0% found this document useful (0 votes)
23 views2 pages

Demand Notice

The document is a demand notice from Gujranwala Electric Power Company for a new electricity connection. It provides details of the customer such as name, address and connection details including load and cost. It specifies a due date of 29-03-2023 for payment and notes that legal action may be taken if documents are found to be false.

Uploaded by

fivver.expert1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

Demand Notice

The document is a demand notice from Gujranwala Electric Power Company for a new electricity connection. It provides details of the customer such as name, address and connection details including load and cost. It specifies a due date of 29-03-2023 for payment and notes that legal action may be taken if documents are found to be false.

Uploaded by

fivver.expert1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DUE Date: 29-03-2023 Gujranwala Electric Power Company (12512-NAROWAL-2) Security Cost

27-02-2023 12512008727 202302938803


New Connection New Connection 27-02-2023
Agriculture 03336133644 29125120470609

Nill

11 (KW) UBL NAROWAL

440 NAROWAL

D-2b (50)T 0

Ghulam Mohiuidin (S/O) Shukker Din (Address) Village kanjroor

30

15000

30

01

Sub-Division Office 12512-NAROWAL-2 SDO Wapda


Line Superintendent 12512-NAROWAL-2 SDO Wapda

Due Date: 29-03-2023 Security Cost

Ghulam Mohiuidin (S/O) Shukker Din (Address) Village kanjroor

27-02-2023 12512008727
15000 27-02-2023 202302938803

29125120470609
UBL NAROWAL

DUE DATE: 29-03-2023 Security Cost


UBL NAROWAL 15000

202302938803 12512008727 202302938803

15000 27-02-2023

NOTE:- Computer generated demand notice, Hence no signature is required.


This subject cited case has been processed in accordance with documents uploded/produced by the
owner/applicant. In case any doocument is found false at later stages, the said connection is likely to be
cannceled and as a result of concealment of facts or fraud at any stage and if codal formalities are not
follwed and company resrved its rights to take legal action against owner/applicant.
Date & Time: (02-03-2023 16:50:36)
DUE DATE: 29-03-2023 Gujranwala Electric Power Company (12512-NAROWAL-2) Service Cost

27-02-2023 12512008727 202302938803


New Connection New Connection 27-02-2023
Agriculture 03336133644 29125120470609

Nill

11 (KW) UBL NAROWAL

440 NAROWAL

D-2b (50)T 0

Ghulam Mohiuidin (S/O) Shukker Din (Address) Village kanjroor

30

631136

30

01

Sub-Division Office 12512-NAROWAL-2 SDO Wapda


Line Superintendent 12512-NAROWAL-2 SDO Wapda

DUE DATE: 29-03-2023 Service Cost

Ghulam Mohiuidin (S/O) Shukker Din (Address) Village kanjroor

27-02-2023 12512008727
631136 27-02-2023 202302938803

29125120470609
UBL NAROWAL

DUE DATE: 29-03-2023 Service Cost

202302938803 12512008727 202302938803

631136 27-02-2023

NOTE:- Computer generated demand notice, Hence no signature is required.


This subject cited case has been processed in accordance with documents uploded/produced by the
owner/applicant. In case any doocument is found false at later stages, the said connection is likely to be
cannceled and as a result of concealment of facts or fraud at any stage and if codal formalities are not
follwed and company resrved its rights to take legal action against owner/applicant.
Date & Time: (02-03-2023 16:50:36)

Powered by TCPDF (www.tcpdf.org)

You might also like