0% found this document useful (0 votes)
22 views19 pages

Gold 2

Uploaded by

riansagemilang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views19 pages

Gold 2

Uploaded by

riansagemilang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

GOLD MINE

IN
INDONESIA
Geology
G Geology of Mine Gold.

RGS S Sustainable
R aRea Location
GOLD
Mine Location
Indonesia, Province
Lampung
The LKC & LSB IUP area is administratively within the Babakan Loa Village
area, District Kedondong, Pesawaran Regency, Lampung Province,
Indonesia. Pesawaran Regency is a new district that is 5 years old, the result
of the expansion of South Lampung Regency. Gedong Tataan is the capital
of Pesawaran Regency, a small town located 27 km north of the mine site.

Babakan Loa is located 8 km on the southwest slope of Mount Pesawaran


which has a peak height 1,682 m above sea level.

Kedondong District borders Cukuh Balak District, Tanggamus


Regency, which is also There are mining and exploration concessions
in Putih Doh Village and its surroundings, located to the southwest
Babakan Loa.
ACCes
s

The IUP area in Babakan Loa is


located around 48 km from
Bandar Lampung. This location
can be reached from Bandar
Lampung with a 2 hour journey
via the Bandar Lampung - Gedong
Tataan – Kedondong - Babakan
Loa - Site route. The alternative
route is Bandar Lampung - Padang
Cermin - Babakan Loa - Site.
Topography

Mineralization
& Alteration
In the IUP area, the local topographic
conditions are moderately undulating
The structures found at the mine to steep with altitude ranges from 300 Silicification
site have an almost north-south m to 500m above sea level. Hills in the
orientation with a slope which is LKC IUP area Part of the north arm has
steep to the east. The fault been partially opened and excavated
structure exposed in the field is in due to mining activities. Whereas
the form of fault breccia, crushed There are no mining activities in the Silicification occurs in wall
zone (broken zone) with a slight hills in the central and southern parts rocks in quartz veins or is
slickenside appearance. This fault of the IUP area. associated with clay alteration.
is associated with alteration clay During a visit to the Babakan
and appears to control Loa mine, only 2 quartz vein
mineralization. zones were found, one outcrop
in the traditional pit and one
outcrop to the south of the
mine. The main underground
hole has not been observed
Geology
The quartz vein found in Lubang
Duren has an almost north-south
direction (N350°E) with tilt 80° to
the east. The quartz vein has a
thickness of 30 cm. Vein shows
characteristics massive chalcedonic
to sugary crystalline texture, vughy
texture, limonitic and manganese
oxidation strong. Then in the
outcrop located at the southern
boundary of the mine there is a
quartz vein zone with north-south
to north-northeast (NNE)
orientation with a slope of 80° to
Based on secondary data information, in the Babakan Loa gold district the west. There are 6 veins quartz
there are 7 quartz vein zones, can be traced along 400m, the vein direction with a thickness of 2 - 12 cm, total
is mainly north-south. Quartz veins are between 1 cm to 1 cm thick 0.5 thickness 23 cm in a zone 3 meters
meters . At the location of PT. LKC has 3 former open pit excavations, wide. Have the same textural
namely Lubang Duren, Lubang Aren and Perak Hole and 1 underground characteristics as the quartz veins
mine called Peter Hole. The pit is currently open is currently inactive and found in the mine
there is a lot of rock and soil collapsing on the open pit walls, thus covering
the vein route quartz
M
Area First Cut A

P
Map Overview
Pit Volume
459,976 bcm

Section -A B
C

Section -B Section -C
Section A
Section B
Section C
155.520 BCM
In year
155.520 BCM
In year
Total Production
17

Massive X presentation to DesignBall team


Production
Average
30kg/month.

Cost
$477b
Profit.

Exploration is Important

85%
Mega Plant

e Project
You
Thank
19

Massive X presentation to DesignBall team

You might also like