Infrastructure
Infrastructure
Deliverables:
1. Roads Network.
2. Water Supply Network.
3. Sewage & Storm drainage Network.
4. Irrigation Network.
5. Firefighting Network.
6. Electricity, Street & landscape lighting.
7. Tie-ins for Landscape & Gates.
8. Communications & Security Systems Network.
9. Sub-Soil drainage (if needed in the soil report).
10. Solid waste management strategy.
11. Solar Energy.
This will be based on quantifying the demand generated by the future population in relation to
adapted standards and indicating on plans the various networks and coordinating their requirements,
Location of major utility structures and/or installations will be determined.
The Consultant is obligated to submit the main loops/networks in reference authorities’ requirements,
relevant codes & regulations in all disciplines, in order to ensure that all Infrastructure main lines
feeding District 6 – A6 & A7 will be permanent & NOT temporary along with a preliminary cost
estimate for the infrastructure based on project components and prevailing market prices.
C. Traffic Study:
Client will provide the external traffic study (showing project exits & entrances from its surroundings),
consultant shall prepare the traffic study for District 6 – A6 & A7 as an optional scope with separate
fees & to be considered in coming stages.
D. Solid Waste management (SWM) strategy:
The consultant shall review, validate the SWM report provided by the client & resubmit updated
concept design report to be considered in further stages.
E. Sustainability Report:
The Consultant will review and verify the sustainability report (provided by the client) and the
consultant to provide alternatives for sustainability solutions (e.g. solar farm, individual lighting poles,
waste water treatment, etc.…) in the BODR for client approval to be considered in further stages.
H. Subsoil Drainage System (Optional based on soil, geophysical & geotechnical reports
recommendations):
The scope of subsoil drainage is to prevent the excess irrigation & filtration water from flowing to the
building foundation, towards the boundary walls and layers underneath footings of building (design
fees for subsoil drainage works to be submitted separately upon requested by the client).
1. The subsurface drainage network with detailed drawings and relevant calculation sheets
shall be divided to serve residential buildings and public landscape areas.
2. Plans and profiles of subsoil drainage system showing diameters, length level, invert levels,
manhole cover level and coordinates.
3. Standard detailed drawings.
4. Utilities corridor cross sectional detailed drawings & plans if required.
5. For the public landscape areas (roads) and residential, the Consultant shall make a detailed
design for the subsurface drainage system.
I. Ancillary Buildings
The Consultant shall (in this stage) initiate the design of Architecture - Structure - MEP for all ancillary
buildings such as tanks, transformers, distributers, pumps stations, NOC Building …etc. To serve District
6 – A6 & A7 if required based on detailed design. Even if located in any phase of the entire project
(3000 Feddan) other than District 6 – A6 & A7.
J. Gas Network
Gas Network shall be prepared by others and to be coordinated with the other Networks through the
Consultant.
I. Design the solid waste disposal plan for the entire development which will include:
1. Location of the solid waste disposal points
2. Location and size of solid waste storage areas at each zone of the development based
on land use plan.
3. Location and size of solid waste loading and unloading areas
4. Plan for the solid waste collection, transfer and disposal from the entire development.
5. Plan for final disposal of solid waste
6. Plan for solid waste recycling and cost recovery.
The Consultant shall ensure the standalone operation of District 6 – A6 & A7 sub-phasing or
construction package.
L. Design Development Report:
A report describing the detailed design works, developed cost estimates for roads, storm water
drainage, sewerage, water supply, Irrigation, Firefighting, electricity, telecommunications, traffic,
Subsoil Drainage System and street lighting (with typical details), etc. along with updated
sustainability report will be prepared and submitted for review and approval by the Client.
M. Data Collection:
The Consultant shall contact the Client, all relevant authorities and concerned parties, for acquisition of
all necessary data for conduction design works for the roads & MEP infrastructure networks. The data
to be collected shall cover different aspects including (but not limited to) the following:
a. Land Use Masterplan and Proposed Building/ Facilities: All data and information related to the
land use plan, phases of development and different types and numbers of proposed building and
facilities.
b. The sources information for water supply, electric power supply within the project area shall be
investigated and coordinated with the authorities and the Client in order to ensure adequate
supply for the proposed facilities also, tie in points diameters and level for sewage, storm and any
existing pump stations (if any) …etc.
c. The Consultant shall closely coordinate with other Consultants (if existing) appointed by the
Client concerning all inputs in relation to roads and MEP infrastructure elements under this project
to assure compatibility with other project’s components.
a. Roads Network
b. Water Supply Network
c. Sewage & Storm drainage Network.
d. Irrigation Network.
e. Firefighting Network.
f. Electricity, Street & Landscape lighting
g. Tie-ins for Landscape & Gates.
h. Communications & Security Systems Network.
i. Sub-Soil drainage (optional scope)
j. Waste water treatment plants for District 6 – A6 & A7 (optional scope)
k. Solid Waste Management (SWM) strategy.
l. Solar energy.
In association with the Client, The Consultant shall closely coordinate with other Consultants appointed
by the Client concerning all inputs in relation to infrastructure elements under this project to assure
compatibility with other project's components.
6.Deliverables:
- Drawings must be shown in proper scale that abides the authorities and the construction needs.
- At each of the design stages, the deliverables including detail designs and construction documents
shall be complete for the purpose intended. Provide interim deliverables as required by the Client for
his review of the constructability, methods of construction, safety, estimating and scheduling.
- Contract bidding deliverables shall be complete to enable the Client to invite competitive bids. The
Consultant will also be required to provide addenda where necessary.
- The Consultant shall prepare the complete set of documents for construction, for the final review of
the Client. These construction documents shall consist of Final Construction Drawings, CSI Format 2016
Specifications, BOQ’s, detailed QS (quantities take off) and Construction Cost Estimates in such a form
and detail as needed by the Client.
- All CAD files prepared by the Consultant shall be saved in AutoCAD 2012 version format.
- Priced and un-priced BOQ shall be provided for phases (1 &2), compatible with MOM and
specification packages.
- The Consultant shall submit all drawings in editable soft copy (AutoCAD format-bound files) as well as
pdf files.
- Upon Completion of Services or in case expiry, termination of this Agreement for whatever cause; the
Consultant shall deliver to the Client in an indexed and orderly manner all completed/in-complete
carried out works (including drawings, reports, documents, models and/or data) in the possession of
the Consultant or under its control in connection with sub Consultancy and/ or special consultancy
works under the terms of contract and Scope of Services mentioned in this agreement.
- The Consultant shall submit other deliverables that are specifically made for this Project such as
colored renderings, weekly and monthly progress reports, and any other reports as per administrative
requirements of the Client.
- The following hard/soft copies of documents will be for all items within the Consultant’s scope of
services/ package as per time schedule (Appendix4):