14 621830 4800000771 Hac Civ Itp 000005 - 01
14 621830 4800000771 Hac Civ Itp 000005 - 01
To PMC AECOM
Signature
PMC’s comments
Signature
Received by Contractor
Name Date
Signature
Document History
Document Approval
Mohamed Alaa
o
DOCUMENT CODE:14-621830-4800000771-HAC-CIV-ITP-000005 REVISION CODE: 01 Page 2 2
f
14-621830-4800000771-HAC-CIV-ITP-000005_01
1 Document Review
Contractor - "RH" of Documents and "H" for
Project Specification Project Specification
Material Sampling and Testing.
Raw Materials Sampling, Testing & Concrete 14-621830-4800000771-HAC- 14-621830-4800000771-
1.1 R/H R/H R/H PMC Quality/NEOM ETSD - "RH" of
Mix Design Approval DES-SPC-000001 HAC-DES-SPC-000001
Documents and "H" for Material Sampling and
Section 03 30 00 Section 03 30 00
Testing.
Project Specification
14-621830-4800000771-HAC-
1.2 Shop and Construction Drawings IFC Drawings R/H R/H R
DES-SPC-000001
Section 03 30 00
2 Receiving Inspection
Project Specification Material Inspection Request (MIR)
Uncoated Steel Reinforcement and Embedded 14-621830-4800000771-HAC- Inspection Checklist Approved MAT Submittal for Materials
2.1 H W/R W/R
Items Receiving Inspection DES-SPC-000001 HAC-CIV-01
Section 03 30 00
3 Installation
Project Specification Contractor to provide survey report
14-621830-4800000771-HAC- Inspection Checklist
3.1 Cast-In-Place Concrete Formwork Inspection H H H
DES-SPC-000001 ALF-CIV-02
Section 03 30 00
Project Specification Contractor to provide MEP Clearance for
14-621830-4800000771-HAC- embedded items.
Uncoated Reinforcing Steel Reinforcement, Inspection Checklist
3.2 DES-SPC-000001 H H H
Embedded Items, and Form Closure Inspection HAC-CIV-03
Section 03 30 00
Method Statement
Project Specification Provide Concrete Pouring Log per each day of
14-621830-4800000771-HAC- pouring.
Concrete Sampling, Testing & Placement Inspection Checklist
3.3 DES-SPC-000001 H W W
Inspection HAC-CIV-04
Section 03 30 00
Method Statement
Cast-In-Place Concrete Finishing and Curing Project Specification Contractor QC - Witness every inspection
Inspection 14-621830-4800000771-HAC- request. PMC Quality/NEOM ETSD - Witness
Inspection Checklist
3.4 DES-SPC-000001 W S S first 3 occurrences and once every 10
HAC-CIV-05
Section 03 30 00 occurrences, thereafter.
Method Statement
Cast-In-Place Concrete Formwork Stripping Project Specification Contractor QC - Witness every inspection
Inspection 14-621830-4800000771-HAC- request. PMC Quality/NEOM ETSD - Witness
Inspection Checklist
3.5 DES-SPC-000001 H S S first 3 occurrences and once every 10
HAC-CIV-06
Section 03 30 00 occurrences, thereafter.
Method Statement
Concrete Compressive Strength Testing and Project Specification Contractor to submit applicable Test Reports to
Approval of Concrete Test
Final Acceptance Inspection 14-621830-4800000771-HAC- AONEX for review and approval.
3.6 Report submission in R/H R/H R/H
DES-SPC-000001
ACONEX
Section 03 30 00
4 Pre-commissioning
Legend:
Legend:
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
Provide certified copies of mill test reports for reinforcing steel, Project
A1 showing physical and chemical analysis, minimum 4 weeks prior to Specification Sec.
commencing reinforcing work. 032100 Subclause
1.5.1
Bending dimensions shall comply with ACI 315. The internal radius of Project
A5
bends shall in no case be less than three times the bar diameter for Specification Sec.
bars up to 20 mm diameter and four times for bars over 20 mm dia., 032100 Subclause
2.4.3
except for mild steel stirrups, column ties, and wall shear bars which
are to be bent to fit closely around the main bars with a radius of two
times.
A6 Tolerances on cutting and bending reinforcement shall comply with ACI Project
Specification Sec.
315
032100 Subclause
2.4.6
REMARKS:
REFERENCE DOCUMENTS:
1- Project Specification SECTION 03 21 00
14-621830-4800000771-HAC-CIV-ITP-000005_01 2
14-621830-4800000771-HAC-CIV-ITP-000005_01
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
All formwork shall be of such quality and strength as will ensure rigidity
Project Specification
A1 throughout the placing, ramming, vibration and setting of the concrete Sec. 033000 Subclause
without visible deflection. 2.16.3.2
All construction joints formwork shall be tightly secured against previously Project Specification
Sec. 033000
A5 cast or hardened concrete to prevent the loss of grout or the formation of Subclause 2.16.4.2
stepping or ridges in the concrete.
Formwork panels shall have true edges to permit accurate alignment of Project Specification
A7 Sec. 033000 Subclause
their sides, to provide clean lines at construction joints and shall be fixed 2.16.4.4
with joints either vertical or horizontal, unless otherwise specified.
Where holes are needed on forms to accommodate projecting
Project Specification
reinforcement or fixing devices, care shall be taken to prevent loss of Sec. 033000 Subclause
A8 2.16.4.5
grout. Special care shall be taken when de-molding in order not to break
off the edge of the concrete adjacent to the projecting reinforcement.
All formwork to be in contact with concrete shall be clean and treated
with a suitable release agent before fixing steel. All rubbish shall be
Project Specification
A9 removed from the interior of the forms before the concrete is placed. Sec. 033000 Subclause
2.16.5.1
14-621830-4800000771-HAC-CIV-ITP-000005_01 3
14-621830-4800000771-HAC-CIV-ITP-000005_01
REMARKS:
REFERENCE DOCUMENTS:
1- Project Specification section 03 30 00
14-621830-4800000771-HAC-CIV-ITP-000005_01 4
14-621830-4800000771-HAC-CIV-ITP-000005_01
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
Spacers shall be used for all column, beam, and wall construction to
A2 secure reinforcement against displacement and maintain required cover Project Specification
distance between the reinforcement and the vertical formwork. Provide Sec. 032100 Subclause
bolsters, bar supports adequate for strength and support of reinforcing 3.2.5
construction conditions.
Nonprestressed cast-in-place concrete members shall have specified
concrete cover for reinforcement at least that given in Table 20.5.1.3.1.
ACI 318
A3 Table 20.5.1.3.1
The inside diameter of bends for stirrups and ties shall be no less than 4
bar diameter for sizes 5 and smaller, all other sizes shall be bent in
accordance with ACI 318 Table 25.3.2
Minimum Diameters of Bend
Bar Size Minimum Diameter ACI 318
A4
No. 3 through No. 8 6db
No. 9, No. 10 and No. 11 8db
25.3.2
No. 14 and No. 18 10db
14-621830-4800000771-HAC-CIV-ITP-000005_01 5
14-621830-4800000771-HAC-CIV-ITP-000005_01
B Embedded Items
All embedded items shown on the drawings shall be fixed in the positions
B1 Project Specification
shown within the specified tolerances. Sec. 032100 Subclause
3.6.1
Project Specification
Do not support embedded items by welding to reinforcement.
B2 Sec. 032100 Subclause
3.6.3
REMARKS:
REFERENCE DOCUMENTS:
1- Project Specification Section 033000
2- ACI 318
3- ACI 301
14-621830-4800000771-HAC-CIV-ITP-000005_01 6
14-621830-4800000771-HAC-CIV-ITP-000005_01
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
A Receiving/Sampling/Testing Inspection
All ready-mix concrete shall be delivered to the site with a batch ticket
listing the following:
1- Name of ready-mix company and batch
12- Type, brand, and amount of cement
plant, or batch plant number
13- Class, brand, and amount of coal fly ash,
2- Serial number of ticket
or raw or calcined natural pozzolans
14- Grade, brand, and amount of ground
3- Date
granulated blast-furnace slag
5- Name of purchaser 16- Type, brand, and amount of admixtures ACI C94
13
A3 6- Specific designation of job (name and 17- Type, brand, and amount of fiber
location) reinforcement
7- Specific class or designation of the concrete
18- Source and amount of each metered or
in conformance with that employed in job
weighed water or recycled slurry
specifications
8- Amount of concrete in cubic yards (or cubic
19- Maximum size of aggregate
metres)
9- Time loaded or of first mixing of cement and 20- Mass (amount) of fine and coarse
aggregates aggregate
10- Water added by receiver of concrete and 21- Ingredients certified as being previously
his initials approved
11- Reading of revolution counter at the first 22- Signature or initials of producer’s
addition of water representative
Mold and cure a min. of three cylinders from each sample in accordance
with ASTM C31/C31M. Test cylinders in accordance with ASTM C
39/C39M.Test one specimen at seven days for information and test a ACI 301
A6 1.6.4.2.e
minimum of two specimens at 28 days for acceptance.
14-621830-4800000771-HAC-CIV-ITP-000005_01 7
14-621830-4800000771-HAC-CIV-ITP-000005_01
Slump, air content, density and temperature tests shall be made at the ASTM C94
16.4
A7 time of placement at the option of the inspector as often as necessary
for control checks.
Concrete, after being discharged from the mixer, shall be transported Project Specification Sec.
B1
as rapidly as possible to its final position in the works by means that 033000
shall be approved by the Engineer, and which shall prevent Subclause 2.17.5.1
Concreting shall not be allowed when the temperature is more than +43
Project Specification Sec.
degrees Celsius on a falling thermometer or +40 degrees Celsius on a 033000
B2
rising thermometer. Subclause 2.18.1.1
Concrete shall not be allowed to drop freely for more than 1.5 m. When
placing operations involve dropping the concrete more than 1.5 m, it
shall be deposited through sheet metal or other approved pipes. These
pipes shall not be made of aluminium. As far as practicable, during Project Specification Sec.
B5 placing keep the pipes full of concrete with their lower ends kept buried 033000
Subclause 2.18.4.1
in the newly placed concrete. After the initial set of the concrete, the
forms shall not be jarred and no strain shall be placed on the ends of
reinforcing bars that project. When pumping of concrete is employed,
equipment and all procedures shall be to the Engineer’s approval and in
accordance with the recommendations of ACI 304.
Project Specification Sec.
Provide sufficient number of vibrators to compact each batch properly,
B6 033000
immediately after it is placed in the forms. Subclause 2.18.5.5
14-621830-4800000771-HAC-CIV-ITP-000005_01 8
14-621830-4800000771-HAC-CIV-ITP-000005_01
REFERENCE DOCUMENTS:
1- Project Specification
2- ACI 301, ACI 318
3- ASTM C94
14-621830-4800000771-HAC-CIV-ITP-000005_01 9
14-621830-4800000771-HAC-CIV-ITP-000005_01
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
Patching Mortar: Mix dry pack patching mortar, consisting of one part
Project Specification Sec.
Portland cement to two and one half parts fine aggregate passing a No.
A3 033000
16 (1.18 mm) sieve, using only enough water for handling and placing. Subclause 2.23.3
Repair defects on concealed formed surfaces that affect concrete's Project Specification Sec.
A5 durability and structural performance as determined by Engineer. 033000
Subclause 2.23.4.3
B Curing Inspection
14-621830-4800000771-HAC-CIV-ITP-000005_01 10
14-621830-4800000771-HAC-CIV-ITP-000005_01
REMARKS:
REFERENCE DOCUMENTS:
1- Project Specification
2- ACI 301
14-621830-4800000771-HAC-CIV-ITP-000005_01 11
14-621830-4800000771-HAC-CIV-ITP-000005_01
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
Removal times will be increased if the concrete temperature following ACI 347R
A2
placement remain below 10 'C or if retarding agents are used. 3.7.2.3
Minimum allowable time after the last cast concrete is placed before
forms, shoring, or wall bracing may be removed; during which the air
surrounding the concrete is above [50 degrees F (10 degrees C)].
Columns 12 hours
Walls 12 hours
Structural live load Structural live load
Structures less than more than
structural dead load structural dead load
14-621830-4800000771-HAC-CIV-ITP-000005_01 12
14-621830-4800000771-HAC-CIV-ITP-000005_01
REMARKS:
REFERENCE DOCUMENTS:
1- NEOM Specification section 03 30 00
2- ACI 347
14-621830-4800000771-HAC-CIV-ITP-000005_01 13