Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3
S no.
Sub T-Code Description
1 EMQ LP10 EMQ against PO
2 EMQ MB21 EMQ against Cost center 3 TO LT12 Confirm TO 4 TO LT21 Check status of Confirm TO 5 Material BD10 Material Transfer to ME 6 Material BD87 Check IDOC 7 BOM CS14 BOM Comparision 8 PO CO01 Create PO 9 PO CO02 Change PO 10 Material MB04 Stock / Req List 11 Coois PO information System (Material Consumption/Recp) 12 Cogi Check Failed Goods movenent in ECC 13 PK13n Req Kanban and Check Status of Kanban board 14 Lb10 Create TR 15 Ih03 Verify As-buld Component InECC 16 CAT2 Time Registration 17 CA01 Create Routing 18 CA02 Change Routing 19 DRFOUT Transfer Master data to ME 20 Cr01 Create Work Center 21 Cr02 Display Work center 22 MM03 Display Material Stock 23 MM02 Change Material 24 MD04 Stock Requirement List 25 MD16 Display Planned Order 26 MD25 EMQ approve 27 MMBE Stock Overview 28 LS24 Stock Overview per material 29 CS15 BOM where used list 30 CS03 BOM display 31 IE02 Change Equipment ( Step by Step) 32 CA10 Standard Tex 33 PKMC Control Cyccle maintenance for Kanban 34 LS26 WH stock per material 35 LS25 Qty per storage bin 36 MD14 Conversion of planned Order 37 LX11 Doc Overview 38 LX03 Bin Status Report 39 LX13 Analysis of difference 40 LX02 Stock List 41 LX14 Material movement Frequency 42 LB13 Display TR 43 MIGO Goods Movement 44 CS01 Create Material BOM 45 CS07 Allocate Material to plant 46 CS11 Display BOM Level by level 47 CS13 Summrize BOM 48 CS12 Multilevel BOM 49 LS41 List of Control Cycle 50 PK05 List of supply area 51 LT10 Create TO ( For full line material) 52 LT01 Create TO ( For partial line material) MB51 Material Doc List MB52 Display WH stock Material MB25 Approve EMQ VL32N Change Inbound Delivery VL02 Change Outbound Delivery LT03 Create TO for Delivery Note LT04 to 1810