Management Review 2020

Uploaded by

momin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Date :

Time :
Venue :
Type of Meeting : Management Review meeting

Present:
-

Minutes of the Meeting:

1. Review of Previous Minutes


The previous meeting minutes was reviewed and approved.

2. OHS Performance Review for the Period

A. Training:

3. Review of IMS Objectives and Targets for 2020


Note: To be provided separately by

4. Results of Internal Audits and evaluation of compliance

No NCR’s found

5. Process Performance and Product/Service conformity


 Discussed about new project specifications and requirements.
 General Manager to ensure compliance and conformity with project or client’s requirements.
 Any issues or concerns in the project sites shall be communicated by the Site Engineer or Site
Supervisor for immediate action by management.

6. Turn Over
 Instruction given to identify new customers to get new orders to achieve business target.

7. Customer Complaints
 Sr. Engineer to monitor customer complaint frequently and alert the General manger in any
complaint. Currently no complaint received from the clients.

8. On Time Completion Target


 General Manager and Sr. Engineer to monitor performance and target completion dates.
 The delay of project was discussed, the delay was due to client issues, a letter was sent to
Siemens for delay compensation.

9. Status of Incident Investigation, Preventive, Corrective Actions


 There was no reported incident or accident during the year 2020
10. Changes that could affect the Integrated Management System including Legal and Other
Requirements
 Relevant IMS system documents shall be updated accordingly.
 Other requirements from new projects are kept in the list of documents from external sources.
 Legal requirement checked and found all fulfil.

11. Results of Participation and Consultation


 Project site meetings with client are being conducted regularly.
 Operations meeting are being held to plan the project activities and support any issues.

12. Customer Feedback both positive and negative


 Customer feedback forms were reviewed and found satisfactory.
 Project visits and meeting has been conducted by Site Engineer and General Manager to assist
clients and verbally receive feedback.

13. The Performance of External Providers

 General Manager to ensure the evaluation of all new suppliers.


 All new regular suppliers were evaluated.

14. Recommendation for Improvements

 Site safety and Housekeeping to be maintained.

15. Adequacy of Resources

 Additional two manpower is required, currently contracting increased.


 One oil machine and two vacuum plant were procured.

16. The effectiveness of actions taken to address risks and opportunities.

 External and internal factors were discussed for their risks and opportunities, the two main
factors are competition and resources.

17. Others
 IMS Policy was reviewed and there is no need for changes.
 Any change or revision of IMS documents shall also update the IMS Documents Master List.
 All new forms shall be registered and added into the IMS Documents Master List.