Boq 1370051
Boq 1370051
Bidder
Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for
this tender. Bidders are allowed to enter the Bidder Name and Values only )
Laying Cement concrete in M-10 1:3:6 including all costs of 45.00 Cum.
2 T&P material required for proper completion of work. #VALUE! #VALUE!
Laying Cement concrete in M-15 1:2:4 including all costs of 63.00 Cum.
3 T&P material required for proper completion of work. #VALUE! #VALUE!
S/L Settlement Joint with G.P./ Copper/Stainless steel water 18.00 R.M.
10 stop including cost of all labor and T&P etc. Complete. #VALUE! #VALUE!
Providing Brick pitching Including cost of all labour and T&P 159.00 Sqm.
11 etc. Complete. #VALUE! #VALUE!
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of 38.00 Nos.
12 all labor and T&P etc. Complete. #VALUE! #VALUE!
Filling up sealing compound or making contraction joint 67.50 R.M.
13 including cost of all labour and T&P etc. Complete. #VALUE! #VALUE!
Providing & Fixing 150 mm wide water stop seal including cost 62.00 R.M.
14 of all labour and T&P etc. Complete. #VALUE! #VALUE!
Dismantling of existing Road Including cost of all labour and 134.00 Cum.
15 T&P etc. Complete. #VALUE! #VALUE!
Earth work in filling for lifting the level of roads upto the VRB 558.00 Cum.
16 levelsincluding Cost of all labour and T&P etc. Complete. #VALUE! #VALUE!
Earth work in filling for Diversion including Cost of all labour 745.00 Cum.
17 and T&P etc. Complete. #VALUE! #VALUE!
Providing Brick on edge Soling For Diversion Including cost of 431.00 Sqm.
18 all labor and T&P etc. Complete. #VALUE! #VALUE!
Making wall & for stopping traffic in M- 100 B/W in 1:6
19 Cement mortar cost of all labour and T & P etc. Complete for 10.00 Cum. #VALUE! #VALUE!
diversion.
Dismantling of brick on edge soling from diversion including 431.00 Sqm.
20 cost of all labour and T&P etc. Complete. #VALUE! #VALUE!
Disposal of earth from the Road of diversion including cost of 707.00 Cum.
21 all labour and T&P etc. Complete. #VALUE! #VALUE!
325.00
Bitumen painting with 16-22 mm gauge stone girt over W-B 300.00
surface (Ist coat ) i/c supply of mixphalt & girt & fuel wood etc
24 i/c maintenance of a side patries & watering then during Sqm. #VALUE! #VALUE!
operation for proper completion of the work as directed by
Engineer in charge
300.00
Providing laying & rolling of open grade premix surfavce of 20
mm thickness composed of 13.2 mm to 5.6 mm aggregate
using bitumen 80/100 to required line grade & level to serve Sqm.
25 as wearing coarse i/c tack coat including all costs of T&P #VALUE! #VALUE!
material required for proper completion of work as directed
Engineer-in -charge.
300.00
Providing laying premix seal coat using crushed stone dust &
bitumen 80/100 grade i/c all labour T&P & machinery Sqm.
26 including all costs of T&P material required for proper #VALUE! #VALUE!
completion of work as directed Engineer-in -charge.
Providing and laying primer coat /tack coat including all costs 300.00
27 of T&P material required for proper completion of work as Sqm. #VALUE! #VALUE!
directed Engineer-in -charge.
Providing brick line edging on both side of road including all 100.00
28 costs of T&P material required for proper completion of work R.M. #VALUE! #VALUE!
as directed Engineer-in -charge.
Total in Figures #VALUE! #VALUE!