0% found this document useful (0 votes)
173 views9 pages

HIRA - RT & SR Work

The document discusses hazard identification and risk assessment of boiler tube leakage arresting work. It identifies hazards such as exposure to dust, sharp edges, slips and trips, height work, radiation, hot work, electrocution, and suffocation. For each hazard, it analyzes the severity, probability, existing controls and risks. It then proposes additional controls and assessments to reduce the residual risks.

Uploaded by

MELCO JITPL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
173 views9 pages

HIRA - RT & SR Work

The document discusses hazard identification and risk assessment of boiler tube leakage arresting work. It identifies hazards such as exposure to dust, sharp edges, slips and trips, height work, radiation, hot work, electrocution, and suffocation. For each hazard, it analyzes the severity, probability, existing controls and risks. It then proposes additional controls and assessments to reduce the residual risks.

Uploaded by

MELCO JITPL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

DOCUMENT HAZARD IDENTIFICATION, RISK ASSESSME

DEPARTMENT BOILER MAINTENANCE DEPT.


TITLE BOILER TUBE LE
Location BOILER NORMAL-NON ROUTINE
VER. NO : 02 REV. NO : 01 Date: 25.11.2020
Hazard Identification Existing Risk Assessment

Risk Score= S*P


Hazard No.

No. of
Existing Control Existing
ACTIVITY Hazard Persons

P
Measures Potential harm
involved

1. PPE's (Nose
1- Respiratory
2.51 Exposure to Dust mask, safety 3 2 2 4
problem
goggles)

1-PTW
2-SMP & HIRA Dec
3-Job specific TBT.
2.52 Sharp edge Cut injury 3 2 3 6
4- Mandatory PPEs
5-Awareness
Training

1. Mandatory PPE's
2. Job specific
2.53 Slip & Trip PPE's (cut Body injury 3 2 2 4
resistance hand
gloves)

1-PTW
2-SMP & HIRA Dec
3-Job specific TBT.
8. NDT Work (SR &
RT) Height Work 4- Mandatory PPEs
Injury to body
2.54 (Person fall from 3 4 3 12
height) part
5-Awareness
Training
6-Height Pass
1-PTW
2-SMP & HIRA Dec
3-Job specific TBT.
1-Rediation
2.55 Radiation 4- Mandatory PPEs 3 4 3 12
5- Certified & Injury
authorized persons
for RT

Reviewed By Reviewed By Reviewed By Reviewed By

(HOD, PMPL) (HOD, VL) (HOD-Safety, PMPL) (HOD-Safety, VL)

1-PTW
Hot work (SR) 2-SMP & HIRA Dec
3-Job specific TBT.
2.56 Electrocution & 4- Mandatory PPEs
Burn injury 3 4 3 12
short circuit. 5- Authorized persons
for SR

8. NDT Work (RT &


SR)
8. NDT Work (RT &
SR)

1-PTW
2-SMP & HIRA Dec
3-Job specific TBT.
1-Injury To Body
4- Mandatory PPEs
Parts
2.57 Suffocation 5-Awareness
2-Breathing
3 4 3 12
6-Confined Space
problem
Pass
7-Calibrated Multi gas
Detector

Reviewed By Reviewed By Reviewed By Reviewed By

(HOD, PMPL) (HOD, VL) (HOD-Safety, PMPL) (HOD-Safety, VL)

Note-1. Mandatory PPEs :- Safety helmet, Safety shoes, Safety goggles, Nose mask, Job specific PPEs :- Cotton dotted han
Full body leather apron, leg guard, hand sleeve, welding face shield, Heat resistance hand gloves ( Hot work), Full body
FORM:MRJ/HIRA/01-00 Note: S= Severity, P= Probability, BC=Business concern, S/NS- Significant/ Non-significant
ENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROLS (HIRADeC)
DOC. NO. : IPP/HIR-BMD/NROU/02
BOILER TUBE LEAKAGE ARRESTING
NORMAL-NON ROUTINE
Date: 25.11.2020 PAGE 1 OF 2
Residual Risk Assessment

Score= S*P
Risk level

Risk level
Ref :Proposed controls (Elimination, Substitution, Engg,
BC S/NS
Sign/Admin & PPE)

P
1-Working area must be cleaned before executation of work.
Acceptable Acceptable
NL NS 2-Awareness Training for using Area Specific PPEs (Nose 2 1 2
Risk Mask, Safety Goggles). Risk

1. Ensure proper housekeeping.

2. Direct contact of body parts with sharp edge to be


Adequate Acceptable
NL NS avoided. 2 2 4
Risk Risk
3. Safety awareness training.
4. Cut resistance hand gloves to be used.
5- Only good condition material to be shifted

1-Ensure safe access & good housekeeping of work place


Acceptable 2-All unwanted material should be removed from work place. Acceptable
NL NS 2 1 2
Risk 3.Extra light to be provided if required. Risk
4.Area to be barricaded.

1- Persons having height pass are only allowed to work


2-Person must use safety belt/ fall arrestor/ life line while
working at height
Substantial Acceptable
NL S 3- Scaffolding must be approved by an authorized person 4 1 4
Risk Risk
4- Scaffolding checklist must be filled & safety tag be provided
before use
5-Strict supervision to be ensured.
1- Adequate monitoring of work place.
2-Boiler 0mtr, 13 Mtr stair case to be barricaded & No
person is allowed to go in boiler area.
3-Radiation Detector must be kept with RT performing
person.
4- All Job specific PPE's to be used as per BARC norms.
Substantial Acceptable
Risk
L S 5- Communication to be done with CCR for unauthorized 4 1 4
Risk
movement during RT
6- Source must be stored at designated place
7- Before doing RT special permission must be taken
from maintenance head & communication must be given
to all area in charges/ HOD/CCR.
8-Strict supervision to be ensured.

Reviewed By Approved by Approved By

(HOD-Safety, VL) (Maintenance Head, PMPL) (Maintenance Head, VL)

1- Power source to be carried from 30mA ELCB point


only
2- Do not touch hot surface in naked hand
3- Do not touch any work piece during live power source
4- Cable condition must be checked before use
Substantial 5- Authorized electrician must engage for cable Acceptable
NL S 4 1 4
Risk connection work Risk
6- Area must be barricaded during SR
7- Work piece to be touched only after it is cooled to
ambient temp
8- SR to be done as per QC standard.
9-Strict supervision to be ensured.
1-Ensure proper Confined space & Isolation certificate.
2-Before starting inside work O2 & other toxic gases level
should be measured by authorized gas tester.
3-Job specific Tool box Talk should be conducted before
starting of work.
4-The worker must be medically fit & must have a valid
confined space pass.
5-Confined space entry & exit register should be
followed.
Substantial 6-Confined space stand by person must available near Acceptable
L S 4 1 4
Risk the entrance of Manhole. Risk
7-24 volt illumination should be provide for lighting
purpose.
8-Periodically rest to be given to worker.
9-Gas testing to be done periodically.
10-Safety watcher to be deputed & Ensure close
supervision.
11- Emergency rescue plan must be attached
12- Rescue team must be informed before start of work
13-Strict supervision to be ensured.

Reviewed By Approved by Approved By

(HOD-Safety, VL) (Maintenance Head, PMPL) (Maintenance Head, VL)

pecific PPEs :- Cotton dotted hand gloves (manual material handling), ear plug (Noisy area)
es ( Hot work), Full body harness. (Height work)
cant/ Non-significant
IPP/WI-MM/BMD-02 & IPP/WI-MM/BMD-09

Refer
SOP/WI
proved By

ance Head, VL)


IPP/WI-MM/BMD-02 & IPP/WI-MM/BMD-09 IPP/WI-MM/BM
proved By

ance Head, VL)


IPP/WI-MM/BMD-02 & IPP/WI-MM/BMD-09

You might also like