0% found this document useful (0 votes)
39 views

SECTION 3 Pre-Action System - System Description

Uploaded by

AMIRUL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

SECTION 3 Pre-Action System - System Description

Uploaded by

AMIRUL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 54

SYSTEM DESCRIPTION

SECTION 3

SECTION 3
SYSTEM DESCRIPTION

TABLE OF CONTENTS

Title Page

3.0 SYSTEM DESCRIPTION ..................................................................................... 3-1


3.1 SYSTEM INFORMATION ........................................................................................... 3-1
3.2 SPRINKLER HYDRAULIC CALCULATIONS .................................................................. 3-7

Rev.: 00 3- 0 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SYSTEM DESCRIPTION

3.0 SYSTEM DESCRIPTION


3.1 SYSTEM INFORMATION

The Pre-Action System are designed according to MS 1910:2017 Fixed


firefighting systems - Automatic sprinkler systems - Design, installation and
maintenance. Based on the Standard, Data Centres are listed under the “Ordinary
Hazard 3” category. It shall be noted that the objective of this design hazard is only to
contain the spread of fire and prolonging escape time in the event of fire.

Pre-action Sprinkler System is a system where the pipes are charged with air under
pressure and the pre-action valve opens to fill the pipes with water when fires are
detected by smoke or heat detectors. As the premise contains large quantities of
equipment and electrical boards that are sensitive to water damages, Pre-action system
is also utilized for rooms housing such equipment.

The Pre-Action System is made up of the following equipment: -

• One Electrical Driven Duty Pump


• One Diesel Driven Standby Pump
• One Electrical Driven Jockey Pump
• Sprinkler Tank
• Dry Pre-action Valve
• Wet Alarm Valve
• Air Compressor
• Butterfly Valve & Flow Switch
• Drain Valves
• K-80 Sprinkler heads
• Air Release Valves

Rev.: 00 3- 1 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SYSTEM DESCRIPTION

Information on the alarm valves station located inside the Main DC Building are as
shown:

ALARM VALVE STATION

SPRINKLER QTY OF
SIZE SPRINKLER
ALARM SERVE AREA SPR
(MM) HEAD TYPE
VALVE NO. SERVED

MY06-FP-C- • ELV RISER G-1


SCV-G-A- • ELV ROOM G-1
PACV-1 • HV SWITCH ROOM G1-1A
• HV SWITCH ROOM G1-1B
• ELV RISER G-3 CONVENTION
• LV RISER G-1 AL K80,
150Ø 247
• ELECTRICAL SWITCH ROOM UPRIGHT,
G-1A 68ºC
• ELECTRICAL SWITCH ROOM
G-1B
• BATT ROOM G1-A
• BATT ROOM G1-B
MY06-FP-C- • LV RISER G-3
SCV-G-A- 150Ø • ELV RISER G-5
PACV-2 • HV SWITCH ROOM G-UBA
• HV SWITCH ROOM G-UBB
• BATT RM G-3A CONVENTION
• BATT RM G-4A AL K80,
180
• ELECTRICAL SWITCH ROOM UPRIGHT,
G-UB 68ºC
• LV RISER G-4
• ELV RISER G-6
• BATT RM G-UBA
• BATT RM G-UBB
MY06-FP-C- • HV SWITCH ROOM G-3A
SCV-G-A- 150Ø • HV SWITCH ROOM G-3B
PACV-3 • ELV RISER G-7
CONVENTION
• HV RISER G-1
AL K80,
• ELECTRICAL SWITCH ROOM 224
UPRIGHT,
G-3A
68ºC
• ELECTRICAL SWITCH ROOM
G-3B
• BATT ROOM G-3B
MY06-FP-C- • ELV RISER G-2
SCV-G-B- • ELV ROOM G-2
PACV-4 • HV SWITCH ROOM G1-2A
• HV SWITCH ROOM G1-2B
• HV RISER G-2
CONVENTION
• ELV RISER G-4
AL K80,
150Ø • LV RISER G-2 267
UPRIGHT,
• ELECTRICAL SWITCH ROOM 68ºC
G-2A
• ELECTRICAL SWITCH ROOM
G-2B
• BATT ROOM G2-A
• BATT ROOM G2-B

Rev.: 00 3- 2 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SYSTEM DESCRIPTION

MY06-FP-C- • HV SWITCH ROOM G-4A


SCV-G-B- • HV SWITCH ROOM G-4B
PACV-5 • ELV RISER G-8 CONVENTION
• ELECTRICAL SWITCH ROOM AL K80,
150Ø 212
G-4A UPRIGHT,
• ELECTRICAL SWITCH ROOM 68ºC
G-4B
• BATT ROOM G-4B
MY06-FP-C- • DATA HALL 1-1A
SCV-G-A- • DATA HALL 1-1B
PACV-6 • DATA HALL 1-1C
CONVENTION
• COOLING CORRIDOR 1-1
AL K80,
150Ø • COOLING CORRIDOR 1-2 530
UPRIGHT,
• COOLING CORRIDOR 1-3
68ºC / 93ºC
• COOLING CORRIDOR 1-4
• COOLING CORRIDOR 1-5
• COOLING CORRIDOR 1-6
MY06-FP-C- • DATA HALL 1-3A
SCV-G-A- • DATA HALL 1-3B
PACV-7 • COOLING CORRIDOR 1-9 CONVENTION
• COOLING CORRIDOR 1-10 AL K80,
150Ø 498
• PDU CORRIDOR 1-3 UPRIGHT,
• PDU CORRIDOR 1-4 68ºC / 93ºC
• CDU CORRIDOR 1-3
• CDU CORRIDOR 1-4
MY06-FP-C- • DATA HALL 1-2A
SCV-G-B- • DATA HALL 1-2B
PACV-8 • COOLING CORRIDOR 1-7
• COOLING CORRIDOR 1-8
• PDU CORRIDOR 1-1 CONVENTION
• PDU CORRIDOR 1-2 AL K80,
150Ø 511
• CDU CORRIDOR 1-1 UPRIGHT,
• CDU CORRIDOR 1-2 68ºC / 93ºC
• ELV RISER 1-2
• ELV RISER 1-4
• LV RISER 1-2
• SECURITY RACK ROOM 1
MY06-FP-C- • DATA HALL 1-4A
SCV-G-B- • DATA HALL 1-4B
PACV-9 • COOLING CORRIDOR 1-11
• COOLING CORRIDOR 1-12
• PDU CORRIDOR 1-5
• PDU CORRIDOR 1-6
CONVENTION
• CDU CORRIDOR 1-5
AL K80,
150Ø • CDU CORRIDOR 1-6 568
UPRIGHT,
• MCC ROOM 1
68ºC / 93ºC
• LV RISER 1-4
• ELV RISER 1-6
• ELV RISER 1-8
• RF ELE ROOM R-A
• RF ELV ROOM A
• RF ELE ROOM R-B

Rev.: 00 3- 3 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SYSTEM DESCRIPTION

✓ Different type of sprinklers is used based on different design hazard as


described in the sections below
.
General Piping Schedule for Sprinkler Installation

Sprinkler System
Components Description Design Reference

Sprinkler Pipe Size: Ø25mm to Ø150mm


MS 1910
(Aboveground) Material: Black B

Sprinkler Pipe Size: Ø150mm


MS 1910
(Underground) Material: G.I. ‘C’

Size: Ø25mm to Ø50mm (Threaded Fittings)


Pipe Fittings
Size: Ø60mm to Ø150mm (Mechanical MS 1910
(Aboveground)
Fittings & grooved coupling joint)

Pipe Fittings
Size: Ø150mm (Welding joint) MS 1910
(Underground)

Sprinkler design information for Main Data Centre Building

Design Hazard Hazard Class: OH3-30m

Design Point 18 Points – 24 points

Max. area of Operation 216m2

Max. Area coverage per head 12 m2

Design Density 5.0mm/min

Sprinkler Head Type Conventional (upright & pendent)

Sprinkler Head Temperature 68°C / 93°C

Sprinkler Head K-Factor K80

Orifice size 15mm

Min. Pressure 0.5Bar

MY06-FP-C-SCV-G-A-PACV-1
MY06-FP-C-SCV-G-A-PACV-2
MY06-FP-C-SCV-G-A-PACV-3
MY06-FP-C-SCV-G-B-PACV-4
Control Alarm Valve Number MY06-FP-C-SCV-G-B-PACV-5
MY06-FP-C-SCV-G-A-PACV-6
MY06-FP-C-SCV-G-A-PACV-7
MY06-FP-C-SCV-G-B-PACV-8
MY06-FP-C-SCV-G-B-PACV-9

Rev.: 00 3- 4 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SYSTEM DESCRIPTION

Sprinkler Pump Capacity


✓ Based on the Full Hydraulic Calculation (HFC), the Sprinkler Pumps Head are
as following:

SPRINKLER AREA / LEVEL SERVED RESULT CAPACITY


ZONE NO.
MY06-FP-C- • ELV RISER G-1 1391 L/min @ 3.10 bar
SCV-G-A- • ELV ROOM G-1
PACV-1 • HV SWITCH ROOM G1-1A
• HV SWITCH ROOM G1-1B
• ELV RISER G-3
• LV RISER G-1
• ELECTRICAL SWITCH ROOM G-1A
• ELECTRICAL SWITCH ROOM G-1B
• BATT ROOM G1-A
• Batt Room G1-B
MY06-FP-C- • LV RISER G-3 1391 L/min @ 2.49 bar
SCV-G-A- • ELV RISER G-5
PACV-2 • HV SWITCH ROOM G-UBA
• HV SWITCH ROOM G-UBB
• BATT RM G-3A
• BATT RM G-4A
• ELECTRICAL SWITCH ROOM G-UB
• LV RISER G-4
• ELV RISER G-6
• BATT RM G-UBA
• BATT RM G-UBB
MY06-FP-C- • HV SWITCH ROOM G-3A 1391 L/min @ 2.55 bar
SCV-G-A- • HV SWITCH ROOM G-3B
PACV-3 • ELV RISER G-7
• HV RISER G-1
• ELECTRICAL SWITCH ROOM G-3A
• ELECTRICAL SWITCH ROOM G-3B
• BATT ROOM G-3B
MY06-FP-C- • ELV RISER G-2 1391 L/min @ 3.73 bar
SCV-G-B- • ELV ROOM G-2
PACV-4 • HV SWITCH ROOM G1-2A
• HV SWITCH ROOM G1-2B
• HV RISER G-2
• ELV RISER G-4
• LV RISER G-2
• ELECTRICAL SWITCH ROOM G-2A
• ELECTRICAL SWITCH ROOM G-2B
• BATT ROOM G2-A
• BATT ROOM G2-B
MY06-FP-C- • HV SWITCH ROOM G-4A 1391 L/min @ 3.3 bar
SCV-G-B- • HV SWITCH ROOM G-4B
PACV-5 • ELV RISER G-8
• ELECTRICAL SWITCH ROOM G-4A
• ELECTRICAL SWITCH ROOM G-4B
• BATT ROOM G-4B
MY06-FP-C- • DATA HALL 1-1A 1391 L/min @ 3.75 bar
SCV-G-A- • DATA HALL 1-1B
PACV-6 • DATA HALL 1-1C
• COOLING CORRIDOR 1-1
• COOLING CORRIDOR 1-2
• COOLING CORRIDOR 1-3
• COOLING CORRIDOR 1-4
• COOLING CORRIDOR 1-5
• COOLING CORRIDOR 1-6

Rev.: 00 3- 5 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SYSTEM DESCRIPTION

MY06-FP-C- • DATA HALL 1-3A 1391 L/min @ 3.82 bar


SCV-G-A- • DATA HALL 1-3B
PACV-7 • COOLING CORRIDOR 1-9
• COOLING CORRIDOR 1-10
• PDU CORRIDOR 1-3
• PDU CORRIDOR 1-4
• CDU CORRIDOR 1-3
• CDU CORRIDOR 1-4
MY06-FP-C- • DATA HALL 1-2A 1391 L/min @ 3.84 bar
SCV-G-B- • DATA HALL 1-2B
PACV-8 • COOLING CORRIDOR 1-7
• COOLING CORRIDOR 1-8
• PDU CORRIDOR 1-1
• PDU CORRIDOR 1-2
• CDU CORRIDOR 1-1
• CDU CORRIDOR 1-2
• ELV RISER 1-2
• ELV RISER 1-4
• LV RISER 1-2
• SECURIT RACK ROOM 1
MY06-FP-C- • DATA HALL 1-4A 1391 L/min @ 3.63 bar
SCV-G-B- • DATA HALL 1-4B
PACV-9 • COOLING CORRIDOR 1-11
• COOLING CORRIDOR 1-12
• PDU CORRIDOR 1-5
• PDU CORRIDOR 1-6
• CDU CORRIDOR 1-5
• CDU CORRIDOR 1-6
• MCC ROOM 1
• LV RISER 1-4
• ELV RISER 1-6
• ELV RISER 1-8
• RF ELE ROOM R-A
• RF ELV ROOM A
• RF ELE ROOM R-B

The pre-action sprinkler system is designed according to Ordinary Hazard


Occupancies Group 3 for all areas. Pre-action sprinkler system is designed to meet
Malaysia Standard (MS-1910) requirements.
Total quantity of Sprinkler Points: - 3,237 Points
Location: The Sprinkler heads are installed at every level, as shown in the layout
drawings
Description: Each sprinkler head is a water discharge device point. It is tightly sealed
by a red / green glass bulb which contains a silicon base liquid and an air bubble.
This glass bulb will burst at 68°C / 93°C respectively. The sprinkler heads are
spaced at a distance of approximately 4m x 3m and connected by pipe work to an
installation valve. The installation valve itself is connected to the sprinkler pump-
sets located in the pump room.

Rev.: 00 3- 6 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SYSTEM DESCRIPTION

3.2 PRE-ACTION SPRINKLER HYDRAULIC CALCULATIONS


Pre-Action Sprinkler Hydraulic Calculations are as shown:

Rev.: 00 3- 7 of 7 MY06-Project Canary


13-10-2023 Fire Protection System (Pre-Action)
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV1

Document No : PACV1-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV1-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 22:02
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00061 l/m and occurs at node 1
Maximum loop unbalanced flow is = 0.06416 l/m and occurs in Pipe Loop 15

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 21


Total water flow for Sprinklers : 1391 l/m
Average Flow : 66.2 l/m
Minimum Flow (Node: 118) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1391 l/m at 3.10 Bar

Specified available pressure at input node 1 : 4.00 Bar


Available pressure minus required pressure is : 0.897 Bar

Pressure at zero flow 0.6080 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 1658 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV1-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 22:02
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1391.0 150 155.09 ASAM 11.200 34.800 0.0012 0.0424 0.4119 0.4543 120 1.23 .0075
3SE 12.900
1GV 0.900
1CV 9.800
2 2 3 1391.0 100 105.11 ASAM 1.000 17.400 0.0081 0.1409 0.0981 0.2390 120 2.67 .0356
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1391.0 100 105.11 ASAM 71.100 80.100 0.0081 0.6488 0.0981 0.7469 120 2.67 .0356
3SE 9.000
4 4 5 1391.0 100 105.11 ASAM 82.000 88.000 0.0081 0.7128 0.0000 0.7128 120 2.67 .0356
2SE 6.000
5 5 6 919.1 100 105.11 ASAM 2.800 8.900 0.0038 0.0335 0.0000 0.0335 120 1.77 .0156
1TT 6.100
6 6 7 461.0 100 105.11 ASAM 3.000 9.100 0.0010 0.0095 0.0000 0.0095 120 0.89 .0039
1TT 6.100
101 5 101 265.1 40 42.01 ASAM 1.600 2.800 0.033 0.0916 0.0000 0.0916 120 3.19 .0507
1SE 1.200
102 101 102 190.4 32 36.09 ASAM 3.000 4.800 0.037 0.1783 0.0000 0.1783 120 3.10 .0480
1TT 1.800
103 102 103 123.9 32 36.09 ASAM 3.000 4.800 0.017 0.0805 0.0000 0.0805 120 2.02 .0203
1TT 1.800
104 103 104 61.5 32 36.09 ASAM 3.000 3.900 0.0046 0.0179 0.0000 0.0179 120 1.00 .0050
1SE 0.900
105 5 105 206.9 32 36.09 ASAM 1.600 3.400 0.043 0.1473 0.0000 0.1473 120 3.37 .0567
1TT 1.800
106 105 106 134.7 32 36.09 ASAM 3.000 4.800 0.020 0.0939 0.0000 0.0939 120 2.19 .0240
1TT 1.800
107 106 107 66.9 32 36.09 ASAM 3.000 3.900 0.0053 0.0209 0.0000 0.0209 120 1.09 .0059
1SE 0.900
108 6 108 260.2 40 42.01 ASAM 1.600 2.800 0.032 0.0886 0.0000 0.0886 120 3.13 .0489
1SE 1.200
109 108 109 186.9 32 36.09 ASAM 3.000 4.800 0.036 0.1723 0.0000 0.1723 120 3.04 .0463
1TT 1.800
110 109 110 121.6 32 36.09 ASAM 3.000 4.800 0.016 0.0778 0.0000 0.0778 120 1.98 .0196
1TT 1.800
111 110 111 60.4 32 36.09 ASAM 3.000 3.900 0.0044 0.0173 0.0000 0.0173 120 0.98 .0048
1SE 0.900
112 6 112 197.9 32 36.09 ASAM 3.000 4.800 0.040 0.1914 0.0000 0.1914 120 3.22 .0518
1TT 1.800
113 112 113 129.2 32 36.09 ASAM 3.000 3.900 0.018 0.0707 0.0000 0.0707 120 2.10 .0221
1SE 0.900
114 113 114 64.0 32 36.09 ASAM 3.000 4.800 0.0049 0.0237 0.0000 0.0237 120 1.04 .0054
1TT 1.800
115 7 115 258.9 40 42.01 ASAM 1.600 2.800 0.031 0.0877 0.0000 0.0877 120 3.11 .0483
1SE 1.200
116 115 116 185.9 32 36.09 ASAM 3.000 4.800 0.036 0.1706 0.0000 0.1706 120 3.03 .0458
1TT 1.800
117 116 117 121.0 32 36.09 ASAM 3.000 4.800 0.016 0.0770 0.0000 0.0770 120 1.97 .0194
1TT 1.800
118 117 118 60.0 32 36.09 ASAM 3.000 3.900 0.0044 0.0171 0.0000 0.0171 120 0.98 .0048
1SE 0.900
119 7 119 202.1 32 36.09 ASAM 1.600 3.400 0.041 0.1410 0.0000 0.1410 120 3.29 .0541
1TT 1.800
120 119 120 131.6 32 36.09 ASAM 3.000 4.800 0.019 0.0899 0.0000 0.0899 120 2.14 .0229
1TT 1.800
121 120 121 65.3 32 36.09 ASAM 3.000 3.900 0.0051 0.0200 0.0000 0.0200 120 1.06 .0056
1SE 0.900
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV1-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.06416 l/m and occurs in Pipe Loop 15
Maximum node unbalanced flow is = 0.00061 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV1-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 22:02
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1391.0 l/m 3.1031 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.6488 5.000
3 2.4098 6.000
4 1.6629 7.000
5 0.9501 7.000
6 0.9166 7.000
7 0.9071 7.000
101 Sprinkler 74.7 60.00 0.8584 7.000 80.60 0.50
102 Sprinkler 66.5 60.00 0.6802 7.000 80.60 0.50
103 Sprinkler 62.4 60.00 0.5997 7.000 80.60 0.50
104 Sprinkler 61.5 60.00 0.5819 7.000 80.60 0.50
105 Sprinkler 72.2 60.00 0.8027 7.000 80.60 0.50
106 Sprinkler 67.9 60.00 0.7088 7.000 80.60 0.50
107 Sprinkler 66.9 60.00 0.6879 7.000 80.60 0.50
108 Sprinkler 73.3 60.00 0.8280 7.000 80.60 0.50
109 Sprinkler 65.3 60.00 0.6557 7.000 80.60 0.50
110 Sprinkler 61.3 60.00 0.5780 7.000 80.60 0.50
111 Sprinkler 60.4 60.00 0.5607 7.000 80.60 0.50
112 Sprinkler 68.6 60.00 0.7251 7.000 80.60 0.50
113 Sprinkler 65.2 60.00 0.6545 7.000 80.60 0.50
114 Sprinkler 64.0 60.00 0.6308 7.000 80.60 0.50
115 Sprinkler 73.0 60.00 0.8194 7.000 80.60 0.50
116 Sprinkler 64.9 60.00 0.6488 7.000 80.60 0.50
117 Sprinkler 60.9 60.00 0.5718 7.000 80.60 0.50
118 Sprinkler 60.0 60.00 0.5547 7.000 80.60 0.50
119 Sprinkler 70.5 60.00 0.7660 7.000 80.60 0.50
120 Sprinkler 66.3 60.00 0.6761 7.000 80.60 0.50
121 Sprinkler 65.3 60.00 0.6561 7.000 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV2

Document No : PACV2-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV2-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:39
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00146 l/m and occurs at node 1
Maximum loop unbalanced flow is = 0.00030 l/m and occurs in Pipe Loop 8

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 21


Total water flow for Sprinklers : 1391 l/m
Average Flow : 66.2 l/m
Minimum Flow (Node: 118) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1391 l/m at 2.49 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 1.51 Bar

Pressure at zero flow 0.6080 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 1000 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV2-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:39
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1391.1 150 155.09 ASAM 11.200 34.800 0.0012 0.0424 0.4119 0.4543 120 1.23 .0075
3SE 12.900
1GV 0.900
1CV 9.800
2 2 3 1391.1 100 105.11 ASAM 1.000 17.400 0.0081 0.1410 0.0981 0.2390 120 2.67 .0356
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1391.1 100 105.11 ASAM 24.450 33.450 0.0081 0.2710 0.0981 0.3690 120 2.67 .0356
3SE 9.000
4 4 5 1391.1 100 105.11 ASAM 52.800 58.800 0.0081 0.4763 0.0000 0.4763 120 2.67 .0356
2SE 6.000
5 5 6 919.1 100 105.11 ASAM 2.800 8.900 0.0038 0.0335 0.0000 0.0335 120 1.77 .0156
1TT 6.100
6 6 7 461.0 100 105.11 ASAM 3.000 9.100 0.0010 0.0095 0.0000 0.0095 120 0.89 .0039
1TT 6.100
101 5 101 265.1 40 42.01 ASAM 1.600 2.800 0.033 0.0916 0.0000 0.0916 120 3.19 .0507
1SE 1.200
102 101 102 190.4 32 36.09 ASAM 3.000 4.800 0.037 0.1783 0.0000 0.1783 120 3.10 .0480
1TT 1.800
103 102 103 123.9 32 36.09 ASAM 3.000 4.800 0.017 0.0805 0.0000 0.0805 120 2.02 .0203
1TT 1.800
104 103 104 61.5 32 36.09 ASAM 3.000 3.900 0.0046 0.0179 0.0000 0.0179 120 1.00 .0050
1SE 0.900
105 5 105 206.9 32 36.09 ASAM 1.600 3.400 0.043 0.1473 0.0000 0.1473 120 3.37 .0567
1TT 1.800
106 105 106 134.7 32 36.09 ASAM 3.000 4.800 0.020 0.0939 0.0000 0.0939 120 2.19 .0240
1TT 1.800
107 106 107 66.9 32 36.09 ASAM 3.000 3.900 0.0053 0.0209 0.0000 0.0209 120 1.09 .0059
1SE 0.900
108 6 108 260.2 40 42.01 ASAM 1.600 2.800 0.032 0.0886 0.0000 0.0886 120 3.13 .0489
1SE 1.200
109 108 109 186.9 32 36.09 ASAM 3.000 4.800 0.036 0.1723 0.0000 0.1723 120 3.04 .0463
1TT 1.800
110 109 110 121.6 32 36.09 ASAM 3.000 4.800 0.016 0.0778 0.0000 0.0778 120 1.98 .0196
1TT 1.800
111 110 111 60.4 32 36.09 ASAM 3.000 3.900 0.0044 0.0173 0.0000 0.0173 120 0.98 .0048
1SE 0.900
112 6 112 197.9 32 36.09 ASAM 3.000 4.800 0.040 0.1915 0.0000 0.1915 120 3.22 .0518
1TT 1.800
113 112 113 129.2 32 36.09 ASAM 3.000 3.900 0.018 0.0707 0.0000 0.0707 120 2.10 .0221
1SE 0.900
114 113 114 64.0 32 36.09 ASAM 3.000 4.800 0.0049 0.0237 0.0000 0.0237 120 1.04 .0054
1TT 1.800
115 7 115 258.9 40 42.01 ASAM 1.600 2.800 0.031 0.0877 0.0000 0.0877 120 3.11 .0483
1SE 1.200
116 115 116 185.9 32 36.09 ASAM 3.000 4.800 0.036 0.1706 0.0000 0.1706 120 3.03 .0458
1TT 1.800
117 116 117 121.0 32 36.09 ASAM 3.000 4.800 0.016 0.0770 0.0000 0.0770 120 1.97 .0194
1TT 1.800
118 117 118 60.0 32 36.09 ASAM 3.000 3.900 0.0044 0.0171 0.0000 0.0171 120 0.98 .0048
1SE 0.900
119 7 119 202.1 32 36.09 ASAM 1.600 3.400 0.041 0.1411 0.0000 0.1411 120 3.29 .0541
1TT 1.800
120 119 120 131.6 32 36.09 ASAM 3.000 4.800 0.019 0.0899 0.0000 0.0899 120 2.14 .0229
1TT 1.800
121 120 121 65.3 32 36.09 ASAM 3.000 3.900 0.0051 0.0200 0.0000 0.0200 120 1.06 .0056
1SE 0.900
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV2-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.00030 l/m and occurs in Pipe Loop 8
Maximum node unbalanced flow is = 0.00146 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV2-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:39
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1391.1 l/m 2.4887 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.0345 5.000
3 1.7955 6.000
4 1.4264 7.000
5 0.9501 7.000
6 0.9166 7.000
7 0.9071 7.000
101 Sprinkler 74.7 60.00 0.8585 7.000 80.60 0.50
102 Sprinkler 66.5 60.00 0.6802 7.000 80.60 0.50
103 Sprinkler 62.4 60.00 0.5997 7.000 80.60 0.50
104 Sprinkler 61.5 60.00 0.5819 7.000 80.60 0.50
105 Sprinkler 72.2 60.00 0.8028 7.000 80.60 0.50
106 Sprinkler 67.9 60.00 0.7088 7.000 80.60 0.50
107 Sprinkler 66.9 60.00 0.6880 7.000 80.60 0.50
108 Sprinkler 73.3 60.00 0.8281 7.000 80.60 0.50
109 Sprinkler 65.3 60.00 0.6558 7.000 80.60 0.50
110 Sprinkler 61.3 60.00 0.5780 7.000 80.60 0.50
111 Sprinkler 60.4 60.00 0.5608 7.000 80.60 0.50
112 Sprinkler 68.6 60.00 0.7252 7.000 80.60 0.50
113 Sprinkler 65.2 60.00 0.6545 7.000 80.60 0.50
114 Sprinkler 64.0 60.00 0.6308 7.000 80.60 0.50
115 Sprinkler 73.0 60.00 0.8194 7.000 80.60 0.50
116 Sprinkler 64.9 60.00 0.6488 7.000 80.60 0.50
117 Sprinkler 60.9 60.00 0.5718 7.000 80.60 0.50
118 Sprinkler 60.0 60.00 0.5547 7.000 80.60 0.50
119 Sprinkler 70.5 60.00 0.7660 7.000 80.60 0.50
120 Sprinkler 66.3 60.00 0.6761 7.000 80.60 0.50
121 Sprinkler 65.3 60.00 0.6562 7.000 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV3

Document No : PACV3-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV3-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:27
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00061 l/m and occurs at node 1
Maximum loop unbalanced flow is = 0.00027 l/m and occurs in Pipe Loop 13

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 18


Total water flow for Sprinklers : 1223 l/m
Average Flow : 67.9 l/m
Minimum Flow (Node: 116) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1223 l/m at 2.55 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 1.45 Bar

Pressure at zero flow 0.6080 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 1347 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV3-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:27
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1223.0 150 155.09 ASAM 11.200 34.800 0.00096 0.0334 0.4119 0.4453 120 1.08 .0058
3SE 12.900
1GV 0.900
1CV 9.800
2 2 3 1223.0 100 105.11 ASAM 1.000 17.400 0.0064 0.1111 0.0981 0.2091 120 2.35 .0275
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1223.0 100 105.11 ASAM 47.600 56.600 0.0064 0.3612 0.1765 0.5378 120 2.35 .0275
3SE 9.000
4 4 5 1223.0 100 105.11 ASAM 71.100 77.100 0.0064 0.4921 0.0000 0.4921 120 2.35 .0275
2SE 6.000
5 5 6 810.7 100 105.11 ASAM 2.800 8.900 0.0030 0.0265 0.0000 0.0265 120 1.56 .0121
1TT 6.100
6 6 7 404.4 100 105.11 ASAM 2.800 8.900 0.00082 0.0073 0.0000 0.0073 120 0.78 .0030
1TT 6.100
101 5 101 263.7 40 42.01 ASAM 1.600 2.800 0.032 0.0908 -0.0785 0.0123 120 3.17 .0502
1SE 1.200
102 101 102 189.4 32 36.09 ASAM 3.000 4.800 0.037 0.1766 0.0000 0.1766 120 3.09 .0475
1TT 1.800
103 102 103 123.3 32 36.09 ASAM 3.000 4.800 0.017 0.0797 0.0000 0.0797 120 2.01 .0201
1TT 1.800
104 103 104 61.2 32 36.09 ASAM 3.000 3.900 0.0045 0.0177 0.0000 0.0177 120 1.00 .0050
1SE 0.900
105 5 105 148.5 32 36.09 ASAM 1.600 3.400 0.023 0.0797 -0.0785 0.0013 120 2.42 .0292
1TT 1.800
106 105 106 73.7 32 36.09 ASAM 3.000 3.900 0.0064 0.0250 0.0000 0.0250 120 1.20 .0072
1SE 0.900
107 6 107 259.9 40 42.01 ASAM 1.600 2.800 0.032 0.0884 -0.0785 0.0099 120 3.12 .0487
1SE 1.200
108 107 108 186.7 32 36.09 ASAM 3.000 4.800 0.036 0.1719 0.0000 0.1719 120 3.04 .0461
1TT 1.800
109 108 109 121.5 32 36.09 ASAM 3.000 4.800 0.016 0.0776 0.0000 0.0776 120 1.98 .0195
1TT 1.800
110 109 110 60.3 32 36.09 ASAM 3.000 3.900 0.0044 0.0172 0.0000 0.0172 120 0.98 .0048
1SE 0.900
111 6 111 146.4 32 36.09 ASAM 1.600 3.400 0.023 0.0776 -0.0785 -0.0008 120 2.38 .0284
1TT 1.800
112 111 112 72.7 32 36.09 ASAM 3.000 3.900 0.0062 0.0243 0.0000 0.0243 120 1.18 .0070
1SE 0.900
113 7 113 258.9 40 42.01 ASAM 1.600 2.800 0.031 0.0877 -0.0785 0.0092 120 3.11 .0483
1SE 1.200
114 113 114 185.9 32 36.09 ASAM 3.000 4.800 0.036 0.1706 0.0000 0.1706 120 3.03 .0458
1TT 1.800
115 114 115 121.0 32 36.09 ASAM 3.000 4.800 0.016 0.0770 0.0000 0.0770 120 1.97 .0194
1TT 1.800
116 115 116 60.0 32 36.09 ASAM 3.000 3.900 0.0044 0.0171 0.0000 0.0171 120 0.98 .0048
1SE 0.900
117 7 117 145.6 32 36.09 ASAM 1.600 3.400 0.023 0.0768 -0.0785 -0.0016 120 2.37 .0281
1TT 1.800
118 117 118 72.1 32 36.09 ASAM 3.000 4.800 0.0062 0.0295 0.0000 0.0295 120 1.17 .0069
1TT 1.800
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV3-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.00027 l/m and occurs in Pipe Loop 13
Maximum node unbalanced flow is = 0.00061 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV3-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:27
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1223.0 l/m 2.5467 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.1014 5.000
3 1.8923 6.000
4 1.3546 7.800
5 0.8625 7.800
6 0.8360 7.800
7 0.8286 7.800
101 Sprinkler 74.3 60.00 0.8502 7.000 80.60 0.50
102 Sprinkler 66.1 60.00 0.6735 7.000 80.60 0.50
103 Sprinkler 62.1 60.00 0.5938 7.000 80.60 0.50
104 Sprinkler 61.2 60.00 0.5761 7.000 80.60 0.50
105 Sprinkler 74.8 60.00 0.8612 7.000 80.60 0.50
106 Sprinkler 73.7 60.00 0.8362 7.000 80.60 0.50
107 Sprinkler 73.3 60.00 0.8260 7.000 80.60 0.50
108 Sprinkler 65.2 60.00 0.6542 7.000 80.60 0.50
109 Sprinkler 61.2 60.00 0.5766 7.000 80.60 0.50
110 Sprinkler 60.3 60.00 0.5594 7.000 80.60 0.50
111 Sprinkler 73.7 60.00 0.8368 7.000 80.60 0.50
112 Sprinkler 72.7 60.00 0.8125 7.000 80.60 0.50
113 Sprinkler 73.0 60.00 0.8194 7.000 80.60 0.50
114 Sprinkler 64.9 60.00 0.6488 7.000 80.60 0.50
115 Sprinkler 60.9 60.00 0.5718 7.000 80.60 0.50
116 Sprinkler 60.0 60.00 0.5547 7.000 80.60 0.50
117 Sprinkler 73.4 60.00 0.8303 7.000 80.60 0.50
118 Sprinkler 72.1 60.00 0.8007 7.000 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV3

Document No : PACV3-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV3-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:27
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00061 l/m and occurs at node 1
Maximum loop unbalanced flow is = 0.00027 l/m and occurs in Pipe Loop 13

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 18


Total water flow for Sprinklers : 1223 l/m
Average Flow : 67.9 l/m
Minimum Flow (Node: 116) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1223 l/m at 2.55 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 1.45 Bar

Pressure at zero flow 0.6080 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 1347 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV3-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:27
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1223.0 150 155.09 ASAM 11.200 34.800 0.00096 0.0334 0.4119 0.4453 120 1.08 .0058
3SE 12.900
1GV 0.900
1CV 9.800
2 2 3 1223.0 100 105.11 ASAM 1.000 17.400 0.0064 0.1111 0.0981 0.2091 120 2.35 .0275
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1223.0 100 105.11 ASAM 47.600 56.600 0.0064 0.3612 0.1765 0.5378 120 2.35 .0275
3SE 9.000
4 4 5 1223.0 100 105.11 ASAM 71.100 77.100 0.0064 0.4921 0.0000 0.4921 120 2.35 .0275
2SE 6.000
5 5 6 810.7 100 105.11 ASAM 2.800 8.900 0.0030 0.0265 0.0000 0.0265 120 1.56 .0121
1TT 6.100
6 6 7 404.4 100 105.11 ASAM 2.800 8.900 0.00082 0.0073 0.0000 0.0073 120 0.78 .0030
1TT 6.100
101 5 101 263.7 40 42.01 ASAM 1.600 2.800 0.032 0.0908 -0.0785 0.0123 120 3.17 .0502
1SE 1.200
102 101 102 189.4 32 36.09 ASAM 3.000 4.800 0.037 0.1766 0.0000 0.1766 120 3.09 .0475
1TT 1.800
103 102 103 123.3 32 36.09 ASAM 3.000 4.800 0.017 0.0797 0.0000 0.0797 120 2.01 .0201
1TT 1.800
104 103 104 61.2 32 36.09 ASAM 3.000 3.900 0.0045 0.0177 0.0000 0.0177 120 1.00 .0050
1SE 0.900
105 5 105 148.5 32 36.09 ASAM 1.600 3.400 0.023 0.0797 -0.0785 0.0013 120 2.42 .0292
1TT 1.800
106 105 106 73.7 32 36.09 ASAM 3.000 3.900 0.0064 0.0250 0.0000 0.0250 120 1.20 .0072
1SE 0.900
107 6 107 259.9 40 42.01 ASAM 1.600 2.800 0.032 0.0884 -0.0785 0.0099 120 3.12 .0487
1SE 1.200
108 107 108 186.7 32 36.09 ASAM 3.000 4.800 0.036 0.1719 0.0000 0.1719 120 3.04 .0461
1TT 1.800
109 108 109 121.5 32 36.09 ASAM 3.000 4.800 0.016 0.0776 0.0000 0.0776 120 1.98 .0195
1TT 1.800
110 109 110 60.3 32 36.09 ASAM 3.000 3.900 0.0044 0.0172 0.0000 0.0172 120 0.98 .0048
1SE 0.900
111 6 111 146.4 32 36.09 ASAM 1.600 3.400 0.023 0.0776 -0.0785 -0.0008 120 2.38 .0284
1TT 1.800
112 111 112 72.7 32 36.09 ASAM 3.000 3.900 0.0062 0.0243 0.0000 0.0243 120 1.18 .0070
1SE 0.900
113 7 113 258.9 40 42.01 ASAM 1.600 2.800 0.031 0.0877 -0.0785 0.0092 120 3.11 .0483
1SE 1.200
114 113 114 185.9 32 36.09 ASAM 3.000 4.800 0.036 0.1706 0.0000 0.1706 120 3.03 .0458
1TT 1.800
115 114 115 121.0 32 36.09 ASAM 3.000 4.800 0.016 0.0770 0.0000 0.0770 120 1.97 .0194
1TT 1.800
116 115 116 60.0 32 36.09 ASAM 3.000 3.900 0.0044 0.0171 0.0000 0.0171 120 0.98 .0048
1SE 0.900
117 7 117 145.6 32 36.09 ASAM 1.600 3.400 0.023 0.0768 -0.0785 -0.0016 120 2.37 .0281
1TT 1.800
118 117 118 72.1 32 36.09 ASAM 3.000 4.800 0.0062 0.0295 0.0000 0.0295 120 1.17 .0069
1TT 1.800
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV3-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.00027 l/m and occurs in Pipe Loop 13
Maximum node unbalanced flow is = 0.00061 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV3-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 21:27
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1223.0 l/m 2.5467 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.1014 5.000
3 1.8923 6.000
4 1.3546 7.800
5 0.8625 7.800
6 0.8360 7.800
7 0.8286 7.800
101 Sprinkler 74.3 60.00 0.8502 7.000 80.60 0.50
102 Sprinkler 66.1 60.00 0.6735 7.000 80.60 0.50
103 Sprinkler 62.1 60.00 0.5938 7.000 80.60 0.50
104 Sprinkler 61.2 60.00 0.5761 7.000 80.60 0.50
105 Sprinkler 74.8 60.00 0.8612 7.000 80.60 0.50
106 Sprinkler 73.7 60.00 0.8362 7.000 80.60 0.50
107 Sprinkler 73.3 60.00 0.8260 7.000 80.60 0.50
108 Sprinkler 65.2 60.00 0.6542 7.000 80.60 0.50
109 Sprinkler 61.2 60.00 0.5766 7.000 80.60 0.50
110 Sprinkler 60.3 60.00 0.5594 7.000 80.60 0.50
111 Sprinkler 73.7 60.00 0.8368 7.000 80.60 0.50
112 Sprinkler 72.7 60.00 0.8125 7.000 80.60 0.50
113 Sprinkler 73.0 60.00 0.8194 7.000 80.60 0.50
114 Sprinkler 64.9 60.00 0.6488 7.000 80.60 0.50
115 Sprinkler 60.9 60.00 0.5718 7.000 80.60 0.50
116 Sprinkler 60.0 60.00 0.5547 7.000 80.60 0.50
117 Sprinkler 73.4 60.00 0.8303 7.000 80.60 0.50
118 Sprinkler 72.1 60.00 0.8007 7.000 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV5

Document No : PACV5-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV5-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 18:10
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00040 l/m and occurs at node 5
Maximum loop unbalanced flow is = 0.04433 l/m and occurs in Pipe Loop 18

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 21


Total water flow for Sprinklers : 1414 l/m
Average Flow : 67.3 l/m
Minimum Flow (Node: 121) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1414 l/m at 3.30 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 0.702 Bar

Pressure at zero flow 0.8826 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 2741 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV5-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 18:10
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1414.0 150 155.09 ASAM 86.500 131.60 0.0013 0.1652 0.6865 0.8517 120 1.25 .0078
8SE 34.400
1GV 0.900
1CV 9.800
2 2 3 1414.0 100 105.11 ASAM 1.000 17.400 0.0084 0.1453 0.0981 0.2434 120 2.72 .0368
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1414.0 100 105.11 ASAM 36.000 45.000 0.0084 0.3758 0.0981 0.4738 120 2.72 .0368
3SE 9.000
4 4 5 1414.0 100 105.11 ASAM 78.000 84.000 0.0084 0.7014 0.0000 0.7014 120 2.72 .0368
2SE 6.000
5 5 6 936.4 100 105.11 ASAM 2.800 8.900 0.0039 0.0346 0.0000 0.0346 120 1.80 .0161
1TT 6.100
6 6 7 467.0 100 105.11 ASAM 2.800 8.900 0.0011 0.0096 0.0000 0.0096 120 0.90 .0040
1TT 6.100
101 5 101 212.9 32 36.09 ASAM 3.000 3.900 0.046 0.1781 0.0000 0.1781 120 3.47 .0600
1SE 0.900
102 101 102 138.6 32 36.09 ASAM 3.000 4.800 0.021 0.0990 0.0000 0.0990 120 2.26 .0254
1TT 1.800
103 102 103 68.8 32 36.09 ASAM 3.000 3.900 0.0056 0.0220 0.0000 0.0220 120 1.12 .0063
1SE 0.900
104 5 104 264.8 32 36.09 ASAM 1.600 2.500 0.068 0.1710 0.0000 0.1710 120 4.31 .0928
1SE 0.900
105 104 105 190.2 32 36.09 ASAM 3.000 4.800 0.037 0.1779 0.0000 0.1779 120 3.10 .0479
1TT 1.800
106 105 106 123.8 32 36.09 ASAM 3.000 4.800 0.017 0.0803 0.0000 0.0803 120 2.02 .0203
1TT 1.800
107 106 107 61.4 32 36.09 ASAM 3.000 3.900 0.0046 0.0178 0.0000 0.0178 120 1.00 .0050
1SE 0.900
108 6 108 209.2 32 36.09 ASAM 3.000 3.900 0.044 0.1725 0.0000 0.1725 120 3.41 .0580
1SE 0.900
109 108 109 136.2 32 36.09 ASAM 3.000 4.800 0.020 0.0959 0.0000 0.0959 120 2.22 .0246
1TT 1.800
110 109 110 67.6 32 36.09 ASAM 3.000 3.900 0.0055 0.0213 0.0000 0.0213 120 1.10 .0061
1SE 0.900
111 6 111 260.1 32 36.09 ASAM 1.600 2.500 0.066 0.1655 0.0000 0.1655 120 4.24 .0896
1SE 0.900
112 111 112 186.8 32 36.09 ASAM 3.000 4.800 0.036 0.1722 0.0000 0.1722 120 3.04 .0462
1TT 1.800
113 112 113 121.6 32 36.09 ASAM 3.000 4.800 0.016 0.0777 0.0000 0.0777 120 1.98 .0196
1TT 1.800
114 113 114 60.3 32 36.09 ASAM 3.000 3.900 0.0044 0.0172 0.0000 0.0172 120 0.98 .0048
1SE 0.900
115 7 115 208.2 32 36.09 ASAM 3.000 3.900 0.044 0.1709 0.0000 0.1709 120 3.39 .0574
1SE 0.900
116 115 116 135.5 32 36.09 ASAM 3.000 4.800 0.020 0.0950 0.0000 0.0950 120 2.21 .0243
1TT 1.800
117 116 117 67.3 32 36.09 ASAM 3.000 3.900 0.0054 0.0211 0.0000 0.0211 120 1.10 .0060
1SE 0.900
118 7 118 258.9 32 36.09 ASAM 1.600 2.500 0.066 0.1640 0.0000 0.1640 120 4.22 .0887
1SE 0.900
119 118 119 185.9 32 36.09 ASAM 3.000 4.800 0.036 0.1706 0.0000 0.1706 120 3.03 .0458
1TT 1.800
120 119 120 121.0 32 36.09 ASAM 3.000 4.800 0.016 0.0770 0.0000 0.0770 120 1.97 .0194
1TT 1.800
121 120 121 60.0 32 36.09 ASAM 3.000 3.900 0.0044 0.0171 0.0000 0.0171 120 0.98 .0048
1SE 0.900
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV5-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.04433 l/m and occurs in Pipe Loop 18
Maximum node unbalanced flow is = 0.00040 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV5-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 18:10
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1414.0 l/m 3.2979 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.4462 7.800
3 2.2028 8.800
4 1.7290 9.800
5 1.0276 9.800
6 0.9929 9.800
7 0.9834 9.800
101 Sprinkler 74.3 60.00 0.8494 9.800 80.60 0.50
102 Sprinkler 69.8 60.00 0.7504 9.800 80.60 0.50
103 Sprinkler 68.8 60.00 0.7284 9.800 80.60 0.50
104 Sprinkler 74.6 60.00 0.8566 9.800 80.60 0.50
105 Sprinkler 66.4 60.00 0.6787 9.800 80.60 0.50
106 Sprinkler 62.3 60.00 0.5984 9.800 80.60 0.50
107 Sprinkler 61.4 60.00 0.5806 9.800 80.60 0.50
108 Sprinkler 73.0 60.00 0.8204 9.800 80.60 0.50
109 Sprinkler 68.6 60.00 0.7246 9.800 80.60 0.50
110 Sprinkler 67.6 60.00 0.7033 9.800 80.60 0.50
111 Sprinkler 73.3 60.00 0.8274 9.800 80.60 0.50
112 Sprinkler 65.2 60.00 0.6552 9.800 80.60 0.50
113 Sprinkler 61.3 60.00 0.5775 9.800 80.60 0.50
114 Sprinkler 60.3 60.00 0.5603 9.800 80.60 0.50
115 Sprinkler 72.7 60.00 0.8125 9.800 80.60 0.50
116 Sprinkler 68.3 60.00 0.7175 9.800 80.60 0.50
117 Sprinkler 67.3 60.00 0.6964 9.800 80.60 0.50
118 Sprinkler 73.0 60.00 0.8194 9.800 80.60 0.50
119 Sprinkler 64.9 60.00 0.6488 9.800 80.60 0.50
120 Sprinkler 60.9 60.00 0.5718 9.800 80.60 0.50
121 Sprinkler 60.0 60.00 0.5547 9.800 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV6

Document No : PACV6-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV6-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:58
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00012 l/m and occurs at node 1
Maximum loop unbalanced flow is = 0.00066 l/m and occurs in Pipe Loop 20

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 20


Total water flow for Sprinklers : 1371 l/m
Average Flow : 68.6 l/m
Minimum Flow (Node: 120) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1371 l/m at 3.75 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 0.246 Bar

Pressure at zero flow 1.2749 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 1562 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV6-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:58
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1371.3 150 155.09 ASAM 20.900 61.700 0.0012 0.0732 0.6865 0.7596 120 1.21 .0073
7SE 30.100
1GV 0.900
1CV 9.800
2 2 3 1371.3 100 105.11 ASAM 1.000 17.400 0.0079 0.1373 0.0981 0.2353 120 2.63 .0346
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1371.3 100 105.11 ASAM 3.000 3.000 0.0079 0.0237 0.2942 0.3179 120 2.63 .0346
4 4 5 1371.3 100 105.11 ASAM 96.000 114.10 0.0079 0.9001 0.1961 1.0962 120 2.63 .0346
4SE 12.000
1TT 6.100
5 5 6 1371.3 100 105.11 ASAM 2.000 5.000 0.0079 0.0394 0.0000 0.0394 120 2.63 .0346
1SE 3.000
6 6 7 1193.3 100 105.11 ASAM 4.000 10.100 0.0061 0.0616 0.0000 0.0616 120 2.29 .0262
1TT 6.100
7 7 8 791.9 100 105.11 ASAM 4.000 10.100 0.0029 0.0288 0.0000 0.0288 120 1.52 .0115
1TT 6.100
8 8 9 395.4 100 105.11 ASAM 3.000 9.100 0.00079 0.0072 0.0000 0.0072 120 0.76 .0029
1TT 6.100
9 6 10 177.9 50 53.11 ASAM 3.800 5.300 0.0050 0.0265 0.0000 0.0265 120 1.34 .0089
1SE 1.500
10 7 11 401.4 50 53.11 ASAM 3.800 5.300 0.023 0.1194 0.0000 0.1194 120 3.02 .0455
1SE 1.500
11 8 12 396.6 50 53.11 ASAM 3.800 5.300 0.022 0.1167 0.0000 0.1167 120 2.98 .0444
1SE 1.500
12 9 13 395.4 50 53.11 ASAM 3.800 5.300 0.022 0.1161 0.0000 0.1161 120 2.97 .0442
1SE 1.500
101 10 101 177.9 50 53.11 ASAM 8.400 11.400 0.0050 0.0569 0.0000 0.0569 120 1.34 .0089
1TT 3.000
102 101 102 88.8 50 53.11 ASAM 2.800 5.800 0.0014 0.0080 0.0000 0.0080 120 0.67 .0022
1TT 3.000
103 11 103 401.4 50 53.11 ASAM 8.400 11.400 0.023 0.2568 0.0000 0.2568 120 3.02 .0455
1TT 3.000
104 103 104 326.3 50 53.11 ASAM 2.800 5.800 0.015 0.0890 0.0000 0.0890 120 2.45 .0301
1TT 3.000
105 104 105 255.2 50 53.11 ASAM 2.800 5.800 0.0097 0.0565 0.0000 0.0565 120 1.92 .0184
1TT 3.000
106 105 106 186.7 40 42.01 ASAM 2.800 5.200 0.017 0.0889 0.0000 0.0889 120 2.24 .0251
1TT 2.400
107 106 107 122.5 40 42.01 ASAM 2.800 6.400 0.0078 0.0502 0.0000 0.0502 120 1.47 .0108
1SE 1.200
1TT 2.400
108 107 108 61.0 40 42.01 ASAM 2.800 5.200 0.0022 0.0112 0.0000 0.0112 120 0.73 .0027
1TT 2.400
109 12 109 396.6 50 53.11 ASAM 8.400 11.400 0.022 0.2511 0.0000 0.2511 120 2.98 .0444
1TT 3.000
110 109 110 322.4 50 53.11 ASAM 2.800 5.800 0.015 0.0871 0.0000 0.0871 120 2.42 .0294
1TT 3.000
111 110 111 252.1 50 53.11 ASAM 2.800 5.800 0.0095 0.0552 0.0000 0.0552 120 1.90 .0180
1TT 3.000
112 111 112 184.4 40 42.01 ASAM 2.800 5.200 0.017 0.0869 0.0000 0.0869 120 2.22 .0245
1TT 2.400
113 112 113 121.0 40 42.01 ASAM 2.800 6.400 0.0077 0.0490 0.0000 0.0490 120 1.46 .0106
1SE 1.200
1TT 2.400
114 113 114 60.2 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV6-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
115 13 115 395.4 50 53.11 ASAM 8.400 11.400 0.022 0.2497 0.0000 0.2497 120 2.97 .0442
1TT 3.000
116 115 116 321.4 50 53.11 ASAM 2.800 5.800 0.015 0.0866 0.0000 0.0866 120 2.42 .0292
1TT 3.000
117 116 117 251.3 50 53.11 ASAM 2.800 5.800 0.0095 0.0549 0.0000 0.0549 120 1.89 .0178
1TT 3.000
118 117 118 183.8 40 42.01 ASAM 2.800 5.200 0.017 0.0864 0.0000 0.0864 120 2.21 .0244
1TT 2.400
119 118 119 120.7 40 42.01 ASAM 2.800 6.400 0.0076 0.0488 0.0000 0.0488 120 1.45 .0105
1SE 1.200
1TT 2.400
120 119 120 60.0 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.00066 l/m and occurs in Pipe Loop 20
Maximum node unbalanced flow is = 0.00012 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV6-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:58
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1371.3 l/m 3.7542 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.9945 7.800
3 2.7592 8.800
4 2.4413 11.800
5 1.3451 13.800
6 1.3057 13.800
7 1.2441 13.800
8 1.2153 13.800
9 1.2081 13.800
10 1.2792 13.800
11 1.1247 13.800
12 1.0985 13.800
13 1.0920 13.800
101 Sprinkler 89.1 60.00 1.2223 13.800 80.60 0.50
102 Sprinkler 88.8 60.00 1.2143 13.800 80.60 0.50
103 Sprinkler 75.1 60.00 0.8679 13.800 80.60 0.50
104 Sprinkler 71.1 60.00 0.7789 13.800 80.60 0.50
105 Sprinkler 68.5 60.00 0.7224 13.800 80.60 0.50
106 Sprinkler 64.2 60.00 0.6335 13.800 80.60 0.50
107 Sprinkler 61.6 60.00 0.5833 13.800 80.60 0.50
108 Sprinkler 61.0 60.00 0.5721 13.800 80.60 0.50
109 Sprinkler 74.2 60.00 0.8474 13.800 80.60 0.50
110 Sprinkler 70.3 60.00 0.7604 13.800 80.60 0.50
111 Sprinkler 67.7 60.00 0.7052 13.800 80.60 0.50
112 Sprinkler 63.4 60.00 0.6182 13.800 80.60 0.50
113 Sprinkler 60.8 60.00 0.5692 13.800 80.60 0.50
114 Sprinkler 60.2 60.00 0.5583 13.800 80.60 0.50
115 Sprinkler 74.0 60.00 0.8423 13.800 80.60 0.50
116 Sprinkler 70.1 60.00 0.7558 13.800 80.60 0.50
117 Sprinkler 67.5 60.00 0.7009 13.800 80.60 0.50
118 Sprinkler 63.2 60.00 0.6145 13.800 80.60 0.50
119 Sprinkler 60.6 60.00 0.5657 13.800 80.60 0.50
120 Sprinkler 60.0 60.00 0.5548 13.800 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV7

Document No : PACV7-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV7-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:07
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00041 l/m and occurs at node 6
Maximum loop unbalanced flow is = 0.00042 l/m and occurs in Pipe Loop 19

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 20


Total water flow for Sprinklers : 1399 l/m
Average Flow : 70.0 l/m
Minimum Flow (Node: 120) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1399 l/m at 3.82 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 0.184 Bar

Pressure at zero flow 1.2749 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 1563 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV7-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:07
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1399.1 150 155.09 ASAM 23.200 64.000 0.0012 0.0788 0.6865 0.7653 120 1.23 .0076
7SE 30.100
1GV 0.900
1CV 9.800
2 2 3 1399.1 100 105.11 ASAM 1.000 17.400 0.0082 0.1425 0.0981 0.2405 120 2.69 .0361
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1399.1 100 105.11 ASAM 3.000 3.000 0.0082 0.0246 0.2942 0.3188 120 2.69 .0361
4 4 5 1399.1 100 105.11 ASAM 98.000 116.10 0.0082 0.9506 0.1961 1.1467 120 2.69 .0361
4SE 12.000
1TT 6.100
5 5 6 1399.1 100 105.11 ASAM 2.000 5.000 0.0082 0.0409 0.0000 0.0409 120 2.69 .0361
1SE 3.000
6 6 7 1219.5 100 105.11 ASAM 4.000 10.100 0.0063 0.0641 0.0000 0.0641 120 2.34 .0274
1TT 6.100
7 7 8 809.7 100 105.11 ASAM 2.400 8.500 0.0030 0.0253 0.0000 0.0253 120 1.56 .0121
1TT 6.100
8 8 9 404.1 100 105.11 ASAM 3.800 9.900 0.00082 0.0081 0.0000 0.0081 120 0.78 .0030
1TT 6.100
9 6 10 179.6 50 53.11 ASAM 4.200 5.700 0.0051 0.0290 0.0000 0.0290 120 1.35 .0091
1SE 1.500
10 7 11 409.9 50 53.11 ASAM 4.200 5.700 0.023 0.1335 0.0000 0.1335 120 3.08 .0474
1SE 1.500
11 8 12 405.5 50 53.11 ASAM 4.200 5.700 0.023 0.1309 0.0000 0.1309 120 3.05 .0465
1SE 1.500
12 9 13 404.1 50 53.11 ASAM 4.200 5.700 0.023 0.1300 0.0000 0.1300 120 3.04 .0461
1SE 1.500
101 10 101 179.6 50 53.11 ASAM 2.800 5.800 0.0051 0.0295 0.0000 0.0295 120 1.35 .0091
1TT 3.000
102 101 102 89.6 50 53.11 ASAM 2.800 5.800 0.0014 0.0081 0.0000 0.0081 120 0.67 .0023
1TT 3.000
103 11 103 409.9 50 53.11 ASAM 2.800 5.800 0.023 0.1358 0.0000 0.1358 120 3.08 .0474
1TT 3.000
104 103 104 330.5 50 53.11 ASAM 2.800 5.800 0.016 0.0911 0.0000 0.0911 120 2.49 .0308
1TT 3.000
105 104 105 254.9 40 42.01 ASAM 2.800 5.200 0.030 0.1583 0.0000 0.1583 120 3.06 .0469
1TT 2.400
106 105 106 186.5 40 42.01 ASAM 2.800 5.200 0.017 0.0887 0.0000 0.0887 120 2.24 .0251
1TT 2.400
107 106 107 122.4 40 42.01 ASAM 2.800 6.400 0.0078 0.0501 0.0000 0.0501 120 1.47 .0108
1SE 1.200
1TT 2.400
108 107 108 60.9 40 42.01 ASAM 2.800 5.200 0.0021 0.0112 0.0000 0.0112 120 0.73 .0027
1TT 2.400
109 12 109 405.5 50 53.11 ASAM 2.800 5.800 0.023 0.1332 0.0000 0.1332 120 3.05 .0465
1TT 3.000
110 109 110 327.0 50 53.11 ASAM 2.800 5.800 0.015 0.0894 0.0000 0.0894 120 2.46 .0302
1TT 3.000
111 110 111 252.2 40 42.01 ASAM 2.800 5.200 0.030 0.1552 0.0000 0.1552 120 3.03 .0459
1TT 2.400
112 111 112 184.5 40 42.01 ASAM 2.800 5.200 0.017 0.0870 0.0000 0.0870 120 2.22 .0246
1TT 2.400
113 112 113 121.1 40 42.01 ASAM 2.800 6.400 0.0077 0.0491 0.0000 0.0491 120 1.46 .0106
1SE 1.200
1TT 2.400
114 113 114 60.2 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV7-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
115 13 115 404.1 50 53.11 ASAM 2.800 5.800 0.023 0.1323 0.0000 0.1323 120 3.04 .0461
1TT 3.000
116 115 116 325.8 50 53.11 ASAM 2.800 5.800 0.015 0.0888 0.0000 0.0888 120 2.45 .0300
1TT 3.000
117 116 117 251.3 40 42.01 ASAM 2.800 5.200 0.030 0.1542 0.0000 0.1542 120 3.02 .0456
1TT 2.400
118 117 118 183.8 40 42.01 ASAM 2.800 5.200 0.017 0.0864 0.0000 0.0864 120 2.21 .0244
1TT 2.400
119 118 119 120.7 40 42.01 ASAM 2.800 6.400 0.0076 0.0488 0.0000 0.0488 120 1.45 .0105
1SE 1.200
1TT 2.400
120 119 120 60.0 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.00042 l/m and occurs in Pipe Loop 19
Maximum node unbalanced flow is = 0.00041 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV7-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:07
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1399.1 l/m 3.8158 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 3.0506 7.800
3 2.8101 8.800
4 2.4913 11.800
5 1.3446 13.800
6 1.3036 13.800
7 1.2395 13.800
8 1.2142 13.800
9 1.2061 13.800
10 1.2747 13.800
11 1.1060 13.800
12 1.0834 13.800
13 1.0761 13.800
101 Sprinkler 89.9 60.00 1.2452 13.800 80.60 0.50
102 Sprinkler 89.6 60.00 1.2371 13.800 80.60 0.50
103 Sprinkler 79.4 60.00 0.9702 13.800 80.60 0.50
104 Sprinkler 75.6 60.00 0.8791 13.800 80.60 0.50
105 Sprinkler 68.4 60.00 0.7208 13.800 80.60 0.50
106 Sprinkler 64.1 60.00 0.6321 13.800 80.60 0.50
107 Sprinkler 61.5 60.00 0.5820 13.800 80.60 0.50
108 Sprinkler 60.9 60.00 0.5709 13.800 80.60 0.50
109 Sprinkler 78.6 60.00 0.9502 13.800 80.60 0.50
110 Sprinkler 74.8 60.00 0.8608 13.800 80.60 0.50
111 Sprinkler 67.7 60.00 0.7057 13.800 80.60 0.50
112 Sprinkler 63.4 60.00 0.6187 13.800 80.60 0.50
113 Sprinkler 60.8 60.00 0.5696 13.800 80.60 0.50
114 Sprinkler 60.2 60.00 0.5587 13.800 80.60 0.50
115 Sprinkler 78.3 60.00 0.9438 13.800 80.60 0.50
116 Sprinkler 74.5 60.00 0.8550 13.800 80.60 0.50
117 Sprinkler 67.5 60.00 0.7008 13.800 80.60 0.50
118 Sprinkler 63.2 60.00 0.6144 13.800 80.60 0.50
119 Sprinkler 60.6 60.00 0.5656 13.800 80.60 0.50
120 Sprinkler 60.0 60.00 0.5548 13.800 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV8

Document No : PACV8-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV8-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:19
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00037 l/m and occurs at node 1
Maximum loop unbalanced flow is = 0.00027 l/m and occurs in Pipe Loop 19

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 20


Total water flow for Sprinklers : 1331 l/m
Average Flow : 66.6 l/m
Minimum Flow (Node: 120) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1331 l/m at 3.84 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 0.155 Bar

Pressure at zero flow 1.2749 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 3247 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELIE/01_MY06-PHASE 3/CA


.. LCULATIONS 10.05.23-PH3-01_REV 0.DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS 10.05.23-PH3-01_REV 0.OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV8-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:19
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1331.5 150 155.09 ASAM 92.900 142.30 0.0011 0.1598 0.6865 0.8463 120 1.17 .0069
9SE 38.700
1GV 0.900
1CV 9.800
2 2 3 1331.5 100 105.11 ASAM 1.000 17.400 0.0075 0.1300 0.0981 0.2280 120 2.56 .0326
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1331.5 100 105.11 ASAM 3.000 3.000 0.0075 0.0224 0.2942 0.3166 120 2.56 .0326
4 4 5 1331.5 100 105.11 ASAM 83.000 101.10 0.0075 0.7552 0.1961 0.9513 120 2.56 .0326
4SE 12.000
1TT 6.100
5 5 6 1331.5 100 105.11 ASAM 47.500 53.600 0.0075 0.4004 0.0000 0.4004 120 2.56 .0326
1TT 6.100
6 6 7 1331.5 100 105.11 ASAM 2.000 5.000 0.0075 0.0373 0.0000 0.0373 120 2.56 .0326
1SE 3.000
7 7 8 1170.1 100 105.11 ASAM 4.000 10.100 0.0059 0.0594 0.0000 0.0594 120 2.25 .0252
1TT 6.100
8 8 9 775.9 100 105.11 ASAM 4.000 10.100 0.0027 0.0278 0.0000 0.0278 120 1.49 .0111
1TT 6.100
9 9 10 387.3 100 105.11 ASAM 2.700 8.800 0.00076 0.0067 0.0000 0.0067 120 0.74 .0028
1TT 6.100
10 7 11 161.3 50 53.11 ASAM 4.200 5.700 0.0042 0.0237 0.0000 0.0237 120 1.21 .0074
1SE 1.500
11 8 12 394.2 100 105.11 ASAM 2.700 8.800 0.00078 0.0069 0.0000 0.0069 120 0.76 .0029
1TT 6.100
12 9 13 388.6 100 105.11 ASAM 2.700 8.800 0.00076 0.0067 0.0000 0.0067 120 0.75 .0028
1TT 6.100
13 10 14 387.3 100 105.11 ASAM 2.700 8.800 0.00076 0.0067 0.0000 0.0067 120 0.74 .0028
1TT 6.100
101 11 101 161.3 50 53.11 ASAM 5.600 8.600 0.0042 0.0358 0.0000 0.0358 120 1.21 .0074
1TT 3.000
102 101 102 80.5 50 53.11 ASAM 2.800 5.800 0.0012 0.0067 0.0000 0.0067 120 0.61 .0018
1TT 3.000
103 12 103 394.2 50 53.11 ASAM 5.600 8.600 0.022 0.1874 0.0000 0.1874 120 2.97 .0439
1TT 3.000
104 103 104 321.7 50 53.11 ASAM 2.800 5.800 0.015 0.0867 0.0000 0.0867 120 2.42 .0292
1TT 3.000
105 104 105 253.1 50 53.11 ASAM 2.800 5.800 0.0096 0.0556 0.0000 0.0556 120 1.90 .0181
1TT 3.000
106 105 106 187.2 50 53.11 ASAM 2.800 5.800 0.0055 0.0318 0.0000 0.0318 120 1.41 .0099
1TT 3.000
107 106 107 122.8 40 42.01 ASAM 2.800 6.400 0.0079 0.0504 0.0000 0.0504 120 1.48 .0109
1SE 1.200
1TT 2.400
108 107 108 61.1 40 42.01 ASAM 2.800 5.200 0.0022 0.0112 0.0000 0.0112 120 0.73 .0027
1TT 2.400
109 13 109 388.6 50 53.11 ASAM 5.600 8.600 0.021 0.1825 0.0000 0.1825 120 2.92 .0427
1TT 3.000
110 109 110 317.1 50 53.11 ASAM 2.800 5.800 0.015 0.0844 0.0000 0.0844 120 2.39 .0284
1TT 3.000
111 110 111 249.4 50 53.11 ASAM 2.800 5.800 0.0093 0.0541 0.0000 0.0541 120 1.88 .0176
1TT 3.000
112 111 112 184.5 50 53.11 ASAM 2.800 5.800 0.0053 0.0310 0.0000 0.0310 120 1.39 .0096
1TT 3.000
113 112 113 121.1 40 42.01 ASAM 2.800 6.400 0.0077 0.0491 0.0000 0.0491 120 1.46 .0106
1SE 1.200
1TT 2.400
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV8-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
114 113 114 60.2 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
115 14 115 387.3 50 53.11 ASAM 5.600 8.600 0.021 0.1813 0.0000 0.1813 120 2.91 .0424
1TT 3.000
116 115 116 315.9 50 53.11 ASAM 2.800 5.800 0.014 0.0839 0.0000 0.0839 120 2.38 .0282
1TT 3.000
117 116 117 248.6 50 53.11 ASAM 2.800 5.800 0.0093 0.0538 0.0000 0.0538 120 1.87 .0175
1TT 3.000
118 117 118 183.8 50 53.11 ASAM 2.800 5.800 0.0053 0.0308 0.0000 0.0308 120 1.38 .0095
1TT 3.000
119 118 119 120.7 40 42.01 ASAM 2.800 6.400 0.0076 0.0488 0.0000 0.0488 120 1.45 .0105
1SE 1.200
1TT 2.400
120 119 120 60.0 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.00027 l/m and occurs in Pipe Loop 19
Maximum node unbalanced flow is = 0.00037 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV8-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :10 MAY 2023
Client : Johor Corporation (JCORP) TIME : 15:19
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1331.5 l/m 3.8446 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.9983 7.800
3 2.7703 8.800
4 2.4537 11.800
5 1.5023 13.800
6 1.1020 13.800
7 1.0646 13.800
8 1.0052 13.800
9 0.9775 13.800
10 0.9708 13.800
11 1.0409 13.800
12 0.9983 13.800
13 0.9707 13.800
14 0.9641 13.800
101 Sprinkler 80.8 60.00 1.0050 13.800 80.60 0.50
102 Sprinkler 80.5 60.00 0.9984 13.800 80.60 0.50
103 Sprinkler 72.6 60.00 0.8109 13.800 80.60 0.50
104 Sprinkler 68.6 60.00 0.7242 13.800 80.60 0.50
105 Sprinkler 65.9 60.00 0.6686 13.800 80.60 0.50
106 Sprinkler 64.3 60.00 0.6368 13.800 80.60 0.50
107 Sprinkler 61.7 60.00 0.5864 13.800 80.60 0.50
108 Sprinkler 61.1 60.00 0.5751 13.800 80.60 0.50
109 Sprinkler 71.6 60.00 0.7883 13.800 80.60 0.50
110 Sprinkler 67.6 60.00 0.7038 13.800 80.60 0.50
111 Sprinkler 65.0 60.00 0.6497 13.800 80.60 0.50
112 Sprinkler 63.4 60.00 0.6187 13.800 80.60 0.50
113 Sprinkler 60.8 60.00 0.5697 13.800 80.60 0.50
114 Sprinkler 60.2 60.00 0.5587 13.800 80.60 0.50
115 Sprinkler 71.3 60.00 0.7828 13.800 80.60 0.50
116 Sprinkler 67.4 60.00 0.6989 13.800 80.60 0.50
117 Sprinkler 64.7 60.00 0.6452 13.800 80.60 0.50
118 Sprinkler 63.2 60.00 0.6144 13.800 80.60 0.50
119 Sprinkler 60.6 60.00 0.5656 13.800 80.60 0.50
120 Sprinkler 60.0 60.00 0.5548 13.800 80.60 0.50
---------------------------------------------------------------------------------------
SPRINKLER HYDRAULIC
CALCULATION
FOR

MY06 PHASE 3

PRE-ACTION SPRINKLER SYSTEM

PACV9

Document No : PACV9-PH3-01

REV : 0
THE ACADS-BSG PROGRAM

HYENA
VERSION 6.11.0

ACADS BSG advises that the program HYENA is intended to be used only
by persons who are proficient in its use and application and that these
results should be verified independently. The results must not be used
without acceptance of the ACADS-BSG's License Agreement for this program.

DESIGN PROGRAM FOR SPRINKLER, HOSE REEL AND HYDRANT SYSTEMS


Copyright (C) 2000 ACADS-BSG Pty Ltd
Calculation build number 6.11.0CV

DESIGN DATA AND SUMMARY RESULTS


Page 1 of 1 - Job No. PACV9-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :22 MAR 2023
Client : Johor Corporation (JCORP) TIME : 0:03
Project : Phase 3
------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum node unbalanced flow is = 0.00012 l/m and occurs at node 1
Maximum loop unbalanced flow is = 0.00131 l/m and occurs in Pipe Loop 2

Fittings Specified as SSCP52


Calculate Input Flow and Pressure to achieve Minimum Discharge Flows

Hazen-Williams formula used


Occupancy Classification : Ordinary Hazard 3
Density of discharge : 5 mm/min
Area of Operation : 216 sq.m
Maximum Coverage per Sprinkler : 10.6 sq.m
Sprinkler orifice size : 15 mm

Number of Sprinklers Operating : 20


Total water flow for Sprinklers : 1349 l/m
Average Flow : 67.5 l/m
Minimum Flow (Node: 106) : 60.0 l/m

Required Flow & Pressure, Input Node 1 : 1349 l/m at 3.63 Bar
Specified available pressure at input node 1 : 4.00 Bar
Available pressure minus required pressure is : 0.370 Bar

Pressure at zero flow 1.2749 Bar - Smallest elevation difference between discharges and input points

Calculated Total Pipe Volume is : 2905 Litres

Rev : 0
Certification Number :

Input data file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA


.. LCULATIONS-PH3-01_REV 0 (RANGE 40).DAT
Results file name : D:/PROJECTS/PROJECTS 2023/TRUST ELITE/01_MY06-PHASE 3/CA
.. LCULATIONS-PH3-01_REV 0 (RANGE 40).OUT
PIPE CHARACTERISTICS
Page 1 of 2 - Job No. PACV9-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :22 MAR 2023
Client : Johor Corporation (JCORP) TIME : 0:03
Project : Phase 3
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
1 1 2 1349.1 150 155.09 ASAM 92.900 142.30 0.0012 0.1637 0.6865 0.8502 120 1.19 .0071
9SE 38.700
1GV 0.900
1CV 9.800
2 2 3 1349.1 100 105.11 ASAM 1.000 17.400 0.0077 0.1332 0.0981 0.2312 120 2.59 .0335
1SE 3.000
1CV 6.700
1AV 6.700
3 3 4 1349.1 100 105.11 ASAM 3.000 3.000 0.0077 0.0230 0.2942 0.3172 120 2.59 .0335
4 4 5 1349.1 100 105.11 ASAM 2.000 8.100 0.0077 0.0620 0.1961 0.2581 120 2.59 .0335
1TT 6.100
5 5 6 1349.1 100 105.11 ASAM 98.100 107.10 0.0077 0.8197 0.0000 0.8197 120 2.59 .0335
3SE 9.000
6 6 7 1349.1 100 105.11 ASAM 2.000 5.000 0.0077 0.0383 0.0000 0.0383 120 2.59 .0335
1SE 3.000
7 7 8 1183.0 100 105.11 ASAM 4.000 4.000 0.0060 0.0240 0.0000 0.0240 120 2.27 .0258
8 8 9 787.6 100 105.11 ASAM 2.400 2.400 0.0028 0.0068 0.0000 0.0068 120 1.51 .0114
9 9 10 393.5 100 105.11 ASAM 3.800 3.800 0.00078 0.0030 0.0000 0.0030 120 0.76 .0029
10 10 11 393.5 50 53.11 ASAM 4.200 5.700 0.022 0.1238 0.0000 0.1238 120 2.96 .0437
1SE 1.500
11 9 12 394.1 50 53.11 ASAM 4.200 5.700 0.022 0.1241 0.0000 0.1241 120 2.96 .0439
1SE 1.500
12 8 13 395.4 50 53.11 ASAM 4.200 5.700 0.022 0.1248 0.0000 0.1248 120 2.97 .0442
1SE 1.500
13 7 14 166.1 50 53.11 ASAM 4.200 5.700 0.0044 0.0250 0.0000 0.0250 120 1.25 .0078
1SE 1.500
101 11 101 393.5 50 53.11 ASAM 2.800 5.800 0.022 0.1260 0.0000 0.1260 120 2.96 .0437
1TT 3.000
102 101 102 320.0 50 53.11 ASAM 2.800 5.800 0.015 0.0859 0.0000 0.0859 120 2.41 .0289
1TT 3.000
103 102 103 250.4 50 53.11 ASAM 2.800 5.800 0.0094 0.0545 0.0000 0.0545 120 1.88 .0177
1TT 3.000
104 103 104 183.4 40 42.01 ASAM 2.800 5.200 0.017 0.0860 0.0000 0.0860 120 2.20 .0243
1TT 2.400
105 104 105 120.7 40 42.01 ASAM 2.800 5.200 0.0076 0.0396 0.0000 0.0396 120 1.45 .0105
1TT 2.400
106 105 106 60.0 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
107 12 107 394.1 50 53.11 ASAM 2.800 5.800 0.022 0.1263 0.0000 0.1263 120 2.96 .0439
1TT 3.000
108 107 108 320.5 50 53.11 ASAM 2.800 5.800 0.015 0.0861 0.0000 0.0861 120 2.41 .0290
1TT 3.000
109 108 109 250.8 50 53.11 ASAM 2.800 5.800 0.0094 0.0547 0.0000 0.0547 120 1.89 .0178
1TT 3.000
110 109 110 183.6 40 42.01 ASAM 2.800 5.200 0.017 0.0862 0.0000 0.0862 120 2.21 .0243
1TT 2.400
111 110 111 120.8 40 42.01 ASAM 2.800 5.200 0.0076 0.0397 0.0000 0.0397 120 1.45 .0105
1TT 2.400
112 111 112 60.1 40 42.01 ASAM 2.800 5.200 0.0021 0.0109 0.0000 0.0109 120 0.72 .0026
1TT 2.400
113 13 113 395.4 50 53.11 ASAM 2.800 5.800 0.022 0.1270 0.0000 0.1270 120 2.97 .0442
1TT 3.000
114 113 114 321.5 50 53.11 ASAM 2.800 5.800 0.015 0.0866 0.0000 0.0866 120 2.42 .0292
1TT 3.000
115 114 115 251.6 50 53.11 ASAM 2.800 5.800 0.0095 0.0550 0.0000 0.0550 120 1.89 .0179
1TT 3.000
116 115 116 184.2 40 42.01 ASAM 2.800 5.200 0.017 0.0868 0.0000 0.0868 120 2.21 .0245
1TT 2.400
PIPE CHARACTERISTICS
Page 2 of 2 - Job No. PACV9-PH3-01
-----------------------------------------------------------------------------------------------------------------------
Pipe diam. Pipe & Fitting TOTAL Loss Pipe Static TOTAL H&W Water Vel.
Pipe Pipe node Flow Nom Actual CODE Length Length per m Loss Loss Loss Co- Vel. Press
No. Numbers (l/m) (mm) (mm) # (m) (m) (Bar) (Bar) (Bar) (Bar) eff ( m/s) (Bar)
-----------------------------------------------------------------------------------------------------------------------
117 116 117 121.2 40 42.01 ASAM 2.800 5.200 0.0077 0.0400 0.0000 0.0400 120 1.46 .0106
1TT 2.400
118 117 118 60.3 40 42.01 ASAM 2.800 5.200 0.0021 0.0110 0.0000 0.0110 120 0.73 .0026
1TT 2.400
119 14 119 166.1 50 53.11 ASAM 2.800 5.800 0.0044 0.0255 0.0000 0.0255 120 1.25 .0078
1TT 3.000
120 119 120 82.9 50 53.11 ASAM 2.800 5.800 0.0012 0.0070 0.0000 0.0070 120 0.62 .0019
1TT 3.000
-----------------------------------------------------------------------------------------------------------------------
LEGEND - Fittings and Pipe Materials used in this run

Standard Fittings
SE = 90 Degree Elbow TT = Tee Branch GV = Gate Valve
CV = Check Valve AV = Alarm Valve (Straightway)

Standard Pipe Materials


ASAM = Medium Steel Tube to AS1074 –1989 & BS 1387
-----------------------------------------------------------------------------------------------------------------------

Maximum unbalanced head loss is = 0.00000 Bar


Maximum loop unbalanced flow is = 0.00131 l/m and occurs in Pipe Loop 2
Maximum node unbalanced flow is = 0.00012 l/m
NODE CHARACTERISTICS
Page 1 of 1 - Job No. PACV9-PH3-01
------------------------------------------------------------------------------------------------------------------
Designer : Trust Elite Pte Ltd DATE :22 MAR 2023
Client : Johor Corporation (JCORP) TIME : 0:03
Project : Phase 3
------------------------------------------------------------------------------------------------------------------
Input Node 1 : 1349.1 l/m 3.6301 Bar 0.800 m elevation
---------------------------------------------------------------------------------------
K-Factor
Node Node --- Flow l/m ---- ------ Pressure Bar ---- Elev. l/m Exp
No Type calc'ed min total min max m Bar
----- ------------- ----------------- ------------------------- ------ ----------
2 2.7799 7.800
3 2.5487 8.800
4 2.2315 11.800
5 1.9734 13.800
6 1.1537 13.800
7 1.1154 13.800
8 1.0914 13.800
9 1.0846 13.800
10 1.0816 13.800
11 0.9578 13.800
12 0.9605 13.800
13 0.9665 13.800
14 1.0903 13.800
101 Sprinkler 73.5 60.00 0.8319 13.800 80.60 0.50
102 Sprinkler 69.6 60.00 0.7460 13.800 80.60 0.50
103 Sprinkler 67.0 60.00 0.6915 13.800 80.60 0.50
104 Sprinkler 62.7 60.00 0.6055 13.800 80.60 0.50
105 Sprinkler 60.6 60.00 0.5658 13.800 80.60 0.50
106 Sprinkler 60.0 60.00 0.5549 13.800 80.60 0.50
107 Sprinkler 73.6 60.00 0.8342 13.800 80.60 0.50
108 Sprinkler 69.7 60.00 0.7481 13.800 80.60 0.50
109 Sprinkler 67.1 60.00 0.6934 13.800 80.60 0.50
110 Sprinkler 62.8 60.00 0.6072 13.800 80.60 0.50
111 Sprinkler 60.7 60.00 0.5674 13.800 80.60 0.50
112 Sprinkler 60.1 60.00 0.5565 13.800 80.60 0.50
113 Sprinkler 73.8 60.00 0.8395 13.800 80.60 0.50
114 Sprinkler 69.9 60.00 0.7529 13.800 80.60 0.50
115 Sprinkler 67.3 60.00 0.6979 13.800 80.60 0.50
116 Sprinkler 63.0 60.00 0.6111 13.800 80.60 0.50
117 Sprinkler 60.9 60.00 0.5711 13.800 80.60 0.50
118 Sprinkler 60.3 60.00 0.5602 13.800 80.60 0.50
119 Sprinkler 83.2 60.00 1.0648 13.800 80.60 0.50
120 Sprinkler 82.9 60.00 1.0578 13.800 80.60 0.50
---------------------------------------------------------------------------------------