FNN Guideline Grid Forming Behaviour of HVDC Systems and DC-connected PPMs - Inhalt

This document provides guidelines for grid forming behavior of HVDC systems and DC-connected power plants. It defines test networks, scenarios and a reference behavior for verifying that these systems can support the grid during disturbances by controlling voltage and frequency without relying on measurements from the AC network.

Uploaded by

taigeras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
33% found this document useful (3 votes)
595 views3 pages

FNN Guideline Grid Forming Behaviour of HVDC Systems and DC-connected PPMs - Inhalt

This document provides guidelines for grid forming behavior of HVDC systems and DC-connected power plants. It defines test networks, scenarios and a reference behavior for verifying that these systems can support the grid during disturbances by controlling voltage and frequency without relying on measurements from the AC network.

Uploaded by

taigeras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

VDE FNN Guideline

FNN Guideline: Grid forming


behaviour of HVDC systems and
DC-connected PPMs

Supplement to VDE-AR-N 4131 for dynamic frequency/active power


behaviour and dynamic voltage control without reactive current
specification
Contents
1 Introduction ..........................................................................................................................1

2 Scope ....................................................................................................................................1

3 Abbreviations and terms......................................................................................................2

4 Requirements from the system perspective.......................................................................2

5 Grid forming relevant design parameters of HVDC systems and


DC-connected PPMs ............................................................................................................3

6 Application-specific guidelines ...........................................................................................4

6.1 General ...........................................................................................................................4


6.2 HVDC systems ................................................................................................................5
6.3 DC-connected PPMs .......................................................................................................5
7 Test network, verification method and reference behaviour for
HVDC systems and DC-connected PPMs ...........................................................................5

7.1 Test networks ..................................................................................................................5


7.2 Definition of test scenarios ...............................................................................................8
7.2.1 Phase angle step in network voltage ....................................................................9
7.2.2 Phase angle step followed by linear frequency change ........................................9
7.2.3 Voltage magnitude step in the network ............................................................... 10
7.2.4 Presence of a negative-sequence component in the
network .............................................................................................................. 10
7.2.5 Presence of harmonics in the network ................................................................ 11
7.2.6 Presence of subharmonics in the network .......................................................... 11
7.2.7 Change in the network impedance ..................................................................... 12
7.2.8 Islanding with DUT and active load .................................................................... 12
7.2.9 Islanding with 2 DUT and active load ................................................................. 13
7.2.10 Change in the network impedance with 2 parallel DUT ...................................... 13
7.3 Reference behaviour ..................................................................................................... 14
7.3.1 Procedure .......................................................................................................... 14
7.3.2 DC-connected PPMs and HVDC systems with options of
energy compensation from independent energy sources ................................... 15
8 Summary and prospect...................................................................................................... 26

9 Bibliography ....................................................................................................................... 27

A. Annex .................................................................................................................................. 28

Verification procedure – Application-specific guidelines ................................................. 28


A.I.A. Required DUT behaviour for evaluation of grid forming
control behaviour (high-level control requirements) ............................................ 28

VDE FNN Guideline


A.I.B. Specification of a load under grid forming control (feed-in) ................................. 29
A.I.C. Definition of measurement variables .................................................................. 35
Comparison of verification procedures........................................................................... 35
A.II.A. Introduction ........................................................................................................ 35
A.II.B. Time curve up to the first peak and of the settled state....................................... 36
A.II.C. Continuous envelope based on the simulation model with
actual topology ................................................................................................... 38
A.II.D. Comparison........................................................................................................ 44
Examples of reference time varying curves with controlled
voltage source ............................................................................................................... 89

VDE FNN Guideline

You might also like