Narrative Progress Final Report r13 en Final 0
Narrative Progress Final Report r13 en Final 0
The purpose of the Narrative Reports (Progress or Final) is to summarize the operational, administrative
and substantive activities undertaken to implement UNDEF funded projects. In order to provide a complete
picture of project implementation activities, please provide specific examples and anecdotes and attach
supplementary materials (as per section 14). UNDEF will compare the information provided in this report
with the signed project document and other materials on file. Please explain in full any changes in project
implementation vis-à-vis the signed project. UNDEF will review the report and will request additional
information as needed.
The report should be no more than fifteen pages, excluding annexes and must be submitted to the UNDEF
Secretariat by email ([email protected]) no later than one month following the completion of each
milestone event and the end of the project (for the final narrative report, FNR).
Moreover, all projects are required to submit a Financial Utilization Report (FUR) after having completed
each Milestone (2 and 3) and a Final Financial Utilization Report (FFUR) no later than three months after the
completion of the project.
1. GENERAL INFORMATION
Milestone 2 Milestone 3 Final
Project Title:
Implementing Partner(s):
Target group(s)/beneficiaries:
Project Objective:
1
2. SUMMARY OF THE PROJECT’S FINANCIAL STATUS (in US dollars)
a) Amount of the UNDEF grant:
Any comments on the financial status (e.g., UNDEF-approved budget revision, significant deviations from
the original budget allocations, over/under-expenditures):
3. MANAGEMENT ACTIONS
Please indicate, where applicable, the actions undertaken to manage the project. Please indicate the
functions of the management team.
Recruitment of Staff:
Procurement of Equipment:
Partnership Agreements:
Please provide information on any shortcomings, delays or changes in the management actions, (e.g.
turnover in staffing or relocation of project offices/activities), and remedial actions taken to overcome
these challenges.
2
4. BASELINE DATA
Please summarize the baseline data collected after the project’s start and describe the way they were
collected (if not already detailed in the project document). Please use bullet points.
Output 1.2:
Intended:
Actual:
Overview and comments on achievements under Output 1.2:
6. OUTCOMES
3
Milestone 2 Milestone 3 Final
Please describe the results made in achieving the outcomes in a manner that can be compared to the
projected outcomes and target indicators in the signed project document (Annex I - Results Framework)
Add more rows as needed (to do this go to table insert rows below).
Outcome 1:
Target Indicator 1.1 Results:
Outcome 2:
Outcome 3:
4
7. PROJECT SCHEDULE CHANGES
Please outline any significant changes in the project document and any impacts on the project schedule.
Explain the reasons for any changes. If a project extension was approved include here the justification
for the delays in implementation.
5
11. IMPACT STORY
Please draft a story (1 page max) that could potentially be published on UNDEF's website or used for
other purposes. This story should highlight a CONCRETE positive impact emanating from the project. It
can be a change brought about as a result of the project (e.g. a legal reform that the project advocated for;
citizens monitoring local government investments for the first time etc.) or a personal story (e.g. young
woman runs for local elections after youth leadership training; local journalist reporting on corruption
issue leads to a solution etc.)
(Include here one related picture only – ideally with UNDEF logo/branding visible)
List all annexes with a numerical reference linking them to the relevant output:
6
14. SIGNATURE
Implementing Agency
Name and Title of the organizational head:
Signature:
Date: