0% found this document useful (0 votes)
10 views4 pages

Boq 1370051

Uploaded by

arch.singh100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views4 pages

Boq 1370051

Uploaded by

arch.singh100
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Validate Print Help Item Rate BoQ

Tender Inviting Authority: SE, MGCCC, MBD

Name of Work: CONSTRUCTION OF VRB AT KM 3.222 OF Chandausi Branch

Tender Notice No: 01/S.E./2023-24/lot-2

Bidder
Name :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for
this tender. Bidders are allowed to enter the Bidder Name and Values only )

NUMBER TEXT # T NUMBER # TEXT # NUMBER # NUMBER # TEXT #


# E
Sl. Item Description I Quantity Units BASIC RATE In TOTAL AMOUNT TOTAL AMOUNT
X
No. t Figures To be Without Taxes In Words
T
e entered by the
m Bidder
Rs. P
C
o
d
1 2 ### 4 5 7 8 9
Earth work in excavation in foundation of Bridge etc. in
ordinary soil excavation to be in the form of regular Pits and
Earth Work in embankment to be in 20cm. layer including
ramming and dressing the surface to the required levels and 885.00 Cum.
1 slopes. and also including 30 m lead and all lifts the earth from #VALUE! #VALUE!
cutting to be used in making Canal Section or to be deposited
in Spoil Bank as per direction of Engineer in charge in the
section

Laying Cement concrete in M-10 1:3:6 including all costs of 45.00 Cum.
2 T&P material required for proper completion of work. #VALUE! #VALUE!

Laying Cement concrete in M-15 1:2:4 including all costs of 63.00 Cum.
3 T&P material required for proper completion of work. #VALUE! #VALUE!

Laying Cement concrete in M-20 1:1.5:3 in Toe wall


4 Transitions sleepers lining etc. including all costs of T&P 243.00 Cum. #VALUE! #VALUE!
material required for proper completion of work.
Laying R.C.C. in M-25 1:1:2 in Raft wall bridge, wearing Coat
5 etc. including all costs of T&P material required for proper 259.00 Cum. #VALUE! #VALUE!
completion of work.
353.00
Centering and shuttering for C.C. works in Toe , Transition wall Sqm.
6 including cost of all labour and T&P etc. complete. #VALUE! #VALUE!

Centering and shuttering for ordinary R.C.C. works including 430.00


7 Sqm. #VALUE! #VALUE!
cost of all labour and T&P etc. complete.
Centering and Shuttering for Special type of R.C.C. works 448.00 Sqm.
8 including cost of all labour and T&P etc. complete. #VALUE! #VALUE!
Laying of reinforcement in R.C.C. including Cutting, Bending,
9 Binding and Placing etc. Including cost of all labour and T&P 21.75 M.T. #VALUE! #VALUE!
etc. Complete.

S/L Settlement Joint with G.P./ Copper/Stainless steel water 18.00 R.M.
10 stop including cost of all labor and T&P etc. Complete. #VALUE! #VALUE!

Providing Brick pitching Including cost of all labour and T&P 159.00 Sqm.
11 etc. Complete. #VALUE! #VALUE!
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of 38.00 Nos.
12 all labor and T&P etc. Complete. #VALUE! #VALUE!
Filling up sealing compound or making contraction joint 67.50 R.M.
13 including cost of all labour and T&P etc. Complete. #VALUE! #VALUE!
Providing & Fixing 150 mm wide water stop seal including cost 62.00 R.M.
14 of all labour and T&P etc. Complete. #VALUE! #VALUE!
Dismantling of existing Road Including cost of all labour and 134.00 Cum.
15 T&P etc. Complete. #VALUE! #VALUE!

Earth work in filling for lifting the level of roads upto the VRB 558.00 Cum.
16 levelsincluding Cost of all labour and T&P etc. Complete. #VALUE! #VALUE!

Earth work in filling for Diversion including Cost of all labour 745.00 Cum.
17 and T&P etc. Complete. #VALUE! #VALUE!
Providing Brick on edge Soling For Diversion Including cost of 431.00 Sqm.
18 all labor and T&P etc. Complete. #VALUE! #VALUE!
Making wall & for stopping traffic in M- 100 B/W in 1:6
19 Cement mortar cost of all labour and T & P etc. Complete for 10.00 Cum. #VALUE! #VALUE!
diversion.
Dismantling of brick on edge soling from diversion including 431.00 Sqm.
20 cost of all labour and T&P etc. Complete. #VALUE! #VALUE!
Disposal of earth from the Road of diversion including cost of 707.00 Cum.
21 all labour and T&P etc. Complete. #VALUE! #VALUE!
325.00

Laying & consolidation of stone ballast 40-63 mm stone ballast


22 in damage and port holes on the road as per requirement i/c Sqm. #VALUE! #VALUE!
making earthen medies opening stack ballast binding with
good earth & watering . Rolling with roller 8-10 tonnes in stage
of proper grade and camber applying and brooming requisite
type of screening / binding material to fill up the interstick to
coarse aggregate watering and compacting to the required
density as per as directed by Engineer-in -charge.
325.00

Laying & consolidation of stone ballast 22-53 mm stone ballast


in 97 mm loose (compacted 75 mm) layer on existing road. i/c
making earthen medies opening stack ballast binding with
good earth & watering . Rolling with roller 8-10 tonnes in stage Sqm.
23 of proper grade and camber applying and brooming requisite #VALUE! #VALUE!
type of screening / binding material to fill up the interstick to
coarse aggregate watering and compacting to the required
density as per as directed by Engineer-in -charge.

Bitumen painting with 16-22 mm gauge stone girt over W-B 300.00
surface (Ist coat ) i/c supply of mixphalt & girt & fuel wood etc
24 i/c maintenance of a side patries & watering then during Sqm. #VALUE! #VALUE!
operation for proper completion of the work as directed by
Engineer in charge
300.00
Providing laying & rolling of open grade premix surfavce of 20
mm thickness composed of 13.2 mm to 5.6 mm aggregate
using bitumen 80/100 to required line grade & level to serve Sqm.
25 as wearing coarse i/c tack coat including all costs of T&P #VALUE! #VALUE!
material required for proper completion of work as directed
Engineer-in -charge.
300.00
Providing laying premix seal coat using crushed stone dust &
bitumen 80/100 grade i/c all labour T&P & machinery Sqm.
26 including all costs of T&P material required for proper #VALUE! #VALUE!
completion of work as directed Engineer-in -charge.

Providing and laying primer coat /tack coat including all costs 300.00
27 of T&P material required for proper completion of work as Sqm. #VALUE! #VALUE!
directed Engineer-in -charge.
Providing brick line edging on both side of road including all 100.00
28 costs of T&P material required for proper completion of work R.M. #VALUE! #VALUE!
as directed Engineer-in -charge.
Total in Figures #VALUE! #VALUE!

Quoted Rate in Words #VALUE!