008 - SAS Gateway
008 - SAS Gateway
b. Verifying the test results with respect to the acceptance criteria wherever
applicable
d. Archiving the completed test results as per the approved archiving system.
Check as per the hardware specification the gateway has the correct number
of following:
1. Video card
2. Ethernet card
3. Serial card
4. RAM
6. Operating System
7. Type of Processor
8. Number of Serial port o/p used for IEC 101 protocol connection
9. Number of Ethernet RJ45 port o/p used for IEC 104 protocol
connection
4.0 REFERENCES
This document shall comply in accordance with the existing Company’s Rules and Regulations.
Any modifications therein found not conformance with the document shall be declared invalid.
For clarification and verification on this document, contact the following:
Substation
SAS Panel Name
Device Name Serial No
__________________ __________________
Date Date
Commissioning Services Department
Not
Hardware components Checked N.A Remarks
Checked
Device ID/Bay No:
Device type:
Activated Function:
RAM Size
Hard Drive Size HDD
CPU Core Type / Type of Processor
Video Card Installed
Communication / Ethernet Card
LAN
Windows
Extension Card (If applicable)
Communication and Ethernet Card
Number of Serial port o/p used for IEC
101 protocol connection
Number of Ethernet RJ45 port o/p
used for IEC 104 protocol connection
Software and Module Interface components
Operating System: All computers
should have the latest OS as specified
in the PTS.
System Start up: System should start
up without any error in BIOS or OS.
Anti-Virus Installation: A valid antivirus
shall be installed with latest updated
antivirus database.
Time Synchronization: The tested
computer should be time synchronized
with GPS Server.
IP Address :
Network Name :
Communication Module Checked:
__________________ __________________
Date Date
Commissioning Services Department
__________________ __________________
Date Date
Commissioning Services Department
event/alarm/analogue
appearance on HMI 1 & 2
Check execution of command
from CRCC.
Check fault indication of
Gateway Main
Gateway Redundant faulty
__________________ __________________
Date Date
Commissioning Services Department
6.0 Forced Switch-over Test: (If applicable : as all the system are not capable
of forcing the gateway, by default it communicates with main gateway
and in case of failure switches to back-up gateway.)
Switch
When Main Gateway is forced Expected Not
switchover, System should take over Approved Remarks
Time Approved
Redundant Gateway.
Time
Main Gateway Forced switchover
to Redundant GTW
Redundant Gateway Forced
switchover to Main GTW
The timing of the Gateway computer starts with switching on the power supply and finishes after
reaching the working condition successfully.
Not
System Start- Expected Measure
Approved Approve
up Time d Time Checked Remarks
d
Gateway PC 1
Gateway PC 2
__________________ __________________
Date Date
Commissioning Services Department
__________________ __________________
Date Date