This document is a control plan for part number TD17071B09 from Knorr Bremse India Pvt. Ltd. It details the processes, characteristics, specifications, control methods, responsibilities and reaction plans for raw material receipt, chemical composition checking, machining operations, dimensional inspection and shipping.

Uploaded by

kumar.kv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

CP - Bottom Bracket

This document is a control plan for part number TD17071B09 from Knorr Bremse India Pvt. Ltd. It details the processes, characteristics, specifications, control methods, responsibilities and reaction plans for raw material receipt, chemical composition checking, machining operations, dimensional inspection and shipping.

Uploaded by

kumar.kv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Doc No: BFPL/NPD/F/04,

CONTROL PLAN Rev No: 00


Rev Date: 01-Apr-2023
Origin Date : 01-Apr-2023

Proto type Pre Launch Production Date (Orgi) Date (Rev) Rev
Key Contact Anoop Urs - 9738786972
Control Plan no CP/KBI/DMRC/TD17071B09 17.04.2024 17.04.2024 0

Part no TD17071B09 Mr. Utsav Agarwal (Marketing)


Customer Engg.Approval Date NA
Mr.Anoop Urs (NPD Manager)
Part Name / Description Mr.Madhusudhan & Ghanesh (Production)
Mr.Venkat Karthick (Quality Manager)
Mr.Umesh.A.S (Quality)
Core Team Mr.Purshottama & Kanthraj (Quality)
Mr.Kumar K v (QMS & NPD) Rev No / Rev Date R1 / 03.05.2024
BOTTOM BRACKET MACHINED Mr. Suresh Dominic (Maintenance)
Mr.Chandan (Design)
Mr.Manoj (NPD Engineer)

Organization / Plant
PROJECT DMRC Other Approval Date (If Req) NA
Knorr Bremse India Pvt.Ltd
Characterstic Method
Machine,Device,Jig,
Process Number Process Name/ Operation Description No Spl Char Class Sample Least count Control Method Resp Reaction Plan
Tools for Jig Product Evaluation Measurement Technique
Process Product/Process Specification/ Tolerance
(Gauge No. if Applicable) Size Freq.

1. Raw material as per specification


1.PO 1.Conformance to material test certificate.
2.Quantity verify against P.O & Invoice
Raw materials Received from Jindal 2.Invoice 2. Batch. No & quantity. 100% Supplier Control
10.0 NA 10.1 3. Free from transit damage (Visual) ..... Confirm from RM Certificate Every Lot ..... Purchase D
3.Unloading 3.No damage (packing in good condition) JAL/ CP/ E102127
JAL/PFD/BFPL
4.MTC
4. Reciept of MTC

20.1 Chemical composition ..... © 6060-T66 Confirm from RM/NABL Certificate 1 No's Every Lot ..... D

20.2 Mechanical Properties ..... ⊕ T66 Confirm from RM/NABL Certificate 1 No's Every Lot ..... D

1. Surface Table
BFPL/QA/F/06
2.Feeler Gauges
20.0 RM Inspection 20.3 Profile Dimension ..... ⊕ Thickness As per Drawing Digital Vernier caliper 1 No's Every Lot 0.01mm RM Inspection Prodn & Quality D/G
3. Vernier Calipers
register
4. Dial Indicator

20.4 Linear and Angular Dimensions … ⊕ Dimensions As per Drawing Instruments and Equipments 100% As per sampling plan - F/G/R

Visual Free from Dents, damages & As per sampling plan


20.5 Appearance ..... ..... Every Lot … G
scratches

BFPL/QA/F/08 In
30.0 Cutting Classic magic 30.1 Length … ..... 846.6mm ±0.5mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection Prodn & Quality F/G/R
register

BFPL/QA/F/08 In
40.1 Tapping Hole dia … ..... 4.2 ±0.1 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.2 Pitch (3X) … ..... 15±0.2mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.3 Distance … ..... 400.8±0.5mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

1st setting Drilling

BFPL/QA/F/08 In
40.4 Diameter (2x) … ..... 6.5 ±0.2mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.5 Distance … ..... 200 ±0.5 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.6 Distance … ..... 200 ±0.5 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register
Doc No: BFPL/NPD/F/04,

CONTROL PLAN Rev No: 00


Rev Date: 01-Apr-2023
Origin Date : 01-Apr-2023

Proto type Pre Launch Production Date (Orgi) Date (Rev) Rev
Key Contact Anoop Urs - 9738786972
Control Plan no CP/KBI/DMRC/TD17071B09 17.04.2024 17.04.2024 0

Part no TD17071B09 Mr. Utsav Agarwal (Marketing)


Customer Engg.Approval Date NA
Mr.Anoop Urs (NPD Manager)
Part Name / Description Mr.Madhusudhan & Ghanesh (Production)
Mr.Venkat Karthick (Quality Manager)
Mr.Umesh.A.S (Quality)
Core Team Mr.Purshottama & Kanthraj (Quality)
Mr.Kumar K v (QMS & NPD) Rev No / Rev Date R1 / 03.05.2024
BOTTOM BRACKET MACHINED Mr. Suresh Dominic (Maintenance)
Mr.Chandan (Design)
Mr.Manoj (NPD Engineer)

Organization / Plant
PROJECT DMRC Other Approval Date (If Req) NA
Knorr Bremse India Pvt.Ltd
Characterstic Method
Machine,Device,Jig,
Process Number Process Name/ Operation Description No Spl Char Class Sample Least count Control Method Resp Reaction Plan
Tools for Jig Product Evaluation Measurement Technique
Process Product/Process Specification/ Tolerance
(Gauge No. if Applicable) Size Freq.

BFPL/QA/F/08 In
40.7 Distance … ..... 3.60 ±0.2mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
Distance (3.60) mm
40.8 … ..... Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
(Reference Dimesnion)
register

BFPL/QA/F/08 In
40.9 Distance … ..... 25 ±0.2mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

Prodn & Quality

BFPL/QA/F/08 In
40.10 Distance … ..... 25 ±0.2mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.11 Distance … ..... 839.4±0.3mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.12 Diameter (3x) … ..... 9 ±0.2mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

40.0 Comet

BFPL/QA/F/08 In
40.13 Distance … ..... 14.50 ±0.3mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.14 Distance … ..... 22.8 ±0.5mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.16 Distance … ..... (25) mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

2nd Setting
Milling

BFPL/QA/F/08 In
40.17 Distance … ..... (22.80) mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.18 Distance … ..... 400.50 ± 0.50 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.19 Distance … ..... 400.50 ± 0.50 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.20 Distance … ..... 8 ± 0.20 mm Digital Vernier caliper 100% As per sampling plan 0.01 mm process Inspection F/G/R
register
Doc No: BFPL/NPD/F/04,

CONTROL PLAN Rev No: 00


Rev Date: 01-Apr-2023
Origin Date : 01-Apr-2023

Proto type Pre Launch Production Date (Orgi) Date (Rev) Rev
Key Contact Anoop Urs - 9738786972
Control Plan no CP/KBI/DMRC/TD17071B09 17.04.2024 17.04.2024 0

Part no TD17071B09 Mr. Utsav Agarwal (Marketing)


Customer Engg.Approval Date NA
Mr.Anoop Urs (NPD Manager)
Part Name / Description Mr.Madhusudhan & Ghanesh (Production)
Mr.Venkat Karthick (Quality Manager)
Mr.Umesh.A.S (Quality)
Core Team Mr.Purshottama & Kanthraj (Quality)
Mr.Kumar K v (QMS & NPD) Rev No / Rev Date R1 / 03.05.2024
BOTTOM BRACKET MACHINED Mr. Suresh Dominic (Maintenance)
Mr.Chandan (Design)
Mr.Manoj (NPD Engineer)

Organization / Plant
PROJECT DMRC Other Approval Date (If Req) NA
Knorr Bremse India Pvt.Ltd
Characterstic Method
Machine,Device,Jig,
Process Number Process Name/ Operation Description No Spl Char Class Sample Least count Control Method Resp Reaction Plan
Tools for Jig Product Evaluation Measurement Technique
Process Product/Process Specification/ Tolerance
(Gauge No. if Applicable) Size Freq.

BFPL/QA/F/08 In
40.21 Distance … ..... 7 ± 0.20 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
40.22 Distance … ..... 7 ± 0.20 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

Prodn & Quality

BFPL/QA/F/08 In
40.23 Distance … ..... 10.50 ± 0.20 mm Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
register

BFPL/QA/F/08 In
Distance (1.50) mm
40.24 … ..... Digital Vernier caliper 100% As per sampling plan 0.01mm process Inspection F/G/R
(Reference Dimesnion)
register

BFPL/QA/F/08 In
Distance (25) mm 100%
40.25 … ..... Digital Vernier caliper As per sampling plan 0.01mm process Inspection F/G/R
(Reference Dimesnion)
register
Doc No: BFPL/NPD/F/04,

CONTROL PLAN Rev No: 00


Rev Date: 01-Apr-2023
Origin Date : 01-Apr-2023

Proto type Pre Launch Production Date (Orgi) Date (Rev) Rev
Key Contact Anoop Urs - 9738786972
Control Plan no CP/KBI/DMRC/TD17071B09 17.04.2024 17.04.2024 0

Part no TD17071B09 Mr. Utsav Agarwal (Marketing)


Customer Engg.Approval Date NA
Mr.Anoop Urs (NPD Manager)
Part Name / Description Mr.Madhusudhan & Ghanesh (Production)
Mr.Venkat Karthick (Quality Manager)
Mr.Umesh.A.S (Quality)
Core Team Mr.Purshottama & Kanthraj (Quality)
Mr.Kumar K v (QMS & NPD) Rev No / Rev Date R1 / 03.05.2024
BOTTOM BRACKET MACHINED Mr. Suresh Dominic (Maintenance)
Mr.Chandan (Design)
Mr.Manoj (NPD Engineer)

Organization / Plant
PROJECT DMRC Other Approval Date (If Req) NA
Knorr Bremse India Pvt.Ltd
Characterstic Method
Machine,Device,Jig,
Process Number Process Name/ Operation Description No Spl Char Class Sample Least count Control Method Resp Reaction Plan
Tools for Jig Product Evaluation Measurement Technique
Process Product/Process Specification/ Tolerance
(Gauge No. if Applicable) Size Freq.

BFPL/QA/F/08 In
50.0 Tapping Tapping Machine 50.1 Tapping … ..... M4 TPG 100% As per sampling plan ..... process Inspection Prodn & Quality F/G/R
register

De-burring & cleaning Handing Concerns Leads to Non Confirming Not accepted 100%
60.0 Manual 60.1 Visual ..... Visual inspection As per sampling plan ..... Prodn & Quality F/G/R
Parts

70.1 Anodizing … ..... As per DIN 17611 TC 100% As per sampling plan ..... MTC F/G/R

70.2 Thickness … ..... 20µm+10 µm TC 100% As per sampling plan ..... MTC Prodn & Quality F/G/R

70.0 Anodizing

70.3 Colour … Natural TC 100% As per sampling plan ..... MTC F/G/R

Free From Dents, Damages, Scratches, Tearing Free From Dents, Damages, Scratches, BFPL/QA/F/09 Final
70.4 Appearance … Tearing marks, Blisters and Bubbles. Visual inspection 100% As per sampling plan ..... Quality F/G/R
marks, Blisters and Bubbles. Inspection register

Ø 4.9 DIN8140 Tap the hole


BFPL/QA/F/08 In
Helicoil Inserting EG M4 (4x) Clean the Surface As per Drawing
80.0 80.1 Threading & Insertion of Helicoil ..... Visual inspection 100% - As per sampling plan - process Inspection Prodn & Quality F/G/R
Helicoil Insert Insertion of Helicoil
register
Helicoil Thread Break off the Helicoil tab
Installation plier

BFPL/QA/F/09
90.0 Final Inspection 1. Anodizing defects, As per Drawing 100%
Dimensions 90.1 As per Drawing … Manual 100% ..... Final Inspection Quality F/G/R
2. Difference in color shade
register

1.Pack the components as per packing standard.


100.1 Open cover with bubble sheet 2.Delivery schedule & Qty as per PO. … Overall Part Visual 100% 100% ..... F

100.0 Packing Standard


Packing & Labelling Bubble sheet Despatch
BFPL / NPD/F/ 07

100.2 Damages Parts damage during the Transit. … Not accepted Visual 100% 100% ..... F

110 Dispatch Dispatch as per schedule against PO - Not accepted 100% Packing Standard
..... 110.1 … Visual inspection Every Lot ..... Despatch F
BFPL / NPD/F/ 07

Amendment History
Note:-
Rev no Description of change Effect Date

00 New Released 17.04.2024 D- Reject the lot & Inform supplier for necessary corrective action
Note :- 100% Inspection parameter carried by operator
01 Dimesnion Added 03.05.2024 F - Stop & Correct the process

R - Stop / Replace / Inform supervisor for necessary action

SP - As per sampling plan G – Stop / Seggregate

⊕ - Special Process

Prepared By: Mr. Manoj Checked By: Mr. Kumar K.V Approved By (Process Owner):Mr. Aoop Urs