This document outlines the steps in a multi-level production process in SAP including creating materials, BOMs, routings, production orders, goods issues, billing and actual costing settlement.

Uploaded by

Ammar Arif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views55 pages

TJ01-Multi Level + Moving Avg - 01-05-2024

This document outlines the steps in a multi-level production process in SAP including creating materials, BOMs, routings, production orders, goods issues, billing and actual costing settlement.

Uploaded by

Ammar Arif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 55

SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Multi-Level Production &


Moving Average

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Table of Contents
Process .................................................................................................................................................................................... 4
Create Material – [MM01] .................................................................................................................................................. 4
Raw Material ................................................................................................................................................................... 4
Packing Material.............................................................................................................................................................. 5
Semi Finished .................................................................................................................................................................. 5
Finished Goods ................................................................................................................................................................ 6
BOM – [CS01] ...................................................................................................................................................................... 6
Activity Type – [KL01] .......................................................................................................................................................... 7
Cost Center – [OKEON]........................................................................................................................................................ 9
Plan Activity Rate – [KP26] ................................................................................................................................................ 10
Work Center – [CR01]........................................................................................................................................................ 12
Routing – [CA01] ............................................................................................................................................................... 15
Production Version – [MM02] ........................................................................................................................................... 17
Costing Sheet .................................................................................................................................................................... 18
Template Allocation .......................................................................................................................................................... 20
Packing Material Standard Price – [MR21] ....................................................................................................................... 20
Cost Estimate – [CK11N/CK24].......................................................................................................................................... 21
Raw Material Initial Stock In – [MIGO].............................................................................................................................. 23
Packing Material Initial Stock In – [MIGO] ........................................................................................................................ 26
Create Production Order - SFG – [CO01] ........................................................................................................................... 27
Goods Issue – AT confirmation – [CO11N] ........................................................................................................................ 28
SFG Received – [MIGO] ..................................................................................................................................................... 29
Create Production Order - FG – [CO01]............................................................................................................................. 31
Goods Issue – AT confirmation – FG Received – [CO11N]................................................................................................. 32
Sales Order – [VA01] ......................................................................................................................................................... 34
Delivery – Picking – PGD – [VL01N]................................................................................................................................... 36
Billing – [VF01] .................................................................................................................................................................. 38
Actual Cost Splitting – [KSS2] ............................................................................................................................................ 40
Actual Rate Calculation Process – [KSII] ............................................................................................................................ 41
Revaluation Production Order | Actual Activity Rate – [MFN1] ....................................................................................... 43
Before Revaluation ........................................................................................................................................................ 43
After Revaluation........................................................................................................................................................... 43
Costing Sheet Actualization – [KGI2] ................................................................................................................................. 44
Template Allocation Actualization – [CPTA] ...................................................................................................................... 45
Before ............................................................................................................................................................................ 46
After .............................................................................................................................................................................. 47
YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/
Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Variance Calculation | Production Order – [KKS1 / KKS2] ................................................................................................ 48
Order Settlement Run – [KO88] ........................................................................................................................................ 50
Material Ledger – [CKMLCP] ............................................................................................................................................. 53
Before ............................................................................................................................................................................ 53
After .............................................................................................................................................................................. 54

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Process
Create Material – [MM01]
Raw Material

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Packing Material

Semi Finished

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Finished Goods

BOM – [CS01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Activity Type – [KL01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Cost Center – [OKEON]

PRD_MA_SFG & PRD_MA_FG

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Plan Activity Rate – [KP26]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Work Center – [CR01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Routing – [CA01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Production Version – [MM02]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Costing Sheet

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Template Allocation

Packing Material Standard Price – [MR21]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Cost Estimate – [CK11N/CK24]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Raw Material Initial Stock In – [MIGO]

Amount is Zero, becz see MM03 of Raw Material Moving Avg price is zero & we are not enter any price at time of MIGO-
MT-561.

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Packing Material Initial Stock In – [MIGO]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Create Production Order - SFG – [CO01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Goods Issue – AT confirmation – [CO11N]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

SFG Received – [MIGO]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Create Production Order - FG – [CO01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Goods Issue – AT confirmation – FG Received – [CO11N]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Sales Order – [VA01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Delivery – Picking – PGD – [VL01N]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Billing – [VF01]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Actual Cost Splitting – [KSS2]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Actual Rate Calculation Process – [KSII]

In This Screen Business Process tab shows due to Activity Base Costing – just ignore it

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Revaluation Production Order | Actual Activity Rate – [MFN1]
1002484

1002485

Before Revaluation

After Revaluation

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Costing Sheet Actualization – [KGI2]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Template Allocation Actualization – [CPTA]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Before

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
After

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil
Variance Calculation | Production Order – [KKS1 / KKS2]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Order Settlement Run – [KO88]

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

Material Ledger – [CKMLCP]


Before

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

After

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/
SAP FICO Ver-MTJ-05-2024 Muhammad Tariq Jamil

YouTube : https://www.youtube.com/@simplesap - LinkedIn : https://www.linkedin.com/in/muhmmad-tj/


Udemy : https://www.udemy.com/user/simple-sap-mtj/