SR Project Ref.N Promoter Name Project Title Project Cost

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views36 pages

SR Project Ref.N Promoter Name Project Title Project Cost

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 36

Sr Project Ref.

N Promoter Name Project Title Project Cost


1 151516 Pondy Oxides Chemicals Limited
Recycling & Mfg Plants Project at Ka500 Crores
2 151514 Festo India Private LimitedPneumatic Components Mfg Unit Proj 520 Crores
3 151513 Sunsure Energy Private Limited
Solar Power Project at Tuticorin & 3150 Crores
4 144711 G R R Storages Warehouse Project at Gowdavalli Vi47 Crores
5 144527 Binjusaria Ispat Private Limited
Induction
- UnitFurnance
II Manufacturing U 5 Crores
6 151507 Shriram Properties LimitedCommercial Complex Project at Hebbal, Bengaluru,
7 151503 Bhansali Engineering Polymers
Brownfield
LimitedABS Project at Abu Road, Sirohi, Rajas
8 151498 Ambuja Cements Limited Cement Unit Project at Tuticorin, 1312.5 Crores
9 151468 Mahindra Lifespace Developers
Residential-cum-Commercial
Limited Complex Project at
10 151530 Aarti Industries Limited Synthetic Organic Chemicals Mfg Uni 1,272 Crores
11 151531 Aarti Industries Limited Co-generation Power Plant Project a1,272 Crores
12 56385 Tata Power Renewable Energy HydelLimited
Power Unit Project at Bhivpu 13,000 Crores
13 151515 Karnataka Cooperative MilkDairy
Producers'
Unit Project
Federation
at Katihalli,
LimitedHass 95 Crores
14 143550 DBG Estates Private LimitedIntegrated Logistics Park Project a 550 Crores
15 144133 Desano Pharmaceuticals Private
Finished
Limited
Formulations & Animal Nut494.74 Crores
16 143810 Dattatreya Enterprises Modular Furniture Mfg Unit Project16.40 a Crores
17 151506 Rajratan Global Wire LimitedTyre Bead Wires Project at Vallam 300 Crores
18 151502 Bhansali Engineering Polymers
Brownfield
LimitedABS Project at Satnoor, Chhindwara,
19 151497 National Highways Authority Road
of India
Upgradation
(NHAI) Project at Challak1157 Crores
20 151493 Ambuja Cements Limited Cement Unit Project at Madukkarai875 Crores
21 151484 Mayuresh Engineering Works Cast Iron Castings Project at Shirol 11.68 Crores
22 151470 Man InfraConstruction Limited
Residential Complex Project at Ghatkopar, Mumb
23 151460 NBCC India Limited Commercial Complex Project at Naur 2694 Crores
24 151457 NBCC India Limited Residential cum Commercial Complex 110.7 Crores
25 151528 National Highways Authority Road
of India
Upgradation Project at Bakaur551 Crores
26 151527 National Highways Authority Road
of India
Upgradation Project at Gundu597 Crores
27 142072 Brigade Enterprises LimitedResidential Complex Project at Pe 720 Crores
28 151517 National Highways & Infrastructure
Road Upgradation
DevelopmentProject
Corporation
at Akegwo 3Limited
23 Crores
29 144158 Indian Oil Corporation Limited
IOCL LPG Bottling Plant Project at N73.98 Crores
30 151505 Rikvin Biotech Private limited
Active Pharmaceutical Ingredients P40 Crores
31 143520 Dee Bee Organics Private Limited
Formaldehyde Manufacturing Project 4.8531 Crores
32 151495 Ramco Cements Limited Cement Project at Virudhunagar, Ta500 Crores
33 151492 Gujarat Ambuja Exports Limited
Starch Project at Hulasoggi, Sitarga 300 Crores
34 151524 Naranja Sahakari Sakkare Karkhane
Ethanol Unit
Niyamit
Project at Immampur 104 Crores
35 151486 Naranja Sahakari Sakkare Karkhane
Co-generation
Niyamit Power Plant Projec 104 Crores
36 151489 Bagmane Developers Private Office
Limited
Complex Project at Byrasand 534 Crores
37 141696 Astral Polytechnik Limited Plastic Pipe Fittings Manufacturing 109.81 Crores
38 144305 Jagdish Ispat Private Limited
Hot Charged Rolling Mill Unit Projec7.50 Crores
39 151469 Sobha Limied Residential Complex Project at Vyttila, Ernakulam,
40 151467 Man Infraconstruction Limited
Residential Complex Project at Tardeo, Mumbai,
41 83326 Noida Metro Rail CorporationMetro
Limited
Rail Project at Sector-142-Bo2,254 Crores
42 56547 Maharashtra State Power Generation
Coal Based Company
Power Unit Limited
Project at 700 Crores
43 151463 Marathon NextGen Realty Residential
Limited Complex Project at Panvel, Raigad, M
44 144712 Bricks Infratech LLP Residential Complex Project at Osm125 Crores
45 148227 Great Galleon Ventures Limited
Captive Power Plant Project at Sej 65 Crores
46 148228 Great Galleon Ventures Limited
Distillery Unit Project at Sejwaya, 65 Crores
47 144240 J G Foundry Limited Steel Plant Project at Chimochak, Di11.72 Crores
48 151482 Ecorex Buildtech Private Limited
Autoclaved Aerated Concrete Blocks40 Crores
49 143817 Bohang Crystal Stone Technology
Engineered
PrivateQuartz
Limited
Slabs Manufacturi 85 Crores
50 148348 Anshul Innovative Chemistry Chemical
Private Manufacturing
Limited Unit Project at Roha, Rai
51 151499 Shahi Exports Private Limited
Textiles Project at Karur, Tamil Nad 1,000 Crores
52 151512 Sunsure Energy Private Limited
Wind Power Project at Tuticorin & T3150 Crores
53 151445 Assam Cancer Care FoundationCancer Care Hospital Project at Na 135 Crores
54 149234 Numaligarh Refinery Limited Petroleum Refinery Project at Numa28,026 Crores
55 151511 Semaliya Energy Private Limited
Hydel Based Power Unit Project at 10,356 Crores
56 151510 Foxconn Industrial InternetMobile
Company Components
Limited Project at Kan 1,600 Crores
57 151501 IPL Biologicals Bio-fertilizer Unit Project at Gandhi 400 Crores
58 151490 Gujarat Ambuja Exports Limited
Sorbitol Project at Hulasoggi, Sitar 100 Crores
59 151488 National Highways Authority Road
of India
Upgradation
(NHAI) Project at Kodunga 1617.2 Crores
60 144273 Atibir Hi Tech Private Limited
lnduction Furnace & Hot Billets Uni 51 Crores
61 151481 Future Warehouse Solutions Warehouse
Private Limited
Project at NH-1 Sonipat, Haryana
62 151480 V J Imaging Technologies Private
Industrial
Limited
X-Ray Inspection Systems42 Crores
63 144223 Jay Industries Bulk Drug & Drug Intermediates Man 2 Crores
64 143849 J K Industries Pigments Manufacturing Unit Projec48 Crores
65 151509 Neelachal Ispat Nigam Limited
Coal Based Power Unit Project at Ka61,769 Crores
66 151476 Neelachal Ispat Nigam Limited
Steel Unit Project at Kalinga Nagar, 61,769 Crores
67 146129 Maa Mahamaya Sahakari Shakkar
DistilleryKarkhana
Unit ProjectMaryadit
at Kerta, Sur 56.33 Crores
68 151462 D N Homes Private LimitedResidential Colony Project at Madanpur, Khurda, O
69 151458 NBCC India Limited Residential Complex Project at Sect575 Crores
70 145356 Mahendra Sponge & PowerCaptiveLimitedPower
- UnitPlant
II Project at Saror40 Crores
71 151226 Srinivasan Associates Private
Commercial
Limited Complex Project at Ram25 Crores
72 127712 Vadhavan Port Project Limited
Vadhavan
(VPPL)Port Project at Dahanu, Pa 76,220 Crores
73 63315 Foxconn Technology India Private
Smartphones
LimitedComponents Unit Proje 2,913 Crores
74 151500 Ambuja Cements Limited Cement Project at Kattupalli, Thiruv1312.5 Crores
75 151483 Tata Power Company Limited Pumped Storage Hydel Power Projec15000 Crores
76 144035 Jind Bio Energy LLP Paddy Straw Based Biomass Power Pla 64 Crores
77 143248 Jivraj Coke Private Limited Non-Recovery Coke Oven Plant Proje 8.0 Crores
78 151478 Building Construction Department,
Sports Academy
Bihar cum Cricket Stadium 740 Crores
79 148246 GR Integrated Steel PrivateIntegrated
Limited Steel Plant Project at M 442 Crores
80 147106 Catapharma Chemicals PrivateSynthetic
LimitedOrganic Chemicals Project1995.8 Crores
81 147756 Ese Energy Private Limited Grain Based Distillery Unit Project 96.745 Crores
82 147757 Ese Energy Private Limited Captive Power Plant Project at Dain96.745 Crores
83 146266 Balaji Buildcon Commercial Complex Project at Mhalunge, Pune, M
84 151461 NBCC India Limited Residential Complex Project at Neta5466 Crores
85 151438 NBCC India Limited Residential Complex Project at Grea290 Crores
86 151443 Assam Cancer Care FoundationCancer Care Hospital Project at Tin 135 Crores
87 151416 Ramco Cements Limited Captive Power Plant Project at Kolimigundla, Kur
88 151494 Adani Ports & Special Economic
Deep Zone
Sea Port
Limited
Project at Tajpur, M 25,000 Crores
89 151491 Semaliya Energy Private Limited
Loop Pumped Storage Project at Khe7,630 Crores
90 151475 Karnataka Power TransmissionSubstation
Corporation
Unit Project
Limitedat Yalwar, B707.58 Crores
91 144893 Clair Electronics Private Limited
Electronics Manufacturing Unit Proj131.80 Crores
92 146118 Century Plyboards India Limited
Synthetic Resins Manufacturing Uni4.123 Crores
93 145011 Meghmani Industries Limited Technical
(Unit V)Pesticide & Pesticide Int 70 Crores
94 144588 Anjalitai Canes Private Limited
Molasses Based Distillery Unit Proje100.90 Crores
95 144620 Anjalitai Canes Private Limited
Incineration Boiler Project at Halaga Village, Bela
96 151466 Kelwon Electronics & Appliances
Consumer
Private
Electronics
Limited Unit Project 300 Crores
97 151464 Man InfraConstruction Limited
Residential Complex Project at Juhu, Mumbai, M
98 67086 Avantis Infrastructures LLPCommercial Complex Project at Parvat, Surat, Guj
99 151453 Baashyaam Construction Private
Residential
LimitedComplex Project at Ma 118.11 Crores
100 145207 Majhaulia Sugar IndustriesCo-generation
Private LimitedPower Unit Project a20 Crores
Project Status Completion D Project Type Ownership Industry
Industrial Projects
Approvals Received New Private
Industrial Projects
Approvals Received New Private
Power Projects
Approvals Received New Private
Construction Projects
Approvals Received New Private
Industrial Projects
Under Approvals New Private
Construction Projects
Construction Started June, 2024 New Private
Industrial Projects
Under Approvals Expansion Private
Industrial Projects
Under Approvals New Private
Construction Started March, 2025 New Private Construction Projects
Construction Started May, 2025 New Private Industrial Projects
Power Projects
Construction Started May, 2025 New Private
Power Projects
Construction Started June, 2027 New Private
Industrial Projects
Construction Started December, 20New Government
Construction Projects
Under Approvals New Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Approvals Received New Private
Industrial Projects
Construction Started December, 20New Private
Industrial Projects
Under Approvals Expansion Private
Infrastructure Projects
Construction Started December, 20Expansion Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Approvals Received New Private
Construction Projects
Construction Started June, 2025 Expansion Private
Construction Projects
Construction Started March 2025 New Private
Construction Projects
Under Approvals New Private
Infrastructure Projects
Construction Started December, 20New Government
Infrastructure Projects
Under Approvals December, 20New Government
Construction Projects
Construction Started February, 202 New Private
Construction Started March, 2026 Expansion Private Infrastructure Projects
Construction Started December, 20New Private Mining Projects
Under Approvals New Private Industrial Projects
Under Approvals Expansion Private Industrial Projects
Industrial Projects
Approvals Received Expansion Private
Industrial Projects
Construction Started March, 2025 New Private
Industrial Projects
Approvals Received New Private
Power Projects
Approvals Received New Private
Construction Projects
Construction Started March, 2025 New Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Under Approvals Expansion Private
Construction Projects
Construction Started December, 20New Private
Construction Projects
Construction Started March, 2025 New Private
Infrastructure Projects
Under Approvals Expansion Government
Power Projects
Construction Started December, 20New Government
Construction Projects
Construction Started March, 2026 New Private
Construction Projects
Under Approvals New Private
Power Projects
Under Approvals New Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Under Approvals Expansion Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Construction Started December, 20Expansion Private
Industrial Projects
Approvals Received New Private
Approvals Received New Private Power Projects
Under Approvals New Private Construction Projects
Mining Projects
Construction Started December, 20Expansion Government
Power Projects
Under Approvals New Private
Industrial Projects
Planning New Private
Industrial Projects
Approvals Received New Private
Industrial Projects
Construction Started April, 2024 New Private
Infrastructure Projects
Construction Started December, 20New Government
Industrial Projects
Approvals Received Expansion Private
Construction Projects
Approvals Received New Private
Industrial Projects
Approvals Received New Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Under Approvals New Private
Power Projects
Approvals Received Expansion Private
Industrial Projects
Approvals Received Expansion Private
Industrial Projects
Approvals Received New Government
Construction Projects
Construction Started December, 20New Private
Construction Projects
Construction Started December, 20New Private
Power Projects
Construction Started December, 20Expansion Private
Construction Started February, 202 New Private Construction Projects
Under Approvals New Government Infrastructure Projects
Planning New Private Industrial Projects
Under Approvals New Private Industrial Projects
Power Projects
Under Approvals New Private
Power Projects
Construction Started December, 20New Private
Industrial Projects
Under Approvals Expansion Private
Construction Projects
Construction Started March, 2025 New Government
Industrial Projects
Construction Started December, 20New Private
Industrial Projects
Construction Started April, 2024 New Private
Industrial Projects
Construction Started December, 20New Private
Power Projects
Construction Started December, 20New Private
Construction Projects
Approvals Received New Private
Construction Projects
Approvals Received Expansion Private
Construction Projects
Nearly Completion March, 2024 New Private
Construction Projects
Under Approvals New Private
Power Projects
Construction Started October, 2024Expansion Private
Infrastructure Projects
Under Approvals New Private
Power Projects
Under Approvals New Private
Power Projects
Under Approvals New Government
Industrial Projects
Construction Started March, 2024 New Private
Industrial Projects
Construction Started December, 20New Private
Industrial Projects
Under Approvals New Private
Industrial Projects
Under Approvals New Private
Under Approvals New Private Power Projects
Under Approvals New Private Construction Projects
Construction Projects
Construction Started March, 2025 New Private
Construction Projects
Construction Started December, 20New Private
Construction Projects
Under Approvals New Private
Power Projects
Approvals Received New Private
Sub Industry Product & Manufacturing
Recycling Capacity
Not Plants Country
Disclosed State City
Plastic & Plastic Products
Pneumatic ComponentsNot Disclosed India Tamil Nadu Thiruvallur
Automobile Ancillaries
Solar Power 300 MW India Tamil Nadu Krishnagiri
Solar Based Power
Built Up Area 30653.4 Sq.mt. India Tamil Nadu Thoothukkudi
Storage & Distribution
India Telangana Medchal-Malkajgir
Ferrous Metals (Iron & Steel)
TMT Bars Complex
Commercial 396000 Tonnes India
Not Disclosed Telangana Rangareddy
Business / Commercial Complexes
Brownfield ABS 75000 TPA to 145000 IndiaTPA Karnataka Bengaluru
Plastic & Plastic Products
Cement 3.75 MTPA India Rajasthan Sirohi
Cement & Asbestos
Residential complex Not Disclosed India Tamil Nadu Thoothukkudi
Real Estate India Maharashtra Mumbai
Synthetic Organic 1,98,205
Chemicals TPA
Chemicals India Gujarat Bharuch
Co-generation Power 4.5 MW
Captive Power
Hydel Power 1000 MW India Gujarat Bharuch
Hydel Based Power
Dairy 60 Lakh Liter India Maharashtra Raigarh
Food & Agro Products
Integrated Logistics4,48,270.24
Park Sq.M.India
ha Karnataka Hassan
Industrial / Software / Other Parks
Plot Area 92513 Sq. mt. India Maharashtra Thane
Chemicals
Modular FurnitureNot Disclosed India Karnataka Ramanagar
Other Industrial Projects
Tyre Bead Wires 60,000 TPA India Karnataka Kolar
Automobile Ancillaries
Brownfield ABS 75000 TPA to 145000 IndiaTPA Tamil Nadu Kancheepuram
Plastic & Plastic Products
Road Upgradation358.50 km to 414.21 India
km Madhya Pradesh Chhindwara
Roadways / Highways
Cement 2.5 MTPA India Karnataka Chitradurga
Cement & Asbestos
Cast Iron CastingsNot Disclosed India Tamil Nadu Coimbatore
Ferrous Metals (Iron & Steel)
Residential Complex 4 lakh sq. ft. India Maharashtra Kolhapur
Real Estate
Build Up Area 25 Acres India Maharashtra Mumbai
Business / Commercial Complexes
Residential Complex Not Disclosed India Delhi South Delhi
Real Estate
Road Upgradation5.575 kms India Rajasthan Jaipur
Roadways / Highways
Road Upgradation27.4 kms India Bihar Supaul
Roadways / Highways
Residential Flats 1450 Flats India Andhra Pradesh West Godavari
Real Estate
Road Upgradation36.94 kms India Tamil Nadu Chennai
Roadways / Highways India Nagaland Phek
IOCL LPG Bottling 30000 MTPA
Petroleum Oil & Gases
Active Pharmaceutical Ingredients India
Not Disclosed Meghalaya Ri Bhoi
Drugs & Pharmaceuticals India Telangana Medak
Formaldehyde 100 MTPD
Chemicals India Rajasthan Alwar
Cement Not Disclosed
Cement & Asbestos
Starch 700 MTPD India Tamil Nadu Virudhunagar
Food & Agro Products
Ethanol 120 KLPD India Uttarakhand Sitarganj
Distilleries & Breweries
Co-generation Power 3.2 MW India Maharashtra Ahmednagar
Captive Power
Office Complex Not Disclosed India Maharashtra Ahmednagar
Business / Commercial Complexes
Plastic Pipe Fittings
35000 TPA India Karnataka Bangalore Rural
Plastic & Plastic Products
Hot Charged Rolling Mill Tons/Year India
57670 Odisha Cuttack
Ferrous Metals (Iron & Steel)
Residential complex Not Disclosed India Chhattisgarh Raipur
Real Estate
Residential complex Not Disclosed India Kerala Ernakulam
Real Estate
Metro Rail 11.56 kms India Maharashtra Mumbai
Railways
Coal Based Power5x500 MW India Uttar Pradesh Muzaffarnagar
Thermal Based Power
India Maharashtra Akola
Residential complex Not Disclosed
Real Estate
Built Up Area 69363.7 Sq.mt. India Maharashtra Raigad
Real Estate
Captive Power 1.8 MW India Telangana Sangareddy
Captive Power
Distillery 120 KLD India Madhya Pradesh Dhar
Distilleries & Breweries
MS Billet 76800 MT/AnnumIndia Madhya Pradesh Dhar
Ferrous Metals (Iron & Steel)
Autoclaved Aerated NotConcrete BlocksIndia
Disclosed Bihar Patna
Cement & Asbestos
Engineered QuartzNot Slabs
Disclosed India Telangana Hyderabad
Other Industrial Projects
Chemical 33267 TPA India Andhra Pradesh SPSR Nellore
Chemicals
Textiles 100 MM India Maharashtra Raigad
Textiles
Wind Power 200 MW India Tamil Nadu Karur
Wind Based Power India Tamil Nadu Thoothukkudi
Hospital Not Disclosed
Hospitals India Assam Nagaon
Petroleum Refinery 6 Mln tpa
Petroleum Oil & Gases
Hydel Based Power 2000 MW India Assam Golaghat
Hydel Based Power
Mobile Components Not Disclosed India Rajasthan Chittaurgarh
Other Industrial Projects
Bio-fertilizer Not Disclosed India Tamil Nadu Kancheepuram
Fertilisers & Pesticides
Sorbitol Not Disclosed India Gujarat Gandhinagar
Food & Agro Products
Road Upgradation26.030 Kms India Uttarakhand Sitarganj
Roadways / Highways
India Kerala Thrissur
Ferrous Metals (Iron & Steel)
Rolling Mill Park237600
FWS Logistics TPASq.ft. India
0.5 Million Jharkhand Giridih
Storage & Distribution
X-Ray Inspection Systems
Not Disclosed India Haryana Sonipat
Other Industrial Projects
Bulk Drug & Drug 50 MT/Month India
Intermediates Karnataka Bangalore Urban
Drugs & Pharmaceuticals
Pigments 2310 TPM India Gujarat Bharuch
Chemicals
Coal Based Power60 MW India Madhya Pradesh Seoni
Captive Power
Steel 1.1 Mln tpa India Odisha Jajapur
Ferrous Metals (Iron & Steel)
Distillery 20 KLPD India Odisha Jajapur
Distilleries & Breweries
Residential complex 12 towers India Chhattisgarh Surguja
Real Estate
Residential complex Not Disclosed India Odisha Khurda
Real Estate
India Uttar Pradesh Gautam Buddha N
Captive Power
Captive Power (WHRB)
Commercial complex 16 MW
4 Floors India Chhattisgarh Raipur
Business / Commercial Complexes India Tamil Nadu Coimbatore
Container Terminal 4 Nos
Shipping Infrastructure India Maharashtra Palghar
Smartphones Components
Not Disclosed
Other Industrial Projects India Karnataka
Cement 3.75 MTPA
Cement & Asbestos India Tamil Nadu Thiruvallur
Pumped Storage HydelNot Disclosed
Power
Hydel Based Power
Paddy Straw Based 9.9 MW Power India
Biomass Maharashtra Raigad
Non Conventional Power Projects (Biomass)
Low Ash Metallurgical MT/month India
5,000Coke Haryana Jind
Ferrous Metals (Iron & Steel)
Sports Academy cum Not Cricket
Disclosed
StadiumIndia Gujarat kutch
Other Construction Projects
India Bihar Nalanda
Ferrous Metals (Iron & Steel)
Rerolled
SyntheticSteel
Organic 231,000
Not
Chemicals TPA
Disclosed India Chhattisgarh Bemetara
Chemicals
Grain Based Distillery
60 KLPD India Maharashtra Nashik
Distilleries & Breweries
Captive Power Plant 2.0 MW India Bihar Kaimur
Captive Power
Built Up Area Not Disclosed India Bihar Kaimur
Business / Commercial Complexes
Residential complex 6587 Flats India Maharashtra Pune
Real Estate
Residential complex 1,638 flats India Delhi South West Delhi
Real Estate
India Uttar Pradesh Greater Noida
Hospital Not Disclosed
Hospitals
Captive Power 18 MW India Assam Tinsukia
Captive Power
Deep Sea Port 1126 Acres India Andhra Pradesh Kurnool
Shipping Infrastructure
Hydel Based Power 1200 MW India West Bengal Midnapore
Hydel Based Power
Substation 2x500 MVA India Rajasthan Chittaurgarh
Power Distribution
Electronics Not Disclosed India Karnataka Bijapur
Other Industrial Projects
Synthetic Resins 18000 TPA India Andhra Pradesh Chittoor
Chemicals
Pesticide & Pesticide
4600
Intermediates
MTPM India West Bengal 24 Parganas
Fertilisers & Pesticides
Molasses Based Distillery
90 KLPD India Gujarat Bharuch
Distilleries & Breweries
Incineration Boiler3 MW/hr India Karnataka Belagavi
Captive Power India Karnataka Belagavi
Consumer Electronics
Not Disclosed
Other Construction Projects India Haryana Gurgaon
Residential complexNot Disclosed
Real Estate
Commercial complex 1215 Shops India Maharashtra Mumbai
Business / Commercial Complexes
Residential ComplexNot Disclosed India Gujarat Surat
Real Estate
Co-generation Power2 MW India Tamil Nadu Chennai
Captive Power
India Bihar West Champaran
Location Contact Person
Mr. Piyush Dhawan - Vice President Tell
044 No
42965454
Kakkalur Mr. Ashok Vasudevan - Managing Director 098450 00862
Mr. Harimohan Lal - Assistant General Manager
097907 75753
Tuticorin & TiruneMr. G Rama Raju - Partner 098490 31343
Gowdavalli VillageMr. Sumeet Kedia - Director 099890 99900
Teegapur Village Mr. Purshotham B - Senior Manager 099000 30622
Hebbal Mr. S.M. Ghike - Project Manager 022-26216060, 64
Abu road Mr. Rajendra Singh Kurmi - Project Head 089820 73542
Tuticorin Mrs. Anita Arjundas - Managing Director (022)-67478600/01
Kandivali
Atali
Atali
Bhivpuri Mr. Suresh Kumar - Director of Engineering 080 26096834
Katihalli Mr. Sanjeev Jhurani - Vice President 098702 81950
Bapgaon & Lonad Mr.
V Sasikumar - Director 0811041 5508
Harohalli Mr. Bharath TN - Executive 072590 17836
Vemgal Industrial Mr. Sunil Upadhyay - Purchase Manager 0731 2546401
Vallam Vadagal Mr. S.M. Ghike - Project Manager 022-26216060, 64
Satnoor Mr. Yogesh Madhan - Assistant General Manager
0562 4054400
- Purchase
Challakere-HariyuMr. Rajendra Singh Kurmi - Project Head 089820 73542
Madukkarai Mr. Mayuresh B. Dhavalikar - Director 093264 87007
Shiroli Mr. Rajan Kale - Projects Manager 098190 21889
Ghatkopar Mr. K. P. Mahadevaswamy - Chairman & Managing
011 - 24367314
Director
Nauroji Nagar Mr. K. P. Mahadevaswamy - Chairman & Managing
011 - 24367314
Director

Bakaur-Parsarma Mr. Siva Sankar Patnala - Project Director 011 25074100, 25074200
Gundugolanu-KalaMr. Ravi Chandran - Dy. Manager 080 41379200
Perumbakkam Mr. Ashok Kumar Jha - General Manager 011-23461647
Akegwo-AvangkhuMr. Manohar Roy - Incharge of Project 094872 89136
Near Shillong
Mirzapalle Mr.
Mr. Ramesh - Accountant
Sushil Mishra - Manager 077999
094147 19068
41626
RIICO Industrial A Mr. M Srinivasan - President 044 28478666
Mr. Santosh Singh - Senior Admin Officer 096900 24326
Hulasoggi Mr. B.S. Aparanji - Managing Director 094484 69135
Immampur Mr. B.S. Aparanji - Managing Director 094484 69135
Immampur Mr. K C Ravi Kumar - Senior General Manager
098442 47714
Byrasandra Mr. Ritesh Patel - Project Manager 079 66212000
Ramdaspur Mr. Subhash Singh - Director 078050 29315
Charoda Village Mr. Arun Kumar - Senior Vice President 080 4646 4500
Vyttila Mr. Rajan Kale - Deputy General Manager 098190 21889
Tardeo
Sector-142-Botanical
Mr. Garden
Milind Ramteke - General Manager 022 26472131
Paras
Mr. Urvesh Mehta - Vice President 098206 14441
Panvel Mr. K Pavan Kumar Reddy - Partner 092465 00502
Osman Nagar Vill Mr. Vinod Singh - Purchase Manager 098260 71184
Sejwaya Mr. Vinod Singh - Purchase Manager 098260 71184
Sejwaya Mr. Girja Shankar Prasad - Director 081022 55495
Chimochak Mr. Mukesh - Purchase Manager 098260 03696
Mr. Swarup Kurapati - Director 099714 99316
Mr. Shirish Satpute - Senior Vice President 098194 90645
Roha Mr. Gopalakrishna Hegde - Chief Exe. Officer080 25180100
Mr. Harimohan lal - Assistant General Manager
097907 75753
Tuticorin & TiruneMr. Robi Prakash Sarma - Manager-Procurement098642 15225
Mr. A T Sharma - Chief Project Manager 011 23739413
Numaligarh Mr. Rama Krishna H - General Manager 040 23636800
Rawatbhata
Mr. Mukesh Sharma - Director 0124 4526000
Mr. Santosh Singh - Senior Admin Officer 096900 24326
Hulasoggi
Kodungallur-Edapally
Mr. Gupta - Project Head 094313 03095
Mohanpur Mr. Rakesh Kathuria - Director 084477 35505
Mr. Vijay Alreja - Director 080 4113 8649
Aerospace SEZ, DeMr. Mayur Kalaria - Partner 098241 83069
GIDC Estate, Ankl Mr. Ritesh Jain - Partner 094248 88111
Dungariya Village Mr. T S K Shroff - Chief General Manager 091784 65256
Kalinga Nagar Mr. T S K Shroff - Chief General Manager 091784 65256
Kalinga Nagar Mr. Vijay Singh Uekey - General Manager - Purchase
097532 64393
Kerta Mr. Ratnamala Swain - Director 094370 62665
Madanpur Mr. K. P. Mahadevaswamy - Chairman & Managing
011 24367314
Director
Sector-76 Mr. Mahendra Agarwal - Managing Director077140 65616
Sarora & Parsada Mr.
V R Srinivasan - Manager 0422 4036666
Ram Nagar Mr. Anil Diggekar - Chairman 022 27244012, 66165600
Dahanu
Mr. Rajendra Singh Kurmi - Poject Head 089820 73542
Kattupalli Mr. Anil Agarwal - Chief Manager of Contracts
0120
& Procurement
6663000 (ERP)
Nenavali Mr. Venu - General Manager 095400 55544
Dhatrath Mr. Dipen Chanchani - Director 098796 07222
Lunva Mr. Rakesh Kumar - Commissioner cum Additional
093341Secretary
16693
Rajgir Mr. Ramesh Agrawal - Managing Director 098264 26010
Mudpar Mr. Shrikant Karwa - Director 094222 58944
Sinnar Mr. Anil Kumar Chaurasia - Project Manager073031 75550
Daindih Mr. Anil Kumar Chaurasia - Project Manager073031 75550
Daindih Mr. Anil Chitodkar - Partner 098230 98773
Mhalunge Mr. K. P. Mahadevaswamy - Chairman & Managing
011 24367314
Director
Netaji Nagar Mr. K. P. Mahadevaswamy - Chairman & Managing
011 24367314
Director
Mr. Robi Prakash Sarma - Procurement Manager
098642 15225
Mr. M Srinivasan - President 044 28478666
Kolimigundla
Tajpur Mr. Rama Krishna H - General Manager 040 23636800
Khera Mr. Rajkumar - Executive Engineer 094483-65211
Yalwar Mr. Narendra Singh - Chief Executive Officer093154 01502
Tirupati Mr. Anand Ranade - General Manager 098308 77045
Kanchowki Mr. Karna R Patel - Director 098795 56834
Dahej 2 Mr. Suresh Jadhav - Director 098506 63609
Halaga Village Mr. Suresh Jadhav - Director 098506 63609
Halaga Village Mr. Manoj Asnotkar - Director 099716 20169
Mr. Rajan Kale - Deputy General Manager 098190 21889
Juhu Mr. Ankit Shah - Director 099781 46209
Parvat
Mambalam Mr.
Mr. Perumal - Project coordinator
Shukla - Director 098407
075440 89258
10981
Majhaulia Village
Email Id
[email protected], [email protected] No. Promoter Contact
[email protected] 4th Floor, KRM Centre, No: 2, Harrington Road, Chetp
[email protected] No 237B, Hosur Road, Bommasandra Industrial Area, Bengaluru-560099
[email protected] 11th Floor, BPTP Park Centra, Opposite 32nd Milestone, Jal Vayu Vihar,
[email protected] 4-59, Dhoolapally Road, Kompally, Gandimisamma Man
[email protected] C-1, Govt. Industrial Estate, Chandulal Baradari, Ba
[email protected] Lakshmi Neela Rite Choice Chamber, 1st Floor, New No
[email protected] 301 & 302, 3rd Floor, Peninsula Heights, C.D. Barfiw
Adani Corporate House, Shantigram, Near Vaishnav Devi Circle, S. G. Hig
[email protected], rera.karnataka@mahind
5thFloor, Mahindra Towers, Worli, Mumbai -400 018,
71, Udyog Kshetra, 2nd floor, Mulund Goregoan Link
71, Udyog Kshetra, 2nd floor, Mulund Goregoan Link
[email protected] 080 2553 6105 Bombay House 24, Homi Mody Street, Mumbai - 400 001, Maharashtra,
[email protected] No 2915, KMF Complex, D.R.College Post, Dr.M.H.Marigowda Road, Ben
[email protected] 7th Floor, Welspun House, Kamala Mills Compound, Senapati Bapat Mar
[email protected] No. 77D, KIADB Industrial Area Jigani, Bengaluru-560105, Karnataka, Ind
[email protected] H. No-1-48, Raichur Road, Atkur, Near Amba Bhavani
[email protected] Rajratan House, 11/2, Meera Path, Dhenu Market, Indore-452003 Madh
[email protected] 301 & 302, 3rd Floor, Peninsula Heights, C. D. Barfiwala Road, Andheri (W
[email protected] G 5&6, Sector-10, Dwarka, New Delhi-110 075, India
[email protected] Adani Corporate House, Shantigram, Near Vaishnav Devi Circle, S. G. Hig
[email protected], [email protected]
25251589 Plot No F-54, M.I.D.C. Shiroli, Kolhapur - 416 120, Maharashtra, India
[email protected] 12th Floor, Krushal Commercial Complex, Above IVY Hotel, G M Road, C
[email protected] NBCC Bhavan, Near Lodhi Hotel Lodhi Road, Delhi - 110003, Delhi, India
NBCC Bhavan, Near Lodhi Hotel Lodhi Road, Delhi - 110003, Delhi, India
[email protected] G 5&6, Sector-10, Dwarka, New Delhi-110 075, India
[email protected] G-5 & G-6, Sector-10, Dwarka, Delhi - 110075, Delhi, India
[email protected] 29th & 30th Floor, World Trade Center, Brigade Gate
[email protected] 3rd Floor, PTI Building, 4-Parliament Street, New Delhi-110001, India
Indian Oil Bhavan, G-9 All Yavar Jung Marg, Bandra
[email protected]
[email protected] 5-5-36/221, IDA Kukatpally, Hyderabad - 500072, Tela
[email protected] F- 937,939, Phase - III, Industrial Area, Bhiwadi-30101
[email protected] Ramamandiram, Rajapalayam, Virudhunagar District-626117, Tamil Nad
[email protected] Ambuja Tower, Opp. Sindhu Bhavan, Sindhu Bhavan Road, Bodakdev, P.
[email protected] G.N. Nagar, Village Imampur, (Near Janwada), Dist.Bidar-585 402, Karna
[email protected] G.N. Nagar, Village Imampur, (Near Janwada), Dist.Bidar-585 402, Karna
[email protected] 079 66212121 5th Floor, B Block, Bagmane Tech Park, 65/2 Laurel Building, Byrasandra
[email protected] Astral House, 207/1, Behind Rajpath Club, Off S.G. Highway, Ahmedabad
[email protected] Khasra No.-143-144, Phase II, Industrial Area, Siltara
[email protected] Sarjapur-Marthahalli Outer Ring Road (ORR), Devarabisanahalli, Belland
12th Floor, Krushal Commercial Complex, Above IVY
[email protected], [email protected] Block-III, 3rd Floor, Ganga Shopping Complex, Sector-
Prakashgad, Plot No. G-9, Bandra East, Mumbai-400 051, Maharashtra,
[email protected]
[email protected] 702, Marathon Max, Mulund-Goregaon Link Road, Mu
[email protected] Sy.No 177 Part, Gopanapally Cross Off. Wipro Circle-
[email protected] 308-309, Prince's Business Skypark, Scheme No. 54,
[email protected] 308-309, Prince's Business Skypark, Scheme No. 54,
[email protected] Gandhi Setu Link Road, Agamkuan, Gulzarbagh, Patna-
[email protected] Sona House, 35/75, Punjabi Colony, Katora Talab, Raipur-492001, Chhatti
[email protected], [email protected], 2nd Floor, Green Park Main, New Delhi - 110016, Delhi, India
[email protected] Flexcel Park, C Wing, 2nd Floor, S. V. Road, Near 24 Karat Multiplex, Joge
[email protected] Industrial Plot No. 1, Sector-28 Faridabad-121008, Haryana, India
[email protected] 11th Floor, BPTP Park Centra, Opposite 32nd Milestone, Jal Vayu Vihar,
[email protected] 3rd Floor, VK Trade Centre, GS Rd, Opp to Down Tow
[email protected] 122A, G.S. Road, Christianbasti, Guwahati-781005, As
Plot No. 236, Road No.72, Prashasannagar, Jubilee Hills, Hyderabad - 50
[email protected] SIPCOT Hitech, Phase 2, Chennai- Bangalore National
[email protected] E-34, Second Floor, Connaught Circus, New Delhi -110001, India
Ambuja Tower, Opp. Sindhu Bhavan, Sindhu Bhavan Road, Bodakdev, P.
[email protected] G 5&6, Sector-10, Dwarka, New Delhi - 110 075, India
[email protected] 20B, Abdul Hamid Street, 7th Floor, Block 7B, Kolkata
[email protected] D-116, Defence Colony, New Delhi, India
[email protected] Building No. 121G, 1st Phase, Hosur Road, Bommasand
[email protected] Plot No -601, GIDC Estate, Taluka Ankleshwar, Bharuc
[email protected], [email protected] Ward No. 48, Flat No. 302, Heavens Residency, Isha
[email protected], [email protected] 1st Floor, Annexe Building, Ipicol House, Janpath, B
[email protected] 1st Floor, Annexe Building, Ipicol House, Janpath, B
[email protected] Village - Kerta Block - Pratappur Distt- Surajpur-49722
[email protected] Plot No. 15 VIP Area, Nayapalli, Bhubaneswar-751015, Odisha, India
[email protected] NBCC Bhavan, Near Lodhi Hotel Lodhi Road, Delhi - 110003 Delhi, India
[email protected] Maruti Business Park, A Block, 2nd Floor, Near Dhupa
14/2 & 4, Avinashi Road, Opp. Tiruppur Textiles, Pe
C/o Jawaharlal Nehru Port Trust 1107, Raheja Centre, 214, Nariman Poin
[email protected] SIPCOT Hitech, Phase 2, Chennai- Bangalore National Highway, Sriperum
[email protected] 0120 6663029 Elegant Business Park, MIDC Cross Road 'B', Off Andheri-Kurla Road, And
[email protected] Bombay House 24, Homi Mody Street Mumbai - 400 001, Maharashtra,
[email protected] House No.D1-4-304, Geetanjali Public School Compoun
[email protected] D- 401, Satej Apartments, Opposite Hotel Neesa Cambay Grand, Thaltej
[email protected] Vikas Bhawan, New Secretariat, Nehru Path, Patna - 800015, Bihar, India
[email protected] G R House, Agrawal Complex, In front of Pandey Nurs
[email protected] Catapharma House, Ghadge Nagar, Near Swimming Poo
[email protected] A-4, U.G.F Krishna Nagar, Block A, New Delhi, East Delhi, Delhi- 110051,
[email protected] A-4, U.G.F Krishna Nagar, Block A, New Delhi, East Delhi, Delhi- 110051,
[email protected] Office No. 3, 771, Mayur Apartment, Off Bhandarkar
[email protected] NBCC Bhawan, Lodhi Road, New Delhi 110 003, India
NBCC Bhawan, Lodhi Road, New Delhi 110 003, India
[email protected]
[email protected] 3rd Floor, VK Trade Centre, GS Rd, Opp to Down Tow
Ramamandiram, Rajapalayam, Virudhunagar District-626 117, Tamil Nad
[email protected] Adani Corporate House, Shantigram, Near Vaishnodevi Circle, S G Highw
[email protected] Plot No. 236, Road No.72, Prashasannagar, Jubilee Hills, Hyderabad - 50
[email protected] Kaveri Bhavan, K. G. Road, Bengaluru-560009, Karnataka, India
[email protected] 94/95, Purasaiwakkam High Road, Kilpauk, Chennai - 600010, Tamil Nad
[email protected] Century House P15/1, Taratala Road, Kolkata-700088,
[email protected] Plot No 89, 90 GIDC, Nandesari, Vadodara-391340, Guj
[email protected] Plot No 91, Shahu Nagar, Shiv Temple Road, Vinayak
[email protected], [email protected] Plot No 91, Shahu Nagar, Shiv Temple Road, Vinayak
[email protected], [email protected]
25251589 C-17, 2nd Floor, Udyog Vihar, Phase-V, Gurgaon - 122
[email protected] 12th Floor, Krushal Commercial Complex, Above IVY Hotel, G M Road, C
S-7, VIP Plaza, 2nd Floor, VIP Road, Near Khatushyam
[email protected]
[email protected] No 87, G.N.Chetty Road, 3rd & 4th Floor, T.Nagar, Ch
7, Transport Depot Rd, Alipore Mint Colony, Alipore, Kolkata 700088, W
Branch Contact Site Location
4th Floor, KRM Centre, No: 2, Harrington Road, Chetpet, Chennai-600 031, Tamil Nadu, India
ustrial Area, Bengaluru-560099, Karnataka, India
2nd Milestone, Jal Vayu Vihar, Sector 30 Gurugram, Haryana - 122001
4-59, Dhoolapally Road, Kompally, Gandimisamma Mandal, Dhoolapally Road, Secunderabad, Medchal Malkajgiri-500014, Te
Survey No. 133/A, Teegapur Village, Kothur Mandal, Ranga Reddy District, Telangana, India
Shriram House, No. 31, 2nd Main Road, T. Chowdaiah Road (near Bhasyam circle), Sadashiva Nagar, Bengaluru - 560080, Karn
Plot No. SP-138-143, Ambaji Industrial Area, Abu Road, Sirohi 307026, Rajasthan, India
ar Vaishnav Devi Circle, S. G. Highway, Khodiyar, Ahmedabad-382421, Gujarat, India
5thFloor, Mahindra Towers, Worli, Mumbai -400 018, Maharashtra, India
Survey No.18 & 19, GIDC Notified Industrial Estate, PCPIR, Atali, Tal. Vagra, Bharuch - 392130, Gujarat, India
Survey No.18 & 19, GIDC Notified Industrial Estate, PCPIR, Atali, Tal. Vagra, Bharuch - 392130, Gujarat, India
Mumbai - 400 001, Maharashtra, India
t, Dr.M.H.Marigowda Road, Bengaluru- 560 029, Karnataka, India
Compound, Senapati Bapat Marg, Lower Parel, Mumbai - 400013, Maharashtra, India
ngaluru-560105, Karnataka, India
H. No-1-48, Raichur Road, Atkur, Near Amba Bhavani Temple, Raichur-584102, Karnataka, India
u Market, Indore-452003 Madhya Pradesh, India
C. D. Barfiwala Road, Andheri (West), Mumbai - 400 058, Maharashtra, India

ar Vaishnav Devi Circle, S. G. Highway, Khodiyar, Ahmedabad-382421, Gujarat, India


416 120, Maharashtra, India
, Above IVY Hotel, G M Road, Chembur (West), Mumbai 400 089, Maharashtra, India
ad, Delhi - 110003, Delhi, India
ad, Delhi - 110003, Delhi, India

0075, Delhi, India


Holiday Inn, No. 110, Rajiv Gandhi Salai (OMR), Thiruvanmiyur, Chennai-600 041, Tamil Nadu, India
et, New Delhi-110001, India
Near Shillong, Ri Bhoi-793103, Meghalaya, India
5-5-36/221, IDA Kukatpally, Hyderabad - 500072, Telangana, India
F- 937,939, Phase - III, Industrial Area, Bhiwadi-301019, Rajasthan, India
agar District-626117, Tamil Nadu, India
dhu Bhavan Road, Bodakdev, P.O. Thaltej, Ahmedabad-380059, Gujarat, India
ada), Dist.Bidar-585 402, Karnataka, India
ada), Dist.Bidar-585 402, Karnataka, India
5/2 Laurel Building, Byrasandra, C.V Raman Nagar, Bangalore-560093, Karnataka, India
b, Off S.G. Highway, Ahmedabad - 380059, Gujarat, India
Khasra No.-143-144, Phase II, Industrial Area, Siltara, Raipur-493111, Chhhattisgarh, India
RR), Devarabisanahalli, Bellandur Post, Bangalore-560103, Karnataka, India
12th Floor, Krushal Commercial Complex, Above IVY Hotel, G M Road, Chembur (West), Mumbai 400 089, Maharashtra, India
Block-III, 3rd Floor, Ganga Shopping Complex, Sector-29, Noida 201301, Uttar Pradesh, India
Mumbai-400 051, Maharashtra, India
702, Marathon Max, Mulund-Goregaon Link Road, Mulund(W), Mumbai-400080, Maharashtra, India
Sy.No 177 Part, Gopanapally Cross Off. Wipro Circle-Tellapur 100b2 Road Gopanapally (V), Serilingampally (M), Hyderabad-04
308-309, Prince's Business Skypark, Scheme No. 54, A.B.Road, Indore - 452010, Madhya Pradesh, India
308-309, Prince's Business Skypark, Scheme No. 54, A.B.Road, Indore - 452010, Madhya Pradesh, India
Patna Sonama Road, Kothia, Didarganj Patna City, Patna-800 009, Bihar, India
ra Talab, Raipur-492001, Chhattisgarh, India
Delhi - 110016, Delhi, India
d, Near 24 Karat Multiplex, Jogeshwari (West), Mumbai 400 102, Maharashtra, India
d-121008, Haryana, India
2nd Milestone, Jal Vayu Vihar, Sector 30, Gurugram-122001, Haryana, India
3rd Floor, VK Trade Centre, GS Rd, Opp to Down Town Hospital, Rukmini Gaon, Guwahati-781022, Assam, India
P.O.: Numaligarh Refinery Project, Dist. Golaghat-785699, Assam, India
ar, Jubilee Hills, Hyderabad - 500096, Telangana, India
SIPCOT Hitech, Phase 2, Chennai- Bangalore National Highway, Sriperumbudur, Sez SIDCO Industrial Park, Kanchipuram-6021
ew Delhi -110001, India
dhu Bhavan Road, Bodakdev, P.O. Thaltej, Ahmedabad 380059, Gujarat, India
10 075, India
Village: Mohanpur, P.O Udnabad, District- Giridih, Jharkhand, India

Building No. 121G, 1st Phase, Hosur Road, Bommasandra Industrial Area, Bengaluru-560099, Karnataka, India
Plot No -601, GIDC Estate, Taluka Ankleshwar, Bharuch-393002, Gujarat, India
Khasra No. 57/1, Vill: Dungariya, Tal & Dist. Seoni, Madhya Pradesh, India
Kalinga Nagar Indl. Complex Neelachal House , Duburi Jajpur - 755026 Odisha, India
Kalinga Nagar Indl. Complex Neelachal House , Duburi Jajpur - 755026 Odisha, India
Village - Kerta Block - Pratappur Distt- Surajpur-497223, Chhattisgarh, India
swar-751015, Odisha, India
ad, Delhi - 110003 Delhi, India
Sarora & Parsada Villages, Tehsil Tilda, District Raipur, Chhattisgarh
14/2 & 4, Avinashi Road, Opp. Tiruppur Textiles, Peelamedu, Coimbatore-641 004, Tamil Nadu, India
aheja Centre, 214, Nariman Point, Mumbai - 400021, Maharashtra, India
ore National Highway, Sriperumbudur, Sez SIDCO Industrial Park, Kanchipuram-602106, Tamil Nadu, India
'B', Off Andheri-Kurla Road, Andheri (E), Mumbai 400059, Maharashtra, India
umbai - 400 001, Maharashtra, India
Alewa Road, Vill : Dhatrath, Pillukhera, Jind - 126110, Haryana, India
l Neesa Cambay Grand, Thaltej, Ahmedabad-380054, Gujarat, India
ath, Patna - 800015, Bihar, India
G R House, Agrawal Complex, In front of Pandey Nursing Home, Samta Colony, Raipur-492001, Chhattisgarh, India
A115-119, A122, A124-126, STICE, Musalgaon, Sinnar - 422 112, Nashik, Maharashtra, India
Delhi, East Delhi, Delhi- 110051, India
Delhi, East Delhi, Delhi- 110051, India
Office No. 3, 771, Mayur Apartment, Off Bhandarkar Road, Deccan Gymkhana, Pune-411004, Maharashtra, India
10 003, India
10 003, India
3rd Floor, VK Trade Centre, GS Rd, Opp to Down Town Hospital, Rukmini Gaon, Guwahati-781022, Assam, India
agar District-626 117, Tamil Nadu, India
ar Vaishnodevi Circle, S G Highway, Khodiyar Ahmedabad - 382421, Gujarat, India
ar, Jubilee Hills, Hyderabad - 500096, Telangana, India
0009, Karnataka, India
k, Chennai - 600010, Tamil Nadu, India
Kanchowki Village, Bihnupur Taluka, 24 Parganas District, West Bengal, India
Plot No 89, 90 GIDC, Nandesari, Vadodara-391340, Gujarat, India
Sy. No 36 Block 1 & Block 2, Halaga Village, Khanapura Taluk, Belagavi District, Karnataka, India
Sy. No 36 Block 1 & Block 2, Halaga Village, Khanapura Taluk, Belagavi District, Karnataka, India
C-17, 2nd Floor, Udyog Vihar, Phase-V, Gurgaon - 122016, Haryana, India
, Above IVY Hotel, G M Road, Chembur (West), Mumbai 400 089, Maharastra, India
S-7, VIP Plaza, 2nd Floor, VIP Road, Near Khatushyam Temple, Surat, Gujarat, India.
No 87, G.N.Chetty Road, 3rd & 4th Floor, T.Nagar, Chennai, 600 017, Tamil Nadu, India
ny, Alipore, Kolkata 700088, West Bengal, India
Consultant Name 1 Contacts Consultant Name 2

Medchal Malkajgiri-500014, Telangana, India

Nagar, Bengaluru - 560080, Karnataka, India

Gujarat, India
Gujarat, India

11B, Pkt - D, SFS Flats, Mayur Vihar, Phase - III, Delhi -110096, India
VKS Infratech Management Private Tower A-II, 11th Floor, Ansal Corporate Park, Sector 142 Noida - 201301, Uttar Pradesh, In
SA Infrastructure Consultants Priva [email protected]
[email protected], [email protected]

bai 400 089, Maharashtra, India


ilingampally (M), Hyderabad-046, Telangana, India

022, Assam, India Prestige Trade Tower, Level 19, 46, Palace Road, High Grounds, Bengaluru-560001, Karnat
Deloitte Touche Tohmatsu India Pri
[email protected]
ustrial Park, Kanchipuram-602106, Tamil Nadu, India

Karnataka, India

A-1709, One Lodha Place, Senapati Bapat Marg, Lower Parel, Mumbai 400013, Maharasht
Pentacle Consultants India Private AECOM India Private Limited
[email protected]

, Chhattisgarh, India

Maharashtra, India
022, Assam, India
Contacts Consultant Name 3 Contacts

oida - 201301, Uttar Pradesh, India


unds, Bengaluru-560001, Karnataka, India

9th Floor, Infinity Tower C DLF Cyber City, DLF Phase II Gurgaon, Harayana, India
Contractor Name 1 Contacts Contractor Name 2

Toyo House, Lal Bahadur Shastri Marg, Kanjurmarg(West), Mumbai-400 078 Maharashtra
Toyo Engineering India Private Limi
[email protected] (For general purpose)

Toyo House, Lal Bahadur Shastri Marg, Kanjurmarg(West), Mumbai-400 078 Maharashtra
Toyo Engineering India Private Limi NBCC Plaza, Tower II, 4th Floor, Pushp Vihar ( Near Saket), New Delhi-110 017, India
PNC Challakere Karnataka [email protected] (For general purpose)

H. No. 508, Sector 15-A, Hisar - 125001, Haryana, India


Dhariwal Buildtech Limited Umesh Smrati 6, Jalam Vilas Scheme, Paota B Road, Jodhpur, Rajasthan, 342001 India
Varaha Infra Limited [email protected]
[email protected]
- -

SP Centre, 41/44, Minoo Desai Marg, Colaba, Mumbai - 400005, Maharashtra, India
Shapoorji Pallonji Group
[email protected]
L&T House, Ballard Estate, P. O. Box: 278, Mumbai 400 001, Maharashtra, India
Larsen And Toubro Limited Technip Energies India Limited
[email protected] 022-22618181 022-22685858

Oriental Structural Engineers Limite


Mr. Raman Kumar Director

BP 22, Opposite Pillar No. 212, West Patel Nagar, Delhi-110008, India
Ramacivil India Construction Privat Baba Construction Private Limited
[email protected], [email protected]

SP Centre, 41/44, Minoo Desai Marg, Colaba, Mumbai - 400005, Maharashtra, India
Shapoorji Pallonji Group NKG Infrastructure Limited
[email protected]
Contacts Contractor Name 3 Contacts

Mumbai-400 078 Maharashtra, India

Mumbai-400 078 Maharashtra, India


New Delhi-110 017, India

ur, Rajasthan, 342001 India

0005, Maharashtra, India


Technip Centre, No.19, Velachery Main Road, Guindy, Chennai- 600 032, India

G-83/201, Vijay Chowk,Laxmi Nagar, New Delhi-110092, India 801, Odyssey, Road No. 9, Wagle Estate, Thane (West)
Structural Specialities & Projects In
[email protected]

204, 2nd Floor, Kailash Building 26 K.G. Marg, Delhi - 110001 Delhi, India

[email protected]
Architect Name 1 Contacts Architect Name 2
. 9, Wagle Estate, Thane (West)-400 604, Maharashtra, India

om
Contacts Architect Name 3 Contacts
Remark
Additionally, Pondy Oxides aims to address the challenges of paper and
As the construction is anticipated to commence soon, the impact and pot
The key features of the project include not only the reduction of the c
The warehouse project, spanning an extensive built-up area of 30,653.4
A 5 crore investment to build a new Induction Furnace Manufacturing Uni
Shriram Hebbal 1, in Bengaluru, Karnataka, will transform Hebbal's busi
The project's dual-site expansion leverages existing infrastructure an
The key features of the project underscore its significance and potenti
For those eager to stay updated, Mahindra Lifespaces encourages individ
Aarti Industries is in the process of establishing a facility for the p
Aarti Industries is in the process of establishing a facility for the p
Tata Power, which recently signed an agreement with the Maharashtra government for development of two pumped hydro s
This substantial project focuses on key features such as the implementa
DBG Estates' Welspun One Logistic Park at Bapgaon & Lonad village, Tal
The project, spanning a substantial plot area of 92,513 sq. m., aims t
This Rs. 16.40 crore project by Dattatreya Enterprises would transform
Rajratan Global Wire Limited's Rs. 300 crore initiative to build a sta
The project's dual-site expansion leverages existing infrastructure an
This declaration came into effect on January 25, 2021. The National H
Key features of the project include its strategic location in Madukkar
The key features of the project include a substantial increase in produ
This ambitious initiative involves the transformation of 10 existing soc
Situated in Nauroji Nagar, the World Trade Centre spans over 25 acres a
The complex boasts key features such as residential towers with modern
Dhariwal Buildtech is undertaking a comprehensive road development pro
The National Highways Authority of India is undertaking the six-laning
Brigade Enterprises is spearheading the development of an expansive Res
The National Highways & Infrastructure Development Corporation has invited three separate bids for widening to two-lane w
The project's key features include a reduction in Meghalaya's dependen
The Mirzapalle project by Rikvin Biotech focuses on the production of e
The project's impact extends beyond mere production expansion. Dee Bee
The expansion plan involves upgrading the existing Kiln-II with a new an
Gujarat Ambuja Exports Limited coming up with new Starch Project at Hulasoggi, Sitarganj, Uttrakhand Project cost is 300 Cro
The project will also comprise 3.2 MW co-generation power plant. The project also comprise expansion of cane crushing capa
The project will also comprise 3.2 MW co-generation power plant. The project also comprise expansion of cane crushing capa
Spanning over 22.71 acres, Bagmane Cosmos is designed to accommodate
The project highlights the company's commitment to incorporating state-o
Jagdish Ispat Private Limited's Hot Charged Rolling Mill Unit Project
Designed and constructed by the renowned Sobha Limited, the Sobha Atlantis shines as a shining example of luxury and calm
The residential apartment project that is now under development in Tardeo, Mumbai, is being constructed by Man Infracons
Noida Metro Rail Corporation (NMRC)'s board this week approved the rev
The Maharashtra State Power Generation Co. envisions the establishment
Key features of Nexzone include panoramic valley views, providing many
The potential impact of this project on the local landscape is consider
The Captive Power Plant, a venture by Great Galleon Ventures Limited, i
The Distillery Unit, a brainchild of Great Galleon Ventures Limited, is
One of the key advantages of this expansion is its potential to foster
AAC blocks, the focal point of this initiative, offer a myriad of benef
Bohang Crystal Stone Technology Private Limited is set to catalyze a tr
The expansion project boasts state-of-the-art production facilities eq
The key features of this project underscore its commitment to excellence
The key features of the project include a commitment to environmental s
This initiative holds immense promise for Nagaon and its adjacent areas
Numaligarh Refinery Limited (NRL) is planning to set up a Polypropylene Unit along with its associated facilities at Numaligarh
Semaliya Energy is set to embark on the development of the Rana Pratap
Foxconn to set up unit to manufacture mobile components in Tamil Nadu
The project, located in Gandhinagar, Gujarat, entails a substantial inve
Key features of the project include the expansion of an existing plant
Oriental Structural Engineers have emerged as lowest bidder of Six laning from KODUNGALLUR to EDAPALLY section of NH b
The company proposes for Expansion & Modernization Project for Final Con
Strategically positioned on NH-1, a major transportation artery, the wa
The project's focus on developing and manufacturing industrial X-ray in
The project, located strategically in GIDC Estate, Ankleshwar, is expec
J K Industries is a Green Field project, proposes to set up the vari
Situated in Kalinga Nagar, Jajpur, Odisha, the project involves the exp
Situated in Kalinga Nagar, Jajpur, Odisha, the project involves the exp
The distillery's focus on ethanol production aligns with sustainable pr
D N Fairy Tale's key features include a spectrum of well-equipped ameni
Silicon City's prime location in Sector-76 ensures excellent connectiv
Mahendra Sponge & Power Ltd. [Unit II] is embarking on an ambitious exp
Srinivasan Associates Private Limited Unveils Plans for a New Commercial Complex in Coimbatore, Tamil Nadu. The project's b
The proposed port, which is slated to be the 13th major port in India. Vadhavan port will be amongst the first 10 biggest port
Foxconn Technology (India), in collaboration with Applied Materials, is
The strategic features of the project are noteworthy, starting with its
The Pumped Storage Technology at the heart of the project operates as a
Set against the backdrop of Haryana, the project aims to utilize paddy
The expansion's key benefits include the enhancement of coke production
The project boasts a range of features that align with international st
The project encompasses the construction of a state-of-the-art integrate
Situated in Sinnar, Nashik, the Synthetic Organic Chemicals Project is
The project's impact extends beyond production and energy to socio-eco
The project's impact extends beyond production and energy to socio-eco
Situated within the Metro Jazz residential complex, this Commercial Com
Spanning over 88 acres, the Netaji Nagar redevelopment project will in
Notable for its commitment to quality construction, NBCC assures mode
This initiative is crucial for Upper Assam, aiming to alleviate the bu
Ramco Cements Limited is building a Captive Power Plant at Kolimigund
Adani Ports & Special Economic Zone, the appointed concessionaire, is s
Semaliya Energy is envisioning the development of the Semaliya-II Off-
The core of the project lies in the construction of a 2x500 MVA 400/220
The project, situated in Tirupati, is categorized as an Electronics Man
The proposed Standalone Resin manufacturing unit is to be set-up within the new identified land already available with Pacifi
This manufacturing unit is strategically positioned to significantly con
The distillery unit focuses on utilizing molasses, a byproduct of sugar
The potential impact of the project is considerable, as it aims to reduc
This initiative aligns with the government's "Make in India" initiativ
Aaradhya Evoq stands out for its exclusive amenities, including a swimm
This dynamic space caters to diverse retail needs and budgets, offering
Situated in the sought-after Mambalam locality, the project is expected
Majhaulia Sugar Industries Private Limited initiated a Co-Generation Un
Progress Dissatisfaction
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work hasDissatisfaction
been completed.LinkProject work will be complete by M
01/2024 : Project is at construction started stage. 50% project work hasDissatisfaction
been completed.LinkProject work will be complete by M
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at construction started stage. 10% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by Ju
Dissatisfaction Link
01/2024 : Project is at construction started stage. 55% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 70% project work hasDissatisfaction
been completed.
LinkProject work will be complete by De
01/2024 : Project is at construction started stage. 70% project work hasDissatisfaction
been completed.
LinkProject work will be complete by De
01/2024 : Project is at construction started stage. 10% project work has been completed. Project work will be complete by Fe
Dissatisfaction Link
01/2024 : Project is at construction started stage. 20% project work hasDissatisfaction
been completed.LinkProject work will be complete by M
01/2024 : Project is at construction started stage. 50% project work hasDissatisfaction
been completed.LinkProject work will be complete by De
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by February, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 5% project work has been completed. Project work will be complete by Ma
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approval stage. Waiting for the govt. approval. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 20% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other detail yet to decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 35% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project Link
Dissatisfaction work will be start by March, 2024.
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. Link yet to be decided.
No other details
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by Ap
Dissatisfaction Link
01/2024 : Project is at construction started stage. 65% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other detail yet to decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by February, 2024.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work hasDissatisfaction
been completed.
LinkProject work will be complete by De
01/2024 : Project is at construction started stage. 30% project work hasDissatisfaction
been completed.
LinkProject work will be complete by De
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by February, 2024.
Dissatisfaction Link
01/2024 : Project is at nearly completion stage. 75% project work has been completed.Link
Dissatisfaction Project work will be complete by Febr
01/2024 : Project is at under approvals stage. Waiting for govt. approvals.
Dissatisfaction Link yet to be decided.
No other details
01/2024 : Project is at planning stage. Not apply for any approvals. No other details yetLink
Dissatisfaction to be decided,
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 60% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 70% project work has been completed. Project work will be complete by Ap
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at construction started stage. 30% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by February, 2024.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link
01/2024 : Project is at nearly completion stage. 80% project work has been completed. Project work will be complete by Mar
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% project work has been completed. Project work will be complete by Oc
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at construction started stage. 70% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at construction started stage. 40% project work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approval stage. Waiting for the govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approval stage. Waiting for the govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details
Dissatisfaction Link yet to be decided.
01/2024 : Project is at construction started stage. 44% project work has been completed. Project work will be complete by M
Dissatisfaction Link
01/2024 : Project is at construction started stage. 50% proejct work has been completed. Project work will be complete by De
Dissatisfaction Link
01/2024 : Project is at under approvals stage. Waiting for govt. approvals. No other details yet to be decided.
Dissatisfaction Link
01/2024 : Project is at approvals received stage. Project got all the clearances. Project work will be start by March, 2024.
Dissatisfaction Link