14 621830 4800000771 Hac Civ Itp 000005 - 01

Uploaded by

Ahmed Morsy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views17 pages

14 621830 4800000771 Hac Civ Itp 000005 - 01

Uploaded by

Ahmed Morsy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

Document Submittal Form

Hassan Allam Saudi Construction Limited Document 14-621830-4800000771-HAC-CIV-ITP-


Contractor 000005_01
Company submittal no.
Contract no. 4800000771 Date 04-September-23

To PMC AECOM

Document no. Type Description Rev no. Action required

14-621830-4800000771-HAC- 4800000771- INSPECTION & TEST PLAN Approval Comments


CIV-ITP-000005 ITP 01
FOR CONCRETE WORKS Information Other
Approval Comments
Information Other
Approval Comments
Information Other

Contractor authorized signatory


Name Karim Nagui Riad Date 04-September-23

Signature

PMC’s comments

Exception as noted revise


No exception taken Revise and resubmit
Status code and resubmit for record
Rejected Review not required Issued for Construction
Engineer’s
Date
name

Signature

Received by Contractor
Name Date

Signature

00-710000-100113-ACM-CON-SOP-000001_FRM_019 - Rev 01 Page 1 of 1


14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION AND TEST PLAN


NC1 – High Density Expansion
Project: CONCRETE WORKS Issued Date 04 SEP 2023 Rev. 01
-Utilities

4800000771-INSPECTION & TEST PLAN FOR


CONCRETE WORKS
14-621830-4800000771-HAC-CIV-ITP-000005 ‘Rev.01’ September 2023

DOCUMENT CODE: 14-621830-4800000771-HAC-CIV-ITP-000005 o


REVISION CODE: 01 Page 1 2
f
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION AND TEST PLAN FOR


NC1 – High Density Expansion
Project: TERMITE CONTROL Issued Date 04 SEP 2023 Rev. 02
-Utilities

Document History

Revision code Description of Changes Purpose of issue Date


01 First Issue For Approval 04 September 2023

Document Approval

Prepared by Reviewed by Approved By


Name Mohamed El Sherbini Alaa Farg Allah Karim Nagy

Job Title QC Manager QA Manager Project Manager

Mohamed Alaa

o
DOCUMENT CODE:14-621830-4800000771-HAC-CIV-ITP-000005 REVISION CODE: 01 Page 2 2
f
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION AND TEST PLAN For CIVIL WORKS Contractor’s


Logo
NEOM QUALITY MANAGEMENT SYSTEM Main Contractor: Hassan Allam Construction Saudi Limited Co.
PROJECT (ITP) for INSPECTION AND TEST PLAN FOR CONCRETE
WORKS Sub-Contractor:
Contract Rev.
Contract No.: 4800000771/000 NC1 -HIGH DENISTY EXPANSION -UTILITIES ITP No.: HAC-CIV-ITP-000005 01 Date: 04 – 09 – 2023
Title: No.:

Level of Participation Points


S Controlling Document/ Acceptance
Activity Phase Inspection / Test Method Remark
No. Reference Standard Criteria Main
PMC NOEM Q&E
Con.

1 Document Review
Contractor - "RH" of Documents and "H" for
Project Specification Project Specification
Material Sampling and Testing.
Raw Materials Sampling, Testing & Concrete 14-621830-4800000771-HAC- 14-621830-4800000771-
1.1 R/H R/H R/H PMC Quality/NEOM ETSD - "RH" of
Mix Design Approval DES-SPC-000001 HAC-DES-SPC-000001
Documents and "H" for Material Sampling and
Section 03 30 00 Section 03 30 00
Testing.
Project Specification
14-621830-4800000771-HAC-
1.2 Shop and Construction Drawings IFC Drawings R/H R/H R
DES-SPC-000001
Section 03 30 00
2 Receiving Inspection
Project Specification Material Inspection Request (MIR)
Uncoated Steel Reinforcement and Embedded 14-621830-4800000771-HAC- Inspection Checklist Approved MAT Submittal for Materials
2.1 H W/R W/R
Items Receiving Inspection DES-SPC-000001 HAC-CIV-01
Section 03 30 00
3 Installation
Project Specification Contractor to provide survey report
14-621830-4800000771-HAC- Inspection Checklist
3.1 Cast-In-Place Concrete Formwork Inspection H H H
DES-SPC-000001 ALF-CIV-02
Section 03 30 00
Project Specification Contractor to provide MEP Clearance for
14-621830-4800000771-HAC- embedded items.
Uncoated Reinforcing Steel Reinforcement, Inspection Checklist
3.2 DES-SPC-000001 H H H
Embedded Items, and Form Closure Inspection HAC-CIV-03
Section 03 30 00
Method Statement
Project Specification Provide Concrete Pouring Log per each day of
14-621830-4800000771-HAC- pouring.
Concrete Sampling, Testing & Placement Inspection Checklist
3.3 DES-SPC-000001 H W W
Inspection HAC-CIV-04
Section 03 30 00
Method Statement
Cast-In-Place Concrete Finishing and Curing Project Specification Contractor QC - Witness every inspection
Inspection 14-621830-4800000771-HAC- request. PMC Quality/NEOM ETSD - Witness
Inspection Checklist
3.4 DES-SPC-000001 W S S first 3 occurrences and once every 10
HAC-CIV-05
Section 03 30 00 occurrences, thereafter.
Method Statement
Cast-In-Place Concrete Formwork Stripping Project Specification Contractor QC - Witness every inspection
Inspection 14-621830-4800000771-HAC- request. PMC Quality/NEOM ETSD - Witness
Inspection Checklist
3.5 DES-SPC-000001 H S S first 3 occurrences and once every 10
HAC-CIV-06
Section 03 30 00 occurrences, thereafter.
Method Statement
Concrete Compressive Strength Testing and Project Specification Contractor to submit applicable Test Reports to
Approval of Concrete Test
Final Acceptance Inspection 14-621830-4800000771-HAC- AONEX for review and approval.
3.6 Report submission in R/H R/H R/H
DES-SPC-000001
ACONEX
Section 03 30 00
4 Pre-commissioning

Not Applicable Not Applicable - - -

ITP Approval Signature


Sub-Contractor (If Applicable) Main Contractor PMC NEOM Q&E

Legend:

S: Responsible for carrying out random surveillance of


H: Contractor must not proceed without approval. R : Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
inspection or test/Random Check.

Document CODE : NEOM-NEN-SOP-008_FRM11 Revision Code: 01.00 Page 1 of 2

14-621830-4800000771-HAC-CIV-ITP-000005_01 ©NEOM [2021]. All rights reserved.


14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION AND TEST PLAN For CIVIL WORKS Contractor’s


Logo
NEOM QUALITY MANAGEMENT SYSTEM Main Contractor: Hassan Allam Construction Saudi Limited Co.
PROJECT (ITP) for INSPECTION AND TEST PLAN FOR CONCRETE
WORKS Sub-Contractor:
Contract Rev.
Contract No.: 4800000771/000 NC1 -HIGH DENISTY EXPANSION -UTILITIES ITP No.: HAC-CIV-ITP-000005 01 Date: 04 – 09 – 2023
Title: No.:

Level of Participation Points


S Controlling Document/ Acceptance
Activity Phase Inspection / Test Method Remark
No. Reference Standard Criteria Main
PMC NOEM Q&E
Con.
Name: Name: Name: Name:

Signature: Signature: Signature: Signature:

Date: Date: Date: Date:


GENERAL NOTES:
The first (3) of each inspection or testing activities listed require 100% participation of client site inspection personnel. After this period, client inspection may adjust the level of client participation based on the contractor's performance.
Hold: QA/QC team shall be notified of the schedule of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC Team/Client representative in attendance.
Review: Required qualification/certification/reports shall be submitted for the QA/QC team review and approval.
Witness: QA/QC team shall be notified of the schedule of inspection or test in advance. If the QA/QC Team/Client representative doesn’t come on time for inspection, the activity can proceed.
Surveillance: QA/QC team to monitor work in progress without notice from the construction organization/Random check selection.

Legend:

S: Responsible for carrying out random surveillance of


H: Contractor must not proceed without approval. R : Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
inspection or test/Random Check.

Document CODE : NEOM-NEN-SOP-008_FRM11 Revision Code: 01.00 Page 2 of 2

14-621830-4800000771-HAC-CIV-ITP-000005_01 ©NEOM [2021]. All rights reserved.


14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION CHECKLIST IC NUMBER PREPARED DATE WIR

Uncoated Steel Reinforcement and Embedded Items HAC-CIV-01


04-09-2023 CIVIL
Receiving Inspection
PROJECT TITLE CONTRACT NUMBER CONTRACTOR

NC1-HIGH DENSITY EXPANSION -UTILITIES 4800000771 HASSAN ALLAM SUADI


CONSTRUCTION CO.
ITP NUMBER SCHEDULED INSPECTION DATE AND TIME WIR
HAC-CIV-ITP-000005 ACCEPTED
NEOM ETSD Q&E INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W H REJECTED

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.

A Uncoated Steel Reinforcement

Provide certified copies of mill test reports for reinforcing steel, Project
A1 showing physical and chemical analysis, minimum 4 weeks prior to Specification Sec.
commencing reinforcing work. 032100 Subclause
1.5.1

Schedule reinforcement in accordance with ACI 315 and the


Project
information on the Drawings.
A2 Specification Sec.
032100 Subclause
1.7.1
Except where noted on the Drawings bar reinforcement shall be hot
A3 Project
rolled ribbed bars of high yield steel; having yield strength of 420 MPa
Specification Sec.
and complying with the requirements of ASTM A 615 except that no bar 032100 Subclause
shall contain a flash weld. At the time of delivery of each 2.1.1
consignment of steel reinforcement, test certificates shall be obtained
for each batch from the supplier/manufacturer for issue to the
Engineer confirming compliance with the ASTM.
Tying wire shall be 1.6 mm diameter soft annealed steel wire to Project
A4
ASTM A-496. Specification Sec.
032100 Subclause
2.1.3

Bending dimensions shall comply with ACI 315. The internal radius of Project
A5
bends shall in no case be less than three times the bar diameter for Specification Sec.
bars up to 20 mm diameter and four times for bars over 20 mm dia., 032100 Subclause
2.4.3
except for mild steel stirrups, column ties, and wall shear bars which
are to be bent to fit closely around the main bars with a radius of two
times.

A6 Tolerances on cutting and bending reinforcement shall comply with ACI Project
Specification Sec.
315
032100 Subclause
2.4.6
REMARKS:

REFERENCE DOCUMENTS:
1- Project Specification SECTION 03 21 00

CONTRACTOR / THIRD PARTY PMC REPRESENTATIVE


QC INSPECTOR PMC
T&I Work
Performed Inspection Work / rework May proceed
Name, Witnessed QC Record Reviewed Verified
Initial & Name, Initial & Date
Date

NEOM ETSD REPRESENTATIVE


NEOM ETSD Q&E
T&I Work
Witnessed QC Record Reviewed Verified
Name, Initial & Date

14-621830-4800000771-HAC-CIV-ITP-000005_01 2
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION CHECKLIST IC NUMBER PREPARED DATE WIR

Cast-In-Place Concrete Formwork Inspection HAC-CIV-02 04-09-2023 CIVIL


PROJECT TITLE CONTRACT NUMBER CONTRACTOR

4800000771 HASSAN ALLAM SUADI


NC1-HIGH DENSITY EXPANSION -UTILITIES
CONSTRUCTION CO.
ITP NUMBER SCHEDULED INSPECTION DATE AND TIME WIR
ACCEPTED
HAC-CIV-ITP-000005
NEOM ETSD Q&E INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
H W REJECTED

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.

A Formwork Installation (General)

All formwork shall be of such quality and strength as will ensure rigidity
Project Specification
A1 throughout the placing, ramming, vibration and setting of the concrete Sec. 033000 Subclause
without visible deflection. 2.16.3.2

Unless otherwise provided on the drawings or directed by the Engineer, all


exposed edges shall be bevelled by using dressed, mill-cut hardwood, Project Specification
A2 Sec. 033000 Subclause
metal or plastic, triangular moulding, having twenty (20) mm sides. Submit
2.16.3.3
details of the bevels to the Engineer for acceptance prior to their use in
the Works.
Allow sufficient time for inspection by the Engineer. Do not commence
A3 concreting until accepted by the Engineer. The period between the
Contractor’s request for acceptance and his intention to commence Project Specification
Sec. 033000 Subclause
concreting shall be not less than one clear normal working day and the 2.16.3.4
Engineer may require a longer period if, in his opinion, the formwork is of
such complexity.
Joints in formwork shall be close fitting to prevent the bleeding of
concrete. If movement or deflection of formwork or less of concrete Project Specification
occurs and if the Engineer so directs, the Contractor shall cut-out and Sec. 033000 Subclause
A4 replace the concrete supported by such formwork at his own expenses. 2.16.4.1

All construction joints formwork shall be tightly secured against previously Project Specification
Sec. 033000
A5 cast or hardened concrete to prevent the loss of grout or the formation of Subclause 2.16.4.2
stepping or ridges in the concrete.

Formwork shall be constructed to provide straight and true angles, arises


Project Specification
A6 or edges. Where chamfers are called for, the fillets shall be accurately Sec. 033000 Subclause
sized to provide a smooth and continuous camber 2.16.4.3

Formwork panels shall have true edges to permit accurate alignment of Project Specification
A7 Sec. 033000 Subclause
their sides, to provide clean lines at construction joints and shall be fixed 2.16.4.4
with joints either vertical or horizontal, unless otherwise specified.
Where holes are needed on forms to accommodate projecting
Project Specification
reinforcement or fixing devices, care shall be taken to prevent loss of Sec. 033000 Subclause
A8 2.16.4.5
grout. Special care shall be taken when de-molding in order not to break
off the edge of the concrete adjacent to the projecting reinforcement.
All formwork to be in contact with concrete shall be clean and treated
with a suitable release agent before fixing steel. All rubbish shall be
Project Specification
A9 removed from the interior of the forms before the concrete is placed. Sec. 033000 Subclause
2.16.5.1

14-621830-4800000771-HAC-CIV-ITP-000005_01 3
14-621830-4800000771-HAC-CIV-ITP-000005_01

REMARKS:

REFERENCE DOCUMENTS:
1- Project Specification section 03 30 00

CONTRACTOR / THIRD PARTY PMC REPRESENTATIVE


QC INSPECTOR PMC
Work
Name, Performed Inspection Work / rework May proceed
T&I Witnessed QC Record Reviewed Verified
Initial & Name, Initial & Date
Date

NEOM ETSD REPRESENTATIVE


NEOM ETSD Q&E
Work
T&I Witnessed QC Record Reviewed Verified
Name, Initial & Date

14-621830-4800000771-HAC-CIV-ITP-000005_01 4
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION CHECKLIST ANIC NUMBER PREPARED DATE WIR

Reinforcing Steel, Embedded Items, and Form Closure


HAC-CIV-03 04-09-2023 CIVIL
Inspection
PROJECT TITLE CONTRACT NUMBER CONTRACTOR

4800000771 HASSAN ALLAM SUADI


NC1-HIGH DENSITY EXPANSION - UTILITIES
CONSTRUCTION CO.
ITP NUMBER SCHEDULED INSPECTION DATE AND TIME WIR
HAC-CIV-ITP-000005 ACCEPTED
NEOM ETSD INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
H H REJECTED

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.

A Reinforcing Steel Inspection (General)

Place reinforcing steel within the following tolerances:

a) For clear protection of reinforcement ± 5mm


Project Specification
a. Lateral spacing of bars shall be within ± 25mm of the specified Sec. 032100 Subclause
A1
spacing. 3.2

b. For longitudinal location of bends and ends of bars ± 50mm except


discontinuous ends which shall be ± 20mm.

Spacers shall be used for all column, beam, and wall construction to
A2 secure reinforcement against displacement and maintain required cover Project Specification
distance between the reinforcement and the vertical formwork. Provide Sec. 032100 Subclause
bolsters, bar supports adequate for strength and support of reinforcing 3.2.5
construction conditions.
Nonprestressed cast-in-place concrete members shall have specified
concrete cover for reinforcement at least that given in Table 20.5.1.3.1.

ACI 318

A3 Table 20.5.1.3.1

The inside diameter of bends for stirrups and ties shall be no less than 4
bar diameter for sizes 5 and smaller, all other sizes shall be bent in
accordance with ACI 318 Table 25.3.2
Minimum Diameters of Bend
Bar Size Minimum Diameter ACI 318
A4
No. 3 through No. 8 6db
No. 9, No. 10 and No. 11 8db
25.3.2
No. 14 and No. 18 10db

Field bending or straightening—Submit request and procedure to field- ACI 301


A5
bend or straighten reinforcing bars partially embedded in concrete at 3.1.2.1(f)
locations not indicated in Contract Documents.
Where concrete members contain galvanised or stainless steel
A6 Project Specification
reinforcement, or embedded items as well as ordinary uncoated mild or Sec. 032100 Subclause
3.3.1
high-yield steel reinforcement, then contact between dissimilar metals
shall be prevented, if necessary by inserting electrically insulating
material between them.
Starter Bars shall be protected from wind blown dust, sand and salts by
Project Specification
A7 wrapping with an agreed system. Sec. 032100 Subclause
3.4.1

14-621830-4800000771-HAC-CIV-ITP-000005_01 5
14-621830-4800000771-HAC-CIV-ITP-000005_01

B Embedded Items

All embedded items shown on the drawings shall be fixed in the positions
B1 Project Specification
shown within the specified tolerances. Sec. 032100 Subclause
3.6.1
Project Specification
Do not support embedded items by welding to reinforcement.
B2 Sec. 032100 Subclause
3.6.3

REMARKS:

REFERENCE DOCUMENTS:
1- Project Specification Section 033000
2- ACI 318
3- ACI 301

CONTRACTOR / THIRD PARTY PMC REPRESENTATIVE


QC INSPECTOR PMC
Work
Performed Inspection Work / rework May proceed
Name, T&I Witnessed QC Record Reviewed Verified
Intial & Name, Intial & Date
Date

NEOM ETSD REPRESENTATIVE


NEOM ETSD Q&E
Work
T&I Witnessed QC Record Reviewed Verified
Name, Intial & Date

14-621830-4800000771-HAC-CIV-ITP-000005_01 6
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION CHECKLIST ANIC NUMBER PREPARED DATE WIR

Concrete Sampling, Testing & Placement Inspection HAC-CIV-04 04-09-2023 CIVIL


PROJECT TITLE CONTRACT NUMBER CONTRACTOR

4800000771 HASSAN ALLAM SUADI


NC1-HIGH DENSITY EXPANSION -UTILITIES
CONSTRUCTION CO.
ITP NUMBER SCHEDULED INSPECTION DATE AND TIME WIR
HAC-CIV-ITP-000005 ACCEPTED
NEOM ETSD INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W W REJECTED

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.

A Receiving/Sampling/Testing Inspection

Before placing concrete the Contractor shall obtain approval of the


Project
mixes proposed for each class of concrete and the average target Specification
A1
strengths. The mixes shall be designed to achieve the minimum Sec. 033000
Subclause 2.12.8
workability for the Contractor to place and compact the concrete
with the equipment proposed for use.
Use concrete from approved suppliers of ready mixed with proven
Project
production record, after satisfying all the requirements of this section Specification
A2
and ASTM C-94-17a, "Standard specifications for ready mixed concrete". Sec. 033000
Subclause
2.17.3.1

All ready-mix concrete shall be delivered to the site with a batch ticket
listing the following:
1- Name of ready-mix company and batch
12- Type, brand, and amount of cement
plant, or batch plant number
13- Class, brand, and amount of coal fly ash,
2- Serial number of ticket
or raw or calcined natural pozzolans
14- Grade, brand, and amount of ground
3- Date
granulated blast-furnace slag

4- Truck number 15- Type, brand, and amount of silica fume

5- Name of purchaser 16- Type, brand, and amount of admixtures ACI C94
13
A3 6- Specific designation of job (name and 17- Type, brand, and amount of fiber
location) reinforcement
7- Specific class or designation of the concrete
18- Source and amount of each metered or
in conformance with that employed in job
weighed water or recycled slurry
specifications
8- Amount of concrete in cubic yards (or cubic
19- Maximum size of aggregate
metres)
9- Time loaded or of first mixing of cement and 20- Mass (amount) of fine and coarse
aggregates aggregate
10- Water added by receiver of concrete and 21- Ingredients certified as being previously
his initials approved
11- Reading of revolution counter at the first 22- Signature or initials of producer’s
addition of water representative

Tests of concrete required to determine compliance with this


ASTM C94
A4 specification shall be made by a certified ACI Concrete Field-Testing 16.2
Technician, Grade I.

Strength tests as well as slump, temperature, density,


and air content tests shall generally be made with a frequency
of not less than one test for each 150 yd3 (115 m3). Each test ASTM C94
A5 16.5
shall be made from a separate batch. On each day concrete is
delivered, at least one strength test shall be made for each class
of concrete.

Mold and cure a min. of three cylinders from each sample in accordance
with ASTM C31/C31M. Test cylinders in accordance with ASTM C
39/C39M.Test one specimen at seven days for information and test a ACI 301
A6 1.6.4.2.e
minimum of two specimens at 28 days for acceptance.

14-621830-4800000771-HAC-CIV-ITP-000005_01 7
14-621830-4800000771-HAC-CIV-ITP-000005_01

Slump, air content, density and temperature tests shall be made at the ASTM C94
16.4
A7 time of placement at the option of the inspector as often as necessary
for control checks.

INSPECTION CHECKLIST ANIC NUMBER PREPARED DATE WIR

Concrete Sampling, Testing & Placement Inspection HAC-CIV-04 04-09-2023 CIVIL


PROJECT TITLE CONTRACT NUMBER CONTRACTOR

4800000771 HASSAN ALLAM SUADI


NC1-HIGH DENSITY EXPANSION CENTRAL AMENITIES
CONSTRUCTION CO.

B Concrete Placement Inspection (General)

Concrete, after being discharged from the mixer, shall be transported Project Specification Sec.
B1
as rapidly as possible to its final position in the works by means that 033000
shall be approved by the Engineer, and which shall prevent Subclause 2.17.5.1

adulteration, segregation, loss or contamination of the ingredients.

Concreting shall not be allowed when the temperature is more than +43
Project Specification Sec.
degrees Celsius on a falling thermometer or +40 degrees Celsius on a 033000
B2
rising thermometer. Subclause 2.18.1.1

Place concrete so as to avoid segregation of the materials and the


displacement of the reinforcement. The use of long troughs, chutes, and Project Specification Sec.
pipes for conveying of concrete from the mixer to the forms shall be 033000
permitted only upon the authorisation, in writing, by the Engineer. If Subclause 2.18.1.4
B3 inferior quality of concrete is produced by the use of such conveyors,
the Engineer may order discontinuance of their use and the substitution
of a satisfactory method of placing.

In preparation for the placing of concrete, remove from the interior of


the forms all sawdust, chips, and other construction debris, and all
extraneous matter. Remove all dust with clean compressed air or water.
Project Specification Sec.
When the concrete has reached a level rendering their service
B4 033000
unnecessary, remove struts, stays, and braces serving temporarily to Subclause 2.18.2.1
hold the forms in correct shape and alignment, pending the placing of
concrete. These temporary members shall be entirely removed from the
forms and not buried in the concrete.

Concrete shall not be allowed to drop freely for more than 1.5 m. When
placing operations involve dropping the concrete more than 1.5 m, it
shall be deposited through sheet metal or other approved pipes. These
pipes shall not be made of aluminium. As far as practicable, during Project Specification Sec.
B5 placing keep the pipes full of concrete with their lower ends kept buried 033000
Subclause 2.18.4.1
in the newly placed concrete. After the initial set of the concrete, the
forms shall not be jarred and no strain shall be placed on the ends of
reinforcing bars that project. When pumping of concrete is employed,
equipment and all procedures shall be to the Engineer’s approval and in
accordance with the recommendations of ACI 304.
Project Specification Sec.
Provide sufficient number of vibrators to compact each batch properly,
B6 033000
immediately after it is placed in the forms. Subclause 2.18.5.5

Apply vibrators at the point of deposit and in the areas of freshly


deposited concrete. Insert and withdrawn vibrators out of the concrete Project Specification Sec.
B7 slowly. The vibration shall be of sufficient duration and intensity to 033000
compact the concrete thoroughly, but shall not be continued so as to Subclause 2.18.5.7
cause segregation. Vibration shall not be continued at any one point to
the extent that localised areas of grout are formed.

Place of concrete in horizontal layers not more than 30 cm thick, except


as herein provided. When less than a complete layer is placed in one Project Specification Sec.
operation, it shall be terminated at a vertical stop-end. Place and 033000
B8
compact each layer before the preceding batch has taken initial set to Subclause 2.18.6.1

avoid surfaces of separation between the batches. Compact each layer


so as to avoid the formation of construction joints with the previous
layer.

14-621830-4800000771-HAC-CIV-ITP-000005_01 8
14-621830-4800000771-HAC-CIV-ITP-000005_01

Throughout the summer months and during hot weather, provide


Project Specification Sec.
B9 suitable means to ensure that the temperature of the concrete when
033000
deposited does not exceed 32 deg. C and the ambient temperature is Subclause 2.19.1
not more than 39 deg. C.
REMARKS:

REFERENCE DOCUMENTS:
1- Project Specification
2- ACI 301, ACI 318
3- ASTM C94

CONTRACTOR / THIRD PARTY PMC REPRESENTATIVE


QC INSPECTOR PMC
Name, Performed Inspection Work / rework May proceed T&I Witnessed QC Record Reviewed Work Verified
Intial & Name, Intial & Date
Date

NEOM ETSD REPRESENTATIVE


NEOM ETSD Q&E
T&I Witnessed QC Record Reviewed Work Verified
Name, Intial & Date

14-621830-4800000771-HAC-CIV-ITP-000005_01 9
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION CHECKLIST IC NUMBER PREPARED DATE WIR

Cast-In-Place Concrete Finishing and Curing Inspection HAC-CIV-05 04-09-2023 CIVIL


PROJECT TITLE CONTRACT NUMBER CONTRACTOR

4800000771 HASSAN ALLAM SUADI


NC1-HIGH DENSITY EXPANSION -UTILITIES
CONSTRUCTION CO.
ITP NUMBER SCHEDULED INSPECTION DATE AND TIME WIR
ACCEPTED
HAC-CIV-ITP-000005
NEOM ETSD INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
S W REJECTED

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.

A Concrete Finishing Inspection of Formed Surfaces

Use qualified flatwork finishers acceptable to NEOM. Unless otherwise


permitted, a minimum of one finisher or finishing supervisor shall be a ACI 301
A1
certified ACI Flatwork Concrete Finisher/Technician or a certified ACI 5.3.4.1
Flatwork Technician as defined in ACI CP 10 or equivalent.

Defective Concrete: Repair and patch defective areas when approved


Project Specification Sec.
by Engineer. Remove and replace concrete that cannot be repaired and
A2 033000
patched to Engineer's approval. Subclause 2.23.1

Patching Mortar: Mix dry pack patching mortar, consisting of one part
Project Specification Sec.
Portland cement to two and one half parts fine aggregate passing a No.
A3 033000
16 (1.18 mm) sieve, using only enough water for handling and placing. Subclause 2.23.3

Repairing Formed Surfaces: Surface defects include color and


texture irregularities. Cracks, spells, air bubbles, honeycombs, rock Project Specification Sec.
A4 pockets, fins and other projections on the surface, and stains and 033000
Subclause 2.23.4
other discoloration s that cannot be removed by cleaning.

Repair defects on concealed formed surfaces that affect concrete's Project Specification Sec.
A5 durability and structural performance as determined by Engineer. 033000
Subclause 2.23.4.3

B Curing Inspection

Proper curing and protection is of fundamental importance in ensuring


acceptable concrete. All concrete shall be covered for at least 14 days Project Specification Sec.
B1 033000
after casting and kept continuously wet for the initial 7 days or as agreed
Subclause 2.23.4.3
with the engineer. The temperature of the curing water shall be similar
to the temperature of the concrete.
Comply with the recommendations of the C.I.R.I.A Guide, and ACI Project Specification Sec.
B2
Standard 305 ‘Recommended Practice for Hot Weather Concreting.” 033000
Subclause 2.23.4.3
Maintain forms in place, maintain hessian water curing/cooling or
adequately shade completed concrete work until permanent enclosure Project Specification Sec.
B3 or covering is installed. Leave pour gaps if needed to allow thermal 033000
Subclause 2.21.5
movement and do not fill with concrete until adjacent elements are
protected from extremes of temperature.

14-621830-4800000771-HAC-CIV-ITP-000005_01 10
14-621830-4800000771-HAC-CIV-ITP-000005_01

REMARKS:

REFERENCE DOCUMENTS:
1- Project Specification
2- ACI 301

CONTRACTOR / THIRD PARTY PMC REPRESENTATIVE


QC INSPECTOR PMC
Name, Performed Inspection Work / rework May proceed T&I Witnessed QC Record Reviewed Work Verified
Intial & Name, Intial & Date
Date

NEOM ETSD REPRESENTATIVE


NEOM ETSD Q&E
T&I Witnessed QC Record Reviewed Work Verified
Name, Intial & Date

14-621830-4800000771-HAC-CIV-ITP-000005_01 11
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION CHECKLIST ANIC NUMBER PREPARED DATE WIR

Cast-In-Place Concrete Formwork Stripping Inspection HAC-CIV-06 04-09-2023 CIVIL


PROJECT TITLE CONTRACT NUMBER CONTRACTOR

4800000771 HASSAN ALLAM SUADI


NC1-HIGH DENSITY EXPANSION -UTILITIES
CONSTRUCTION CO.
ITP NUMBER SCHEDULED INSPECTION DATE AND TIME WIR
ACCEPTED
HAC-CIV-ITP-000005
NEOM ETSD INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
W W REJECTED

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.

A Cast-In-Place Concrete Formwork Stripping Inspection

The engineer/architect should specify the minimum strength of the


concrete to be attained before removal of forms or shores.The strength ACI 347R
A1
can be determined by tests on job-cured specimens or on in-place 3.7.2
concrete.

Removal times will be increased if the concrete temperature following ACI 347R
A2
placement remain below 10 'C or if retarding agents are used. 3.7.2.3

Forms and shoring in the formwork used to support the weight of


Project Specification Sec.
concrete in beams, slabs and other structural members shall remain 033000
A3 undisturbed until the concrete has attained sufficient strength to sustain Subclause 2.16.6.1
its own weight in addition to any temporary or permanent load which
may be placed on it during construction of the building.

Minimum allowable time after the last cast concrete is placed before
forms, shoring, or wall bracing may be removed; during which the air
surrounding the concrete is above [50 degrees F (10 degrees C)].

Sides of beams and girders 12 hours

Columns 12 hours
Walls 12 hours
Structural live load Structural live load
Structures less than more than
structural dead load structural dead load

Arch centers 14 days 7 days


Joist, beam or girder soffits
Under 10 ft (3 m) clear span 7 days 4 days
between structural supports
Joist, beam or girder ACI 347R
A4
soffits10 to 20 ft (3 to 6 m) 3.7
14 days 7days
clear span between
structural supports
Joist, beam or girder
soffitsOver 20 ft (6 m) clear
21 days 14 days
span between structural
supports
One-way floor slabs Under 10
ft (3 m) clear span 4 days 3 days
between structural supports
One-way floor slabs 10 to 20
ft (3 to 6 m) clear span 7 days 4 days
between structural supports
One-way floor slabs Over 20
ft (6 m) clear span 10 days 7 days
between structural supports

Project Specification Sec.


Formwork shall be removed without damage to the concrete.
033000
A5 Subclause 2.16.7.6

14-621830-4800000771-HAC-CIV-ITP-000005_01 12
14-621830-4800000771-HAC-CIV-ITP-000005_01

INSPECTION CHECKLIST ANIC NUMBER PREPARED DATE WIR

Cast-In-Place Concrete Formwork Stripping Inspection CIVIL


PROJECT TITLE CONTRACT NUMBER CONTRACTOR

Where it is intended to re-use formwork it shall be thoroughly cleaned


Project Specification Sec.
and made good to the satisfaction of the Engineer.
A6 033000
Subclause 2.16.7.7

REMARKS:

REFERENCE DOCUMENTS:
1- NEOM Specification section 03 30 00
2- ACI 347

CONTRACTOR / THIRD PARTY PMC REPRESENTATIVE


QC INSPECTOR PMC
Work
Performed Inspection Work / rework May proceed
Name, T&I Witnessed QC Record Reviewed Verified
Intial & Name, Intial & Date
Date

NEOM ETSD REPRESENTATIVE


NEOM ETSD Q&E
Work
T&I Witnessed QC Record Reviewed Verified
Name, Intial & Date

14-621830-4800000771-HAC-CIV-ITP-000005_01 13