NGP Con BRG Gad 838 4 - V13
NGP Con BRG Gad 838 4 - V13
310
300
CL OF PROP. THIRD LINE PROP.1/1.22 m RCC SLAB TOP OF B.B.- 586.276 4. DRAWING SHALL NOT BE SCALED. ONLY WRITTEN DIMENSIONS TO BE FOLLOWED.
TC-8246 BOTTOM OF B.B.- 585.976 5. ALL THE DIMENSIONS & LEVELS SHOULD BE VERIFIED & RECONCILED BY THE
4800 395
ENGINEER IN CHARGE AT SITE BEFORE EXECUTION OF WORK.
4500 PROP.R.L:587.324 m 995 6. PRIOR INTIMATION TO BE GIVEN TO CONCERNED DEPARTMENT VIZ S&T, TRD,
1:3
1123 4075 3925 EX.R.L:586.904 m 446 984 2300
2247 2247 FORM. LEVEL - 586.586 OPERATING & ENGINEERING AS APPLICABLE BEFORE COMMENCEMENT OF WORK.
7950 100 100 310 .5:
1 TOP OF B.B.- 586.276 7. ALL RCC/PCC WORK SHALL BE DONE AS PER IRS CONCRETE BRIDGE CODE.
4902 8 DIA @200mm c/c BED LEVEL 585.027
4825 3048
1
3123 3125
1525 PROP.R.L:587.324 m 698
610
SL
O PE BOTTOM OF B.B.- 585.976 8. THE MINIMUM SBC OF FOUNDING STRATA SHALL BE MORE THAN 89 T/M²
EX.R.L:586.904 m B.L.585.578 529 995 12 DIA @100mm c/c 600
750
1:3
PROP.F.L:586.586 m 450 10 DIA @100mm c/c 9. BACKFILL MATERIAL SHOULD BE AS PER CLAUSE 7.5 OF IRS BRIDGE SUBSTRUCTURE
TOP AND BOTTOM
B.O.S.586.276 B.O.S.586.276 310 PROP.B.L:585.027 m AND FOUNDATION CODE.
H.F.L:585.781 SLO LEVEL -584.627
585.976 300 PE H.F.L:585.781 10. THE GAD APPROVAL BY CBE'S OFFICE IS NOT FOR STRUCTURAL DESIGN AND
600
V.C.316 B.L.585.578 2:1 2282 LEVEL -584.327 STRPS 4 LEGS
FLOW 1249 600 8 DIA @200mm c/c DETAILS. THE SAME SHALL BE APPROVED BY COMPETENT AUTHORITY OF
1064
FOUND. LEVEL - 584.027 FOUND. LEVEL - 584.027
301 PROP.B.L:585.027 m CAO(C)OFFICE.
LEVELLING COURSE
584.514 m 584.514 m 150 MM 11. THERE IS NO PAST HISTORY OF SCOURING AS PER BRIDGE INSPECTION REGISTER.
1000 1000 150 MM
5327 584.027 584.027 CROSS SECTION X-X LEVELLING COURSE 300 12. DEPTH OF FOUNDATION AND LENGTH OF FACE WALL IS TENTATIVE AND SHALL BE
DECIDED BY ENGINEER-IN-CHARGE AT SITE TO SUIT THE SITE CONDITION AND
BED LEVEL LOWER BY 551 SCALE - 1:100 NATURE OF SOIL.
SECTION OF ABUTMENT @A-A
SECTIONAL ELEVATION Y-Y BL- 585.027 13. NECESSARY PROTECTION/SHORING SHALL BE PROVIDED IF REQUIRED DURING THE
BL- 208.536
SCALE - 1:100 14. THE BRIDGE LOCATION COMES UNDER SESMIC ZONE-III.
BOTTOM OF B.B.-585.976
FORM. LEVEL - 586.586
15.BEFORE STARTING EXECUTION, A WORKING CROSS-SECTION AT THE SITE SHALL BE
1000
TO ITARSI
300
TOE WALL FOUND. LEVEL - 584.027 CONCERNED COMPETENT AUTHORITY, BEFOREHAND.
900
16.IT IS CERTIFIED BY THE FIELD STAFF AND OFFICIALS THAT, TRAIL PIT DETAILS SHOWN
CL DN M/L CL OF PROP. THIRD LINE 450 SECTION OF TOE WALL ON GAD ARE AS PER ACTUAL DATA COLLECTED FROM SITE.
CL UP M/L TC-8246 Z 586.736 (SCALE - 1:50) 17.IN ORDER TO ACHIEVE MINIMUM 1.0M FREE BOARD, THE RAISING OF FORMATION
586.586 m LEVEL IS VERY DIFFICULT AND MAY INVOLVE NUMBER OF ACTIVITIES WHICH RESULTS
1123
X 3100 X IN HEAVY EXPENDITURE.HENCE,IN TERMS OF IRBM PARA 313 (02), THE FREE BOARD
1067 3124 4885 3037 BAT BAT MAY BE RELAXED AT THE DISCRETION OF PCE/CBE.
2 1
1:15
1:10
1:3 FRONT SIDE
C OF BRIDGE
4500 1525 WHICH RESULTS IN HEAVY EXPENDITURE.HENCE, IN TERMS OF IRBM PARA 312 (04),
SCALE - 1:100
1840 300 SBC (T/M2) THE VERTICAL CLEARANCE MAY BE RELAXED AT THE DISCRETION OF PCE/CBE.
995 PROP.B.L:585.027 m B.L:585.027 m 19.LOADING STANDARD OF EXISTING BRIDGE RBG.
395 20.THE CONDITION OF EXISTING BRIDGE IS SOUND AS PER OPEN LINE BRIDGE
CL OF BRIDGE Y 2247 6 2247 CL OF BRIDGE Y 310
CLEAR SPAN
100 100 INSPECTION REGISTER
FLOW
1220
1220 B4 B HARD
1:
A 1000 21.WEEP HOLES SHALL BE OF 75/100 DIA PVC/AC PIPES STAGGERED @1000C/C IN
3
3
3
1500
1:
DF
ROCK BOTH HORIZONTAL AND VERTICAL DIRECTIONS ABOVE LOW WATER LEVEL IN BOTH
2272 995 300 995 89.73 (T/M2) FDN LVL FACE WALL:584.027 ABUTMENT AND FACE WALL.
2734
1:3 584.327 300 300
:1
584.027
6248 3658
1.5
WF TRIAL PIT DETAILS SPECIFICATIONS:-
A
LEVEL -584.327
3658 1. GRADE OF COCRETE FOR R.C.C SLAB ......................M 25.
4826 C C 2. GRADE OF STEEL ......................Fe-500.
Z H DF B B B B4 WF 3. MINIMUM CLEAR COVER FOR MAIN REINFORCING BARS ......................50mm
1 2 3
1559 1000 104 156 233 233 1776 TRACK DETAILS: EXISTING PROPOSED
6. GRADE OF CONCRETE FOR ABUTMENT & FACE WALL ........................M-25.
RAIL LEVEL 586.904 m 587.324 m 7. MAXIMUM FOUNDING PRESSURE OF PCC FACE WALL ........................10.0 T/M 2
8. MAXIMUM FOUNDING PRESSURE OF PCC ABUTMENT ........................12.0 T/M 2
FORMATION LEVEL 586.346 m 586.586 m
SECTION OF FACE WALL @C-C
HALF TOP AND HALF BOTTOM PLAN (SCALE-1:50)
ALIGNMENT CURVE (3D) CURVE(2D)
SCALE - 1:100 GRADE R 1 IN 71 R 1 IN 67
C.N
REFERENCES:
O 1. IBRIDGE MANUAL /SUB STRUCTURE CODE.
Δ=2 .23(RH
1°36 ) 2. FOR DETAILS OF WEEP HOLE & BACK FILLING REFER DRG.NO.
R=4
37.5 '59'' RDSO/GE/SD/0006/REV.1/2002
D=4 00m LTC C.NO.25 (LH)
° TL = = 60m
S= Δ= 60°30'15'' LTC = 60 m 3. FORMATION LEVEL AND SITE PLAN AS PER APPROVED PROJECT SHEET NO.GM
0
Vma .342m CL = 113.587 R= 388.889 m TL =257.036 m BRIDGE DETAILS EXISTING PROPOSED
HYDRAULIC DATA EXISTING PROPOSED
(E) MB-31542/05 OF 19 GDYA-CCD SECTION.
x 22 m
T1= =75 km Ca=105 5.058m D= 4.50° CL = 470.665 m TYPE SLAB 1 CATCHMENT AREA KM2 0.137 0.137 4. RCC SLAB(1.220m CLEAR SPAN) SHALL BE AS PER DRG.NO.RDSO.NO.
60 9307 / h m RCC SLAB
R68 R2 T2=
9 5.74 r Cd=7 m S = 0.385 m Ca=75 mm RDSO/BA-10063.
APE 3300.80 2 m 2 mm SPAN 1/1.22 m 1/1.22 m
KM:838.100
CH:92970m
X CH 0m Vmax=65 km/hr Cd=75mm 2 DESIGN DISCHARGE 2.932 m3/S 2.932 m3/S 5. FOR DETAILS OF ABUTMENT REFER DRG.NO. GM(E) MB-99040
R68
R260 R68 :931
89.3
R67 T1=93890.420 m BED LEVEL 585.578 585.027 m VELOCITY (M/S)
3
380 0
3.2 3.2
CH:931 80
29m
m
50m
T2=94361.085 m
CH 838.5
.2
BRIDGE DN M/L PROP.3RD LINE 4 WATER WAY REQUIRMENT (M2) 0.920 0.920
KM:838
PR
KM
m
3RD M/L DM
R 67 R74 R74 R77 6 HFL
/L 585.781 585.781
2
CH:94060m
:93
H:93130 m
0m
KM:839.19
9380
C.N
Δ= O. 2 FOUNDATION OPEN FOUNDATION OPEN FOUNDATION
AT
N
/3 ,
8
℄ OF P D= 75m '25'' PROP.3 TRACK CENTER 4.902 8.246 0.495 M 0.495 M
38/2 , AT C
S= RD M/L
KM 8 ROP. B Vm 0.171 TL = 60 BASIC WIND SPEED 39 M/S 39 M/S LENGTH OF LONGEST STREAM COURSE
(CH: 38.300 LOCK C CL =111 m
O.
m
ABIN
5.742m
0m) C
T2= 9342 km/h a=4 21.73 2m
5 ICAL SUBZONE (LOWER GODAVARI) (LOWER GODAVARI)
AP 9364 5.520 r Cd= mm 0m 65 65
.B
EXPOSURE
m
H:9313
CH 50 m mm
0
12 SUB ZONE 3f 3f
.
: 93
0.80
ST
.OF
536
B
.63
I
/1.2 SIDE 2 SLA
324
PROP.T1 @
EX
0
:9
.80
C.L.OF EX
OF
CH
.2
.J
PROP
2@
SESMIC ZONE-III
PRO:9353 INE A BY TH 4 , 1/1
PROP
:93
5.5
.
38/ 0m
BLOC
P.J
2m
CH
CENTRAL RAILWAY
342
AT ON D C SLA O. 8 85.52
ET. END K
E
CABI
PRO
H:9
48m
N
50m
m
4
.T2
7.250
DHQ. STN.
87.2
S1
OP
OP EX. @ CH
,
8/5
N
.T1
:9364
PR
:935
61m
766 .NO. 83
1
CH
J
@ CH
PR
m.
OP
NL
48m
m
C RLY. BOUN
2@
DARY
PR
.642
0.420
61m 1188.230
Signature block
NAGPUR DIVISION GDYA-CCD SECTION
F
m
P.T2
R
O
0.420
AT C F EX. B
C.NO
.
:9389
C.L
59.50 m
CH
223 m
PR
1220.000
SSE-C-DRG-III-NGP
.
BR
C RL
D=3°
@ CH
LTC= BOUND
@ CH
6 48m
CONSULTANTS:-
CL=3 0m HYDROPNEUM SYSTEMS
W
KM93
P.T1
108 m
10m RAMNARESH YADAV Digitally signed by RAMNARESH (ISO 9001 : 2008 Certified)
CH:93000
T/C-8.246 m.
DN M RAGHUVANSH, CTS NO. 755/80,
P.J1
5.83m
PRO
/L AXEN-C-BZU YADAV
C RL
Y. BO
UNDA 61m 3RD PLOT NO -78, 2nd Floor, MAYUR
RY
117 m
C.N LINE SUJIT KUMAR SINGH Digitally signed by SUJIT KUMAR COLONY, KOTHRUD, PUNE- 411038.
DYCE-C-BZU SINGH
R72 R
70 R=5 O.-28 Date:2022.12.15 04:27:54 +05'30'
TEL +91 (020)25430180/181/182
(
D=3 83.333 LH) NGP. END SACHIN WAMANRAO GANER Digitally signed by SACHIN
KM:838.188
CH:93058m
DN M
° m
LTC C.RL UP M AIN LINE SRDEN-N-NGP WAMANRAO GANER
BRIDGE NO - 838/4
= AIN L MJY.STN.
FLOW
CH:94000
:
KM
KM
DYCE-C-DESIGN
DN
M/L CH: 839 Date:2024.01.11 02:56:43 +05'30' P.B.I.No. 21 OF 2015-16
938 VINOD MADHUKAR BHANGALE Digitally signed by
SITE PLAN 70 CPM-II-NGP VINOD MADHUKAR BHANGALE SCALE 1:100 UNLESS SPECIFIED OTHERWISE
SCALE:-1:5000 Date:2024.01.17 06:17:34 +05'30'
HD.QRS.FILE NO.