0% found this document useful (0 votes)
36 views2 pages

DDTM Desember 2023

The document lists 27 issues with computers and networks at a company in January 2022. It provides details of each problem, the repair work done, start and end times and which technician addressed it. Most issues took 1-5 hours to resolve and were handled by the same technician, with no recorded delays.

Uploaded by

laaanang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

DDTM Desember 2023

The document lists 27 issues with computers and networks at a company in January 2022. It provides details of each problem, the repair work done, start and end times and which technician addressed it. Most issues took 1-5 hours to resolve and were handled by the same technician, with no recorded delays.

Uploaded by

laaanang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Departemen : MIS IT

DATA DOWN TIME MIS - IT Periode : 01-31 JANUARI 2022


Halaman : 1 dari 1
PT. DHARMA PRECISION PARTS
December 2023
PARTS MULAI SELESAI WAKTU
NO NAMA PC/SERVER MASALAH PENYELESAIAN JENIS Jumlah/
TGL JAM TGL JAM TOTAL PROSES DELAY
TEKNISI PC USER
pcs
01 PARTS-PPIC04 Excel lemot Repairing dan buar chace C komputer 01 10:00:00 01 12:10:00 2:10:00 2:10:00 0:00:00 RDS
02 PARTS-PPIC03 Komputer Selalu berat Upgrade HW dan SW repair OS RAM 8GB 1 02 9:00:00 02 16:30:00 3:45:00 3:45:00 0:00:00 RDS
03 PARTS-WORKSHOP01 Display ngeblur Bersihkan HW komputer & VGA 04 10:00:00 04 11:30:00 1:30:00 1:30:00 0:00:00 RDS
04 PARTS-PRDTOOLMAN Jaringan ga bisa Cek arah kabel tray Atas 05 10:30:00 05 15:00:00 4:30:00 4:30:00 0:00:00 RDS
05 PARTS-MKT04 Jaringan putus sambung Ganti krimping kabel 06 13:10:00 06 14:30:00 1:20:00 1:20:00 0:00:00 RDS
06 PARTS-PROD01 Internet off Repair SW Jaringan PC 07 8:30:00 07 10:30:00 0:40:00 0:40:00 0:00:00 RDS
07 PARTS-RnD01 Flasdisk ga kebaca Repair PC terindikasi virus 08 10:00:00 08 15:30:00 1:50:00 1:50:00 0:00:00 RDS
08 JARINGAN Maintenance ServerDPA DPT BC Data Report & DHCP 09 8:30:00 09 16:30:00 2:40:00 2:40:00 0:00:00 RDS
09 PARTS-ACCU04 Printer Gak mau narik Maintenance Roll belakang printer 11 8:00:00 11 10:00:00 0:40:00 0:40:00 0:00:00 RDS
10 PARTS-PPICDLV01 Situs IDBM error cek koneksi FW arah situs idbm 12 10:00:00 12 11:25:00 0:28:20 0:28:20 0:00:00 RDS
11 PARTS-ACCU03 Komputer gak nyala Hardisk Rusak (Butuh repair) 13 0:00:00 0:00:00 0:00:00 RDS
12 SYSBSN Proxy error Koonfigurasi koneksi proxy 14 16:00:00 14 21:00:00 5:00:00 5:00:00 0:00:00 RDS
13 PARTS-QA01 Hasil Print blur Maintenance Printer cartride 15 9:30:00 15 12:10:00 2:40:00 2:40:00 0:00:00 RDS
14 TOOLS-ENGNJIG Komputer Gambar Berat Maintenance HW+Modifikasi Resis SW 17 8:00:00 17 16:00:00 4:00:00 4:00:00 0:00:00 RDS
15 PARTS-ENGN01 File komputer tidak bisa diaksess Repair File + tambah security user 19 11:00:00 19 11:45:00 0:22:30 0:22:30 0:00:00 RDS
16 PARTS-RND02 Isue Virus Full Cek dengan Antivirus dan repair regis 20 13:00:00 20 15:30:00 1:15:00 1:15:00 0:00:00 RDS
17 PARTS-PRODLB01 File Excel berat Hapus link file yg tidak terpakai 21 10:00:00 21 11:15:00 1:15:00 1:15:00 0:00:00 RDS
18 PARTS-QA03 Komputer restart terus Maintenance HW + bersihkan prosesor 22 9:00:00 22 14:00:00 5:00:00 5:00:00 0:00:00 RDS
19 JARINGAN Bikin Jaringan depan Line Denso 23 9:00:00 23 16:00:00 7:00:00 7:00:00 0:00:00 RDS
20 JARINGAN CCTV Instalasi CCTV Area Prod L-Denso 24 9:00:00 24 16:30:00 7:30:00 7:30:00 0:00:00 RDS
21 PARTS-MTN01 File laporan error repair file excel, + buat recovery time 26 8:30:00 26 9:30:00 1:00:00 1:00:00 0:00:00 RDS
22 PARTS-PPICDLV02 Link file berat cek penempatan file yg terhubung 27 14:00:00 27 16:00:00 1:00:00 1:00:00 0:00:00 RDS
23 PARTS-PPIC02 layar biru bergoyang ganti SW chipset vga + kabel Kabel Analog VGA 1 28 8:30:00 28 11:00:00 1:15:00 1:15:00 0:00:00 RDS
24 JARINGAN BC server Full Backup file server 29 9:00:00 29 16:30:00 3:45:00 3:45:00 0:00:00 RDS
25 30 30 RDS
26 RDS
27 RDS
Departemen : MIS IT
DATA DOWN TIME MIS - IT Periode : 01-31 JANUARI 2022
Halaman : 1 dari 1
PT. DHARMA PRECISION PARTS
December 2023
PARTS MULAI SELESAI WAKTU
NO NAMA PC/SERVER MASALAH PENYELESAIAN JENIS Jumlah/
TGL JAM TGL JAM TOTAL PROSES DELAY
TEKNISI PC USER
pcs

01
02
03

You might also like