4Sq mm Black


11R2

12R2

13R2
11B2

12B2

13B2
11Y2

12Y2

13Y2
C

11R5 12R5 13R5

C11 1 3 5 C12 1 3 5 C13 1 3 5 C14 1 3 5 C15 1 3 5 C16 1 3 5 C17 1 3 5 C18 1 3 5 C19 1 3 5


/36.1:F /36.2:F /36.2:F /36.5:F /36.6:F /36.7:F /37.1:F /37.2:F /37.3:F
POWER POWER POWER POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6
25A,TP 25A,TP 12A,TP 25A,TP 25A,TP 12A,TP 25A,TP 25A,TP 12A,TP

4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black
11R3

11R4

12R3

12R4

13R3

13R4
11B3

11B4

12B3

12B4

13B3

13B4
11Y3

11Y4

12Y3

12Y4

13Y3

13Y4
E
PE

PE

PE
X9 1 2 3 4 5 6 7 X10 1 2 3 4 5 6 7 X11 1 2 3 4 5 6 7
PE PE PE

W1 U2 W1 U2 W1 U2

V1 M V2 V1 M V2 V1 M V2

F 3~ 3~ 3~
U1 W2 U1 W2 U1 W2

MOTOR-6 MOTOR-7 MOTOR-8

HWR PUMP-1 DEGREASING PUMP 1-2 DEGREASING PUMP-2

7.5KW,3Ph, 415VAC,50Hz 7.5KW,3Ph, 415VAC,50Hz 7.5KW,3Ph, 415VAC,50Hz

G 2Rx4Cx4Sq mm 2Rx4Cx4Sq mm 2Rx4Cx4Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 11
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

11.9:A / L1 L1 / 13.0:A
A
11.9:A / L2 L2 / 13.0:A

11.9:A / L3 L3 / 13.0:A

11.9:B / N N / 13.0:B
14R1

15R1

16R1
14B1

38B1

16B1
14Y1

38Y1

16Y1
4Sq.mm Black 4Sq.mm Black 4Sq.mm Black

B
1 3 5 13 21 21 1 3 5 13 21 1 3 5 13 21

Q12 Q13 Q14


MPCB 14 22 22 MPCB 14 22 MPCB 14 22
10-16A 10-16A 10-16A
/37.4:C

/37.4:C

/37.7:C

/38.0:C

/38.3:C

/38.5:C

/38.8:C
I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6

4Sq mm Black 4Sq mm Black 4Sq mm Black


14R2

15R2

16R2
14B2

15B2

16B2
14Y2

15Y2

16Y2
C

14R5 15R5 16R5

C20 1 3 5 C21 1 3 5 C22 1 3 5 C23 1 3 5 C24 1 3 5 C25 1 3 5 C26 1 3 5 C27 1 3 5 C28 1 3 5


/37.4:F /37.5:F /37.6:F /38.0:F /38.2:F /38.2:F /38.5:F /38.6:F /38.7:F
POWER POWER POWER POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6
25A,TP 25A,TP 12A,TP 25A,TP 25A,TP 12A,TP 25A,TP 25A,TP 12A,TP

4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black
14R3

14R4

15R3

15R4

16R3

16R4
14B3

14B4

15B3

15B4

16B3

16B4
14Y3

14Y4

15Y3

15Y4

16Y3

16Y4
E
PE

PE

PE
X12 1 2 3 4 5 6 7 X13 1 2 3 4 5 6 7 X14 1 2 3 4 5 6 7
PE PE PE

W1 U2 W1 U2 W1 U2

V1 M V2 V1 M V2 V1 M V2

F 3~ 3~ 3~
U1 W2 U1 W2 U1 W2

MOTOR-9 MOTOR-10 MOTOR-11

WATER RINSE 1 PUMP WATER RINSE 2 PUMP IRON PHOSPHATING PUMP 1

7.5KW,3Ph, 415VAC,50Hz 7.5KW,3Ph, 415VAC,50Hz 7.5KW,3Ph, 415VAC,50Hz

G 2Rx4Cx4Sq mm 2Rx4Cx4Sq mm 2Rx4Cx4Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 12
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 12.9:A / L1 L1 / 14.0:A

12.9:A / L2 L2 / 14.0:A

12.9:A / L3 L3 / 14.0:A

12.9:B / N N / 14.0:B
17R1

18R1

19R1
17B1

18B1

19B1
17Y1

18Y1

19Y1
4Sq.mmBlack 4Sq.mmBlack 2.5Sq.mm Black
B

1 3 5 13 21 1 3 5 13 21 21 1 3 5 13

Q15 Q16 Q17


MPCB 14 22 MPCB 14 22 22 7-10A 14
10-16A 10-16A MPCB
/39.1:C

/39.3:C

/39.4:C

/39.7:C

/40.2:C

/40.1:B
I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6

4Sq mm R/Y/B 4Sq mm R/Y/B


17R2

18R2
17B2

18B2
17Y2

18Y2
C

19R2

19B2
19Y2
2.5Sq.mmBlack

17R5 18R5

C29 1 3 5 C30 1 3 5 C31 1 3 5 C32 1 3 5 C33 1 3 5 C34 1 3 5


/39.1:F /39.2:F /39.2:F /39.4:F /39.6:F /39.6:F
POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 C35 3 5
1
25A,TP 25A,TP 12A,TP 25A,TP 25A,TP 12A,TP
D /40.1:F
POWER
CONTACTOR 2 4 6
16A,TP

4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack

E
17R3

17R4

18R3

18R4
17B3

17B4

18B3

18B4
17Y3

17Y4

18Y3

18Y4
PE

PE
2.5Sq.mm Black

X15 1 2 3 4 5 6 7 X16 1 2 3 4 5 6 7
PE PE

19R3

19B3
19Y3

PE
W1 U2 W1 U2
X17 1 2 3 4 PE

F
V1 M V2 V1 M V2

3~ 3~ U V W PE
U1 W2 U1 W2
M
3
MOTOR-12 MOTOR-13 MOTOR-14
IRON PHOSPHATING PUMP 2 WATER RINSE 3 PUMP
CIRCULATION PUMP
( PHOSPHATING TANK TO PHE)
7.5KW,3Ph, 415VAC,50Hz 7.5KW,3Ph, 415VAC,50Hz
G 4KW, 3Ph, 415VAC,50Hz
2Rx4Cx4Sq mm 2Rx4Cx4Sq mm
1Rx4Cx2.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 13
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

13.9:A / L1 L1 / 15.0:A
A
13.9:A / L2 L2 / 15.0:A

13.9:A / L3 L3 / 15.0:A

13.9:B / N N / 15.0:B

20R1

21R1

22R1

23R1
20B1

21B1

22B1

23B1
20Y1

21Y1

22Y1

23Y1
2.5Sq.mmBlack 2.5Sq.mmBlack 2.5Sq.mmBlack 2.5Sq.mmBlack

B
1 3 5 13 21 1 3 5 13 21 1 3 5 13 21 1 3 5 13 21

Q18 Q19 Q20 Q21


2.2-3.2A 14 22 0.7-1A 14 22 0.7-1A 14 22 07-1A 14 22
MPCB MPCB MPCB MPCB

/40.3:B

/40.5:C

/40.7:B

/40.9:C

/41.2:B

/41.4:C

/41.5:B

/41.6:C
I> I> I> I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6 2 4 6
20R2

21R2

22R2

23R2
20B2

21B2

22B2

23B2
20Y2

21Y2

22Y2

23Y2
C
2.5Sq.mmBlack 2.5Sq.mmBlack 2.5Sq.mmBlack 2.5Sq.mmBlack

C36 1 3 5 C37 1 3 5 C38 1 3 5 C39 1 3 5


/40.3:F /40.7:F /41.2:F /41.5:F
POWER POWER POWER POWER
D CONTACTOR 2 CONTACTOR 2 CONTACTOR 2 CONTACTOR 2
4 6 4 6 4 6 4 6
9A,TP 7A,TP 7A,TP 7A,TP

E 2.5Sq.mmBlack 2.5Sq.mmBlack 2.5Sq.mmBlack 2.5Sq.mmBlack


20R3

21R3

22R3

23R3
20B3

21B3

22B3

23B3
20Y3

21Y3

22Y3

23Y3
PE

PE

PE

PE
PE PE PE PE
X18 1 2 3 4 X19 1 2 3 4 X20 1 2 3 4 X21 1 2 3 4

F U V W PE U V W PE U V W PE U V W PE

M M M M
3 3 3 3

MOTOR-15 MOTOR-16 MOTOR-17 MOTOR-18

CIRCULATION PUMP
( HOT WATER TANK TO PHE) BOOSTER PUMP 1 BOOSTER PUMP 2 BOOSTER PUMP 3

4KW, 3Ph, 415VAC,50Hz 0.5KW, 3Ph, 415VAC,50Hz 0.5KW, 3Ph, 415VAC,50Hz 0.5KW, 3Ph, 415VAC,50Hz

G 1Rx4Cx2.5Sq mm 1Rx4Cx2.5Sq mm 1Rx4Cx2.5Sq mm 1Rx4Cx2.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 14
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

14.8:A / L1 L1 / 16.0:A
A
14.8:A / L2 L2 / 16.0:A

14.8:A / L3 L3 / 16.0:A

14.8:B / N N / 16.0:B

24N1

25N1
24R1

25Y1

26N1

27N1

28N1
27R1

28R1
26B1
2.5Sq.mmBlack 2.5Sq.mmBlack
B 2.5Sq mm Black 2.5Sq mm Black 2.5Sq mm Black

M4 M5 1 3 1 3 1 3
MINIATURE MINIATURE
M6 M7 M8
CIRCUIT BREAKER CIRCUIT BREAKER
MINIATURE 2 4 MINIATURE 2 4 MINIATURE 2 4
6A,DP 6A,DP
CIRCUIT BREAKER CIRCUIT BREAKER CIRCUIT BREAKER
10A,DP 10A,DP 10A,DP

C
24N2

25N2
24R2

25Y2

26N2

27N2

28N2
27R2

28R2
26B2
13 23 13 23 13 23 13 23 13 23
SW1 SW2 SW3 SW4 SW5
D 10A,2P 14 24 10A,2P 14 24 16A,2P 14 24 16A,2P 14 24 16A,2P 14 24
ON/OFF ON/OFF ON/OFF ON/OFF ON/OFF

1.5Sq.mmBlack 1.5Sq.mmBlack 1.5Sq.mmBlack


1.5Sq.mmBlack 1.5Sq.mmBlack
24R43

24N3

25N3
25Y2

28N7
28R3
27N3
27R3
26N7
26B3
PE

PE

PE

PE

PE
X22 1 2 3 X23 1 2 3 X24 1 2 3 X25 1 2 3 X26 1 2 3
PE PE PE PE PE

IRON PHOSPHATING
HWR - OIL SKIMMER DEGREASING-OIL SKIMMER HWR - DOSING PUMP DEGREASING DOSING PUMP DOSING PUMP
- 230 V AC SINGLE PHASE 230 V AC SINGLE PHASE
SUPPLY SUPPLY SUPPLY
SUPPLY SUPPLY
230V AC,1PH,50Hz 230V AC,1PH,50Hz 230V AC,1PH,50Hz
1Ph,230V,AC 1Ph,230V,AC
G 1Rx3Cx2.5Sq mm 1Rx3Cx2.5Sq mm 1Rx3Cx2.5Sq mm
1Rx3Cx2.5Sq mm 1Rx3Cx2.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 15
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 15.9:A / L1 L1 / 17.0:A

15.9:A / L2 L2 / 17.0:A

15.9:A / L3 L3 / 17.0:A

15.9:B / N N / 17.0:B

29R1

30R1
29B1

30B1
29Y1

30Y1

31N1
31R1
6Sq.mm R/Y/B 6Sq.mm R/Y/B 2.5Sq mm Black
B
1 3 5 13 21 21 1 3 5 13 21 1 3 5 13 13 21

Q22 Q23 Q24


MPCB 14 22 22 MPCB 14 22 MPCB 14 14 22
27-32A 10-16A 1.1-1.6A

/42.1:C

/42.4:C

/43.7:C

/42.5:C

/42.8:C

/43.1:B

/43.4:C

/43.3:B
I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6

31R2
4Sq mm Black 4Sq mm Black
29R2

30R2
29B2

30B2
29Y2

30Y2

31N2
31R3
C

2.5Sq mm Black
29R5 30R5

C40 1 3 5 C41 1 3 5 C42 1 3 5 C43 1 3 5 C44 1 3 5 C45 1 3 5 C46 1 3 5


/42.1:F /42.2:F /42.3:F /42.5:F /42.7:F /42.8:F /43.1:F
POWER POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2
32A,TP 32A,TP 12A,TP 25A,TP 25A,TP 12A,TP 4 6
7A,TP
D

31R4
4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black A2
2.5Sq mm Black
RL4

31N3
31R5
A1

31R5
E

PE
29R3

29R4

30R3

30R4
29B3

29B4

30B3

30B4
29Y3

29Y4

30Y3

30Y4
PE

PE
X29 1 2 3 4
PE
X27 1 2 3 4 5 6 7 X28 1 2 3 4 5 6 7
PE PE

W1 U2 W1 U2

V1 M V2 V1 M V2
F 3~ 3~ BURNER-4
U1 W2 U1 W2 230V AC,2.2A

MOTOR-19 MOTOR-20 MOTOR-21

WDO BLOWER-1 WDO BLOWER-2 WDO BURNER


SUPPLY 0.45KW
15 KW,3Ph, 415VAC,50Hz 15 KW,3Ph, 415VAC,50Hz 1PHASE,230VAC,50Hz
G 2Rx4Cx4Sq mm 2Rx4Cx4Sq mm 1Rx6Cx1.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 16
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

16.9:A / L1 L1 / 19.0:A
A
16.9:A / L2 L2 / 19.0:A

16.9:A / L3 L3 / 19.0:A

16.9:B / N N / 19.0:B

32R1

33R1
32B1

33B1
32Y1

33Y1

34N1
34Y1
4Sq.mm Black 6Sq.mmBlack 1.5Sq.mm Black

B
1 3 5 13 21 1 3 5 13 21
M9
Q25 Q26 MINIATURE
MPCB 14 22 MPCB 14 22
CIRCUIT BREAKER
10-16A 10-16A

/44.1:C

/44.5:C

/44.5:C

/44.9:C
I> I> I> I> I> I> 6A,DP
2 4 6 2 4 6

4Sq mmBlack 4Sq mmBlack 1.5Sq.mm Black


32R2

33R2
32B2

33B2
32Y2

33Y2
C

32R5 33R5

34N2
34Y2
C47 1 3 5 C48 1 3 5 C49 1 3 5 C50 1 3 5 C51 1 3 5 C52 1 3 5
/43.4:F /43.5:F /43.6:F /44.1:F /44.3:F /44.4:F
POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 13 23
25A,TP 25A,TP 12A,TP 25A,TP 25A,TP 12A,TP
SW6
D 10A,2P 14 24
ON/OFF

4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack


1.5Sq.mm Black

34N3
34Y3
32R3

32R4

33R3

33R4
32B3

32B4

33B3

33B4
32Y3

32Y4

33Y3

33Y4
E
PE

PE
X30 1 2 3 4 5 6 7 X31 1 2 3 4 5 6 7
PE PE

PE
W1 U2 W1 U2
X32 1 2 3
PE

V1 M V2 V1 M V2

3~ 3~
F U1 W2 U1 W2

MOTOR-22 MOTOR-23
MSB LIGHTING -1
MSB BLOWER 1 MSB BLOWER-2
LIGHTING SUPPLY
7.5KW,3Ph, 415VAC,50Hz 7.5KW,3Ph, 415VAC,50Hz
1Ph,230V,AC
2Rx4Cx4Sq mm 2Rx4Cx4Sq mm
G 1Rx3Cx2.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 17
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 17.9:A / L1 L1 / 21.0:A

17.9:A / L2 L2 / 21.0:A

17.9:A / L3 L3 / 21.0:B

17.9:B / N N / 21.0:B
35R1

36R1
35B1

36B1
35Y1

36Y1

37N1

38N1
37Y1

38Y1
6Sq.mm Black 6Sq.mm R/Y/B 2.5Sq.mm YL/BK 2.5Sq.mm YL/BK
B

1 3 5 13 21 1 3 5 13 21
M10 M11
Q27 Q28 MINIATURE MINIATURE
MPCB 14 22 MPCB 14 22
CIRCUIT BREAKER CIRCUIT BREAKER
35-45A 35-45A
/45.2:C

/45.5:C

/48.1:C

/48.4:C
I> I> I> I> I> I> 6A,DP 6A,DP
2 4 6 2 4 6

4Sq mm Black 4Sq mm Black 1.5Sq.mmBlack 1.5Sq.mmBlack


35R2

36R2
35B2

36B2
35Y2

36Y2
C

35R5 36R5

37N2

38N2
37Y2

38Y2
C53 1 3 5 C54 1 3 5 C55 1 3 5 C56 1 3 5 C57 1 3 5 C58 1 3 5
/44.5:F /44.7:F /44.8:F /45.2:F /45.3:F /45.4:F
POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 13 23 13 23
40A,TP 40A,TP 25A,TP 40A,TP 40A,TP 25A,TP
D SW14 SW15
10A,DP 14 24 10A,DP 14 24
ON/OFF ON/OFF

4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack


1.5Sq.mmBlack 1.5Sq.mmBlack

37N3

38N3
37Y3

38Y3
E
35R3

35R4

36R3

36R4
35B3

35B4

36B3

36B4
35Y3

35Y4

36Y3

36Y4
PE

PE
X33 1 2 3 4 5 6 7 X34 1 2 3 4 5 6 7
PE PE

PE

PE
W1 U2 W1 U2
X35 1 2 3 X36 1 2 3
PE PE

F
V1 M V2 V1 M V2

3~ 3~
U1 W2 U1 W2

MOTOR-24 MOTOR-25
PCB1-1 PCB1-2
PCB-1 BLOWER-1 PCB-1 BLOWER-2
LIGHTING SUPPLY LIGHTING SUPPLY
15KW,3Ph, 415VAC,50Hz 15KW,3Ph, 415VAC,50Hz
G 1Ph,230V,AC 1Ph,230V,AC
2Rx4Cx4Sq mm 2Rx4Cx4Sq mm
1Rx3Cx2.5Sq mm 1Rx3Cx2.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 19
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A
19.9:A / L1 L1 / 22.0:A

19.9:A / L2 L2 / 22.0:A

19.9:A / L3 L3 / 22.0:A

19.9:B / N N / 22.0:B

39N1

40N1

41N1

42N1
39R1

40R1

41R1

42R1
39B1

40B1

41B1

42B1
39Y1

40Y1

41Y1

42Y1
B
6Sq.mm Black 6Sq.mm Black 6Sq.mm Black 6Sq.mm Black

1 3 5 1 3 5 1 3 5 1 3 5
M12 M13 M14 M15
25A,4P 25A,4P 25A,4P 25A,4P
MCB 2 4 6 MCB 2 4 6 MCB 2 4 6 MCB 2 4 6

4Sq.mm Black 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black

E
39N2

40N2
39R2

40R2
39B2

40B2
39Y2

40Y2

41N2

42N2
41R2

42R2
41B2

42B2
41Y2

42Y2
X37 1 2 3 4 X38 1 2 3 4 X39 1 2 3 4 X40 1 2 3 4

PCB-1 RECIPROCATORS1-1 PCB-1 RECIPROCATORS1-2 PCB-1 RECIPROCATORS1-3 PCB-1 RECIPROCATORS1-4


SUPPLY SUPPLY SUPPLY SUPPLY
G
4 KW,3PHASE,415V AC 4 KW,3PHASE,415V AC 4 KW,3PHASE,415V AC 4 KW,3PHASE,415V AC
1Rx4Cx16Sq mm 1Rx4Cx16Sq mm 1Rx4Cx16Sq mm 1Rx4Cx16Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 21
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 21.9:A / L1 L1 / 24.0:A

21.9:A / L2 L2 / 24.0:A

21.9:B / L3 L3 / 24.0:A

21.9:B / N N / 24.0:B

43R1

44R1
43B1

44B1
43Y1

44Y1

45N1
45R1
10Sq.mm Black 10Sq.mm Black 2.5Sq.mmBlack
B

1 3 5 13 21 1 3 5 13 21
M16
Q29 Q30 MINIATURE
MPCB 14 22 MPCB 14 22
CIRCUIT BREAKER
35-45A 35-45A

/48.5:C

/48.8:C

/51.1:C

/51.5:C
I> I> I> I> I> I> 6A,DP
2 4 6 2 4 6

6Sq mmBlack 6Sq mmBlack 1.5Sq.mmBlack


43R2

44R2
43B2

44B2
43Y2

44Y2
C

43R5 44R5

45N2
45R2
C59 1 3 5 C60 1 3 5 C61 1 3 5 C62 1 3 5 C63 1 3 5 C64 1 3 5
/48.1:F /48.2:F /48.3:F /48.5:F /48.6:F /48.7:F
POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 13 23
40A,TP 40A,TP 25A,TP 40A,TP 40A,TP 25A,TP
D SW22
10A,DP 14 24
ON/OFF

6Sq.mmBlack 6Sq.mmBlack 6Sq.mmBlack 6Sq.mmBlack


1.5Sq.mm R/BK

45N3
45R3
E
43R3

43R4

44R3

44R4
43B3

43B4

44B3

44B4
43Y3

43Y4

44Y3

44Y4
PE

PE
X41 1 2 3 4 5 6 7 X42 1 2 3 4 5 6 7
PE PE

PE
W1 U2 W1 U2
X43 1 2 3
PE

F
V1 M V2 V1 M V2

3~ 3~
U1 W2 U1 W2

MOTOR-26 MOTOR-27
PCB2-1
PCB-2 BLOWER-1 PCB-2 BLOWER-2
LIGHTING SUPPLY
22KW,3Ph, 415VAC,50Hz 22KW,3Ph, 415VAC,50Hz
G 1Ph,230V,AC
2Rx4Cx4Sq mm 2Rx4Cx4Sq mm
1Rx3Cx2.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 22
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 22.9:A / L1 L1 / 25.0:A

22.9:A / L2 L2 / 25.0:A

22.9:A / L3 L3 / 25.0:A

22.9:B / N N / 25.0:B

46N1

47N1

48N1

49N1
46R1

47R1

48R1

49R1
46B1

47B1

48B1

49B1
46Y1

47Y1

48Y1

49Y1
B 4Sq.mm Black 4Sq.mm Black 4Sq.mm Black

4Sq.mm Black

1 3 5 1 3 5 1 3 5 1 3 5
M17 M18 M19 M20
25A,4P 25A,4P 25A,4P 25A,4P
MCB 2 4 6 MCB 2 4 6 MCB 2 4 6 MCB 2 4 6

4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack

E
46N2

47N2

48N2

49N2
46R2

47R2

48R2

49R2
46B2

47B2

48B2

49B2
46Y2

47Y2

48Y2

49Y2
X44 1 2 3 4 X45 1 2 3 4 X46 1 2 3 4 X47 1 2 3 4

PCB-2 RECIPROCATORS-1 PCB-2 RECIPROCATORS-2 PCB-2RECIPROCATORS-3 PCB-2 RECIPROCATORS-4


SUPPLY SUPPLY SUPPLY SUPPLY

G 4KW,3PHASE,415V AC 4KW,3PHASE,415V AC 4KW,3PHASE,415V AC 4KW,3PHASE,415V AC


1Rx4Cx16Sq mm 1Rx4Cx16Sq mm 1Rx4Cx16Sq mm 1Rx4Cx16Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 24
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 24.9:A / L1 L1 / 26.0:A

24.9:A / L2 L2 / 26.0:A

24.9:A / L3 L3 / 26.0:A

24.9:B / N N / 26.0:B
50R1

51R1
50B1

51B1
50Y1

51Y1

52N1
52Y1
6Sq.mm Black 6Sq.mm Black 2.5Sq mm Black
B

1 3 5 13 21 1 3 5 13 21 1 3 5 13 21

Q31 Q32 Q33


MPCB 14 22 MPCB 14 22 MPCB 14 22
27-32A 27-32A 1.4-2A
/51.5:C

/51.9:C

/52.2:B

/52.2:B

/52.4:C

/52.8:C
I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6

52Y2
4Sq mmBlack 4Sq mmBlack
50R2

51R2
50B2

51B2
50Y2

51Y2
C

52N2
52Y3
1.5Sq mmBlack
50R5 51R5

C65 1 3 5 C66 1 3 5 C67 1 3 5 C68 1 3 5 C69 1 3 5 C70 1 3 5 C71 1 3 5


/51.1:F /51.2:F /51.3:F /51.5:F /51.7:F /51.8:F /52.2:F
POWER POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2
32A,TP 32A,TP 12A,TP 32A,TP 32A,TP 12A,TP 4 6
D 7A,TP

52Y4
A2
4Sq.mm Black 4Sq.mm Black 4Sq.mmBlack 4Sq.mmBlack 1.5Sq mmBlack
RL5

52Y5

52N3
A1
E

52Y6

PE
50R3

50R4

51R3

51R4
50B3

50B4

51B3

51B4
50Y3

50Y4

51Y3

51Y4
PE

PE
X50 1 2 3 4
PE
X48 1 2 3 4 5 6 7 X49 1 2 3 4 5 6 7
PE PE

W1 U2 W1 U2

F
V1 M V2 V1 M V2

3~ 3~ BURNER
U1 W2 U1 W2 230V AC,2.2A

BURNER-5
-MOTOR1-28 MOTOR-29 230V AC,2.2A
PCO-1 BLOWER-1 PCO-1 BLOWER-2 PCO-1 BURNER

15KW,3Ph, 415VAC,50Hz 15KW,3Ph, 415VAC,50Hz 1PHASE,230VAC,50Hz


G
2Rx4Cx4Sq mm 2Rx4Cx4Sq mm 1Rx6Cx1.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 25
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 25.9:A / L1 L1 / 27.0:A

25.9:A / L2 L2 / 27.0:A

25.9:A / L3 L3 / 27.0:A

25.9:B / N N / 27.0:B
53R1

54R1
53B1

54B1
53Y1

54Y1

55N1
55B1
6Sq.mmBlack 6Sq.mmBlack 2.5Sq mm Black
B

1 3 5 13 21 1 3 5 13 21 1 3 5 13 21

Q30 Q31 Q32


MPCB 14 22 MPCB 14 22 MPCB 14 22
27-32A 27-32A 1.4-2A
/51.1:C

/51.5:C

/51.5:C

/51.9:C

/52.2:B

/52.2:B
I> I> I> I> I> I> I> I> I>
2 4 6 2 4 6 2 4 6
4Sq.mmBlack

55B2
4Sq.mmBlack
53R2

54R2
53B2

54B2
53Y2

54Y2
C

55N2
55B3
1.5Sq mm Black
53R5 54R5

C72 1 3 5 C73 1 3 5 C74 1 3 5 C75 1 3 5 C76 1 3 5 C77 1 3 5 C78 1 3 5


/52.4:F /52.5:F /52.6:F /53.1:F /53.3:F /53.4:F /53.6:F
POWER POWER POWER POWER POWER POWER POWER
CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2 4 6 CONTACTOR 2
32A,TP 32A,TP 12A,TP 32A,TP 32A,TP 12A,TP 4 6
D 7A,TP

55B4
A2
4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack 4Sq.mmBlack 1.5Sq mm Black
RL6

55N3
55B5
A1

55B6
E

PE
53R3

53R4

54R3

54R4
53B3

53B4

54B3

54B4
53Y3

53Y4

54Y3

54Y4
PE

PE
X53 1 2 3 4
PE
X51 1 2 3 4 5 6 7 X52 1 2 3 4 5 6 7
PE PE

W1 U2 W1 U2

F
V1 M V2 V1 M V2

3~ 3~ BURNER-
U1 W2 U1 W2 230V AC,2.2A

BIRNER-6
-MOTOR-30 MOTOR-31
230V AC ,2.2A
PCO-2 BLOWER PCO-2 BLOWER-2 PCO-2 BURNER
SUPPLY 0.76KW
15KW,3Ph, 415VAC,50Hz 15KW,3Ph, 415VAC,50Hz 1PHASE,230VAC,50Hz
G
2Rx4Cx4Sq mm 2Rx4Cx4Sq mm 1Rx6Cx1.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 26
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A 26.9:A / L1 L1 / 28.0:A

26.9:A / L2 L2 / 28.0:A

26.9:A / L3 L3 / 28.0:A

26.9:B / N N / 28.0:B

56R1

56B1
56Y1
8.8:F / 100 100 / 29.0:A

B
2.5Sq mm Black 8.8:F / 101 101 / 29.0:F

1 3 5
RPM
M21 20 19
16A,TP
MCB 2 4 6 RPM METER
AUX.230V AC
SPEED INDICATOR
INPUT(4-20mA)
1 2

56N1
56R2

56B2
56Y2
C
300 301
302
9
RL7
9 10 303
/54.7:G 5 1 2 3
RL7

+24V

DI1
/54.7:G 5 6 304
10K,10Turn
D1
D L1 L2 L3 +24 DI1 AO1 GND GND AI1 +10V

DIGITAL ANALOG ANALOG


INPUT OUTPUT INPUT
VFD,1.5KW,3PHASE
VSX48003

U V W PE R1C R1A R1B R2C R2A R2B


56N2
56R4

E
56R3

56B3
56Y3

PE
R1C

R1A

R1B

R2C

R2A

X8 5 6
PE

/
/

/
/

X54 1 2 3 4

F U1 V1 W1 PE

M
3

MOTOR-33

CONVEYOR
BRAKE SUPPLY

1.1KW,3Ph, 415VAC,50Hz
230V AC
G
1Rx4Cx2.5Sq mm
1Rx2Cx1.5Sq mm

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 27
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

27.9:A / L1
A
27.9:A / L2

27.9:A / L3

27.9:B / N
57R1 57N1 58Y1 58N1 59B1 59N1 60R1 60N1
1 1 1 1
M28 M29 M30 M31
6A,SP 6A,SP 6A,SP 6A,SP
2 2 2 2
B MCB MCB MCB MCB

1SQMM R/BK1 1SQMM R/BK1 1SQMM R/BK1 1SQMM R/BK1

H10
H1

H4

H7
C

11 11 11 11 11 11 11 11

DLS1 DLS1 DLS2 DLS2 DLS3 DLS3 DLS4 DLS4


/28.2:C /28.1:C /28.3:C /28.2:C /28.5:C /28.4:C /28.6:C /28.6:C
12 12 12 12 12 12 12 12
DOOR DOOR DOOR DOOR DOOR DOOR DOOR DOOR
LIMI SWITCH LIMI SWITCH LIMI SWITCH LIMI SWITCH LIMI SWITCH LIMI SWITCH LIMI SWITCH LIMI SWITCH

H11

H12
H2

H3

H5

H6

H8

H9
SK1

D
x1 1 x1 1 x1 1 x1 1

PL1 M PL2 M PL3 M PL4 M


CF1 CF2 CF3 CF4
PANEL LAMP
COOLING 1~ PANEL LAMP
COOLING 1~ PANEL LAMP
COOLING 1~ PANEL LAMP
COOLING 1~
x2 FAN x2 FAN x2 FAN x2 FAN
2 2 2 2

Drg.Approved By. Title: POWER WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 28
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

27.4:B / 100 100 / 30.0:A

TIC2-7 / 33.7:D

TIC2-8 / 33.7:D
B

TIC1-8 / 33.5:D

TIC3-7 / 33.5:E

TIC3-8 / 33.5:E

TIC3-4 / 33.7:E

TIC3-5 / 33.7:E
TIC1-7 / 33.5:D
X2 5 6

168 168 168 168


TIC1 TIC2 TIC3

C 4 5

COM
4 5 9 6 7 8 4 5

COM

COM

COM
NO

NO
9 6 7 8 9 6 7 8

NC
COM

COM
NO

NO

NO

NO
NC

NC
RL1 RL2 RL1 RL2 RL1 RL2

RL1 RL2

TEMP. CONTROLLER TEMP. CONTROLLER TEMP. CONTROLLER

PT100 PT100 PT100


D

10 18 19 20 10 18 19 20 10 18 19 20

E
PE 303 304 305 PE PE
300 301 302 300 301 302

X2 7 8 9 X3 10 11 12
X5 7 8 9

27.4:B / 101 101 / 30.0:F


FLUE GAS TEMPERATURE(HWR +DEGREASING)
HWR BATH TEMPERATURE DEGREASING BATH TEMPERATURE

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 29
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

29.8:A / 100 100 / 31.0:A

TIC4-8 / 34.5:E
TIC4-7 / 34.5:E
X5 5 6
X5 5 6

X5 5 6

168 168
TIC4 TIC5 TIC6

C 4 5

COM
4 5 9 6 7 8 4 5

COM

COM

COM
NO

NO
9 6 7 8 9 6 7 8

NC
COM

COM
NO

NO

NO

NO
NC

NC
RL1 RL2 RL1 RL2 RL1 RL2

RL1 RL2

TEMP. CONTROLLER TEMP. CONTROLLER TEMP. CONTROLLER

PT100 PT100 PT100


D

10 18 19 20 10 18 19 20 10 18 19 20

E
PE 303 304 305 PE PE
300 301 302 300 301 302

X5 7 8 9 X5 10 11 12
X5 7 8 9

29.8:F / 101 101 / 31.0:F


FLUE GAS TEMP(HOT WATER TANK) HOT WATER TANK BATH TEMPERATURE
IRON PHOSPHATING BATH TEMPERATURE

Drg.Approved By. Title: PID CONTROLLER WIRING P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 30
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

30.8:A / 100 100 / 32.0:A

TIC8-7 / 43.1:E

TIC8-8 / 43.1:E
B

TIC9-7 / 52.2:D

TIC9-8 / 52.2:D
TIC7-8 / 43.1:E
TIC7-7 / 43.1:D
X29 5 6 X50 5 6

168 168 168 168


TIC7 TIC8 TIC9

C 4 5

COM
4 5 9 6 7 8 4 5

COM

COM

COM
NO

NO
9 6 7 8 9 6 7 8

NC
COM

COM
NO

NO

NO

NO
NC

NC
RL1 RL2 RL1 RL2 RL1 RL2

RL1 RL2

TEMP. CONTROLLER TEMP. CONTROLLER TEMP. CONTROLLER

PT100 PT100 PT100


D

10 18 19 20 10 18 19 20 10 18 19 20

E
PE 303 304 305 PE PE
300 301 302 300 301 302

X29 7 8 9 X29 10 11 12
X50 7 8 9

30.8:F / 101 101 / 32.0:F


WDO AIR TEMPERATURE WDO FLUE GAS TEMP PCO AIR TEMPERATURE TIC & SENSOR

Drg.Approved By. Title: PID CONTROLLER WIRING P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 31
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

31.8:A / 100 100 / 33.0:A

TIC11-7 / 53.6:D

TIC11-8 / 53.6:E
B

TIC10-8 / 52.2:E

TIC12-7 / 53.6:E

TIC12-8 / 53.6:E
TIC10-7 / 52.2:E
X50 5 6 X53 5 6

168 168
TIC10 TIC11 TIC12

C 4 5

COM
4 5 9 6 7 8 4 5

COM

COM

COM
NO

NO
9 6 7 8 9 6 7 8

NC
COM

COM
NO

NO

NO

NO
NC

NC
RL1 RL2 RL1 RL2 RL1 RL2

TEMP. CONTROLLER TEMP. CONTROLLER TEMP. CONTROLLER

PT100 PT100 PT100


D

10 18 19 20 10 18 19 20 10 18 19 20

E
PE 303 304 305 PE PE
300 301 302 300 301 302

X50 7 8 9 X53 10 11 12
X53 7 8 9

31.8:F / 101 101 / 33.0:F


PCO FLUE GAS TEMP PCO FLUE GAS TEMP PCO AIR TEMPERATURE

Drg.Approved By. Title: PID CONTROLLER WIRING P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 32
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

EMG
8.2:F / SPP.13 SPP 8.3:F FUME EXHAUST BLOWER HWR TANK BURNER DEGREASING TANK BURNER
A SPP.14
12 11 100A 13 14 102
32.8:A / 100 102 / 34.0:A
/8.2:D

102
102
XL 3
FUTURE
XL 1
FUTUTR XL 4 INTERLOCK
INTERLOCK
XL 2 109
B 103 13
Q2
13 /9.3:B 14
Q1
/9.1:B 14 21 21 21
C1 Q1 41 Q2
/33.2:F /9.1:B /9.3:B
104
22 22 C1 22
/33.2:F 42

C 11
ILPB2 110
STOP 12

13 13

105 ILSS1 ILSS2


107 108 /33.6:F 14 /33.7:F 14
116
BURNER1 BURNER2
OFF/ON OFF/ON

111 TIC-1 113 TIC-2


13 13

D ILPB1 C1 TIC1-7 / 29.2:C


START /33.2:F TIC2-7 / 29.4:C
14 14

TIC1-8 / 29.2:C TIC2-8 / 29.4:C

111 114
106 TIC-3 TIC-3

TIC3-7 / 29.7:C TIC3-5 / 29.8:C

E TIC3-8 / 29.7:C TIC3-4 / 29.7:C

112
115

A1 x1 x1 x1 A1 x1 A1 x1 x1
C1 ILPB1 ILPB2 L1 C2 ILSS1 C3 ILSS2 L2
F ON OFF TRIP /33.5:C /33.6:C TRIP
A2 x2 x2 x2 A2 x2 A2 x2 x2
GREEN RED AMBER ON ON AMBER
GREEN GREEN
101
32.8:F / 101 101 / 34.0:F
MAIN OFF TRIP STAGE-1 ON STAGE-2 ON TRIP
BURNER BURNER
ON ON

1 2 /9.1:D 1 2 /9.3:D 1 2 /9.5:D


3 4 /9.1:D 3 4 /9.3:D 3 4 /9.5:D
5 6 /9.1:D 5 6 /9.3:D 5 6 /9.5:D
G 13 14 /33.3:D
21 22 /33.3:C
41 42 /33.5:C

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 33
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

FLUE GAS EXHAUST BLOWER (IRON PHOSPHATING) IRON PHOSPHATING TANK BURNER
102
33.9:A / 102 102 / 35.0:A

102
102
XL 7
XL 5 FUTURE
B FUTURE INTERLOCK
INTERLOCK XL 8
XL 6
127 21
117
Q5
/10.1:B 22
13
13 21 21
Q5
Q4 C4 Q4 /10.1:B 14
/9.6:B 14 /34.1:F 22 /9.6:B 22

118 128
C
11 13
ILPB4 C5
STOP 12 /34.2:F 14

129
119
13
ILSS3
13 13 /34.5:F 14
D HETAER1
ILPB3 C4 125 126 OFF/ON 132
START 14 /34.1:F 14

130
TIC-4

TIC4-7 / 30.2:C
25 15
T1 T1 TIC4-8 / 30.2:C
/34.2:F 26 /34.2:F 16
E
120 121 122 131
21 21
C6 C5
/34.3:F 22 /34.2:F 22

123 124
A1 A1 A1 x1 A1 x1 x1 A1 x1 x1

F C4 T1 C5 ILPB9 C6 ILPB4 L3 C7 ILSS3 L4


A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 /34.5:D x2 TRIP x2
GREEN RED AMBER ON AMBER
GREEN
101
33.9:F / 101 101 / 35.0:F
MAIN DELTA STAR OFF TRIP STAGE1 ON TRIP
BURNER
ON
1 2 /9.6:D
3 4 /9.7:D 15 16 /34.3:E 1 2 /9.7:D 1 2 /9.8:D
1 2 /10.1:D
5 6 /9.7:D 3 4 /9.8:D 3 4 /9.9:D
3 4 /10.1:D
13 14 /34.1:D 25 26 /34.2:E 5 6 /9.8:D 5 6 /9.9:D
G 21 22 /34.4:C
5 6 /10.1:D
13 14 /34.5:C 21 22 /34.2:E
21 22 /34.3:E
230V AC : 1sqmm Grey

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 34
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

HWR FUME EXHAUST BLOWER DEGREASING FUME EXHAUST BLOWER IRON PHOSPHATING FUME EXHAUST BLOWER
A
102 102 102
34.9:A / 102 102 / 36.0:A

102 102 102


XL 9
FUTUTR XL 11
FUTUTR XL 13
FUTUTR
INTERLOCK INTERLOCK
INTERLOCK
XL 10 XL 12 XL 14
133 139
B 145

13 13 13
Q6 Q7 Q8
/10.3:B 14 21 21 /10.5:B 14 21 21 /10.6:B 14 21 21
C8 Q6 C9 Q7 C10 Q8
/35.1:F 22 /10.3:B 22 /35.4:F 22 /10.5:B 22 /35.6:F 22 /10.6:B 22
134 140 146

C 11 11 11
ILPB6 ILPB8 ILPB10
STOP 12 STOP 12 STOP 12

135 137 138 141 143 144 147 149 150

13 13 13 13 13 13

D ILPB5 C8 ILPB7 C9 ILPB9 C10


START 14 /35.1:F 14 START 14 /35.4:F 14 START 14 /35.6:F 14

136 142
148
E

A1 x1 x1 x1 A1 x1 x1 x1 A1 x1 x1 x1
C8 ILPB5 ILPB6 L5 C9 ILPB7 ILPB8 L6 C10 ILPB11 ILPB12 L7
F ON OFF TRIP ON OFF TRIP ON OFF TRIP
A2 x2 x2 x2 A2 x2 x2 x2 A2 x2 x2 x2
GREEN RED AMBER GREEN RED AMBER GREEN RED AMBER

101 101 101


34.9:F / 101 101 / 36.0:F
MAIN OFF TRIP MAIN OFF TRIP MAIN OFF TRIP

1 2 /10.3:D 1 2 /10.5:D 1 2 /10.6:D


3 4 /10.3:D 3 4 /10.5:D 3 4 /10.7:D
5 6 /10.3:D 5 6 /10.5:D 5 6 /10.7:D
G 13 14 /35.2:D 13 14 /35.4:D 13 14 /35.7:D
21 22 /35.2:C 21 22 /35.5:C 21 22 /35.8:C

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 35
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A
DEGREASING PUMP 1
HWR PUMP

102 102
35.9:A / 102 102 / 37.0:A

102 102

XL 15 XL 17
B FUTURE FUTURE
INTERLOCK INTERLOCK
XL 16 XL 18

151 161
WLS 1 WLS 3
13 21 21 5 13 21 21 5
Q9 C11 Q9 RL8 Q10 C14 Q10 RL9
/11.1:B 14 /36.1:F 22 /11.1:B 22 /36.4:F 9 WLS-1 /11.4:B 14 /36.5:F 22 /11.4:B 22 /36.9:F 9 WLS-2
WATER WATER
LEVEL LEVEL
152 LOW 162 LOW
C
11 WLS 2 11 WLS 4

ILPB111 ILPB14
STOP 12 STOP 12

153 163

160B
D 13 13 13 13
159 160 160A 169 170 170A 170B
ILPB10 C11 ILPB13 C14
START 14 /36.1:F 14 START 14 /36.5:F 14

25 15 25 15
T2 T2 T3 T3
/36.1:F 26 /36.1:F 16 /36.6:F 26 /36.6:F 16
E
154 155 156 164 165 166
21 21 21 21
C13 C12 C16 C15
/36.2:F 22 /36.2:F 22 /36.7:F 22 /36.6:F 22

157
158 SX1 1 167 168 SX1 3

A1 A1 A1 x1 A1 x1 x1 x1 A1 A1 A1 A1 x1 A1 x1 x1 x1 A1

F C11 T2 C12 ILPB13 C13 ILPB14 L8 SOL-1 RL8 C14 T3 C15 ILPB15 C16 ILPB16 L9 SOL-2 RL9
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 x2 A2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 x2 A2
GREEN RED AMBER GREEN RED AMBER
SX1 2 SX1 4
101 101
35.9:F / 101 101 / 37.0:F
MAIN DELTA STAR OFF TRIP WLS-1LOW MAIN DELTA STAR OFF TRIP WLS-2LOW
SLO-1 ON SLO-2 ON

1 2 /11.1:D 5 9 /36.4:C 1 2 /11.4:D 5 9 /36.8:C


3 4 /11.1:D 15 16 /36.2:E 1 2 /11.2:D 1 2 /11.3:D 3 4 /11.4:D 15 16 /36.7:E 1 2 /11.5:D 1 2 /11.6:D
5 6 /11.1:D 3 4 /11.2:D 3 4 /11.3:D 5 6 /11.4:D 3 4 /11.5:D 3 4 /11.6:D
13 14 /36.1:D 25 26 /36.2:E 5 6 /11.2:D 5 6 /11.3:D 13 14 /36.5:D 25 26 /36.6:E 5 6 /11.5:D 5 6 /11.6:D
G 21 22 /36.3:C 21 22 /36.7:C
21 22 /36.2:E 21 22 /36.2:E 21 22 /36.7:E 21 22 /36.6:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 36
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

DEGREASING PUMP 2 WATER RINSE 1 PUMP


102 102
36.9:A / 102 102 / 38.0:A

102 102

XL 19 XL 21
B FUTURE FUTURE
INTERLOCK INTERLOCK
XL 20 XL 22

171 181
WLS 5
13 21 21 13 21 21 5
Q11 C17 Q12 Q12 C20 Q12 RL10
/11.7:B 14 /37.1:F 22 /12.1:B 22 /12.1:B 14 /37.4:F 22 /12.1:B 22 /37.8:F 9 WLS-3
WATER
LEVEL
172 182 LOW
C
11 11 WLS 6

ILPB16 ILPB18
STOP 12 STOP 12

173 183

D 13 13 13 13
179 180 189 190 190A 190B
ILPB15 C17 ILPB17 C20
START 14 /37.1:F 14 START 14 /37.4:F 14

25 15 25 15
T4 T4 T5 T5
/37.1:F 26 /37.1:F 16 /37.5:F 26 /37.5:F 16
E
174 175 176 184 185 186
21 21 21 21
C19 C18 C22 C21
/37.3:F 22 /37.2:F 22 /37.6:F 22 /37.5:F 22

177 178 187 188 SX1 5

A1 A1 A1 x1 A1 x1 x1 A1 A1 A1 x1 A1 x1 x1 x1 A1

F C17 T4 C18 ILPB17 C19 ILPB18 L10 C20 T5 C21 ILPB19 C22 ILPB20 L11 SOL-3 RL10
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 x2 A2
GREEN RED AMBER GREEN RED AMBER
SX1 6
101 101
36.9:F / 101 101 / 38.0:F
MAIN DELTA STAR OFF TRIP MAIN DELTA STAR OFF TRIP WLS-3LOW
SLO-3 ON

1 2 /11.7:D 1 2 /12.1:D 5 9 /37.8:C


3 4 /11.7:D 15 16 /37.3:E 1 2 /11.8:D 1 2 /11.9:D 3 4 /12.1:D 15 16 /37.6:E 1 2 /12.2:D 1 2 /12.3:D
5 6 /11.7:D 3 4 /11.8:D 3 4 /11.9:D 5 6 /12.1:D 3 4 /12.2:D 3 4 /12.3:D
13 14 /37.1:D 25 26 /37.2:E 5 6 /11.8:D 5 6 /11.9:D 13 14 /37.5:D 25 26 /37.5:E 5 6 /12.2:D 5 6 /12.3:D
G 21 22 /37.3:C 21 22 /37.7:C
21 22 /37.3:E 21 22 /37.2:E 21 22 /37.6:E 21 22 /37.5:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 37
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

WATER RINSE 2 PUMP IRON PHOSPHATING PUMP 1


102 102
37.9:A / 102 102 / 39.0:A

102 102

XL 23 XL 25
B FUTURE FUTURE
INTERLOCK INTERLOCK
XL 24 XL 26

191 201
WLS 8 WLS 10
13 21 21 5 13 21 21 5
Q13 C23 Q13 RL11 Q14 C26 Q14 RL12
/12.4:B 14 /38.0:F 22 /12.4:B 22 /38.4:F 9 WLS-4 /12.7:B 14 /38.5:F 22 /12.7:B 22 /38.9:F 9 WLS-5
WATER WATER
LEVEL LEVEL
192 202 LOW
C LOW

11 WLS 9 11 WLS 11

ILPB20 ILPB24
STOP 12 STOP 12

193 203

200B
D 13 13 13 13
199 200 200A 209 210 210A 210B
ILPB19 C23 ILPB23 C26
START 14 /38.0:F 14 START 14 /38.5:F 14

25 15 25 15
T6 T6 T7 T7
/38.1:F 26 /38.1:F 16 /38.5:F 26 /38.5:F 16
E
194 195 196 204 205 206
21 21 21 21
C25 C24 C28 C27
/38.2:F 22 /38.2:F 22 /38.7:F 22 /38.6:F 22

197 207
198 SX1 8 208 SX1 10

A1 A1 A1 x1 A1 x1 x1 x1 A1 A1 A1 A1 x1 A1 x1 x1 x1 A1

F C23 T6 C24 ILPB21 C25 ILPB22 L12 SOL-4 RL11 C26 T7 C27 ILPB9 C28 ILPB10 L13 SOL-5 RL12
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 x2 A2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 x2 A2
GREEN RED AMBER GREEN RED AMBER
SX1 9 SX1 11
101 101
37.9:F / 101 101 / 39.0:F
MAIN DELTA STAR OFF TRIP WLS-4LOW WLS-4 LOW MAIN DELTA STAR OFF TRIP WLS-5 LOW WLS-5 LOW
SLO-4 ON SLO-5 ON

1 2 /12.4:D 5 9 /38.4:C 1 2 /12.7:D 5 9 /38.8:C


3 4 /12.4:D 15 16 /38.2:E 1 2 /12.5:D 1 2 /12.6:D 3 4 /12.7:D 15 16 /38.7:E 1 2 /12.8:D 1 2 /12.9:D
5 6 /12.4:D 3 4 /12.5:D 3 4 /12.6:D 5 6 /12.7:D 3 4 /12.8:D 3 4 /12.9:D
13 14 /38.1:D 25 26 /38.2:E 5 6 /12.5:D 5 6 /12.6:D 13 14 /38.5:D 25 26 /38.6:E 5 6 /12.8:D 5 6 /12.9:D
G 21 22 /38.3:C 21 22 /38.7:C
21 22 /38.2:E 21 22 /38.2:E 21 22 /38.7:E 21 22 /38.6:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 38
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

IRON PHOSPHATING PUMP 2 WATER RINSE 3 PUMP


102 102
38.9:A / 102 102 / 40.0:A

102 102

XL 1 XL 3
B FUTURE FUTURE
INTERLOCK INTERLOCK
XL 2 XL 4

211 221
WLS 12
13 21 21 13 21 21 5
Q15 C29 Q15 Q16 C32 Q16 RL13
/13.1:B 14 /39.1:F 22 /13.1:B 22 /13.4:B 14 /39.4:F 22 /13.4:B 22 /39.9:F 9 WLS-6
WATER
LEVEL
212 222 LOW
C
11 11 WLS 13

ILPB24 ILPB26
STOP 12 STOP 12

213 223

D 13 13 13 13
219 220 229 230 230A 230B
ILPB23 C29 ILPB25 C32
START 14 /39.1:F 14 START 14 /39.4:F 14

25 15 25 15
T8 T8 T9 T9
/39.1:F 26 /39.1:F 16 /39.5:F 26 /39.5:F 16
E
214 215 216 224 225 226
21 21 21 21
C31 C30 C34 C33
/39.2:F 22 /39.2:F 22 /39.6:F 22 /39.6:F 22

217 218 227


228 SX1 12

A1 A1 A1 x1 A1 x1 x1 A1 A1 A1 x1 A1 x1 x1 x1 A1

F C29 T8 C30 ILPB25 C31 ILPB26 L14 C32 T9 C33 ILPB27 C34 ILPB28 L15 SOL-6 RL13
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 x2 A2
GREEN RED AMBER GREEN RED AMBER
SX1 13
101 101
38.9:F / 101 101 / 40.0:F
MAIN DELTA STAR OFF TRIP MAIN DELTA STAR OFF TRIP WLS-6 LOW WLS-6 LOW
SLO-6 ON

1 2 /13.1:D 1 2 /13.4:D 5 9 /39.8:C


3 4 /13.1:D 15 16 /39.2:E 1 2 /13.2:D 1 2 /13.3:D 3 4 /13.4:D 15 16 /39.6:E 1 2 /13.5:D 1 2 /13.6:D
5 6 /13.1:D 3 4 /13.2:D 3 4 /13.3:D 5 6 /13.4:D 3 4 /13.5:D 3 4 /13.6:D
13 14 /39.1:D 25 26 /39.2:E 5 6 /13.2:D 5 6 /13.3:D 13 14 /39.5:D 25 26 /39.6:E 5 6 /13.5:D 5 6 /13.6:D
G 21 22 /39.3:C 21 22 /39.7:C
21 22 /39.2:E 21 22 /39.2:E 21 22 /39.6:E 21 22 /39.6:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 39
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A CIRCULATION PUMP ( PHOSPHATING TANK TO PHE) CIRCULATION PUMP ( HOT WATER TANK TO PHE) BOOSTER PUMP 1
102 102 102
39.9:A / 102 102 / 41.1:A

102 102 102


XL 5 XL 7
FUTUTR XL 9
FUTUTR
FUTUTR
INTERLOCK INTERLOCK INTERLOCK
XL 6 XL 8 XL 10
237
B 231 243

13 13 13
Q17 Q18 WLS 14 Q19
/13.7:B 14 21 21 /14.1:B 14 21 21 5 /14.3:B 14 21 21
C35 Q16 C36 Q18 RL14 C37 Q19
/40.1:F 22 /13.4:B 22 /40.3:F 22 /14.1:B 22 /40.6:F 9 WLS-7 /40.7:F 22 /14.3:B 22
232 238 WATER 244
LEVEL
LOW

C 11 11 11
WLS 15
ILPB28 ILPB30 ILPB32
STOP 12 STOP 12 STOP 12

233 235 236 239 241 242 242A 242B 245 247 248

13 13 13 13 13 13

D ILPB27 C35 ILPB29 C36 ILPB31 C37


START 14 /40.1:F 14 START 14 /40.3:F 14 START 14 /40.7:F 14

234
246
E
240

SX1 14

A1 x1 x1 x1 A1 x1 x1 x1 x1 A1 A1 x1 x1 x1
C35 ILPB27 ILPB28 L16 C36 ILP29 ILPB30 L17 SOL-7 RL14 C37 ILPB33 ILPB34 L18
F ON OFF TRIP ON OFF TRIP ON OFF TRIP
A2 x2 x2 x2 A2 x2 x2 x2 x2 A2 A2 x2 x2 x2
GREEN RED AMBER GREEN RED AMBER GREEN RED AMBER
SX1 15
101 101 101
39.9:F / 101 101 / 41.1:F
MAIN OFF TRIP MAIN OFF TRIP WLS-7 LOW WLS-7 LOW MAIN OFF TRIP
SLO-7 ON

5 9 /40.5:C
1 2 /13.7:D 1 2 /14.1:D 1 2 /14.3:D
3 4 /13.7:D 3 4 /14.1:D 3 4 /14.3:D
5 6 /13.8:D 5 6 /14.1:D 5 6 /14.3:D
G 13 14 /40.1:D 13 14 /40.3:D 13 14 /40.7:D
21 22 /40.2:C 21 22 /40.4:C 21 22 /40.8:C

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 40
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A BOOSTER PUMP 2 BOOSTER PUMP 3


102 102
40.9:A / 102 102 / 42.0:A

102 102
XL 11 XL 13
FUTUTR FUTUTR
INTERLOCK INTERLOCK
XL 12 XL 14
249 255
B

13 13
Q20 Q21
/14.4:B 14 21 21 /14.6:B 14 21 21
C38 Q20 C39 Q21
/41.2:F 22 /14.4:B 22 /41.5:F 22 /14.6:B 22
250 256

C 11 11
ILPB34 ILPB36
STOP 12 STOP 12

251 253 254 257 259 260

13 13 13 13

D ILP33 C38 ILPB35 C39


START 14 /41.2:F 14 START 14 /41.5:F 14

252
E 258

A1 x1 x1 x1 A1 x1 x1 x1
C38 ILPB33 ILPB34 L20 C39 ILPB35 ILPB36 L21
F ON OFF TRIP ON OFF TRIP
A2 x2 x2 x2 A2 x2 x2 x2
GREEN RED AMBER GREEN RED AMBER

101 101
40.9:F / 101 101 / 42.0:F
MAIN OFF TRIP MAIN OFF TRIP

1 2 /14.4:D 1 2 /14.6:D
3 4 /14.4:D 3 4 /14.6:D
5 6 /14.5:D 5 6 /14.7:D
G 13 14 /41.2:D 13 14 /41.5:D
21 22 /41.3:C 21 22 /41.6:C

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 41
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

WATER DRYING OVEN BLOWER-1 WATER DRYING OVEN BLOWER-2


102 102
41.8:A / 102 102 / 43.0:A

102 102

XL 15
XL 17
FUTURE FUTURE
B INTERLOCK INTERLOCK
XL 16
XL 18
261
17
272
17
T12
/43.2:F 18 T12
21 21 21 21
/43.2:F
262 18
C40 Q22 273 C43 Q23
13 /42.1:F 22 /16.1:B 22 /42.5:F 22 /16.4:B 22
13
Q22 Q23
/16.1:B 14
C /16.4:B 14

263 274

11 11
ILPB38 ILPB40
STOP 12 STOP 12

264 275

13 13 13 13
D ILPB37 C40 ILPB39 C43
270 271 281 282
START 14 /42.1:F 14 START 14 /42.5:F 14

25 15 25 15
T10 T10 T11 T11
/42.2:F 26 /42.2:F 16 /42.6:F 26 /42.6:F 16
E
265 266 267 276 277 278
21 21 21 21
C42 C41 C45 C44
/42.3:F 22 /42.2:F 22 /42.8:F 22 /42.7:F 22

268 269 279 280

A1 A1 A1 x1 A1 x1 x1 A1 A1 A1 x1 A1 x1 x1

F C40 T10 C41 ILPB37 C42 ILPB38 L22 C43 T11 C44 ILPB39 C45 ILPB40 L23
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2
GREEN RED AMBER GREEN RED AMBER

101 101
41.8:F / 101 101 / 43.0:F
MAIN DELTA STAR OFF TRIP MAIN DELTA STAR OFF TRIP

1 2 /16.1:D 1 2 /16.4:D
3 4 /16.1:D 15 16 /42.3:E 1 2 /16.2:D 1 2 /16.3:D 3 4 /16.4:D 15 16 /42.8:E 1 2 /16.5:D 1 2 /16.6:D
5 6 /16.1:D 3 4 /16.2:D 3 4 /16.3:D 5 6 /16.4:D 3 4 /16.5:D 3 4 /16.6:D
13 14 /42.1:D 25 26 /42.2:E 5 6 /16.2:D 5 6 /16.3:D 13 14 /42.6:D 25 26 /42.7:E 5 6 /16.5:D 5 6 /16.6:D
G 21 22 /42.4:C 21 22 /42.8:C
13 14 /43.1:C 21 22 /42.2:E 13 14 /43.1:C 21 22 /42.7:E
21 22 /42.3:E 21 22 /42.8:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 42
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

WATER DRYING OVEN BURNER-1 METALLIC SPRAY BOOTH BLOWER-1


102
42.9:A / 102 102 / 44.0:A

102
102
XL 19

FUTURE XL 21
B INTERLOCK FUTURE
XL 20
INTERLOCK
283
XL 22
13 21
302
Q24 Q24
/16.7:B /16.7:B 22
14
13 21 21
284
Q24 C47 Q22
13 /16.7:B 14 /43.4:F 22 /16.1:B 22
C41
/42.2:F 14 303
C
285
11
13
ILPB42
C44 STOP 12
/42.7:F 14
286
304
13
ILSS5
/43.1:F 14 13 13
D BURNER 4
OFF/ON 301 ILPB41 C47 310 311
287 TIC-7 START 14 /43.4:F 14

TIC7-7 / 31.2:C

21
TIC7-8 / 31.2:C
C46 25 15
/43.1:F 22
T13 T13
288 /43.5:F /43.5:F
TIC-8 26 16
E
305 306 307
TIC8-7 / 31.4:C
21 21
300
TIC8-8 / 31.4:C C49 C48
/43.6:F 22 /43.5:F 22

299 308
309
A1 x1 A1 x1 A1 A1 A1 x1 A1 x1 x1

F C46 ILSS5 T12 L24 C47 T13 C48 ILPB41 C49 ILPB42 L25
A2 /43.1:D x2 A2 TRIP x2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2
ON AMBER GREEN RED AMBER
GREEN
101
42.9:F / 101 101 / 44.0:F
STAGE1 ON TRIP MAIN DELTA STAR OFF TRIP
BURNER
ON
1 2 /17.1:D
17 18 /42.1:B 3 4 /17.1:D 1 2 /17.3:D
1 2 /16.7:D 15 16 /43.6:E 1 2 /17.2:D
17 18 /42.5:C 5 6 /17.1:D 3 4 /17.2:D 3 4 /17.3:D
3 4 /16.7:D
13 14 /43.5:D 25 26 /43.5:E 5 6 /17.2:D 5 6 /17.3:D
G 5 6 /16.7:D
21 22 /43.7:C 21 22 /43.6:E 21 22 /43.5:E
21 22 /43.2:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 43
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

METALLIC SPRAY BOOTH BLOWER-2 POWDER COATING BOOTH-1 BLOWER-1


102 102
43.9:A / 102 102 / 45.1:A

102 102

XL 23 XL 1
B FUTURE FUTURE
INTERLOCK INTERLOCK
XL 24 XL 2

312 322

13 21 21 13 21 21
Q25 C50 Q25 Q26 C53 Q26
/17.1:B 14 /44.1:F 22 /17.1:B 22 /17.4:B /44.5:F 22 /17.4:B 22
14
323
313
C
11
ILPB44 11
STOP 12 ILPB46
STOP 12

314 324

13 13 13 13
D ILPB43 C50 ILPB45 C53
320 321 331 332
START 14 /44.1:F 14 START 14 /44.5:F 14

25 15 25 15
T14 T14 T15 T15
/44.2:F 26 /44.2:F 16 /44.6:F 26 /44.6:F 16
E
315 316 317 325 326 327

21 21 21 21
C52 C51 C55 C54
/44.4:F 22 /44.3:F 22 /44.8:F 22 /44.7:F 22

329
318 319 330
A1 A1 A1 x1 A1 x1 x1 A1 A1 A1 x1 A1 x1 x1

F C50 T14 C51 ILPB43 C52 ILPB44 L26 C53 T15 C54 ILPB45 C55 ILPB46 L27
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2
GREEN RED AMBER GREEN RED AMBER

101 101
43.9:F / 101 101 / 45.1:F
MAIN DELTA STAR OFF TRIP MAIN DELTA STAR OFF TRIP

1 2 /17.4:D 1 2 /19.1:D
3 4 /17.4:D 15 16 /44.4:E 1 2 /17.5:D 1 2 /17.6:D 3 4 /19.1:D 15 16 /44.8:E 1 2 /19.2:D 1 2 /19.3:D
5 6 /17.4:D 3 4 /17.5:D 3 4 /17.6:D 5 6 /19.1:D 3 4 /19.2:D 3 4 /19.3:D
13 14 /44.2:D 25 26 /44.3:E 5 6 /17.6:D 5 6 /17.6:D 13 14 /44.6:D 25 26 /44.7:E 5 6 /19.2:D 5 6 /19.3:D
G 21 22 /44.4:C 21 22 /44.8:C
21 22 /44.4:E 21 22 /44.3:E 13 14 /46.1:C 21 22 /44.7:E
21 22 /44.8:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 44
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

POWDER COATING BOOTH-1 BLOWER-2


102
44.9:A / 102 102 / 46.0:A

102

XL 3
B FUTURE
INTERLOCK
XL 4

333

13 21 21
Q27 C56 Q27
/19.1:B 14 /45.2:F 22 /19.1:B 22

334
C
11
ILPB48
STOP 12

335

13 13
D ILPB47 C56 341 342
START 14 /45.2:F 14

25 15
T16 T16
/45.3:F 26 /45.3:F 16
E
336 337 338
21 21
C58 C57
/45.4:F 22 /45.3:F 22

339
340
A1 A1 A1 x1 A1 x1 x1

F C56 T16 C57 ILPB47 C58 ILPB48 L28


A2 A2 A2 ON x2 A2 OFF x2 TRIP x2
GREEN RED AMBER

101
44.9:F / 101 101 / 46.0:G
MAIN DELTA STAR OFF TRIP

1 2 /19.4:D
3 4 /19.4:D 15 16 /45.4:E 1 2 /19.5:D 1 2 /19.6:D
5 6 /19.4:D 3 4 /19.5:D 3 4 /19.6:D
13 14 /45.2:D 25 26 /45.3:E 5 6 /19.5:D 5 6 /19.6:D
G 21 22 /45.5:C 13 14 /46.1:C 21 22 /45.3:E
21 22 /45.4:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 45
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

SECTION II
102
45.8:A / 102 102 / 47.0:A

Solinoid Valve-1 Solinoid Valve-2 Solinoid Valve-3 Solinoid Valve-4 Solinoid Valve-5 Solinoid Valve-6
B

13 13
-SS1
SEQ.TIMER 14 14 XL1 1 3 5 7 9 11
AUTO/OFF/MANUAL
343
101 101 101 101 101 101
13
C54 x1
x1 x1 x1 x1 x1
/44.7:F 14
C SV2
344 SV1 SV3 SV4 SV5 SV6
x2 x2 x2 x2 x2 x2
13
C57
/45.3:F 14

XL1 2 4 6 8 10 12

D 345 346 347 348 349 350 351

345 / 47.0:D

ST1

A1 OP0 OP1 OP2 OP3 OP4 OP5


13 14 13 14 13 14 13 14 13 14 13 14
E

6-CHANNEL SEQUENTIAL TIMER


NC

A2 NC NC S1 S2 C1 C2 O1 O2 I1 I2

101

G 45.8:F / 101 101 / 47.0:G

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 46
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

SECTION II

46.9:A / 102 102 / 48.0:A

Solinoid Valve-7 Solinoid Valve-8 Solinoid Valve-9 Solinoid Valve-10 Solinoid Valve-11 Solinoid Valve-12
B

XL1 13 15 17 19 21 23

101 101 101 101 101 101

x1 x1 x1 x1 x1 x1
C SV8
SV7 SV9 SV10 SV11 SV12
x2 x2 x2 x2 x2 x2

XL1 14 16 18 20 22 24

D 352 353 354 355 356 357

46.7:D / 345

ST1

A1 OP7 OP8 OP9 OP10 OP11 OP12


13 14 13 14 13 14 13 14 13 14 13 14
E

6-CHANNEL SEQUENTIAL TIMER


NC

A2 NC NC S1 S2 C1 C2 O1 O2 I1 I2

G 46.9:G / 101 101 / 48.0:F

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 47
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

POWDER COATING BOOTH 2 BLOWER-1 POWDER COATING BOOTH 2 BLOWER-2


102 102
47.9:A / 102 102 / 49.0:A

102 102

XL 5 XL 9
B FUTURE FUTURE
INTERLOCK INTERLOCK
XL 6 XL 10

368
358

13 21 21 13 21 21
Q28 C59 Q28 Q29 C62 Q29
/19.4:B 14 /48.1:F 22 /19.4:B 22 /22.1:B 14 /48.5:F 22 /22.1:B 22

359 369
C
11 11
ILPB50 ILPB52
STOP 12 STOP 12

360 370

13 13 13 13
D ILPB49 C59 ILPB51 C62
366 367 376 377
START 14 /48.1:F 14 START 14 /48.5:F 14

25 15 25 15
T17 T17 T18 T18
/48.2:F 26 /48.2:F 16 /48.6:F 26 /48.6:F 16
E
361 362 363 371 372 373
21 21 21 21
C61 C60 C64 C63
/48.3:F 22 /48.2:F 22 /48.7:F 22 /48.6:F 22

364 365 374 375

A1 A1 A1 x1 A1 x1 x1 A1 A1 A1 x1 A1 x1 x1

F C59 T17 C60 ILPB49 C61 ILPB50 L29 C62 T18 C63 ILPB53 C64 ILPB54 L30
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2
GREEN RED AMBER GREEN RED AMBER

101 101
47.9:G / 101 101 / 49.0:G
MAIN DELTA STAR OFF TRIP MAIN DELTA STAR OFF TRIP

1 2 /22.1:D 1 2 /22.4:D
3 4 /22.1:D 15 16 /48.3:E 1 2 /22.2:D 1 2 /22.3:D 3 4 /22.4:D 15 16 /48.7:E 1 2 /22.5:D 1 2 /22.6:D
5 6 /22.1:D 3 4 /22.2:D 3 4 /22.3:D 5 6 /22.4:D 3 4 /22.5:D 3 4 /22.6:D
13 14 /48.1:D 25 26 /48.2:E 5 6 /22.2:D 5 6 /22.3:D 13 14 /48.5:D 25 26 /48.6:E 5 6 /22.5:D 5 6 /22.6:D
G 21 22 /48.4:C 21 22 /48.8:C
13 14 /49.1:C 21 22 /48.2:E 13 14 /49.1:C 21 22 /48.6:E
21 22 /48.3:E 21 22 /48.7:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 48
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

SECTION II
102
48.9:A / 102 102 / 50.0:A

Solinoid Valve-13 Solinoid Valve-14 Solinoid Valve-15 Solinoid Valve-16 Solinoid Valve-17 Solinoid Valve-18
B

13 13
SS2
SEQ.TIMER 14 14 XL1 25 27 29 31 33 35
AUTO/OFF/MANUAL
378
101 101 101 101 101 101
13
C60 x1
x1 x1 x1 x1 x1
/48.2:F 14
C SV14
379 SV13 SV15 SV16 SV17 SV18
x2 x2 x2 x2 x2 x2
13
C63
/48.6:F 14

XL1 26 28 30 32 34 36

D 380 381 382 383 384 385 386

380 / 50.0:D

ST2

A1 OP0 OP1 OP2 OP3 OP4 OP5


13 14 13 14 13 14 13 14 13 14 13 14
E

6-CHANNEL SEQUENTIAL TIMER


NC

A2 NC NC S1 S2 C1 C2 O1 O2 I1 I2

G 48.9:F / 101 101 / 50.0:G

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 49
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

SECTION II

49.9:A / 102 102 / 51.0:A

Solinoid Valve-19 Solinoid Valve-20 Solinoid Valve-21 Solinoid Valve-22 Solinoid Valve-23 Solinoid Valve-24
B

XL1 37 39 41 43 45 47

101 101 101 101 101 101

x1 x1 x1 x1 x1 x1
C SV20
SV19 SV21 SV22 SV23 SV24
x2 x2 x2 x2 x2 x2

XL1 38 40 42 44 46 48

D 387 388 389 390 391 392

49.7:D / 380

ST2

A1 OP7 OP8 OP9 OP10 OP11 OP12


13 14 13 14 13 14 13 14 13 14 13 14
E

6-CHANNEL SEQUENTIAL TIMER


NC

A2 NC NC S1 S2 C1 C2 O1 O2 I1 I2

G 49.9:G / 101 101 / 51.0:F

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 50
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

POWDER COATING OVEN 1-BLOWER-1 POWDER COATING OVEN 1-BLOWER-2


102 102
50.9:A / 102 102 / 52.0:A

102
102
XL 11
FUTURE XL 1
B INTERLOCK FUTURE
INTERLOCK
XL 12
393 XL 2

15 404
T21 25
/52.3:F 18 21 21 T21 21 21
/52.3:F
394 C65 Q30 28 C68 Q31
/51.1:F 22 /22.4:B 22 405 /51.5:F 22 /25.1:B 22
13
13
C Q30
/22.4:B Q31
14
/25.1:B 14
395 406
11
11
ILPB56
ILPB54 STOP 12
STOP 12

396
407

13 13 13 13
D ILPB53 C65 ILPB55 C68
402 403 413 414
START 14 /51.1:F 14 START 14 /51.5:F 14

25 15 25 15
T19 T19 T20 T20
/51.2:F 26 /51.2:F 16 /51.6:F 26 /51.6:F 16
E
397 398 399 408 409 410
21 21 21 21
C67 C66 C70 C69
/51.3:F 22 /51.2:F 22 /51.8:F 22 /51.7:F 22

400 411 412


401
A1 A1 A1 x1 A1 x1 x1 A1 A1 A1 x1 A1 x1 x1

F C65 T19 C66 ILPB53 C67 ILPB54 L31 C68 T20 C69 ILPB55 C70 ILPB56 L32
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2
GREEN RED AMBER GREEN RED AMBER

101 101
50.9:G / 101 101 / 52.0:F
MAIN DELTA STAR OFF TRIP MAIN DELTA STAR OFF TRIP

1 2 /25.1:D 1 2 /25.4:D
3 4 /25.1:D 15 16 /51.3:E 1 2 /25.2:D 1 2 /25.3:D 3 4 /25.4:D 15 16 /51.8:E 1 2 /25.5:D 1 2 /25.6:D
5 6 /25.1:D 3 4 /25.2:D 3 4 /25.3:D 5 6 /25.4:D 3 4 /25.5:D 3 4 /25.6:D
13 14 /51.2:D 25 26 /51.2:E 5 6 /25.2:D 5 6 /25.3:D 13 14 /51.6:D 25 26 /51.7:E 5 6 /25.5:D 5 6 /25.6:D
G 21 22 /51.4:C 21 22 /51.8:C
13 14 /52.2:C 21 22 /51.2:E 13 14 /52.2:C 21 22 /51.7:E
21 22 /51.3:E 21 22 /51.8:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 51
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

POWDER COATING BOOTH 1BURNER 1 POWDER COATING BOOTH 2-BLOWER-1


A 102
51.9:A / 102 102 / 53.0:A

102 102

XL 3
XL 5
FUTURE FUTURE
INTERLOCK INTERLOCK
XL 4
XL 6
415 424
B 13
Q32 17
/25.4:B 14 21 T24
416 /53.7:F 18
Q32
13 /25.4:B 22
425
21 21
C66 13
/51.2:F 14 Q33 C72 Q33
/25.7:B /52.4:F 22 /25.7:B 22
417 14

13
426
C
C69
11
/51.7:F 14
ILPB58
418 STOP 12

13
ILSS6 427
/52.2:F 14
BURNER 4
OFF/ON 419 TIC-9
13 13
D 11
ILPB57 C72
422 433 434
TIC9-7 / 31.7:C C71 START /52.4:F
14 14
/52.2:F 12
TIC9-8 / 31.7:C

420 25 15
TIC-10 T22 T22
423 /52.5:F 26 /52.5:F 16
E TIC10-7 / 32.2:C
428 429 430
TIC10-8 / 32.2:C 21 21
C74 C73
/52.6:F 22 /52.5:F 22

421
431 432

A1 x1 x1 A1 A1 A1 A1 x1 A1 x1 x1

F C71 ILSS6 L33 T21 C72 T22 C73 ILPB57 C74 ILPB58 L34
A2 /52.2:D x2 TRIP x2 A2 A2 A2 A2 ON x2 A2 OFF x2 TRIP x2
ON AMBER GREEN RED AMBER
GREEN
101
51.9:F / 101 101 / 53.0:F
STAGE1 ON TRIP MAIN DELTA STAR OFF TRIP
BURNER
ON
1 2 /26.1:D
15 18 /51.1:B 3 4 /26.1:D 1 2 /26.3:D
1 2 /25.7:D 15 16 /52.6:E 1 2 /26.2:D
25 28 /51.5:C 5 6 /26.1:D 3 4 /26.2:D 3 4 /26.3:D
3 4 /25.7:D
13 14 /52.4:D 25 26 /52.5:E 5 6 /26.2:D 5 6 /26.3:D
G 5 6 /25.7:D
21 22 /52.7:C 13 14 /53.6:C 21 22 /52.5:E
11 12 /52.3:D
21 22 /52.6:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 52
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

POWDER COATING BOOTH 2-BLOWER-1 POWDER COATING BOOTH -2 BURNER-2


102
52.9:A / 102 102 / 54.0:A
102
102
XL 9
FUTURE
XL 7 INTERLOCK
B FUTURE
XL 10
INTERLOCK 446
XL 8
13 21
435
Q35 Q35
13 22
14
Q34 21 21 447
14 C75 Q34
436 /53.1:F 22 22
13
C73
17 /52.5:F 14
C T24 448
/53.7:F 18
437 13
11 C76
/53.3:F
ILPB60 14
STOP 12 449
438
13
ILSS7 TIC-11
13 13
/53.6:F 14
D ILPB59 C75 BURNER 4
444 445 452 11
START /53.1:F OFF/ON
14 14 117 C78
/53.6:F 12
TIC11-7 / 32.4:C

TIC11-8 / 32.4:C
25 15
T23 T23 450
/53.2:F 26 /53.2:F 16 TIC-12
453
E
439 440 441 TIC12-7 / 32.7:C
21 21
C77 C76 TIC12-8 / 32.7:C
/53.4:F 22 /53.3:F 22

442 443 451

A1 A1 A1 x1 A1 x1 x1 A1 x1 x1 A1

F C75 T23 C76 ILPB59 C77 ILPB60 L35 C78 ILSS7 L36 T24
A2 A2 A2 ON x2 A2 OFF x2 TRIP x2 A2 /53.6:D x2 TRIP x2 A2
GREEN RED AMBER ON AMBER
GREEN
101
52.9:F / 101 101 / 54.0:G
MAIN DELTA STAR OFF TRIP STAGE1 ON TRIP
BURNER
ON
1 2 /26.4:D
3 4 /26.4:D 1 2 /26.6:D 17 18 /52.4:B
15 16 /53.4:E 1 2 /26.5:D 1 2 /26.7:D
5 6 /26.4:D 3 4 /26.5:D 3 4 /26.6:D 17 18 /53.1:C
3 4 /26.7:D
13 14 /53.2:D 25 26 /53.3:E 5 6 /26.5:D 5 6 /26.6:D
G 21 22 /53.4:C
5 6 /26.7:D
13 14 /53.6:C 21 22 /53.3:E
11 12 /53.7:D
21 22 /53.4:E

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 53
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

CONVEYOR
A 53.9:A / 102 102 / 55.0:A

102
XL4 11
FUTURE
INTERLOCK
XL4 12
199

VFD

B D1-COM /

/ D1-NO
D1-NC /

200D
XL4 9

C PD1 PB1 11
/54.2:D 200C
Loading
PD6 200
Area
12 /54.6:E PB6 11
STOP DOWN
point 21
STOP 12 11 203 RL1
XL4 10
200A XL4 16 ILPB64 /9.4:E 22
STOP 12
XL4 11

204
XL4 17 XL4 17 XL4 21 201
D 200A 201 201 201
PD2 PB2 11 PD1 PD3 13 13
/54.3:E 13 13 PD5 13
Left Side /54.0:C PB2 /54.0:E PB2 /54.1:E
PB2 ILPB63 RL1
STOP Loading RIGHT SIDE UP SIDE
12 START /9.4:E
200B Area 14 Area 14 START 14
14 14
START START
XL4 12
200C
PD5 202 202
/54.5:D PB5 11
202 202
UP
point XL4 23
STOP 12 XL4 18 XL4 19 XL4 18 XL4 19 XL4 22
201 201 201
E XL4 13
XL4 16
PD2 PD4 PD6
PD3 200B /54.0:D PB2 13
/54.1:F PB2 13
/54.1:C PB2 13
/54.3:D Left Side UNLOAGING DOWN SIDE
PB4 11
START POINT START
Right Side 14 14 14
XL4 15 START
STOP
12
202
200C
200C 202 202
PD4 XL4 24
XL4 14
PB3 11 XL4 20 XL4 20
/54.4:E
un;oading
point
STOP 12
F
XL4 15 XL4 16

x1 x1 x1
A1
ILPB61 L37 ILPB62
RL7 ON TRIP x2 OFF x2
x2 AMBER RED
A2 GREEN

101
53.9:F / 101 101 / 55.0:F
ON TRIP OFF
9 5 /27.1:D
G
9 5 /27.2:C
10 6 /27.1:D

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 54
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A
SECTION III

54.9:A / 102
101

FTB 1 FTB 2

B
102A 101A
~ ~
-TA1
100-240 VAC / 24 V / 2.1 A
Rectifier

+ -

C 24VDC
11

SS3
ON/OFF
12

0VDC
205

21
D
RL1
/9.4:E 22

206

SX 16

x1
SOL8
x2

F SX 17

54.9:G / 101

LUBRICATION ON/OFF

Drg.Approved By. Title: CONTROL WIRING DIAGRAM P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 55
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X1 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-1:U 1 FLUE GAS EXHAUST BLOWER (HWR +DEGREASING) 4KW, 3Ph, 415VAC,50Hz 2R3 -C1:2 /9.1:D

-MOTOR-1:V 2 = 2Y3 -C1:4 /9.1:D

-MOTOR-1:W 3 = 2B3 -C1:6 /9.1:D

-MOTOR-1:PE 4 = PE PE /9.2:F

Drg.Approved By. Title: Terminal diagram =+-X1 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 56
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X2 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-BURNER-1230V AC,2.2A 1 HWR TANK BURNER SUPPLY 0.18KW 1PHASE,230VAC,50Hz 3R5 -C2:4 /9.3:D

-BURNER-1230V AC,2.2A 2 = 3N3 -C2:6 /9.3:D

-BURNER-1230V AC,2.2A 3 HWR TANK BURNER SUPPLY 0.18KW 1PHASE,230VAC,50Hz 3R6 -RL1:A1 /9.4:E

-BURNER-1230V AC,2.2A 4 = PE PE /9.4:E

C 5 COM_PCO AIR TEMPERATURE 2nd Stage 168 -TIC1:4 /29.2:C

6 NO_PCO AIR TEMPERATURE 2nd Stage 168 -TIC1:5 /29.3:C

7 PCO AIR TEMPERATURE RTD PT100_+ 300 -TIC1:18 /29.2:D

8 PCO AIR TEMPERATURE RTD PT100_I/P 301 -TIC1:19 /29.2:D

9 PCO AIR TEMPERATURE RTD PT100_- 302 -TIC1:20 /29.2:D

Drg.Approved By. Title: Terminal diagram =+-X2 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 57
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X3 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-BURNER-2230V AC,2.2A 1 DEGREASING TANK BURNER 0.18KW1PHASE,230VAC,50Hz 5R5 -C3:4 /9.5:D

-BURNER-2230V AC,2.2A 2 = 5N3 -C3:6 /9.5:D

5N3 -RL2:A2 /9.6:E

-BURNER-2230V AC,2.2A 3 DEGREASING TANK BURNER 0.18KW1PHASE,230VAC,50Hz 5R6 -RL2:A1 /9.6:E

C -BURNER-2230V AC,2.2A 4 = PE PE /9.6:E

10 PCO FULE GAS TEMP.SENSOR RTD PT100_+ 303 -TIC2:18 /29.4:D

11 PCO FULE GAS TEMP.SENSOR RTD PT100_I/P 304 -TIC2:19 /29.4:D

12 PCO FULE GAS TEMP.SENSOR RTD PT100_- 305 -TIC2:20 /29.4:D

Drg.Approved By. Title: Terminal diagram =+-X3 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 58
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X4 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-2:U1 1 FLUE GAS EXHAUST BLOWER (IRON PHOSPHATING) 5.5KW,3Ph, 415VAC,50Hz 6R3 -C4:2 /9.6:D

-MOTOR-2:V1 2 = 6Y3 -C4:4 /9.7:D

-MOTOR-2:W1 3 = 6B3 -C4:6 /9.7:D

-MOTOR-2:U2 4 = 6R4 -C5:2 /9.7:D

C -MOTOR-2:V2 5 = 6Y4 -C5:4 /9.8:D

-MOTOR-2:W2 6 = 6B4 -C5:6 /9.8:D

-MOTOR-2 7 = PE PE /9.8:F

Drg.Approved By. Title: Terminal diagram =+-X4 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 59
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X5 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-BURNER-3230V AC,2.2A 1 IRON PHOSPHATING TANK BURNER 0.18KW 1PHASE,230VAC,50Hz 7R5 -C7:4 /10.1:D

-BURNER-3230V AC,2.2A 2 = 7N3 -C7:6 /10.1:D

7N3 -RL3:A2 /10.2:E

-BURNER-3230V AC,2.2A 3 IRON PHOSPHATING TANK BURNER 0.18KW 1PHASE,230VAC,50Hz 7R6 -RL3:A1 /10.2:E

C -BURNER-3230V AC,2.2A 4 = PE PE /10.2:E

5 COM_PCO AIR TEMPERATURE 2nd Stage 168 -TIC4:4 /30.2:C

5 = -TIC5:7 /30.4:C

5 = -TIC6:7 /30.7:C

6 NO_PCO AIR TEMPERATURE 2nd Stage 168 -TIC4:5 /30.3:C

D 6 = -TIC5:8 /30.4:C

6 = -TIC6:8 /30.7:C

7 PCO AIR TEMPERATURE RTD PT100_+ 300 -TIC3:18 /29.7:D

7 = 300 -TIC4:18 /30.2:D

7 = 300 -TIC6:18 /30.7:D


E
8 PCO AIR TEMPERATURE RTD PT100_I/P 301 -TIC3:19 /29.7:D

8 = 301 -TIC4:19 /30.2:D

8 = 301 -TIC6:19 /30.7:D

9 PCO AIR TEMPERATURE RTD PT100_- 302 -TIC3:20 /29.7:D

F 9 = 302 -TIC4:20 /30.2:D

9 = 302 -TIC6:20 /30.7:D

10 PCO FULE GAS TEMP.SENSOR RTD PT100_+ 303 -TIC5:18 /30.4:D

11 PCO FULE GAS TEMP.SENSOR RTD PT100_I/P 304 -TIC5:19 /30.4:D

12 PCO FULE GAS TEMP.SENSOR RTD PT100_- 305 -TIC5:20 /30.4:D


G

Drg.Approved By. Title: Terminal diagram =+-X5 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 60
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X6 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-3:U 1 HWR FUME EXHAUST BLOWER 1.1KW, 3Ph, 415VAC,50Hz 8R3 -C8:2 /10.3:D

-MOTOR-3:V 2 = 8Y3 -C8:4 /10.3:D

-MOTOR-3:W 3 = 8B3 -C8:6 /10.3:D

-MOTOR-3:PE 4 = PE PE /10.4:F

Drg.Approved By. Title: Terminal diagram =+-X6 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 61
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X7 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-4:U 1 DEGREASING FUME EXHAUST BLOWER 1.5KW, 3Ph, 415VAC,50Hz 9R3 -C9:2 /10.5:D

-MOTOR-4:V 2 = 9Y3 -C9:4 /10.5:D

-MOTOR-4:W 3 = 9B3 -C9:6 /10.5:D

-MOTOR-4:PE 4 = PE PE /10.6:F

Drg.Approved By. Title: Terminal diagram =+-X7 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 62
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X8 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-5:U 1 IRON PHOSPHATING FUME EXHAUST BLOWER1 1.5KW, 3Ph, 415VAC,50Hz 10R3 -C10:2 /10.6:D

-MOTOR-5:V 2 = 10Y3 -C10:4 /10.7:D

-MOTOR-5:W 3 = 10B3 -C10:6 /10.7:D

-MOTOR-5:PE 4 = PE PE /10.7:F

C 5 BRAKE SUPPLY SUPPLY 230V AC 56R4 -RL7:5 /27.1:D

6 BRAKE SUPPLY SUPPLY 0V AC 56N2 -RL7:6 /27.1:D

Drg.Approved By. Title: Terminal diagram =+-X8 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 63
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X9 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-6:U1 1 HWR PUMP-1 7.5KW,3Ph, 415VAC,50Hz 2Rx4Cx4Sq mm 11R3 -C11:2 /11.1:D

-MOTOR-6:V1 2 = 11Y3 -C11:4 /11.1:D

-MOTOR-6:W1 3 = 11B3 -C11:6 /11.1:D

-MOTOR-6:U2 4 = 11R4 -C12:2 /11.2:D

C -MOTOR-6:V2 5 = 11Y4 -C12:4 /11.2:D

-MOTOR-6:W2 6 = 11B4 -C12:6 /11.2:D

-MOTOR-6 7 = PE PE /11.3:E

Drg.Approved By. Title: Terminal diagram =+-X9 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 64
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X10 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-7:U1 1 DEGREASING PUMP 1-2 7.5KW,3Ph, 415VAC,50Hz 12R3 -C14:2 /11.4:D

-MOTOR-7:V1 2 = 12Y3 -C14:4 /11.4:D

-MOTOR-7:W1 3 = 12B3 -C14:6 /11.4:D

-MOTOR-7:U2 4 = 12R4 -C15:2 /11.5:D

C -MOTOR-7:V2 5 = 12Y4 -C15:4 /11.5:D

-MOTOR-7:W2 6 = 12B4 -C15:6 /11.5:D

-MOTOR-7 7 = PE PE /11.6:E

Drg.Approved By. Title: Terminal diagram =+-X10 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 65
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X11 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-8:U1 1 DEGREASING PUMP-2 7.5KW,3Ph, 415VAC,50Hz 13R3 -C17:2 /11.7:D

-MOTOR-8:V1 2 = 13Y3 -C17:4 /11.7:D

-MOTOR-8:W1 3 = 13B3 -C17:6 /11.7:D

-MOTOR-8:U2 4 = 13R4 -C18:2 /11.8:D

C -MOTOR-8:V2 5 = 13Y4 -C18:4 /11.8:D

-MOTOR-8:W2 6 = 13B4 -C18:6 /11.8:D

-MOTOR-8 7 = PE PE /11.9:E

Drg.Approved By. Title: Terminal diagram =+-X11 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 66
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X12 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-9:U1 1 WATER RINSE 1 PUMP 7.5KW,3Ph, 415VAC,50Hz 14R3 -C20:2 /12.1:D

-MOTOR-9:V1 2 = 14Y3 -C20:4 /12.1:D

-MOTOR-9:W1 3 = 14B3 -C20:6 /12.1:D

-MOTOR-9:U2 4 = 14R4 -C21:2 /12.2:D

C -MOTOR-9:V2 5 = 14Y4 -C21:4 /12.2:D

-MOTOR-9:W2 6 = 14B4 -C21:6 /12.2:D

-MOTOR-9 7 = PE PE /12.3:E

Drg.Approved By. Title: Terminal diagram =+-X12 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 67
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X13 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-10:U1 1 WATER RINSE 2 PUMP 7.5KW,3Ph, 415VAC,50Hz 15R3 -C23:2 /12.4:D

-MOTOR-10:V1 2 = 15Y3 -C23:4 /12.4:D

-MOTOR-10:W1 3 = 15B3 -C23:6 /12.4:D

-MOTOR-10:U2 4 = 15R4 -C24:2 /12.5:D

C -MOTOR-10:V2 5 = 15Y4 -C24:4 /12.5:D

-MOTOR-10:W2 6 = 15B4 -C24:6 /12.5:D

-MOTOR-10 7 = PE PE /12.6:E

Drg.Approved By. Title: Terminal diagram =+-X13 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 68
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X14 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-11:U1 1 IRON PHOSPHATING PUMP 1 7.5KW,3Ph, 415VAC,50Hz 2Rx4Cx4Sq mm 16R3 -C26:2 /12.7:D

-MOTOR-11:V1 2 = 16Y3 -C26:4 /12.7:D

-MOTOR-11:W1 3 = 16B3 -C26:6 /12.7:D

-MOTOR-11:U2 4 = 16R4 -C27:2 /12.8:D

C -MOTOR-11:V2 5 = 16Y4 -C27:4 /12.8:D

-MOTOR-11:W2 6 = 16B4 -C27:6 /12.8:D

-MOTOR-11 7 = PE PE /12.9:E

Drg.Approved By. Title: Terminal diagram =+-X14 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 69
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X15 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-12:U1 1 IRON PHOSPHATING PUMP 2 7.5KW,3Ph, 415VAC,50Hz 2Rx4Cx4Sq mm 17R3 -C29:2 /13.1:D

-MOTOR-12:V1 2 = 17Y3 -C29:4 /13.1:D

-MOTOR-12:W1 3 = 17B3 -C29:6 /13.1:D

-MOTOR-12:U2 4 = 17R4 -C30:2 /13.2:D

C -MOTOR-12:V2 5 = 17Y4 -C30:4 /13.2:D

-MOTOR-12:W2 6 = 17B4 -C30:6 /13.2:D

-MOTOR-12 7 = PE PE /13.3:F

Drg.Approved By. Title: Terminal diagram =+-X15 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 70
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X16 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-13:U1 1 WATER RINSE 3 PUMP 7.5KW,3Ph, 415VAC,50Hz 18R3 -C32:2 /13.4:D

-MOTOR-13:V1 2 = 18Y3 -C32:4 /13.4:D

-MOTOR-13:W1 3 = 18B3 -C32:6 /13.4:D

-MOTOR-13:U2 4 = 18R4 -C33:2 /13.5:D

C -MOTOR-13:V2 5 = 18Y4 -C33:4 /13.5:D

-MOTOR-13:W2 6 = 18B4 -C33:6 /13.5:D

-MOTOR-13 7 = PE PE /13.6:F

Drg.Approved By. Title: Terminal diagram =+-X16 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 71
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X17 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-14:U 1 CIRCULATION PUMP ( PHOSPHATING TANK TO PHE) 4KW, 3Ph, 415VAC,50Hz 19R3 -C35:2 /13.7:D

-MOTOR-14:V 2 = 19Y3 -C35:4 /13.7:D

-MOTOR-14:W 3 = 19B3 -C35:6 /13.8:D

-MOTOR-14:PE 4 = PE PE /13.8:F

Drg.Approved By. Title: Terminal diagram =+-X17 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 72
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X18 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-15:U 1 CIRCULATION PUMP ( HOT WATER TANK TO PHE) 4KW, 3Ph, 415VAC,50Hz 20R3 -C36:2 /14.1:D

-MOTOR-15:V 2 = 20Y3 -C36:4 /14.1:D

-MOTOR-15:W 3 = 20B3 -C36:6 /14.1:D

-MOTOR-15:PE 4 = PE PE /14.2:F

Drg.Approved By. Title: Terminal diagram =+-X18 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 73
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X19 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-16:U 1 BOOSTER PUMP 1 0.5KW, 3Ph, 415VAC,50Hz 21R3 -C37:2 /14.3:D

-MOTOR-16:V 2 = 21Y3 -C37:4 /14.3:D

-MOTOR-16:W 3 = 21B3 -C37:6 /14.3:D

-MOTOR-16:PE 4 = PE PE /14.4:F

Drg.Approved By. Title: Terminal diagram =+-X19 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 74
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X20 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-17:U 1 BOOSTER PUMP 2 0.5KW, 3Ph, 415VAC,50Hz 22R3 -C38:2 /14.4:D

-MOTOR-17:V 2 = 22Y3 -C38:4 /14.4:D

-MOTOR-17:W 3 = 22B3 -C38:6 /14.5:D

-MOTOR-17:PE 4 = PE PE /14.5:F

Drg.Approved By. Title: Terminal diagram =+-X20 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 75
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X21 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-18:U 1 BOOSTER PUMP 3 0.5KW, 3Ph, 415VAC,50Hz 23R3 -C39:2 /14.6:D

-MOTOR-18:V 2 = 23Y3 -C39:4 /14.6:D

-MOTOR-18:W 3 = 23B3 -C39:6 /14.7:D

-MOTOR-18:PE 4 = PE PE /14.7:F

Drg.Approved By. Title: Terminal diagram =+-X21 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 76
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X22 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 HWR - OIL SKIMMER - 230 V AC SINGLE PHASE 24R43 -SW1:14 /15.1:D

2 = 24N3 -SW1:24 /15.1:D

3 = PE PE /15.2:F

Drg.Approved By. Title: Terminal diagram =+-X22 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 77
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X23 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 DEGREASING-OIL SKIMMER 230 V AC SINGLE PHASE 25Y2 -SW2:14 /15.3:D

2 = 25N3 -SW2:24 /15.3:D

3 = PE PE /15.3:F

Drg.Approved By. Title: Terminal diagram =+-X23 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 78
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X24 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 HWR - DOSING PUMP LIGHTING SUPPLY 230V AC,1PH,50Hz 26B3 -SW3:14 /15.4:D

2 = 26N7 -SW3:24 /15.4:D

3 = PE PE /15.5:F

Drg.Approved By. Title: Terminal diagram =+-X24 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 79
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X25 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 DEGREASING DOSING PUMP LIGHTING SUPPLY 230V AC,1PH,50Hz 27R3 -SW4:14 /15.5:D

2 = 27N3 -SW4:24 /15.5:D

3 = PE PE /15.6:F

Drg.Approved By. Title: Terminal diagram =+-X25 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 80
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X26 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 IRON PHOSPHATING DOSING PUMP LIGHTING SUPPLY 230V AC,1PH,50Hz 28R3 -SW5:14 /15.7:D

2 = 28N7 -SW5:24 /15.7:D

3 = PE PE /15.8:F

Drg.Approved By. Title: Terminal diagram =+-X26 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 81
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X27 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-19:U1 1 WDO BLOWER-1 15 KW,3Ph, 415VAC,50Hz 29R3 -C40:2 /16.1:D

-MOTOR-19:V1 2 = 29Y3 -C40:4 /16.1:D

-MOTOR-19:W1 3 = 29B3 -C40:6 /16.1:D

-MOTOR-19:U2 4 = 29R4 -C41:2 /16.2:D

C -MOTOR-19:V2 5 = 29Y4 -C41:4 /16.2:D

-MOTOR-19:W2 6 = 29B4 -C41:6 /16.2:D

-MOTOR-19 7 = PE PE /16.3:E

Drg.Approved By. Title: Terminal diagram =+-X27 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 82
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X28 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-20:U1 1 WDO BLOWER-2 15 KW,3Ph, 415VAC,50Hz 30R3 -C43:2 /16.4:D

-MOTOR-20:V1 2 = 30Y3 -C43:4 /16.4:D

-MOTOR-20:W1 3 = 30B3 -C43:6 /16.4:D

-MOTOR-20:U2 4 = 30R4 -C44:2 /16.5:D

C -MOTOR-20:V2 5 = 30Y4 -C44:4 /16.5:D

-MOTOR-20:W2 6 = 30B4 -C44:6 /16.5:D

-MOTOR-20 7 = PE PE /16.6:E

Drg.Approved By. Title: Terminal diagram =+-X28 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 83
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X29 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-BURNER-4230V AC,2.2A 1 WDO BURNER SUPPLY 0.45KW 1PHASE,230VAC,50Hz 31R5 -C46:4 /16.7:D

-BURNER-4230V AC,2.2A 2 = 31N3 -C46:6 /16.7:D

31N3 -RL4:A2 /16.8:E

-BURNER-4230V AC,2.2A 3 WDO BURNER SUPPLY 0.45KW 1PHASE,230VAC,50Hz 31R5 -RL4:A1 /16.8:E

C -BURNER-4230V AC,2.2A 4 = PE -X28:PE /16.9:E

5 COM_PCO AIR TEMPERATURE 2nd Stage 168 -TIC7:4 /31.2:C

6 NO_PCO AIR TEMPERATURE 2nd Stage 168 -TIC7:5 /31.3:C

7 PCO AIR TEMPERATURE RTD PT100_+ 300 -TIC7:18 /31.2:D

8 PCO AIR TEMPERATURE RTD PT100_I/P 301 -TIC7:19 /31.2:D

D 9 PCO AIR TEMPERATURE RTD PT100_- 302 -TIC7:20 /31.2:D

10 PCO FULE GAS TEMP.SENSOR RTD PT100_+ 303 -TIC8:18 /31.4:D

11 PCO FULE GAS TEMP.SENSOR RTD PT100_I/P 304 -TIC8:19 /31.4:D

12 PCO FULE GAS TEMP.SENSOR RTD PT100_- 305 -TIC8:20 /31.4:D

Drg.Approved By. Title: Terminal diagram =+-X29 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 84
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X30 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-22:U1 1 MSB BLOWER 1 7.5KW,3Ph, 415VAC,50Hz 32R3 -C47:2 /17.1:D

-MOTOR-22:V1 2 = 32Y3 -C47:4 /17.1:D

-MOTOR-22:W1 3 = 32B3 -C47:6 /17.1:D

-MOTOR-22:U2 4 = 32R4 -C48:2 /17.2:D

C -MOTOR-22:V2 5 = 32Y4 -C48:4 /17.2:D

-MOTOR-22:W2 6 = 32B4 -C48:6 /17.2:D

-MOTOR-22 7 = PE PE /17.3:E

Drg.Approved By. Title: Terminal diagram =+-X30 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 85
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X31 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-23:U1 1 MSB BLOWER-2 7.5KW,3Ph, 415VAC,50Hz 2Rx4Cx4Sq mm 33R3 -C50:2 /17.4:D

-MOTOR-23:V1 2 = 33Y3 -C50:4 /17.4:D

-MOTOR-23:W1 3 = 33B3 -C50:6 /17.4:D

-MOTOR-23:U2 4 = 33R4 -C51:2 /17.5:D

C -MOTOR-23:V2 5 = 33Y4 -C51:4 /17.5:D

-MOTOR-23:W2 6 = 33B4 -C51:6 /17.6:D

-MOTOR-23 7 = PE PE /17.6:E

Drg.Approved By. Title: Terminal diagram =+-X31 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 86
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X32 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 MSB LIGHTING SUPPLY-1 1Ph,230V,AC 34Y3 -SW6:14 /17.7:D

2 = 34N3 -SW6:24 /17.7:D

3 = PE PE /17.8:F

Drg.Approved By. Title: Terminal diagram =+-X32 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 87
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X33 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-24:U1 1 PCB-1 BLOWER-1 15KW,3Ph, 415VAC,50Hz 35R3 -C53:2 /19.1:D

-MOTOR-24:V1 2 = 35Y3 -C53:4 /19.1:D

-MOTOR-24:W1 3 = 35B3 -C53:6 /19.1:D

-MOTOR-24:U2 4 = 35R4 -C54:2 /19.2:D

C -MOTOR-24:V2 5 = 35Y4 -C54:4 /19.2:D

-MOTOR-24:W2 6 = 35B4 -C54:6 /19.2:D

-MOTOR-24 7 = PE PE /19.2:F

Drg.Approved By. Title: Terminal diagram =+-X33 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 88
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X34 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-25:U1 1 PCB-1 BLOWER-2 15KW,3Ph, 415VAC,50Hz 36R3 -C56:2 /19.4:D

-MOTOR-25:V1 2 = 36Y3 -C56:4 /19.4:D

-MOTOR-25:W1 3 = 36B3 -C56:6 /19.4:D

-MOTOR-25:U2 4 = 36R4 -C57:2 /19.5:D

C -MOTOR-25:V2 5 = 36Y4 -C57:4 /19.5:D

-MOTOR-25:W2 6 = 36B4 -C57:6 /19.5:D

-MOTOR-25 7 = PE PE /19.6:F

Drg.Approved By. Title: Terminal diagram =+-X34 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 89
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X35 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 LIGHTING SUPPLY PCB1-14 1Ph,230V,AC 37Y3 -SW14:14 /19.7:D

2 = 37N3 -SW14:24 /19.7:D

3 = PE PE /19.8:F

Drg.Approved By. Title: Terminal diagram =+-X35 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 90
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X36 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 LIGHTING SUPPLY PCB1-2 1Ph,230V,AC 38Y3 -SW15:14 /19.8:D

2 = 38N3 -SW15:24 /19.8:D

3 = PE PE /19.9:F

Drg.Approved By. Title: Terminal diagram =+-X36 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 91
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X37 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 RECIPROCATORS-1 SUPPLY 1.5KW,3PHASE,415V AC 39R2 -M12:2 /21.1:C

2 = 39Y2 -M12:4 /21.1:C

3 = 39B2 -M12:6 /21.1:C

4 = 39N2 -M12 /21.1:C

Drg.Approved By. Title: Terminal diagram =+-X37 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 92
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X38 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 RECIPROCATORS-2 SUPPLY 1.5KW,3PHASE,415V AC 40R2 -M13:2 /21.2:C

2 = 40Y2 -M13:4 /21.2:C

3 = 40B2 -M13:6 /21.2:C

4 = 40N2 -M13 /21.2:C

Drg.Approved By. Title: Terminal diagram =+-X38 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 93
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X39 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 RECIPROCATORS-3 SUPPLY 1.5KW,3PHASE,415V AC 41R2 -M14:2 /21.4:C

2 = 41Y2 -M14:4 /21.4:C

3 = 41B2 -M14:6 /21.4:C

4 = 41N2 -M14 /21.4:C

Drg.Approved By. Title: Terminal diagram =+-X39 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 94
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X40 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 RECIPROCATORS-4 SUPPLY 1.5KW,3PHASE,415V AC 42R2 -M15:2 /21.5:C

2 = 42Y2 -M15:4 /21.5:C

3 = 42B2 -M15:6 /21.5:C

4 = 42N2 -M15 /21.5:C

Drg.Approved By. Title: Terminal diagram =+-X40 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 95
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X41 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-26:U1 1 PCB-2 BLOWER-1 22KW,3Ph, 415VAC,50Hz 43R3 -C59:2 /22.1:D

-MOTOR-26:V1 2 = 43Y3 -C59:4 /22.1:D

-MOTOR-26:W1 3 = 43B3 -C59:6 /22.1:D

-MOTOR-26:U2 4 = 43R4 -C60:2 /22.2:D

C -MOTOR-26:V2 5 = 43Y4 -C60:4 /22.2:D

-MOTOR-26:W2 6 = 43B4 -C60:6 /22.2:D

-MOTOR-26 7 = PE PE /22.3:F

Drg.Approved By. Title: Terminal diagram =+-X41 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 96
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X42 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-27:U1 1 PCB-2 BLOWER-2 22KW,3Ph, 415VAC,50Hz 44R3 -C62:2 /22.4:D

-MOTOR-27:V1 2 = 44Y3 -C62:4 /22.4:D

-MOTOR-27:W1 3 = 44B3 -C62:6 /22.4:D

-MOTOR-27:U2 4 PCB-2 BLOWER-2 22KW,3Ph, 415VAC,50Hz 2Rx4Cx4Sq mm 44R4 -C63:2 /22.5:D

C -MOTOR-27:V2 5 = 44Y4 -C63:4 /22.5:D

-MOTOR-27:W2 6 = 44B4 -C63:6 /22.5:D

-MOTOR-27 7 = PE PE /22.6:F

Drg.Approved By. Title: Terminal diagram =+-X42 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 97
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X43 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 LIGHTING SUPPLY PCB2-1 1Ph,230V,AC 45R3 -SW22:14 /22.7:D

2 = 45N3 -SW22:24 /22.7:D

3 = PE PE /22.8:F

Drg.Approved By. Title: Terminal diagram =+-X43 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 98
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X44 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 AHU Condensing Unit1 Supply ,16KW,3Ph,415V AC 46R2 -M17:2 /24.1:C

2 = 46Y2 -M17:4 /24.1:C

3 = 46B2 -M17:6 /24.1:C

4 = 46N2 -M17 /24.1:C

Drg.Approved By. Title: Terminal diagram =+-X44 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 99
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X45 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 AHU Condensing Unit1 Supply ,16KW,3Ph,415V AC 47R2 -M18:2 /24.2:C

2 = 47Y2 -M18:4 /24.2:C

3 = 47B2 -M18:6 /24.2:C

4 = 47N2 -M18 /24.2:C

Drg.Approved By. Title: Terminal diagram =+-X45 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 100
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X46 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 AHU Condensing Unit1 Supply ,16KW,3Ph,415V AC 48R2 -M19:2 /24.4:C

2 = 48Y2 -M19:4 /24.4:C

3 = 48B2 -M19:6 /24.4:C

4 = 48N2 -M19 /24.4:C

Drg.Approved By. Title: Terminal diagram =+-X46 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 101
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X47 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 AHU Condensing Unit1 Supply ,16KW,3Ph,415V AC 49R2 -M20:2 /24.5:C

2 = 49Y2 -M20:4 /24.5:C

3 = 49B2 -M20:6 /24.5:C

4 = 49N2 -M20 /24.5:C

Drg.Approved By. Title: Terminal diagram =+-X47 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 102
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X48 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR1-28:U1 1 PCO-1 BLOWER-1 15KW,3Ph, 415VAC,50Hz 2Rx4Cx4Sq mm 50R3 -C65:2 /25.1:D

-MOTOR1-28:V1 2 = 50Y3 -C65:4 /25.1:D

-MOTOR1-28:W1 3 = 50B3 -C65:6 /25.1:D

-MOTOR1-28:U2 4 = 50R4 -C66:2 /25.2:D

C -MOTOR1-28:V2 5 = 50Y4 -C66:4 /25.2:D

-MOTOR1-28:W2 6 = 50B4 -C66:6 /25.2:D

-MOTOR1-28 7 = PE PE /25.2:F

Drg.Approved By. Title: Terminal diagram =+-X48 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 103
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X49 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR1-28:U1 1 PCO-1 BLOWER-2 15KW,3Ph, 415VAC,50Hz 51R3 -C68:2 /25.4:D

-MOTOR1-28:V1 2 = 51Y3 -C68:4 /25.4:D

-MOTOR1-28:W1 3 = 51B3 -C68:6 /25.4:D

-MOTOR1-28:U2 4 = 51R4 -C69:2 /25.5:D

C -MOTOR1-28:V2 5 = 51Y4 -C69:4 /25.5:D

-MOTOR1-28:W2 6 = 51B4 -C69:6 /25.5:D

-MOTOR1-28 7 = PE PE /25.6:F

Drg.Approved By. Title: Terminal diagram =+-X49 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 104
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X50 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-BURNER230V AC,2.2A 1 PCO-1 BURNER 1PHASE,230VAC,50Hz 52Y5 -C71:4 /25.7:D

-BURNER230V AC,2.2A 2 = 52N3 -C71:6 /25.7:D

52N3 -RL5:A2 /25.8:E

-BURNER230V AC,2.2A 3 PCO-1 BURNER 1PHASE,230VAC,50Hz 52Y6 -RL5:A1 /25.8:E

C -BURNER230V AC,2.2A 4 = PE -X49:PE /25.8:E

5 COM_PCO AIR TEMPERATURE 2nd Stage 168 -TIC9:4 /31.7:C

5 = -TIC10:4 /32.2:C

6 NO_PCO AIR TEMPERATURE 2nd Stage 168 -TIC9:5 /31.8:C

6 = -TIC10:5 /32.3:C

D 7 PCO AIR TEMPERATURE RTD PT100_+ 300 -TIC9:18 /31.7:D

7 = 300 -TIC10:18 /32.2:D

8 PCO AIR TEMPERATURE RTD PT100_I/P 301 -TIC9:19 /31.7:D

8 = 301 -TIC10:19 /32.2:D

9 PCO AIR TEMPERATURE RTD PT100_- 302 -TIC9:20 /31.7:D


E
9 = 302 -TIC10:20 /32.2:D

Drg.Approved By. Title: Terminal diagram =+-X50 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 105
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X51 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-30:U1 1 PCO-2 BLOWER-1 15KW,3Ph, 415VAC,50Hz 53R3 -C72:2 /26.1:D

-MOTOR-30:V1 2 = 53Y3 -C72:4 /26.1:D

-MOTOR-30:W1 3 = 53B3 -C72:6 /26.1:D

-MOTOR-30:U2 4 = 53R4 -C73:2 /26.2:D

C -MOTOR-30:V2 5 = 53Y4 -C73:4 /26.2:D

-MOTOR-30:W2 6 = 53B4 -C73:6 /26.2:D

-MOTOR-30 7 = PE PE /26.2:F

Drg.Approved By. Title: Terminal diagram =+-X51 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 106
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X52 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-30:U1 1 PAINT CURING OVEN BLOWER-2 7.5KW,3Ph, 415VAC,50Hz 54R3 -C75:2 /26.4:D

-MOTOR-30:V1 2 = 54Y3 -C75:4 /26.4:D

-MOTOR-30:W1 3 = 54B3 -C75:6 /26.4:D

-MOTOR-30:U2 4 = 54R4 -C76:2 /26.5:D

C -MOTOR-30:V2 5 = 54Y4 -C76:4 /26.5:D

-MOTOR-30:W2 6 = 54B4 -C76:6 /26.5:D

-MOTOR-30 7 = PE PE /26.6:F

Drg.Approved By. Title: Terminal diagram =+-X52 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 107
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X53 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-BURNER-230V AC,2.2A 1 PCO-2 BURNER SUPPLY 0.76KW 55B5 -C78:4 /26.7:D

-BURNER-230V AC,2.2A 2 = 55N3 -C78:6 /26.7:D

55N3 -RL6:A2 /26.8:E

-BURNER-230V AC,2.2A 3 PCO-2 BURNER SUPPLY 0.76KW 55B6 -RL6:A1 /26.8:E

C -BURNER-230V AC,2.2A 4 = PE -X52:PE /26.8:E

5 COM_PCO AIR TEMPERATURE 2nd Stage 168 -TIC12:4 /32.7:C

6 NO_PCO AIR TEMPERATURE 2nd Stage 168 -TIC12:5 /32.8:C

7 PCO AIR TEMPERATURE RTD PT100_+ 300 -TIC12:18 /32.7:D

8 PCO AIR TEMPERATURE RTD PT100_I/P 301 -TIC12:19 /32.7:D

D 9 PCO AIR TEMPERATURE RTD PT100_- 302 -TIC12:20 /32.7:D

10 PCO FULE GAS TEMP.SENSOR RTD PT100_+ 303 -TIC11:18 /32.4:D

11 PCO FULE GAS TEMP.SENSOR RTD PT100_I/P 304 -TIC11:19 /32.4:D

12 PCO FULE GAS TEMP.SENSOR RTD PT100_- 305 -TIC11:20 /32.4:D

Drg.Approved By. Title: Terminal diagram =+-X53 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 108
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-X54 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-MOTOR-33:U1 1 CONVEYOR 1.5KW,3Ph, 415VAC,50Hz 56R3 -D1:U /27.2:E

-MOTOR-33:V1 2 = 56Y3 -D1:V /27.2:E

-MOTOR-33:W1 3 = 56B3 -D1:W /27.2:E

-MOTOR-33:PE 4 = PE -X8:PE /27.2:E

Drg.Approved By. Title: Terminal diagram =+-X54 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 109
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 FUME EXHAUST BLOWER FUTURE INTERLOCK 102 /33.2:A

1 IRON PHOSPHATING PUMP 2,FUTURE INTERLOCK 102 /39.1:B

1 POWDER COATING BOOTH-1 BLOWER-1 ,FUTURE INTERLOCK 102 /44.5:B

1 POWDER COATING OVEN 1-BLOWER-2,FUTURE INTERLOCK 102 /51.5:B

C 2 FUME EXHAUST BLOWER FUTURE INTERLOCK 103 -Q1:13 /33.2:B

2 IRON PHOSPHATING PUMP 2,FUTURE INTERLOCK 211 -Q15:13 /39.1:C

2 POWDER COATING BOOTH-1 BLOWER-1 ,FUTURE INTERLOCK 322 -Q26:13 /44.5:C

2 POWDER COATING OVEN 1-BLOWER-2,FUTURE INTERLOCK 404 -T21:25 /51.5:C

3 HWR TANK BURNER FUTURE INTERLOCK 102 /33.5:A

D 3 WATER RINSE 3 PUMP FUTURE INTERLOCK 102 /39.4:B

3 POWDER COATING BOOTH-1 BLOWER-2FUTURE INTERLOCK 102 /45.2:B

3 POWDER COATING BOOTH 1BURNER 1 FUTURE INTERLOCK 102 /52.2:A

4 HWR TANK BURNER FUTURE INTERLOCK 109 -Q2:13 /33.5:B

4 WATER RINSE 3 PUMP FUTURE INTERLOCK 221 -Q16:13 /39.4:C


E
4 POWDER COATING BOOTH-1 BLOWER-2FUTURE INTERLOCK 333 -Q27:13 /45.2:C

4 POWDER COATING BOOTH 1BURNER 1 FUTURE INTERLOCK 415 -Q32:13 /52.2:B

5 FLUE GAS EXHAUST BLOWER (IRON PHOSPHATING),FUTURE INTERLOCK 102 /34.1:B

5 CIRCULATION PUMP ( PHOSPHATING TANK TO PHE) FUTURE INTERLOCK 102 /40.1:A

F 5 POWDER COATING BOOTH 2 BLOWER-1,FUTURE INTERLOCK 102 /48.1:B

5 POWDER COATING BOOTH 2-BLOWER-1 FUTURE INTERLOCK 102 /52.4:A

6 FLUE GAS EXHAUST BLOWER (IRON PHOSPHATING),FUTURE INTERLOCK 117 -Q4:13 /34.1:C

6 CIRCULATION PUMP ( PHOSPHATING TANK TO PHE) FUTURE INTERLOCK 231 -Q17:13 /40.1:B

6 POWDER COATING BOOTH 2 BLOWER-1,FUTURE INTERLOCK 358 -Q28:13 /48.1:C


G
6 POWDER COATING BOOTH 2-BLOWER-1 FUTURE INTERLOCK 424 -T24:17 /52.4:B

7 IRON PHOSPHATING TANK BURNERFUTURE INTERLOCK 102 /34.5:B

Drg.Approved By. Title: Terminal diagram =+-XL P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 110
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
7 CIRCULATION PUMP ( HOT WATER TANK TO PHE) FUTURE INTERLOCK 102 /40.3:A

7 POWDER COATING BOOTH 2-BLOWER-1 FUTURE INTERLOCK 102 /53.1:B

8 IRON PHOSPHATING TANK BURNERFUTURE INTERLOCK 127 -Q5:13 /34.5:C

8 CIRCULATION PUMP ( HOT WATER TANK TO PHE) FUTURE INTERLOCK 237 -Q18:13 /40.3:B

C 8 POWDER COATING BOOTH 2-BLOWER-1 FUTURE INTERLOCK 435 -Q34:13 /53.1:C

9 HWR FUME EXHAUST BLOWER FUTURE INTERLOCK 102 /35.1:A

9 BOOSTER PUMP 1 FUTURE INTERLOCK 102 /40.7:A

9 POWDER COATING BOOTH 2 BLOWER-2,FUTURE INTERLOCK 102 /48.5:B

9 POWDER COATING BOOTH -2 BURNER-2 FUTURE INTERLOCK 102 /53.6:B

D 10 HWR FUME EXHAUST BLOWER FUTURE INTERLOCK 133 -Q6:13 /35.1:B

10 BOOSTER PUMP 1 FUTURE INTERLOCK 243 -Q19:13 /40.7:B

10 POWDER COATING BOOTH 2 BLOWER-2,FUTURE INTERLOCK 368 -Q29:13 /48.5:C

10 POWDER COATING BOOTH -2 BURNER-2 FUTURE INTERLOCK 446 -Q35:13 /53.6:B

11 DEGREASING FUME EXHAUST BLOWER FUTURE INTERLOCK 102 /35.4:A


E
11 BOOSTER PUMP 2 FUTURE INTERLOCK 102 /41.2:A

11 POWDER COATING OVEN 1-BLOWER-1 FUTURE INTERLOCK 102 /51.1:B

12 DEGREASING FUME EXHAUST BLOWER FUTURE INTERLOCK 139 -Q7:13 /35.4:B

12 BOOSTER PUMP 2 FUTURE INTERLOCK 249 -Q20:13 /41.2:B

F 12 POWDER COATING OVEN 1-BLOWER-1 FUTURE INTERLOCK 393 -T21:15 /51.1:B

13 IRON PHOSPHATING FUME EXHAUST BLOWER FUTURE INTERLOCK 102 /35.6:A

13 BOOSTER PUMP 3 FUTURE INTERLOCK 102 /41.5:A

14 IRON PHOSPHATING FUME EXHAUST BLOWER FUTURE INTERLOCK 145 -Q8:13 /35.6:B

14 BOOSTER PUMP 3 FUTURE INTERLOCK 255 -Q21:13 /41.5:B


G
15 HWR BLOWER ,FUTURE INTERLOCK 102 /36.1:B

15 WATER DRYING OVEN BLOWER-1,FUTURE INTERLOCK 102 /42.1:B

Drg.Approved By. Title: Terminal diagram =+-XL P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 110.a
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
16 HWR BLOWER ,FUTURE INTERLOCK 151 -Q9:13 /36.1:C

16 WATER DRYING OVEN BLOWER-1,FUTURE INTERLOCK 261 -T12:17 /42.1:B

17 DEGREASING PUMP 1,FUTURE INTERLOCK 102 /36.5:B

17 WATER DRYING OVEN BLOWER-2 FUTURE INTERLOCK 102 /42.5:B

C 18 DEGREASING PUMP 1,FUTURE INTERLOCK 161 -Q10:13 /36.5:C

18 WATER DRYING OVEN BLOWER-2 FUTURE INTERLOCK 272 -T12:17 /42.5:C

19 DEGREASING PUMP 2 FUTURE INTERLOCK 102 /37.1:B

19 WATER DRYING OVEN BURNER-1 FUTURE INTERLOCK 102 /43.1:B

20 DEGREASING PUMP 2 FUTURE INTERLOCK 171 -Q11:13 /37.1:C

D 20 WATER DRYING OVEN BURNER-1 FUTURE INTERLOCK 283 -Q24:13 /43.1:B

21 WATER RINSE 1 PUMP FUTURE INTERLOCK 102 /37.4:B

21 METALLIC SPRAY BOOTH BLOWER-1 FUTURE INTERLOCK 102 /43.4:B

22 WATER RINSE 1 PUMP FUTURE INTERLOCK 181 -Q12:13 /37.4:C

22 METALLIC SPRAY BOOTH BLOWER-1 FUTURE INTERLOCK 302 -Q24:13 /43.4:C


E
23 WATER RINSE 2 PUMP FUTURE INTERLOCK 102 /38.0:B

23 METALLIC SPRAY BOOTH BLOWER-2,FUTURE INTERLOCK 102 /44.1:B

24 WATER RINSE 2 PUMP FUTURE INTERLOCK 191 -Q13:13 /38.0:C

24 METALLIC SPRAY BOOTH BLOWER-2,FUTURE INTERLOCK 312 -Q25:13 /44.1:C

F 25 IRON PHOSPHATING PUMP 1 FUTURE INTERLOCK 102 /38.5:B

26 = 201 -Q14:13 /38.5:C

Drg.Approved By. Title: Terminal diagram =+-XL P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 110.b
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL1 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
1 Solinoid Valve-1 101 -SV1:x1 /46.2:C

-SV1:x2 2 = 346 -A1 /46.2:E

3 Solinoid Valve-2 101 -SV2:x1 /46.3:C

-SV2:x2 4 = 347 -A1 /46.3:E

C 5 Solinoid Valve-3 101 -SV3:x1 /46.3:C

-SV3:x2 6 = 348 -A1 /46.3:E

7 Solinoid Valve-4 101 -SV4:x1 /46.4:C

-SV4:x2 8 = 349 -A1 /46.4:E

9 Solinoid Valve-5 101 -SV5:x1 /46.5:C

D -SV5:x2 10 = 350 -A1 /46.5:E

-A2 101 11 Solinoid Valve-6 101 -SV6:x1 /46.6:C

-A2

-SV6:x2 12 Solinoid Valve-6 351 -A1 /46.6:E

13 Solinoid Valve-7 101 -SV7:x1 /47.2:C


E
-SV7:x2 14 = 352 -A1 /47.2:E

15 Solinoid Valve-8 101 -SV8:x1 /47.3:C

-SV8:x2 16 = 353 -A1 /47.3:E

17 Solinoid Valve-9 101 -SV9:x1 /47.3:C

F -SV9:x2 18 = 354 -A1 /47.3:E

19 Solinoid Valve-10 101 -SV10:x1 /47.4:C

-SV10:x2 20 = 355 -A1 /47.4:E

21 Solinoid Valve-11 101 -SV11:x1 /47.5:C

-SV11:x2 22 = 356 -A1 /47.5:E


G
-A2 23 Solinoid Valve-12 101 -SV12:x1 /47.6:C

-C59:A2

Drg.Approved By. Title: Terminal diagram =+-XL1 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 111
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL1 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-SV12:x2 24 Solinoid Valve-12 357 -A1 /47.6:E

25 Solinoid Valve-13 101 -SV13:x1 /49.2:C

-SV13:x2 26 = 381 -A1 /49.2:E

27 Solinoid Valve-14 101 -SV14:x1 /49.3:C

C -SV14:x2 28 = 382 -A1 /49.3:E

29 Solinoid Valve-15 101 -SV15:x1 /49.3:C

-SV15:x2 30 = 383 -A1 /49.3:E

31 Solinoid Valve-16 101 -SV16:x1 /49.4:C

-SV16:x2 32 = 384 -A1 /49.4:E

D 33 Solinoid Valve-17 101 -SV17:x1 /49.5:C

-SV17:x2 34 = 385 -A1 /49.5:E

-A2 35 Solinoid Valve-18 101 -SV18:x1 /49.6:C

-A2

-SV18:x2 36 Solinoid Valve-18 386 -A1 /49.6:E


E
37 Solinoid Valve-19 101 -SV19:x1 /50.2:C

-SV19:x2 38 = 387 -A1 /50.2:E

39 Solinoid Valve-20 101 -SV20:x1 /50.3:C

-SV20:x2 40 = 388 -A1 /50.3:E

F 41 Solinoid Valve-21 101 -SV21:x1 /50.3:C

-SV21:x2 42 = 389 -A1 /50.3:E

43 Solinoid Valve-22 101 -SV22:x1 /50.4:C

-SV22:x2 44 = 390 -A1 /50.4:E

45 Solinoid Valve-23 101 -SV23:x1 /50.5:C


G
-SV23:x2 46 = 391 -A1 /50.5:E

-A2 47 Solinoid Valve-24 101 -SV24:x1 /50.6:C

Drg.Approved By. Title: Terminal diagram =+-XL1 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 111.a
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL1 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-C65:A2

-SV24:x2 48 Solinoid Valve-24 392 -A1 /50.6:E

Drg.Approved By. Title: Terminal diagram =+-XL1 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 111.b
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL4 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-PD1-PB1:11 9

10 -PD1-PB1:12 /54.1:C

11 CONVEYOR FUTURE INTERLOCK 102 /54.1:A

11 200A -PD2-PB2:11 /54.1:D

C 12 CONVEYOR FUTURE INTERLOCK

12 200B -PD2-PB2:12 /54.1:D

13 200B -PD3-PB4:11 /54.1:E

14 200C -PD3-PB4:12 /54.1:E

15

D 15 200C -PD4-PB3:11 /54.2:F

-PD6-PB6:12 16 -PD5-PB5:11 /54.2:E

-PD5-PB5:12 16

-PD4-PB3:12 16

17 201 -PD1-PB2:13 /54.2:D


E
17 201 -PD3-PB2:13 /54.4:D

18 202 -PD1-PB2:14 /54.2:D

18 202 -PD3-PB2:14 /54.4:D

19 201 -PD2-PB2:13 /54.3:E

F 19 201 -PD4-PB2:13 /54.5:E

20 202 -PD2-PB2:14 /54.3:E

20 202 -PD4-PB2:14 /54.5:E

21 201 -PD5-PB2:13 /54.6:D

22 202 -PD5-PB2:14 /54.6:D


G
-ILPB63:13 201 23 201 -PD6-PB2:13 /54.6:E

Drg.Approved By. Title: Terminal diagram =+-XL4 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 112
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-XL4 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-RL7:A1 24 202 -PD6-PB2:14 /54.6:E

Drg.Approved By. Title: Terminal diagram =+-XL4 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 112.a
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-WLS Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-WLS-1 1 WATER LEVLE LOW SENSER-1 ON -RL8:5 /36.4:C

102 /36.5:B

-WLS-1 2 WATER LEVLE LOW SENSER-1 ON 160B -RL8:A1 /36.4:F

-WLS-2 3 WATER LEVLE LOW SENSER-2 ON -RL9:5 /36.8:C

C 102 /37.1:B

-WLS-2 4 WATER LEVLE LOW SENSER-2 ON 170B -RL9:A1 /36.9:F

-WLS-3 5 WATER LEVLE LOW SENSER-3 ON -RL10:5 /37.8:C

102 /38.0:B

-WLS-3 6 WATER LEVLE LOW SENSER-3 ON 190B -RL10:A1 /37.8:F

D -WLS-4 8 WATER LEVLE LOW SENSOR -4 ON -RL11:5 /38.4:C

102 /38.5:B

-WLS-4 9 WATER LEVLE LOW SENSOR -4 ON 200B -RL11:A1 /38.4:F

-WLS-5 10 WATER LEVLE LOW SENSOR -5 ON -RL12:5 /38.8:C

102 /39.1:B
E
-WLS-5 11 WATER LEVLE LOW SENSOR -5 ON 210B -RL12:A1 /38.9:F

-WLS-6 12 WATER LEVLE LOW SENSOR -6 ON -RL13:5 /39.8:C

102 /40.1:A

-WLS-6 13 WATER LEVLE LOW SENSOR -6 ON 230B -RL13:A1 /39.9:F

F -WLS-7 14 WATER LEVEL LOW SENSOR -6 ON -RL14:5 /40.5:C

102 /40.7:A

-WLS-7 15 WATER LEVEL LOW SERSOR -6 ON 242B -RL14:A1 /40.6:F

Drg.Approved By. Title: Terminal diagram =+-WLS P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 113
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-SX1 Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-RL8:9 160A 1 WATER LEVEL LOW -1 SOLENOID ON -SOL-1:x1 /36.4:F

-SOL-1:x2 2 = -L8:x2 /36.3:F

-RL8:A2 /36.4:F

-RL9:9 170A 3 WATER LEVEL LOW-2 SOLENOID ON -SOL-2:x1 /36.8:F

C -SOL-2:x2 4 = -L9:x2 /36.8:F

-RL9:A2 /36.9:F

-RL10:9 190A 5 WATER LEVLE LOW -3 SOLENOID ON -SOL-3:x1 /37.8:F

-SOL-3:x2 6 WATER LEVLE LOW-3 SOLENOID ON -L11:x2 /37.7:F

-RL10:A2 /37.8:F

D -RL11:9 200A 8 WATER LEVLE LOW SOLENOID-4 ON -SOL-4:x1 /38.4:F

-SOL-4:x2 9 = -L12:x2 /38.3:F

-RL11:A2 /38.4:F

-RL12:9 210A 10 WATER LEVLE LOW SOLENOID-5 ON -SOL-5:x1 /38.8:F

-SOL-5:x2 11 = -L13:x2 /38.8:F


E
-RL12:A2 /38.9:F

-RL13:9 230A 12 WATER LEVLE LOW SOLENOID -6 ON -SOL-6:x1 /39.8:F

-SOL-6:x2 13 = -L15:x2 /39.7:F

-RL13:A2 /39.9:F

F -RL14:9 242A 14 WATER LEVLE LOW SOLENOID -7 ON -SOL-7:x1 /40.5:F

-SOL-7:x2 15 = -L17:x2 /40.5:F

-RL14:A2 /40.6:F

Drg.Approved By. Title: Terminal diagram =+-SX1 P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 114
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115
0 1 2 3 4 5 6 7 8 9

A Terminal diagram TB DETALS CHOLA

Strip
External targets
=+-SX Internal targets

Target designation wiring jumper function text wiring Target designation Placement
B
-SOL8:x1 16 LUBRICATION ON/OFF 206 -RL1:22 /55.2:D

-SOL8:x2 17 = 0VDC -TA1:- /55.2:B

Drg.Approved By. Title: Terminal diagram =+-SX P.O.No. -----------------


AMK
Appln: ---- Job.No. V2400 SHEET
Drg.Checked By. REV 115
H JMN Client: SHIRDI SAI ELECTRICALS LTD Drg.No. ''V''
01
00 AMK 2023 28 TOTAL
FOR CUSTOMER APPROVAL Drg.Prepared By. Year Month Date
Rev. Revision Appd. Year Week CHINTU Prism SURFACE COATINGS (P) LTD
2023 05 23
115

You might also like