Overview on Transport Infrastructure Sectors in the Kingdom of Cambodia (2023, IRITWG)
Road Cost Length Year
Org. Section Fund Pavement status
No. (Mill.) (km) Start End
Kratie – Stung Treng – Lao Border
$62.80 192.8 2004 2007 Loan TBST
(Trapeang Kriel)
China
$10.68 38.8 Maintenance NR7 - - - Completed
45.0 Skun - Kampong Cham AC (4 lanes)
8 China $143.80 109.08 Prek Tameak - Anlong Chrey 2007 2011 Loan AC
Rehabilitation (Krabau – Meaoun
8-1,
China $14.80 24.21 Chey) and (Aunlong Chrey – 2009 2012 Loan AC
8-2
Krek)
9 China $63.8 143.33 Tbaeng Meanchey – Talaborivath 2012 2015 Loan DBST
10 China $188.38 197.363 Samlot - Veal Veng - Koh Kong 2019 Loan DBST (in Progress)
ADB - 90.4 2001 2004 Loan DBST
11 NR1: Neak Loeung – NR7: Thnal
China $72.00 90.4 2015 2017 Loan AC, Completed
Tortoeung
13 ADB $23.39 62.4 Svay Rieng - Anlong Chrey 2014 2016 Loan DBST (Completed)
ADB - 77.5 2002 2004 Loan DBST
21
Korea $40.74 55 AC, 4 & 2 lanes structures 2015 2017 Loan Completed
Deum Thlork – Koh Thom bridge
27 China $45.00 53.5 2015 - Loan 2015 Project
– Peam Raing Leu
Pea Reang Leu – Chombork
23 China $33.00 53.00 2013 - Loan DBST
(border)
31 WB $12.90 51.7 2003 2005 Loan DBST
31, 33, 2 lanes, slope protection and
Korea $24.95 106.10 2011 2014 Loan DBST
117 drainage system and Structures
WB 39.8 Takeo - Kampong Trach - Kampot 2002 2005 Loan
33 Kampong Trach - Lork (Vietnam
ADB $13.00 17.0 2007 2010 Loan DBST
border)
National Road 4 - Prek Thnout
WB - - Loan DBST
River
41
Thal Tortoeng – Chum kiri -
China $46.25 95.28 2011 2014 Loan DBST
Kampot
NR4: Treng Troyeng – NR3: DBST (planned
43 China $77 77.00 2015 2017 Loan
Thvear Thmey 2016-2017)
Chbamorn – Oral – Amleang – DBST (65.06% As
44 China $80.30 139.14 2012 2015 Loan
Udong of 31 May 2014)
Thai $21.89 149.0 Koh Kong - Sre Ambel 2004 2007 Loan DBST
AC(Commencement
Korea $75.70 148.0 2021 - Loan
48 Nov 2021)
WB,
$60.00 - Upgrade 2018 2020 Loan N/A
ADB
WB $5.80 38.9 Udong - Thnal Torteng 2003 2006 Loan DBST
51 AC (under
China $27 38.9 Udong - Thnal Torteng 2014 - Loan
negotiation)
Pursat – Thmar Da, Thai –
55 China $132.80 182.16 2015 2018 Loan DBST (Completed)
Cambodia border
ADB +
56 $29.90 84.0 29km from Sisophon to Samrong 2009 2015 Loan Road improvement
Korea
57 China $41.88 103.14 Batambang – Pailin - Thai Border 2008 2012 Loan DBST
Reconstruction:
1) Tmor Kol - Bovel - Sampov
57B China $89.98 176.81 Luun 2010 2013 Loan DBST
2) Bovel-Samseb-Phnom Prek
3) Samseb - Kamrieng
Banteaymeanchey – Banteay
Meanrit – Thmar Daun – Phaong
58 China $122.98 174.16 2015 2018 Loan DBST (Completed)
(including connecting road
8.98km)
NR 59 (Koun Damrey - Malay -
59 China $72.89 140.25 Sampov Luun – Phnom Prek – 2010 2013 Loan DBST
Kamrieng - Pailin)
National Road 5 - Thai border DBST (not yet
5x Private $5.50 13.0 2004 - -
(through Chay investment) started)
140 + DBST (+ bridge
60B China $135 Kg. Thmor – Kratie + Bridge 2015 2017 Loan
1.650 cost), 2015 project
WB 16.0 Prek Kdam - Thnal Keng (NR6) 2002 2005 Loan Maintenance
61
China $9.76 15.63 Prek Kdam - Thnal Keng (NR6) 2010 2012 Loan AC
Koh Ke – Thnal Bek, Tbeng
$57.80 150.46 2008 2011 Loan DBST
Meanchey - Preah Vihear temple
62 China
Kampong Thom - Tbaeng
$52.00 128.0 2009 2013 Loan DBST
Meanchey
$1.40 18.5 Phnom Dek - Rovieng 2004 2006 Loan DBST
66 WB DBST (not yet
$3.20 18 Rovieng - River Stung Sen Loan
started)
$3.06 18.0 Choam Sa Ngam - Anlong Veng 2006 2007 Grant DBST
67 Thai
$33.42 131.0 Anlong Veng - Siem Reap 2007 2009 Loan DBST
- 35 -
Overview on Transport Infrastructure Sectors in the Kingdom of Cambodia (2023, IRITWG)
Road Cost Length Year
Org. Section Fund Pavement status
No. (Mill.) (km) Start End
Thai $35.00 113.0 O Smach - Kralanh 2007 2009 Loan DBST
68 113.745 + O Smach – Kralanh + Bypass Nat.
Cambodia $33.00 2009 2011 DBST Re-pavement
3.175 Samraong town Budget
Tonlebet – Srey Santhor – Prek
China $150.00 150.00 2015 2017 - DBST, 2015 project
Tameak – Lvear Em – Peam Ro
70B
Traueng (NR7) - Kampong Thmar
WB $1.50 15.5 2004 2006 Loan DBST
(NR6)
Tbong Khmum – Kroch chmar – DBST (planned
71C China $78.00 110.00 2015 2017 -
Chamkarleu + Kroch chmar bridge 2016-2017)
72 ADB 14.0 Memot – Tropeang Plong 2007 2009 Loan
71 + 7 Tropeang Plong – Krek – Troeung AC (planned 2016-
China $113 145 2015 2017 -
+ 72 – Kg. Thmar 2017)
China $51.90 127.0 Snoul - Sen Monorom 2008 2011 Loan DBST
76 Sen Monorom – Koh Nhek – DBST (52.25% as
China $91.68 171.78 2012 2016 Loan
Lumphat – Ta Ang of 31 May 2014)
VN $22.00 69.56 Bang Lung - O Yadav 2007 2009 Loan AC
78
China $73.30 121.1 O Pong Moan - Ban Lung 2009 2012 Loan DBST
DBST (not yet
78x Private $6.00 36.0 Ban Lung - Bou Sra (waterfall) 2008 - -
started)
Sam’Ang (NR9) – Kg. Sralav II – DBST, Rolling plan
92 China $76.00 137.00 2015 2017 -
Kg. Sralav I – Mom Bei 2013 - 2017
134B + Chumkiri – Chhuk – Dorng Tung DBST, planned
China $25.00 43.00 2015 2015 2017
135 – Kg. Trach 2016-2017
181 WB $2.00 28 Samraong - Chong Kal 2004 2006 Loan DBST
207 WB $1.00 1 Sautr Nikum - Boeung Tonle Sap 2004 2006 Loan DBST
DBST (RGC bought
210 Private $21.50 - Siem Reap - Koh Ke 2003 - BOT
back)
Kob (NR5, PK: 383) – O
258D China $48.30 20.0 2011 2013 Grant DBST
Beychoann
314D ADB $14.32 25.6 NR1 –VN border: Prey Mlu 2014 2016 Loan DBST (in progress)
NR7: Dong Krolor – NR78: DBST (Rolling plan
378 China $86.00 141.00 2015 2017 Loan
Banlung 2013 – 2017)
NR44: Smach Meanchey – NR55: DBST (Rolling plan
1551 China $73.00 135.00 2015 2017 Loan
Promoy 2013 – 2017)
Veal Veng (NR55) – Samlot
1554 China $42 66.00 2015 - Loan DBST, 2015 project
(PR1577)
Sek Sork – Samlot – Border Pass
1577 China $37.28 51.798 2015 2018 Loan DBST (Completed)
400
3762 China $14.89 26.38 Sen Monorom - Dakdam 2010 2012 Loan DBST
DBST (Rolling plan
3787 China $99.00 180.00 Banlung – Kantuyneak 2015 2017 Loan
2013 – 2017)
Source: MPWT
- 36 -
Overview on Transport Infrastructure Sectors in the Kingdom of Cambodia (2023, IRITWG)
Name of Type of Cost Length Year Progress
Donor Location Fund
Bridge Bridge (Mill$) (km) Start End status
Prek Kdam Concrete China $28.90 0.975 Kandal, NR5 & NR61 2007 2011 Loan Completed
Prek Phnov
Concrete Private $42.00 1.543 Phnom Penh - NR6 - 2010 BOT Completed
Bridge
Prek Tameak Concrete China $43.50 1.066 Kandal, NR8 & NR6 2007 2010 Loan Completed
Stoeung Treng, as part
Se Kong Bridge Concrete China $15.00 1.057 2007 2007 Loan Completed
of NR7
Stung
Phnom Penh - Chaom
Meanchey Concrete Private $5.00 1999 BOT Completed
Chao
Bridge
RC
China $25.40 0.855 Takhmao town 2012 2015 Loan Completed
Takhmao bridge
Bridge Connecting road to
AC $7.49 12.07 2012 2015 Loan Completed
NR1
RC/PC,
Kandal, Prey Veng,
Tsubasa Bridge Cable Japan $98.24 2.2 2010 2015 Grant Completed
NR1
stay
3 Concrete
Concrete Japan $7.67 - On NR 2 and NR3 2005 2007 Grant Completed
Bridges
4 Bridges Concrete Thailand $7.20 1.6 Along NR48 2005 2007 Grant Completed
8 Bridges Concrete Japan $15.00 - On NR11 (Prey Veng) 2012 2015 Grant Completed
38 Concrete Along 56-68
Bridges & 57 Concrete ADB $10.50 0.185 (Sisophon - Samraong 2006 2008 Loan Completed
Culverts - Kralanh)
Cable
New Russey
stayed Cambodia $35.08 0.922 Across Tonle Sap 2017 2023 OCIC Completed
Keo bridge
Concrete
Across Mekong National
Koh Pen Bridge Concrete Cambodia $13.00 0.779 2011 2018 Completed
/Kampong Cham budget
Stung Bot Ban Nong Lan
Concrete Thailand $19.00 0.62 2017 2019 Grant Completed
Bridge -Stung Bot
Kroch Chmar –
Stung Trang Concrete China $57.00 1.131 Across Mekong 2018 2021 Grant Completed
bridge
Source: MPWT