0% found this document useful (0 votes)
9 views5 pages

Individual Accomplishment Report 10

The document outlines the weekly activities and tasks completed by Datu Hoffer Ampatuan during his supervised field work from April 22-28, 2024. It details 13 activities including drafting chapters for a research proposal, facilitating learning events, benchmarking exemplar local government units, attending meetings and assemblies. For each activity, it provides descriptions, required outputs, timelines, status and dates completed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views5 pages

Individual Accomplishment Report 10

The document outlines the weekly activities and tasks completed by Datu Hoffer Ampatuan during his supervised field work from April 22-28, 2024. It details 13 activities including drafting chapters for a research proposal, facilitating learning events, benchmarking exemplar local government units, attending meetings and assemblies. For each activity, it provides descriptions, required outputs, timelines, status and dates completed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

SUPERVISED FIELD WORK INDIVIDUAL ACCOMPLISHMENT

DATU HOFFER AMPATUAN


Municipality/City

MAGUINDANAO DEL SUR


Province

Week: April 22 - 28, 2024

Status Date
Activity/Tasks Description Required Outputs Timeline Remarks
(Ongoing/Done) Accomplished

Select appropriate research Uploaded the drafted


methods and Chapter 3 to Google
Formulation of Chapter 3 Drafted Study Design drive.
approaches.Draft the April 06 - 25 Done April 25
- Methodology References https://tinyurl.com/Res
methodology section
outlining procedures. earchDatuHoffer

Submit the drafted/finalized


Submission of Chapter 3 Chapter 3 of the research Drafted/Finalized Chapter 3 April 26 Done April 26
proposal.
Synthesize findings, draft
Revision and Finalization
the proposal, and Revised Research Proposal April 27 - May 05 Ongoing
of the Research Proposal
incorporate feedback.
Pre and Post Evaluation
Conduct the 1st Learning Implement and facilitate the Form
April 17 - 18 Done April 22 - 23
Event 1st learning event Attendance Sheet
Photo Documentation

Induction Training for BARMM-MILG Local Government Operations Officers-Batch 56


Status Date
Activity/Tasks Description Required Outputs Timeline Remarks
(Ongoing/Done) Accomplished

Terminal Report
Preparation of materials
Photo Documentation
Preparation for the 2nd and venue
Program April 20 - 21 Ongoing
Learning Event Coordination with involved
Presentation slides
officials and/or participants
Pre and Post Evaluation
nd Form The date was moved
Conduct the 2 Learning Implement and facilitate the
Attendance Sheet April 22- 30 Ongoing to May 6. Due to
Event 2nd learning event
Photo Documentation conflicting schedules.
Terminal Report
OTHERS
Benchmarking in April 28 travel to
Exemplar (Partner) LGU Benchmarking the Good Observation Report Malaybalay City
April 22 - May 03 Ongoing
Practices of other LGUs Established Best Practices Bukidnon.
outside BARMM
Third pass availability for
PASS Privilege the second month of the Approved Pass Slip April 25 Done April 25 In the morning, I went
SFW. to the Regional Office,
and in the afternoon, I
NSHP Technodemo Joined the site visitation in joined the farm
Photo Documentation April 25 Done April 25
Validation Barangay Tuayan Mother. visitation.

Attended and delivered the


Conduct of Barangay
SILG message on the
Assembly Day of Brgy. Photo documentation April 26 Done April 26
Barangay Assembly Day of
Sayap
Brgy. Sayap

Induction Training for BARMM-MILG Local Government Operations Officers-Batch 56


Status Date
Activity/Tasks Description Required Outputs Timeline Remarks
(Ongoing/Done) Accomplished

Compiled list of
Submission of Individual accomplishments and Individual Accomplishment
April 22 - 28 Done April 28
Accomplishment Report achievements to be Report
reported

Prepared by:

Induction Training for BARMM-MILG Local Government Operations Officers-Batch 56


NAJM JIBRIL M. PULINDAO
Apprentice

Approved by: Noted by:

SHIRLYN PANANGUILAN MOHAIMA B. DIMANGADAP


Supervisor Coordinator

Date:

04/28/2024

Induction Training for BARMM-MILG Local Government Operations Officers-Batch 56


___________________________________________________________

NOTE: This SFW Individual Accomplishment should be submitted every Monday


following the week of implementation. This should be attached to your
Documentation Report at the end of the SFW.

Induction Training for BARMM-MILG Local Government Operations Officers-Batch 56

You might also like