0% found this document useful (0 votes)
223 views2 pages

02-Daily HSE Inspection Checklist-GPC-HSE-F-02-2023

Uploaded by

sufiyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
223 views2 pages

02-Daily HSE Inspection Checklist-GPC-HSE-F-02-2023

Uploaded by

sufiyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Establish and Integrate Company LTE Network with The National security

Networks.

Contract No # 22059056
DAILY HSE SITE INSPECTION CHECKLIST
Location: Date:
SN INSPECTION ITEMS YES NO N/A REMARK
1 WORK PERMIT

a The permit is for the work type, equipment and locations on which personnel are
b working?
Personnel are following all conditions and precautions identified on the permit?
c The permit is for the correct day and time?
d The permit is on the work site?
2 PERSONAL PROTECTIVE EQUIPMENT (PPE)

a Are personnel utilizing the required PPE?


b Are PPE items in good condition?
c Are safety belts being utilized in accordance with site requirements?
d Where task requires, is hearing protection being utilized?
e Where task requires, is the respiratory protection appropriate for contamination?
f Where task requires, are proper gloves being utilized?
3 HOUSEKEEPING

a Are walkways clearly identified and clear of materials?


b Are welding leads adequately routed to avoid tripping hazards?
c Is material properly stored to avoid congestion in the work areas?
d Are walking surfaces maintained free of oil and other materials?
e Are nails removed from stored timbers and wood?
4 POWER TOOLS AND EQUIPMENT

a All tools are inspected and tagged to indicate last inspection?


b Required safety guards are in place?
c Discs on portable grinders matched to the ROM’s of the grinder?
Power and extension cords are elevated or otherwise routed to prevent damage to the
d
cords and prevent tripping hazards?
5
PORTABLE LADDER
a The ladder is erected on a firm and stable base material?
b Safety feet are used and in good condition?
c The ladder is erected at a 4:1 ratio of height to base?
d The ladder is tied off at the top?
e Personnel are standing at least two rungs below the top rung of the ladder?
f The ladder is free of defects i.e. cracks, bad rungs, etc?
g The ladder made of Aluminum?
6 SCAFFOLDING

a Scaffold components, planking/decking in good condition? Planks graded for scaffold?


b All scaffold components in place and no defects?
c Competent person in charge of erection/inspection?
d Screw jacks being used to level and plumb scaffold when required?
e Scaffold legs braced, with braces properly attached?
f Guard railing in place on all open sides and ends?
g Visual check to verify clamps secured in place?
h Scaffold secured to structure to prevent movement?
i Brackets, tube and clamp, and accessories properly placed with wedges tightened?
j Area around scaffold has been secured/roped off?
k Toe boards properly installed where required?
l Proper access to get on and off the scaffold? Ladders secured
m Scaffold control tag has been signed and approved for use?
7 CRANE OPERATIONS
a Load charts are posted and utilized?
b The swing radius of the counter weight is barricaded?
c The crane is operated on level ground and with all outriggers down?
d Flagmen are used when moving cranes or transporting a load?
e The operator is trained for the specific crane he uses?
f An anti-blocking device is provided and checked to ensure it functions?
g Sufficient clearance from power lines is provided?
1 GPC-HSE-F-02-2023
h Loads are lifted away from personnel or sensitive equipment?
8 RIGGING
a Approved rigging practices are used?
b Rigging equipment is free of visible damage?
c All crane hooks are equipped with a functional safety latch?
d Third party load test inspection is conducted on the rigging tools, tackles &
e equipments?
The throat of load hooks is measured routinely to detect changes in hook gap?
f The load capacity of each rigging device is clearly marked on the device?
g Tag lines are used to control suspended loads?
h Signals or warnings are given before raising loads?
9 MATERIAL STORAGE
a Aisles and passageways are clear and unobstructed?
b Materials are stacked or otherwise organized to prevent the piles or stacks from falling?
c Chemicals are segregated to avoid storing incompatible items in proximity to each
Hazardous or flammable liquids are stored in curbed or drained areas to prevent
d accumulation
in the event of leaks or spills?
e Caution and warning signs are posted for hazardous materials?
f Rack storage systems are anchored and stable?
10 EXCAVATION AND TRENCHING
a Is the site cleared for utilities and other underground obstructions?
Is PTW obtained with all the required documents (JHA, Site Drawing and confined
b space if it is
confined
c Is space
excavated category)
material placed 1 Meter or more from the edge?
d If ladders are used, are they secured and do they extend 3 feet above the edge of the
excavation?
e Is the excavation well marked and barricaded to prevent personnel or vehicles from
f falling
If rampsin?are used are their appropriate means to prevent slipping?
Are support systems provided to stabilize adjacent structures, buildings, roadways,
g sidewalks,
etc.?
If excavation is a confined space Is confined space PTW available at site and Gas test
h results
recorded
Are support systems provided to stabilize adjacent structures, buildings, roadways,
i sidewalks,
etc.?
j Is there available means to prevent surface water from entering excavation?
11 EMERGENCY PREPAREDNESS
a Emergency power and lighting is available for critical or safe haven or other inhabited
b areas?
Emergency alarms / signals are routinely tested?
c Excavation / muster drills are routinely conducted?
d Personnel have been trained concerning the emergency plan?
e Radio or other means of emergency communications are available and operational?
Emergency medical treatment facilities and supplies are available in less than 3 minutes
f travel
g time?
The written site emergency plan is available and current?
h Emergency phone numbers or radio frequencies are clearly posted throughout the work
12 site?
HOT WORK
a Fire watch is on site, equipped and understands their duties?
b Sparks are being contained to the immediate work area?
The permit is posted on the job site? & Personnel are following all conditions and
c precautions
d identified
The work on
areatheis permit?
free of combustible and flammable materials?
e The required number of fire extinguishers are available, serviceable & operable?
Have suitable and sufficient hazard warning signs been posted adjacent to (including
f above and
below,
g Are where appropriate)
compressed gas bottlesthe work
well area?
segregated?
h Are compressed gas bottles well secured?
i Are the (compressed gas bottles) not in use capped and secured?
j Is fire watcher provided for the activity?
Observation:
Name of HSE Engineer/ Supervisor / Officer: Signature