The document contains questions about risk-based inspection programs. It asks about the main production consequences of RBI, how maintenance impact is measured, how risk is calculated, criteria for accepting risk, what is included in inspection and maintenance planning using risk assessment, how sensitive analysis can improve risk analysis, how risk analysis is generally communicated, whether probability and consequence categories have different weightings, and how risks judged acceptable during RBI analysis are handled.

Uploaded by

xyz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

456 Asd

The document contains questions about risk-based inspection programs. It asks about the main production consequences of RBI, how maintenance impact is measured, how risk is calculated, criteria for accepting risk, what is included in inspection and maintenance planning using risk assessment, how sensitive analysis can improve risk analysis, how risk analysis is generally communicated, whether probability and consequence categories have different weightings, and how risks judged acceptable during RBI analysis are handled.

Uploaded by

xyz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Risk Based Inspection Question Bank

24. The main Production consequences for RBI are


a) Financial.
b) Failures.
c) Equipment deterioration

25. Maintenance impact in RBI program will be generally be measured in monitory


terms and typically includes
a) Repair
b) Equipment replacement.
c) A & B

26. Risk is calculated as product of


a) Probability X consequences
b) Consequence X rate of deterioration
c) Life of equipment X consequences

27. Users across the world will refer for more information on Risk acceptance.
a) ASME sec VIII
b) API 579, fitness for purpose.
c) A comparison of criteria for acceptance of Risk by Pressure vessel
research council.
d) None of the above.

28. Inspection and maintenance planning using risk assessment will follow
a) Items/ equipment require inspection
b) Inspection Technique
c) Extent of inspection.
d) All the above.
29. Sensitive analysis will help in improving the risk anlysis.
a) Quality and accuracy
b) Benefit cannot be achieved.
c) Will drastically adverse the quality and accuracy.

30. General way of communicating the risk analysis is


a) Risk analysis comprehensive report
b) Using a risk matrix
c) This is confidential and to be used by only team.

31. Different weighting is given to consequence category than probability


a) Will symmetrical matrix
b) Will be asymmetrical matrix
c) Having no relation with the individual weighting.
32. Risks that are judged acceptable during RBI analysis
a) No mitigation may be required and no further action necessary.
b) Inspection monitoring is required.
c) Reevaluation is to be done about the facts by a team.