F03(QCDP03)R01/A.
20
MN Maihar -'UltraTech PPC' Issue Date:31.03.2023
`
UltraTech Cement
TEST CERTIFICATE
FOR
Portland Pozzolana Cement
(Fly Ash based)
Test & Compliance
Particulars Test Results Requirements of
CHEMICAL REQUIREMENTS
IS:1489-2015(Part 1)
29.62 4.0(100-X)
1. Insoluble Residue (% by mass) X+ Max
100
(x = Declared % of Fly Ash)
0.60 X Min
2. Magnesia (% by mass) 3.62
6.00 Max
3. Sulphuric Anhydride (% by mass) 1.88
3.50 Max
4. Loss on Ignition (% by mass) 2.42
5.00 Max
5. Total Chlorides (% by mass) 0.018
0.100 Max
PHYSICAL REQUIREMENTS
2
1. Fineness (m /kg) 340
300 Min
2. Standard Consistency (%) 32.0
3. Setting Time (minutes)
a. Initial 255 30 Min
b. Final 300 600 Max
4. Soundness
a.Le-Chat Expansion (mm) 1.0 10.0 Max
b.Autoclave Expansion (%) 0.12 0.8 Max
5. Compressive Strength (MPa)
a.72 +/- 1hr.(3 days) 27.0 16 Min
b.168 +/- 2 hr.(7 days) 36.5 22 Min
c.672 +/- 4 hr.(28 days) 54.5 33 Min
6. Drying Shrinkage (%) UT 0.15 Max
7. % of Fly Ash addition 30.80 15.00 Min
35.00 Max
The above cement complies with the requirements of
IS:1489-2015(Part 1) for Portland Pozzolana Cement (Fly Ash based)
*Amount of Fly Ash addition in finished cement does not vary more
than +/ - 3% from the declared value.
Date of Dispatch : 20.03.2023
Week no : 11 of 2023
HOD(QC)
UltraTech Cement Limited
CIN:L26940MH2000PLC128420
Works: Maihar Cement Works,P.O Sarla Nagar,SatnaMadhya Pradesh - 485772