0% found this document useful (0 votes)
21 views

Man Machine

The document discusses an operator servicing machines over time. It presents two options - the operator servicing either 3 or 4 machines. It calculates the cost and productivity of each option and recommends one.

Uploaded by

Angel Mae Palas
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Man Machine

The document discusses an operator servicing machines over time. It presents two options - the operator servicing either 3 or 4 machines. It calculates the cost and productivity of each option and recommends one.

Uploaded by

Angel Mae Palas
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

It takes an operator 1 minute to service a machine and 0.1 min to walk to the next machine.

Each machine runs


automatically for 3 minutes. The operator earns $10 per hour and the machine costs $20 per hour.
a. How many machines can the operator service?
b. Present both options through a man-machine chart.
c. What is your recommendation as an IE?

n = l+m/l+w
n = 1+3/1+0.1
n= 3.6

Tecn₃ = (l+m)(k₁+n₁k₂)/n₁
= (1+3)(10+3*20)/3*60
= $ 1.56/unit

Tecn₄ = (l+w)(k₁+n₂k₂)
= (1+0.1)(10+4*20)/60
= $1.65/unit

Recommendation
OPTION 1
OPERATOR MACHINE 1
Activity Time Activity Time
service mc 1 1 min service mc 1 1 min
walk to mc 2 0.1 min
service mc 2 1 min
processing 2.2 mins
walk to mc 3 0.1 min
service mc 3 1 min
walk to mc 1 0.1 min idle 0.1 min
Idle 0 0.1 min
prod mins 3.3 mins 3.2 mins

OPTION 2
OPERATOR MACHINE 1
Activity Time Activity Time
service mc 1 1 min service mc 1 1 min
walk to mc 2 0.1 min
service mc 2 1 min
walk to mc 3 0.1 min
processing 3.3 mins
service mc 3 1 min
walk to mc 4 0.1 min
service mc 4 1 min
walk to m1 0.1 min idle 0.1 min
Idle 0 0.1 min
prod mins 4.4 4.3 mins
MACHINE 2 MACHINE 3
Activity Time Activity Time
Processing 1.1 min
processing 2.1 mins
idle 0.1 min
service mc 2 1 min idle 0.1 min
service mc 3 1 min
processing 1.1 mins
processing 0.1 min
0.1 min 0.1 min
3.2 mins 3.2 mins

MACHINE 2 MACHINE 3 MACHINE 4


Activity Time Activity Time Activity
processing 1.1 min
processing 2.2 mins
idle 0.1 min processing
sevice mc 2 1 min
idle 0.1 min
service mc 3 1 min idle
processing 2.2 mins
service mc 4
processing 1.1 min
processing
0.1 min 0.1 min
4.3 mins 4.3 mins
MACHINE 4
Time

3.2 mins

0.1 min
1 min
0.1 min
0.1 min
4.3 mins

You might also like