S AK WOSUSOKAS 199-06-2024 Notification Letter Abo 240606 152532
S AK WOSUSOKAS 199-06-2024 Notification Letter Abo 240606 152532
750 Ls
REVISIONS REVISIONS
SHEET SHEET
0 1 2 3 4 5 6 7 0 1 2 3 4 5 6 7
1 X 48
2 X 49
3 X 50
4 X 51
5 X 52
6 X 53
7 X 54
8 X 55
9 X 56
10 X 57
11 X 58
12 X 59
13 X 60
14 X 61
15 X 62
16 X 63
17 X 64
18 X 65
19 X 66
20 X 67
21 X 68
22 X 69
23 X 70
24 X 71
25 X 72
26 X 73
27 X 74
28 X 75
29 X 76
30 X 77
31 X 78
32 X 79
33 X 80
34 X 81
35 X 82
36 X 83
37 X 84
38 X 85
39 X 86
40 X 87
41 X ATTACHMENT \ APPENDIX
42 A
43 B
44 C
45 D
46 E
47 F
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
1. TABLE OF CONTENTS
DESCRIPTIONS PAGE NO.
1. TABLE OF CONTENTS..................................................................................................................... 3
2. REVISION LIST ................................................................................................................................. 5
3. INTRODUCTION ............................................................................................................................... 6
3.1. Objective and Scope ......................................................................................................................... 6
3.2. Abbreviations ................................................................................................................................... 6
3.3. Venue, Schedule and Organization .................................................................................................. 6
3.4. Execution and Documentation ......................................................................................................... 7
4. HARDWARE INSPECTION PROCEDURE ..................................................................................... 9
4.1. System Configuration and Quantity Check ...................................................................................... 9
4.2. Appearance and Construction Check ..............................................................................................10
4.3. STARDOM PLC I/O Module Loading Check ................................................................................12
4.4. Power Distribution Check ...............................................................................................................13
5. SYSTEM STARTUP ..........................................................................................................................15
5.1. STARDOM PLC for Startup Check ................................................................................................15
6. VISUAL TEST & POWER ON Field Instrument ..............................................................................16
6.1. Turbidity Analyzer ..........................................................................................................................16
6.2. pH Analyzer ....................................................................................................................................18
6.3. Chlorine Analyzer ...........................................................................................................................20
6.4. Stream Current Monitor ..................................................................................................................22
6.5. Sludge Finder ..................................................................................................................................24
6.6. Radar Level Transmitter..................................................................................................................25
6.7. Magnetic Flowmeter .......................................................................................................................26
6.8. Pressure Transmitter........................................................................................................................27
7. STARDOM PLC IO Check ................................................................................................................28
7.1. Loop Check .....................................................................................................................................28
8. CI SERVER HMI Graphic Test ..........................................................................................................30
8.1. Outline.............................................................................................................................................30
8.2. Reference: .......................................................................................................................................30
8.3. Selection of Overview Graphics......................................................................................................31
8.4. Selection of Link Graphics ..............................................................................................................32
8.5. Selection of Indication in Graphic...................................................................................................33
9. APPLICATION SOFTWARE TEST .................................................................................................34
9.1. SOFTWARE SEQUENCE .............................................................................................................34
10. COMMUNICATION TEST ...............................................................................................................35
10.1. Communication Between Subsystem and Server ............................................................................35
11. Appendix ............................................................................................................................................36
11.1. Appendix A – CERTIFICATE OF FACTORY ACCEPTANCE TEST (FAT) .............................36
11.2. Appendix B – RELEASE NOTE FOR SHIPMENT .......................................................................37
11.3. Appendix C – FAT Schedule ..........................................................................................................38
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
2. REVISION LIST
3. INTRODUCTION
The FAT for SPAM REGIONAL WOSUSOKAS project will be conducted in accordance with the
test procedures described here in this document.
The scope of this F.A.T. at YIN Staging in Jakarta will include visual checks on workmanship;
functional and operational tests in accordance with the F.A.T. reference documents; and to clear
the equipment for delivery to site.
The scope of the FAT shall include visual checks on workmanship and functional tests in
accordance with the FAT procedure specified herein.
3.2. Abbreviations
YIN : PT. Yokogawa Indonesia
AK : PT. ADHI KARYA
BPPW : BPPW JAWA TENGAH
FAT : Factory Acceptance Test
RTU : Remote Terminal Unit
HMI : Human Machine interface
SCADA : Supervisory Control and Data Acquisition
PSU : Power Supply Unit
I/O : Input Output Point
FCN : Field Control Network
3.4.10. I/O STARDOM checklists for each system shall be provided at the FAT, compiled
from the latest I/O list.
3.4.11. YIN shall configure CI SERVER HMI assignments in accordance with approved
graphics.
3.4.12. Test equipment for FAT is as listed in Appendix E.
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
4.1.1. Outline
All hardware manufactured for this project is subject to client’s visual inspection to verify that
all components are in accordance with the specifications and the quantities are as per the
approved Bill of Materials.
4.1.2. Objective
To verify all components are supplied in accordance with the specifications.
4.1.3. Reference
• Bill of Material (Doc. No.WTP WSKS-VD-BOM-001)
• Overal System Architecture (Doc. No.WTP WSKS-VD-DWG-001)
4.1.4. Procedure
For each component, visually inspect and verify the following:
• Component numbers and description are correct on the nameplates for the cabinets and
for components mounted inside the cabinets (As per approved drawings)
• Model numbers are correct as per the Hardware Specification.
• Quantity of items as per the System Configuration.
4.1.5. Criteria
All components should conform to System Configuration and Hardware Specification.
The nameplate descriptions and component numbers should be as per the Approved
drawings.
Note: Certain hardware will be used temporarily only for the FAT purpose and will not be part of
the scope of supply. These items are excluded from the above verification.
COMMENTS:
4.2.1. Outline
All components and accessories manufactured by YIN are specified in the Hardware
Specification and in the System Cabinet layout and Internal Wiring Connection drawings.
They are certified free from scratches and deformations that impair the quality and
appearance of the product.
4.2.2. Objective
To make sure all components and accessories are manufactured as specified and free from
scratches and deformations.
To verify that:
• All items are mounted in accordance with the approved drawings
• All dimensions are in accordance with those shown in the drawings
• Grounding is in accordance with specifications
• Proper isolation is provided for system components
• Power supplies are arranged as indicated in the drawings
• Expansion spare capacity (spare space) is available in each cabinet
4.2.3. Reference
• Network Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-001).
• RTU Intake Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-002)
• RTU Automation Dosing Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-
VD-LAY-003)
• RTU Filtration Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-
004)
• RTU Reservoir Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-
005)
• RTU SDB Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-006)
• Desk/Local Control Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-007)
• Water Sampling Rack Intake Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-
LAY-008)
• Water Sampling Rack Inlet & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-009)
• Water Sampling Rack Sedimentation Layout & Wiring Diagram (Doc. No. WTP
WSKS-VD-LAY-010)
• Water Sampling Rack Reservoir Layout & Wiring Diagram (Doc. No. WTP WSKS-
VD-LAY-011)
4.2.4. Procedure
• Visually check all components against the appropriate documents.
• Verify the space for future additions.
4.2.5. Criteria
• All components should be complete and free from scratches and deformations.
• Mounting of components, dimensions, grounding, isolation and power supplies
arrangement should be as per approved drawings.
• Quantity of installed spares should be (as per Specification)
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
COMMENTS:
4.3.1. Outline
I/O modules are assigned according to the I/O modules assignments. The position and
quantity of these items in the STARDOM PLC are of utmost importance.
4.3.2. Objective
To verify all I/O modules including spares are correctly supplied and installed (As per
Hardware Specification).
4.3.3. Reference
• Input-Output Assignment (Doc. No. WTP WSKS-VD-LST-001)
4.3.4. Procedure
Visually check that all I/O modules are installed according to the STARDOM PLC I/O
Modules Assignments. Visually check that spare modules and spare space are provided as
per specifications.
4.3.5. Criteria
The quantity, type and location of all I/O modules including the spares must match the
approved STARDOM PLC I/O Modules Assignments.
COMMENTS:
4.4.1. Outline
Power distribution is fed from field 220 VAC. Power distribution and assignment are
scheduled to offer isolation protection against individual equipment risk and give easy of
maintenance. Failure of one equipment power supply should not affect other equipments.
4.4.2. Objective
To verify that each equipment have an individual isolated power terminal.
4.4.3. Reference
• Network Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-001).
• RTU Intake Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-002)
• RTU Automation Dosing Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-
VD-LAY-003)
• RTU Filtration Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-
004)
• RTU Reservoir Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-
005)
• RTU SDB Cabinet Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-006)
• Desk/Local Control Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-007)
• Water Sampling Rack Intake Layout & Wiring Diagram (Doc. No. WTP WSKS-VD-
LAY-008)
• Water Sampling Rack Inlet & Wiring Diagram (Doc. No. WTP WSKS-VD-LAY-009)
• Water Sampling Rack Sedimentation Layout & Wiring Diagram (Doc. No. WTP
WSKS-VD-LAY-010)
• Water Sampling Rack Reservoir Layout & Wiring Diagram (Doc. No. WTP WSKS-
VD-LAY-011)
4.4.4. Procedure
• Connect the main input Power
• Measure the input Power
• Switch ON main Breaker
• Switch ON one by one breaker of power distributed observes the related equipments
4.4.5. Criteria
All equipments must match with the related breakers.
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
COMMENTS:
5. SYSTEM STARTUP
5.1.1. Outline
STARDOM PLC goes to their operating state automatically upon powering up, provided that
all application software and image are properly loaded in the system.
5.1.2. Objective
To verify STARDOM PLC automatically boot up when going from ‘stop’ state to ‘operating’
state.
5.1.3. Reference
System Startup and Operation Manual.
5.1.4. Procedure
• Power down the STARDOM PLC panel power distribution.
• Power up the STARDOM PLC panel power distribution.
5.1.5. Criteria
• STARDOM PLC must boot up automatically.
COMMENTS:
6.1.1. Outline
This chapter is to check functional test and Power ON the Turbidity that used TB820D and
FLXA402T
6.1.2. Objective
The purpose of this test is to verify that the Turbidity TB820D can works properly
No. Item Description Manufacturer Model Qty
1 Turbidity Detector, 0-500 NTU Yokogawa TB820D-NT-AB-NN-NN-CT- 1
NN/L03/D1
2 Turbidity Detector, 0-500 NTU Yokogawa TB820D-NT-AB-NN-NN-CT- 3
NN/L03/D3
3 Turbidity Detector, 0-700 NTU Yokogawa TB820D-FN-AB-NN-NN-CT- 4
NN/L03/D3
4 Liquid Analyzer for Turbidity Yokogawa FLXA402T-A-B-AB-TB-NN-N2-NR- 8
N-R-N-NN-NN/UM
COMMENTS:
6.2. pH Analyzer
6.2.1. Outline
This chapter is to check functional test and Power ON the Turbidity that used FLXA202 and
FU20
6.2.2. Objective
The purpose of this test is to verify that the Ph Analyzer FLXA202 can works properly
No. Item Description Manufacturer Model Qty
1 Widebody type pH/ORP sensor Yokogawa FU20-03-T1-NPT/FPS 8
2 2-Wire Analyzer Yokogawa FLXA202-D-C-D-AB-P1-NN-A-N- 8
LA-N-NN/UM
3 Flow fitting Yokogawa FF40-P22 8
COMMENTS:
6.3.1. Outline
This chapter is to check functional test and Power ON the Turbidity that used FLXA402T
6.3.2. Objective
The purpose of this test is to verify that the Chlorine Analyzer FLXA402T can works properly
No. Item Description Manufacturer Model Qty
1 Non-reagent type Free Available Yokogawa FC800D-F3-AB-NN-NN/L03 1
Chlorine Analyzer
2 Liquid Analyzer for Chlorine Yokogawa FLXA402T-A-B-AB-CL-NN-N2-NR- 1
N-R-N-NN-NN/UM
COMMENTS:
6.4.1. Outline
This chapter is to check functional test and Power ON the Turbidity that used SCM-2
6.4.2. Objective
The purpose of this test is to verify that the SCM-2 can works properly
No. Item Description Manufacturer Model Qty
1 Streaming Current Meter Micrometrix SCM-2 3
COMMENTS:
6.5.1. Outline
This chapter is to check functional test and Power ON the Turbidity that used Sludge Finder
2 and Tranducer V10
6.5.2. Objective
The purpose of this test is to verify that the SCM-2 can works properly
No. Item Description Manufacturer Model Qty
1 Sludge Blanket Level Pulsar Sludge Finder 2 6
Measurement
2 Transducer Pulsar V10 Viper 20m 6
6.6.1. Outline
This chapter is to check functional test and Power ON the Level Transmitter that used KRG-
10
6.6.2. Objective
The purpose of this test is to verify that the KRG-10 can works properly
No. Item Description Manufacturer Model Qty
1 Radar Level Transmitter Tokyo Keiki KRG-10-NN04HV-AA 1
COMMENTS:
6.7.1. Outline
This chapter is to check functional test and Power ON the Flowmeter that used AXW300,
AXW400, AXW600, AXW10 and AXW4A
6.7.2. Objective
The purpose of this test is to verify that the Flowmeter can works properly
No. Item Description Manufacturer Model Qty
1 Magnetic Flowmeter, 300mm Yokogawa AXW300-WW000CE2UL110B- 1
NNNNN
2 Magnetic Flowmeter, 400mm Yokogawa AXW400-WW000CE1HL110B- 1
NNNNN
3 Magnetic Flowmeter, 600mm Yokogawa AXW600W-WNHL1N-CE2N-0NB 3
4 Magnetic Flowmeter, 1000mm Yokogawa AXW10LG-J1HL1N-CE2N-21B 1
(General Purpose)
5 Magnetic Flowmeter, 1000mm Yokogawa AXW10LW-WNHL1N-CE2N-0NB 1
(Submersible)
6 Remote Transmitter Yokogawa AXW4A-G000101JA11 6
6.8.1. Outline
This chapter is to check functional test and Power ON the Pressure Transmitter that used
EJA530
6.8.2. Objective
The purpose of this test is to verify that the Flowmeter can works properly
No. Item Description Manufacturer Model Qty
1 Gauge Pressure Transmitter Yokogawa EJA530E-JBS4N-019EN/HE 7
COMMENTS:
7.1.1. Outline
All I/O cards and modules installed in the STARDOM PLC are confirmed functional by YIN
QA dept. The I/O check is performed to verify the functionality of the IO cards. The I/O check
is also performed to verify I/O’s are correctly assigned in the STARDOM PLC.
7.1.2. Objective
To verify STARDOM PLC input and output signals, circuits and their assignment in the
STARDOM PLC.
7.1.3. Reference
• Input-Output Assignment & Node Loading (Doc. No. WTP WSKS-VD-LST-001)
7.1.4. Procedure
Analog input:
Simulate appropriate analog input signals at the terminals using the portable calibrator and
record corresponding STARDOM PLC reading displayed in the corresponding faceplate at
the HMI. For Analog Input points, 3 input signals shall be simulated:
• signal 1 = 0% 4.00 mA
• signal 2 = 50% 12.00 mA
• signal 3 = 100% 20.00 mA
Analog output:
From the faceplate at the HIS, set the output (MV) of the tag and measure the corresponding
signal output at the output terminals (in STARDOM PLC Panel) using an ampere meter. For
Analog Output points, 3 output signals shall be set:
• signal 1 = 0.1%
• signal 2 = 50%
• signal 3 = 99.9%
Digital input:
Open or close the input point at the input terminals (in STARDOM PLC Panel) and record
the status indication for the corresponding tag faceplate at the HIS. For Digital Input points,
2 input states shall be simulated:
• signal 1 = 0 or open contact input signal
• signal 2 = 1 or close contact input signal
Digital output:
Set or reset the output point through the faceplate at the HIS and test the status of the output
point at the output terminals for the corresponding tag. For Digital Output points, 2 output
states shall be set:
• signal 1 = 0 or open contact output
• signal 2 = 1 or close contact output
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
7.1.5. Criteria
Accuracy : +/- 16 µA
COMMENTS:
8.1. Outline
This chapter gives specifications of the tests in graphic. It tests the following functionality:
• selection of graphic via the navigation bar and graphic link
• selection of various symbol on graphic
• graphics contents: symbols, formats, colours and dynamics
• graphic display performance
• graphic display positions
8.2. Reference:
COMMENTS:
8.3.1. Procedure
During this test, the contents of the schematics should be checked against the approved schematic
drawing.
8.3.2. Criteria
The Selection of Schematics via the Main Menu Test should been done successfully.
COMMENTS:
8.4.1. Procedure
Click on every symbol which content link to other schematic diagram.
8.4.2. Criteria
The selection of schematics via the schematic selection panel test should been done
successfully
COMMENTS:
8.5.1. Procedure
Click on every symbol which data indication in each schematic diagram.
8.5.2. Criteria
The selection of data indication in Schematic graphic test should been done successfully
COMMENTS:
OBJECTIVE: 1. The purpose of this test is to verify that the specified control configurations
perform as defined in the approved functional specifications.
PROCEDURE: 1. Simulate input and/or output signals to check the logic function, calculation
sequence function, etc.
2. Check that valves are shut/open, pumps are started/stopped, appropriate
alarm messages are displayed etc.
3. Check that appropriate graphic pages for related status indication.
4. Check the valve action (DIR/REV) of SIO instrument block for ON/OFF valves.
CRITERIA: Ensure that the sequence functions, calculations etc, work as per approved logic.
COMMENTS:
10.1.1. Outline
This chapter gives specifications of the tests in graphic. It tests the following functionality :
All Pump and Valve to CI Server at SPAM Wosusokas, In this case communication both of them
using protocol Modbus RTU.
10.1.2. Reference
System Configuration (Doc.No. : WTP WSKS-VD-DWG-001)
10.1.3. Criteria
Communication between all Subsystems and CI SERVER should been done successfully.
COMMENTS:
11. Appendix
[ COMMENTS ]
Remarks :
Signature : Signature :
Date : Date :
Signature :
Date :
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
This is to certify that it is mutually agreed by all parties that all items covered under the above
Purchase Orders can be released for shipment, subject to fulfillment by Yokogawa of all actions
required to be completed prior to shipment, as per the "Punch List".
[ COMMENTS ]
Remarks :
Signature : Signature :
Date : Date :
Signature :
Date :
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
• Visual Check
• Visual check as per
Hardware
Opening Bill Of Material and
• Visual Check
1 Meeting Hardware
Field Instrument
& FAT • Summary &
• Summary &
Punchlist
Punch list
• Logic Test
• Check HMI
• Logic Test comply
Graphic
with graphic test
2 FAT • Check Logic
• Sequence test
• Summary &
comply with
Punch list
narrative
Company :
Witnessed By Signature
(Name)
Company :
Solution:
Approval (Name)
SPAM REGIONAL WOSOSUKAS KAP. 750 L/S
The corresponding check sheet for the I/O loading inspection for will be supplied and used