0% found this document useful (0 votes)
11 views

RA Working in Ceilings

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

RA Working in Ceilings

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

COMPANY:

HAZARD IDENTIFICATION AND RISK ASSESSMENT


COMPILED BY: J. Reed
DATE OF ASSESSMENT:
SCOPE OF WORK: WORKING IN CEILINGS
REVIEW DATE: 2024

5 lmost certain to inevitable. atal 5 No production. 5 ermanent effects. 5 R500 000 5 azard permanently present.
5
PROBABILITY INDEX

FREQUENCY INDEX
INJURY/DISEASE (I)

ENVIRONMENT (E)
4 robable ermanent to Slight Disability. 4 Loss of 1 month or more production. 4 ong term - >2 years. 4 100 000 - R499 999 4 azard arises every week.

SEVERITY INDEX
PRODUCTION (P)
SEVERITY INDEX

SEVERITY INDEX

SEVERITY INDEX
4

COST (C)
3 mprobable 14 Days with complete recovery. 3 Loss of 1 week production. 3 ed. – 6 moths to 1 year. 3 10 000 - R99 999 3 azard arises every month.
3
2 ess than even chance. edical attention ≤14 Day with complete recovery. 2 Loss of 1 day’s production. 2 hort term – 1 day to 6 months. 2 1 000 - R9 999 2 azard arises every year.
2
1 ighly improbable. irst aid only. 1 Loss of 1 man shift. 1 nsignificant effect. 1 0 - R999 1 azard arises every 5 years.
1
0 ot probable. 0 ear miss. 0 No loss time. 0 o aspect or impact. 0 o cost involved. 0 o hazard exists.
PROBABILITY VALUE X SEVERITY TOTAL X FREQUENCY VALUE ÷ 500 ACTION TO BE TAKEN EFFECTIVENESS OF CONTROLS - RR
Risk A: 75 - 100% Immediate Training, SWP & Detailed Action Plan Elimination/Termination Effective – 100%
= TOTAL SCORE (%) (PURE RISK) Value B: 60 - 74% Within 1 week Training, SWP & Detailed Action Plan Substitution Controls – 80%
Residual Risk: Pure Risk x (100-effectiveness of controls) = Residual risk
C: 45 - 59% Within 1 month Training, SWP, Registers Engineering Controls – 60%
100
D: 30 - 44% Within 6 months Training & SOP Administrative Controls – 40%
E: 15 - 29% Within 12 months Training PPE – 20%
F: 0 - 14% As reasonable Training No Controls – 0%

Sensitivity Label: General


ndex Scor be co equipmn
Conditions complimenting the tota (The total effect, without mitigation)
e mple tro ent ormu
effect without mitigating)
Task / mente s a
enera d to
ctiviti Elimin
/ ate /
quipm Redu
nt e/
ontr
Risk
i azar
i s

2. Entering Ceilings • Working at height • Injury to employees • See Safe Work Procedure
• Damage to infrastructure for working in Ceilings
• Check Visibility
• Plan route
• Inspect area to access, for
any possible hazards
• Site agent and supervisor to
control

3. Moving around in the • Working at height • Injury to employees ▪ Wear PPE based on hazards
ceiling • Damage to Infrastructure identified
▪ Move carefully and according
to planned routes
▪ PPE Register
▪ Work done under
Supervision

Sensitivity Label: General


4. Exiting Ceilings • Ladder • Injury to employees ▪ Seed ladder risk assessment
▪ See Safe work procedure for
Ladders
▪ Access area clearly
demarcated
▪ Ensure access latches
closed and work area
cleaned
▪ Work done under supervisors
▪ Ladder register completed
▪ Risk assessment training
▪ Fall protection plan training

5. Accessing are below • Exposed edges • Injury to employees ▪ Access area clearly ▪ ▪ ▪
raised flooring demarcated
▪ Work done under
supervisors
▪ Risk assessment
training

6. Entering flooring area • Openings in floor confined space ▪ Injury to employees ▪ Check visibility
▪ Damage to infrastructure ▪ Plan route
▪ Inspect area to access, for
any possible hazards
▪ Area clearly demarcated
▪ Site agent and supervisor to
control

7. Never stand on the top • Ladder may tip over • Injury to employee ▪ Ensure ladder is long enough
three rungs of the ladder for the job
▪ Change hand and supervisor
to check the length of ladder

8. When adjusting the • Ladder could slip out of position • Injury to employee ▪ Secure locking device with
length of an extension wire or rope
ladder, make sure the ▪ Charge hand and supervisor
locking device is to check
secured before use

Sensitivity Label: General


9. A ladder must be • Working at any other angle is unsafe • Injury to employee ▪ Make sure the ladder is in
positioned at an angle of and causes an unsafe condition • Poor quality of work good condition
60° and 70° ▪ Use another employee to hold
the ladder in position
▪ Charge hand and / or
supervisor to make other
employees available
10. Both hands must be free • Not being able to support and hold • Employee may fall ▪ Supply carry bags
when climbing up a onto the ladder with both hands • Materials or equipment might be ▪ Use a rope and pulley to get
ladder dropped materials or equipment to
different levels
▪ Charge hand and supervisor
to arrange lifting device

11. Ladders must have non- • Ladder could slip out of position • Injury to employee ▪ Ensure non-slip feet are in ▪ ▪ ▪ ▪ ▪
slip devices fitted on the good condition
feet ▪ Supervisor to check
condition of ladder

12. Wooden ladders must • Slippery because of paint • Injury to employees ▪ Do not allow cracks to be ▪ ▪ ▪ ▪ ▪
not be painted • Hides cracks painted
▪ Supervisor to check

13. Only one person at any • Overloading the ladder can topple • Injury to employee ▪ Control use of ladder ▪ ▪ ▪ ▪ ▪
one time on the ladder and fall ▪ Charge hand and supervisor
to control
14. All stepladders must be • Ladder could slip and fold close • Injury to employee ▪ Ensure spreaders are ▪ ▪ ▪ ▪ ▪
fully extended, and operational and can lock into
spreaders must be position
locked into position

15. Limb up and down the • Facing outwards could cause an • Injury to employee ▪ Train employees on safe ▪ ▪ ▪ ▪ ▪
ladder facing the rungs employee to slip or miss a rung procedures to use a ladder
▪ Charge hand and supervisor
to train and overlook
employees

16. • • ▪ ▪ ▪ ▪ ▪ ▪

DATE OF RISK ASSESSMENT COMMENTS BY RISK ASSESSOR AND RISK ASSESSMENT TEAM
NAME OF RISK ASSESSORS AND RISK APPROVAL

Sensitivity Label: General


ASSESSMENT TEAM

1. [Risk Assessor] J. Reed Risk assessment for

2. Signature: