8. The Board reserves the right to review, amend, suspend, revoke this consent and the
same shall be binding on the industry.
9. This consent should not be construed as exemption from obtaining necessary NOC/
permission from any other Government authorities.
10. Industry shall install online continuous monitoring system as per CPCB guidelines &
data to be transmitted directly from Data Logger to Board server .
11. The applicant shall obtain Consent to Operate from Maharashtra Pollution Control
Board before actual commencement of the Unit/Activity. (Establish)
12. The applicant shall obtain permission from Central Ground Water Authority (CGWA) for
use of bore-well water for industrial purpose.
13. The applicant shall obtain necessary permission from the Directorate of Industrial
Safety and Health (DISH).
14. The applicant shall not take any effective steps towards alternation, modification of
manufacturing process and expansion in production consented quantity till valid
permission from MPCBoard.
B] The Applicant shall operate the sewage treatment system to treat the sewage so
as to achieve the following standards.
C] The treated sewage shall be recycled for secondary purposes to the maximum
extent and remaining shall be discharged on land for gardening within premise
after confirming above standards. In no case, sewage shall find its way for
gardening / outside factory premises.
3. The Board reserves its rights to review plans, specifications or other data relating to
plant setup for the treatment of waterworks for the purification there of & the system
for the disposal of sewage or trade effluent or in connection with the grant of any
consent conditions. The Applicant shall obtain prior consent of the Board to take steps
to establish the unit or establish any treatment and disposal system or an extension or
addition thereto.
4. The industry shall ensure replacement of pollution control system or its parts after
expiry of its expected life as defined by manufacturer so as to ensure the compliance
of standards and safety of the operation thereof.
5. The Applicant shall comply with the provisions of the Water (Prevention & Control of
Pollution) Act, 1974 and as amended, by installing water meters and other provisions
as contained in the said act:
Water consumption quantity
Sr. No. Purpose for water consumed
(CMD)
Industrial Cooling, spraying in mine pits
1. 8.00
or boiler feed
2. Domestic purpose 7.00
Processing whereby water gets polluted
3. 0.00
& pollutants are easily biodegradable
Processing whereby water gets polluted
4. & pollutants are not easily 0.00
biodegradable and are toxic
5. Gardening 0
BG Forfeiture History
Amount of Amount of Reason of
Consent Submission Purpose
Srno. BG BG BG
(C2E/C2O/C2R) Period of BG
imposed Forfeiture Forfeiture
NA
BG Return details
Srno. Consent (C2E/C2O/C2R) BG imposed Purpose of BG Amount of BG Returned
NA