Boq Health Centre Ground - Zanzibar Submit Final
Boq Health Centre Ground - Zanzibar Submit Final
CENTRE
ZANZIBAR
MINISTRY OF HEALTH
ZANZIBAR
BILL OF QUANTITIES
2023
PRELIMINARIES
DESCRIPTION
PRELIMINARY PARTICULARS
The Contractor shall be responsible for the provision of all plant, tools, and vehicles and
workmen required for the Works except in so far as may be stated otherwise herein or
except or such items specifically and only required for the use of and provided by
Nominated Subcontractors as described herein no timber used for scaffolding, formwork
or similar purpose shall be used afterwards in the permanent work. -
Safety, health and Welfare of the work people
The Contractor shall be responsible for and shall ensure the safety and welfare of his work
people, and those of his Subcontractors, Nominated Subcontractors, Nominated Suppliers
and persons employed directly by the Employer. Allow for providing and maintaining on
the site adequate medical facilities and approved first aid equipment kept fully replenished
and in an accessible position. -
The Contractor shall give all notices in accordance with the Conditions of Contract. -
The Contractor shall pay all fees and charges required in the Conditions of Contract. The
amount of all such fees and charge shall be deemed to be included in the Contract Sum. -
Those in respect of the following items are included elsewhere in this Document if
applicable to the Works. -
Hoardings -
Temporary telephones -
The Contractor shall set Out the Works in accordance with the dimensions and levels
shown on the Drawings and shall be responsible for the correctness of all dimensions and
levels so set out by him and will be required to amend all errors arising from inaccurate
setting out at his own cost and expense. In the event of any error or discrepancy in the
dimensions or levels marked on the Drawings being discovered such errors or
discrepancies must be reported by the Contractor to the Project Manager/Architect for his
immediate attention. -
No work shall be commenced by the Contractor until he has received written instructions
from the Project Manager/Architect to adjust such discrepancies which may be proved.
Upon receipt of such instructions the Contractor shall there upon be responsible for the
accurate setting out of the works, giving effect to the adjustments necessary to comply
with such instructions, and no claim for extra expense based on any discrepancy or error
in the dimensions or levels shown on the Drawings may be made thereafter. -
PRELIMINARIES
To collection page -
B.5 Contractor’s Supervision
The Contractor shall provide full and adequate supervision during the progress of the
works and shall keep a competent and authorized Agent or General foreman, approved by
the Project Manager/ /Architect (which approval may be withdrawn at any time) constantly
on the works. Such authorized Agent or General Foreman shall give his whole time to the
supervision of the works and must be able to receive and act upon (on behalf of the
Contractor) all instructions, direction, or orders issued by the Architect or his
representative. -
No work shall be carried out at night or on gazette holidays unless authorized by the
Project Manager/Architect in writing. -
The Contractor shall provide Fuel for consaltant team of 600l per month throghout during
the project -
The Contractor shall provide all labour and shall include for all costs arising from the
current Government regulations regarding annual leave and passages, medical facilities,
public holidays, overtime training levy, income tax, housing, traveling allowances, wages
and salaries, and any other statutory requirement current at the date of tender. -
The Contractor shall pay rates of wages and observe hours and conditions of labour not
less favourable than the minimum rates of remuneration and minimum conditions of
employment applicable in the district in which the work is carried out as laid down by the
Regulations of Wages and Conditions of Employment Act, Building and Construction
Industry Wages Council. The relevant notice must be kept posted upon the site where it
can be conveniently read by the employees concerned. -
The Contractor shall provide all watching and lighting and everything else necessary by
day and night for the due protection and Security of the Works and the public and other
persons. -
The Contractor will be liable for all consequences of theft from the site of his own or
Subcontractors or Suppliers materials or equipment. Any such theft will not relieve the
Contractor of his liability for completion on time. -
The Contractor shall be, responsible for all damage to roads, (whether public or private),
crossover, services and the like arising out of, or in the course of, or by reason of, the
execution of the works and shall be responsible for observing any by laws or other
regulation imposed by a competent authority regarding the keeping of such roads free
from mud, filth, etc arising as aforesaid. -
PRELIMINARIES
Police regulations
The Contractor shall at all times observe any police regulations including those regarding
the loading or unloading or any waiting by vehicles on the public highway and the Contract
Sum shall be deed to include for strictly compliance therewith. -
Immediately after signing the Contract the Contractor is to prepare a time and progress
chart showing the time and order in which he proposes to carry out the works within the
total construction time stated in the Contract. The chart shall show in detail the
construction time and order in which each section of the work is to be carried out and be
subdivided into trades or tasks. Where the Contract is made up of individual buildings a
separate chart shall be provided for each. -
To collection page -
Upon the letting of Subcontracts the Contractor is to incorporate similar times and details
of each separate Subcontractor’s work (which information is to be provided by the
Subcontractor) and the chart shall be so designed to accommodate this information. -
At the end of each week the Contractor is to mark on the chart, in a different colour, the
actual time taken to complete the respective stages and sections of the work. -
The Contractor shall also show upon the chart the anticipated weekly labour strength
required upon the site (divided into labourers and craftsmen) and shall similarly mark up
the actual numbers employed. -
Before the 25th day of each month the Contractor shall submit a monthly progress report
in triplicate to the Project Manager/Architect indicating the month’s progress and giving
details of any delays caused by inclement weather or other reasons beyond his control.
The report must include information on labour employed, and the progress of all trades,
including Nominated Subcontractors. -
The Contractor shall be responsible for checking all schedules and drawings supplied by
the Project Manager/Architect and all shop drawings approved by the Project
Manager/Architect. In the event of any discrepancy being found between such schedules
and drawings or if the Contractor considers that additional detail drawings are required,
then in either case the Contractor shall report such discrepancy to the Project
Manager/Architect for instruction or apply in writing for such detail at least 28 days before
the works concerned are to be executed. The Contractor shall ascertain from the drawings
or otherwise any holes, recesses, plugs, etc, which may be required in time to form these
as the works proceed. No extra payment will be allowed for cutting or forming such holes,
recesses, or plugging, Subsequently. -
The Contractor’s attention is drawn to the requirements for the submission of samples,
shop drawings, certificates & guarantees contained in previous or subsequent items of
this Document. -
Samples
PRELIMINARIES
Tests
When directed by the Architect, samples of materials (the samples being taken by
approved sampling methods) are to be supplied by the Contractor for laboratory tests and
shall be delivered by the Contractor at his own cost to the Project Manager/Architect office
or as otherwise directed. -
The Contractor shall, whenever so instructed by the Project Manager/Architect, cut out
sections of work executed or samples of materials incorporated therein and shall deliver
them where directed for the purpose of testing. -
All work disturbed shall be made good forthwith by the Contractor. All costs incurred in
cutting out, making good and delivering as aforesaid, shall be borne by the Contractor
unless the result of the test shows that the materials etc, are in accordance with this
Contract. -
Allow for keeping the site and buildings free from water arising from whatsoever cause. -
The Contractor shall notify the Project Manager/Architect as soon as water percolation or
water-logging becomes apparent and he shall obtain the written permission of the Project
Manager/Architect before carrying out any continuous pumping or other method of
removal of water which may lower the water level on adjoining sites.
-
The Contractor shall ensure that no nuisance is caused by the outfall of pumped water
and shall obtain the necessary permission before connecting temporary drainage to
existing drains and/or sewers. Any fees and charges in connection with such work shall be
deemed to be included in the Contract Sum. -
Site levels
Before commencing work the Contractor must arrange for and agree with the Project
Manager/Architect the existing site levels and similarly establish and agree a bench mark. -
The levels and bench mark thus agreed will then be used for the duration of works for all
purposes. -
The Contractor shall allow in his tender the need to attain a leveled ground by cut and fill
method from midpoint of the site. -
Interruption of work
PRELIMINARIES
The Contractor shall allow herein for all costs incurred by the interruption of work owing to
public parades, processions and the like. -
Overtime
The Contractor shall allow in his tender for any extra costs for overtime working he
considers will be necessary in order to complete the work by the contract Date for
Completion. -
If during the course of the Contract overtime is worked for a specific purpose in
accordance with a written instruction issued by the Project Manager/Architect the
Contractor will be reimbursed in respect of such overtime to the extent only of the
additional net cost of unproductive time payable over and above the basic hourly rates as
laid down in the regulations affecting the wages and conditions of employment, etc. in the
construction industry but excluding any bonuses, profits and overheads. -
The area of the site which may be occupied by the Contractor for use as storage and for
the purpose of erecting workshops, etc., shall be agreed between the Project
Manager/Architect and the Contractor. -
Stamp charges
Allow for paying all stamp charges in connection with the Surety Bond and the Contractor
Agreement. -
PRELIMINARIES
To collection page -
The Contractor shall treat the details of this Contract as private and confidential for his
own information only and shall not publish or disclose the details of the Contract in any
trade or technical paper or elsewhere (except as necessary for the purpose hereof)
without the previous consent in writing of the Employer. -
PRELIMINARIES
Copyright
The contractor shall at his own expense use whatever means at his disposal, provide on
the site plentiful, suitable and clean water for use of the works. -
The Contract Sum shall be deemed to include for all costs and charges of whole water to
be used in the works. -
The Contractor shall provide all artificial lighting, electric power and the energy required
for the execution of the work. The provision of light and, where appropriate, power for
Nominated Subcontractors, Local Authorities is included in the items of general and
special attendance in Provisional and P.C. Sums. -
The Contract sum shall be deemed to include for all fees and charges for all temporary
services and clearing away on completion, and for the cost of all electricity consumed for
the works. -
The Contractor shall provide for the efficient of the public, the Employer’s servants and
property and all other persons occupying or using the premises, also of adjoining or
neighbouring property during the progress of the works included in or required to be done
on connection with the Contract. -
The Contractor shall take all precaution to eliminate as far as possible the danger to the
public and other persons arising from the entry and exit of vehicles to and from the site. -
All reasonable means shall be used to avoid inconveniencing adjoining owners and
occupiers. No workmen or plant employed on the works shall be allowed to trespass upon
adjoining properties. If the execution of the works requires that workmen or plant must
enter upon adjoining property, the necessary permission shall be first obtained by the
Contractor who shall see that these instructions are carried out. The Contractor shall
indemnify the Employer against any claim or action for damages on account of any
trespass or other misconduct of the Contractor’s employees. -
The Contractor shall not obstruct any public way or otherwise do or suffer to be done
anything which may amount to a nuisance or annoyance, and shall not interfere with any
right of way or right to adjoining property, and any notice received by him or left upon the
site requiring the discontinuance or suspension of any part of the works shall at once be
forwarded by him to the Architect or, if given verbally, shall at once be communicated by
him to the Architect in writing, and the Contractor shall keep the Employer indemnified
against any claim or loss consequent upon any act, neglect or omission of the Contractor,
his agents, servants or workmen in this respect. -
The Contractor shall provide all temporary roads, tracks, hard standings, crossing and the
like to ensure satisfactory and efficient access to the works. The cost of such temporary
works shall be deemed to be included in the Contract Sum.
All such temporary roads shall be to the approval of the Project Manager/Architect and in
general will only be permitted over the areas planned for permanent roads and hard
standing as indicated on the Site Plan.
Temporary roads
Prior to execution of such temporary works the Contractor shall submit his proposals to
the Architect for approval. -
The contractor shall, at his own cost, supply and erect all temporary buildings, sheds,
mess rooms and stores with floors at least 150mm above ground level. No office, stores
or other temporary buildings shall be erected on the site without first obtaining the consent
of the Project Manager/Architect as to the type of temporary building to be supplied and
the position in which they are to be erected. -
Temporary latrines
To collection page -
The Contractor shall provide, erect and maintain where convenient an approved lockup
office building for the sole use of the Project Manager/Architect with a floor area of not
less than 50 square metres. -
The office is to be furnished with lockable steel cabinet, a table and chairs, of sufficient
size and number for site meetings, a plan chest and pin-up boards. -
The Contractor shall also supply cleaning and attendance on the above mentioned
accommodation as required. -
Copies of the Drawings, Specification and Bills of quantities shall be kept in this office at
all times. -
The Contractor shall be responsible for the payment of all rates and taxes in respect of
huts or other temporary buildings erected anywhere for the purposes of the works. The
Contractor shall also be responsible for agreeing or otherwise dealing with notice of
assessment, demand note or other like document which may be received in respect of
such huts or temporary buildings. The Contract Sum shall be deemed to include for the
aforesaid and for payment of any expenses incurred by the Contractor in connection with
such assessment. -
Temporary telephone
The Contractor shall arrange for, provide and maintain a telephone connection to the
offices from the commencement to completion of the Contract and shall pay all charges in
connection therewith including local calls made by the Project Manager/Architect. -
Sign board
The Contractor shall unless otherwise directed, obtain any necessary consent or license
from the Local Authority and immediately upon commencement of the works the
Contractor shall, in accordance with the details supplied by the Project Manager/Architect,
make and erect a sign board showing the name of the Employer and such other
information as shall be directed and approved by the Project Manager/Architect. 5,000,000
Temporary hoarding
The works shall be enclosed by the Contractor with a fence not less than 2.40m high neat
and uniform in .appearance to the approval of the Architect. The fence shall be a sufficient
obstacle to prevent the ingress of unauthorized persons or children and shall be complete
with all necessary padlocked entrance gates, fans and screens as may be requisite to
ensure the safety of the public or adjoining owners and of the works. 10,000,000
PRELIMINARIES
The Contractor shall maintain the fence, gates, and screens, obtain all necessary licenses
and pay all fees in connection therewith, the amounts of which shall be deemed to be
included in the Contract Sum. The Contractor shall allow for moving or adapting the
fencing as and when required during the progress of the works and shall dismantle and
remove at completion of the work, but not until all danger to the public has passed and
shall make good all work disturbed.
Provide all scaffolding, (tubular steel or similar), that may be required for the works. 10,000,000
The words “Prime Cost” (or the initials (“P.C”) wherever appearing in these Bills of
Quantities, shall mean net cost exclusive of any trade, cash or other discount whatsoever
but inclusive of the cost of packing, carriage and delivery. Such cost shall be the sums
due to the Subcontractor or Supplier after adjustment where applicable in respect of
measurements or rates. -
Any increases or decreases in these Prime Cost sums resulting from the adjustments and
properly paid by the Contractor, shall be added to or deducted from the Contract Sum in
the final account. In substantiation the Contractor will be required to produce to the Project
Manager/Architect all quotations, invoices and receipted accounts as shall be necessary
to show the details of the sums actually paid. -
Any sum added by the Contractor in these Bills of Quantities in respect of profit upon any
Prime Cost sum will be deducted at the final settlement of accounts and a sum will be
added, the amount of which will bear the same proportion to the sum added as the net
amount properly expended bears to the original P.C. Sum -
When inviting quotations for the supply of goods or the execution of work described under
P.C. Sums, full particulars as contained herein (except the sums provided), and shown on
the drawings in respect of the goods or work in question shall in all cases be supplied by
the contractor to the persons, firms or companies quoting. -
All such invitations shall contain a stipulation that the quotations must state a guaranteed
time for delivery or fixing, as the case may be, from the date when the particulars are
supplied, in the case of materials to be delivered on the site in bulk, the person, firm or
company quoting musts guarantee the delivery of the quantity required, (uniform with the
approved samples), by and at the time required to suit the progress of the building
operations. The Contractor shall, with such invitations, supply full details of the times at
which such delivery and/or fixing will be required in order that such guaranteed times may
be stated.
-
Protection of works
PRELIMINARIES
The Contractor shall allow for and provide and/or maintain during the execution of the
Works all shoring, strutting, needling and other supports and shall take all other
precautions and adopt such expedients as may be necessary to preserve the stability of
all buildings, structures, fences, walls, land and property, roads and footpaths, sewers,
drains, gullies and other services (including those of adjoining owners) that may in any
way be affected by the work to be executed under the Contract immediately he has taken
possession of the Site and until completion of the Works. The Contractor shall hold the
Employer completely indemnified against all or any claim for damage or losses accruing
from any settlement resulting from such shoring and strutting or lack thereof and the
striking and removal of same.
-
Any damage and/or settlement that may be caused arising out of or directly or indirectly
consequent upon the aforesaid protective measures or the lack thereof or the carrying out
of the Works is to be made good by the Contractor at his own expense to the satisfaction
of the Architect and all other parties concerned. -
The Contractor shall cover up and protect all finished work liable to damage including
provision of temporary roofs, gutters, drains, etc., until the completion of the Works. -
The entire responsibility in respect of all matters mentioned or referred to in this clause
shall rest with the Contractor not withstanding any approval given by the Architect to, or
concurrence in, the action taken or proposed to be taken by the Contractor, in pursuance
of his obligations. -
To collection page -
The Contractor shall, upon completion of the Works remove and clear away all temporary
buildings, plant, rubbish and unused materials, and shall leave the whole of the Site of the
Works in a clean and tidy state to the Satisfaction of the Project Manager/Architect. He
shall also remove all rubbish and dirt from the Site at weekly intervals or as directed by the
Project Manager/Architect. 2,000,000
PRELIMINARIES
Before handing over any building the Contractor shall properly clean all floors and finished
surfaces, clean glass inside and outside and leave all sanitary and other appliances in full
working order. He shall also cut and weed all grassed areas, clean down external steps,
paths and roads and leave the whole in perfect condition ready for occupation. 500,000
COLLECTION PAGE
Page 1/1/1 -
Page 1/1/2 -
Page 1/1/4 -
Page 1/1/7 -
Page 1/1/8 -
PRELIMINARIES
COLLECTION PAGE
A Element No 1: Substructure 715,793,600
C Element No 3: Staircases -
SUBSTRUCTURE
SITE PREPARATION
site of bushes , scrubs under growth and the like and grubbing up
their roots
A cleaning site 3339 SM 1,000 3,339,000
EXCAVATION
Vegetable soil
Disposal
excavated material
Earth backfill to
F excavated trenches 225 CM 5,000 1,125,000
DISPOSAL OF WATER
General
General
STABILIZATION
HARDCORE FILLINGS
Sand filling
E to hard core beds and tops of foundation walls 1977 SM 4,000 7,908,000
At rate of 8 litres per linear metre per 300mm depth per 235mm
width
CONCRETE WORK
Normal class 15
Blinding
Normal class 20
Foundation in trenches
H irrespective in thickness 163 CM 270,000 44,010,000
Beds
D 150mm thick 1977 SM 43,500 85,999,500
REINFORCEMENTS (Provisional)
MEASURED WKS
E In any location and different size (20,16,12 and mm) 12,346 KG 3,300 40,741,800
Wire mesh
Reinforced with wire mesh Reference A142; 150mm end and side
laps; including with spacer blocks
Edges of bed
K over 75mm but not exceeding 150mm wide 442 M 10,000 4,420,000
BLOCK WORK
Walls
Horizontal
SUNDRIES
INSITU FINISHINGS
Walls
COLLECTION PAGE
SUBSTRUCTURE
FRAMES
PRECAST CONCRETE
Cills;
Reinforced with wire mesh Reference A98; once throated and
weathered fair exposed surface; bedded with cement: sand mortar
(1:4)
D 75 x 200mm 150 LM 43,500 6,525,000
REINFORCEMENTS (Provisional)
In any location
MEASURED WKS
E In any location and different size (20,16,12 and mm) 16,548 KG 3,300 54,608,400
FRAMES
WALLING
BLOCK WORK
Walls
Buttresses;
Parapet wall
Horizontal
WALLING
F Waterproofed cement and sand (1:4) beds and backings 389 SM 15,000 5,835,000
STRUCTURAL TIMBER
Purlins
H 50x75mm 2544 lm 4,500 11,448,000
Brindering
M 50X50 7250 lm 3,000 21,750,000
Wroght soft wood, primer quality
Facia boards
N 25X250mm 450 lm 15,000 6,750,000
One coat primer, one undercoat, one coat oil based paint full
Gloss finish
Wood surface :External
Burge and Facia Board
O 200to 300mm girth 450 lm 7,000 3,150,000
ROOFING
Paneled door: 40 x 100mm top, rails and stiles, 200mm bottom rail,
single panel infilling with 20mm thick tongued, groved and vee
jointed both sides vertical boarding
IRONMONGERY
Supply and fix the following Ironmongery or any other and equal
approved as manufactured by "UNION" with all necessary fittings
and matching screws
M Rubber door stop; fixed to floor with matching screws 122 No 50,000 6,100,000
GLASS IN OPENINGS
METAL WORK
Aluminium casements
MEASURED WKS
BALUSTRADES
HANDRAILS/BALUSTERS
Site welded in concrete stair, primed before and painted after fixing.
Z 38mm diameter wall side hand rail at 1.00m high from steps 20 LM 600,000 12,000,000
METAL WORKS
TERAZO floor
Granolithic floor finish in cement and granolithic chippings (1:2:5); surface
ground and polished
25mm thick 1997 m² 60,000 119,820,000
skirting
Granolithic skirting in cement and granolithic chippings (1:2:5); surface
ground and polished
INSITU FINISHINGS
Plaster; 12mm first coat of cement sand (1:4); 3mm thick second
coat of cement and lime putty(1:5) steel trowelled; internal
External render; 12mm first coat of cement and sand (1:4); 3mm
second with approved plasticizer steel trowelled to a smooth finish;
external
Two coat works; to concrete or block work base generally to
36 LM 50,000.00 1,800,000
Ceiling finish;
L 12mm thick plain moisture resistance gypsum board 150 M2 20,000.00 3,000,000
Walls
MEASURED WKS
Ceilings
Walls
Hardwood surfaces
ELECTRICAL INSTALLATIONS
PRELIMINARIES
MAIN SUPPLY
6-Ways purpose made free standing main LV Panel
board (MDB) with 160A TPN MCCB incomer, metal
clad, cubical pattern to IP20 from 2b, comprising of
A ABB switch gear, surge arrestor, Ammeter and
Voltmeter complete unit, ABB type or Equal and
approved . 1 nr 700,000
COLLECTION
Page 1
Page 2
GROUND FLOOR
Supply, install, test and commission split unit, indoor
with outdoor unit Each Set shall be completed with
A condensate drain pump and wireless remote
controller. Type of refrigerant should be R410A/
R407C .
F Mounting brackets
Condensate Drainage Pipes(PVC)
COLLECTION
A PRELIMINARY
B ELECTRICAL INSTALLATION
C AC & VENTILLATION
1,500,000.00
1,500,000.00
3,000,000.00
6,000,000.00
900,000
1,000,000
250,000
50,000
900,000
1,000,000
250,000
50,000
900,000
1,000,000
250,000
50,000
700,000
1,000,000
250,000
50,000
900,000
1,000,000
250,000
50,000
900,000
6,480,000
880,000
312,000
96,000
705,000
40,000
500,000
60,000
20,773,000
AMOUNT (TZS)
1,750,000
10,500,000
2,500,000
2,250,000
3,000,000
4,000,000
1,900,000
850,000
1,200,000
1,450,000
8,640,000
2,000,000
25,000
190,000
250,000
70,000
110,000
300,000
700,000
1,250,000
500,000
250,000
43,685,000
20,773,000
43,685,000
64,458,000
AMOUNT
2,500,000
20,000,000
15,000,000
1,400,000
1,875,000
1,960,000
11,600,000
4,350,000
9,600,000
68,285,000
68,285,000
64,458,000
68,285,000
132,743,000
PROPOSED HEALTH CENTER BLOCK TO BE BUILT AT …........................ ON P
ZANZIBAR
HEALTH CENTER BUILDING BILL OF QUANTITIES
ITEM DESCRIPTION QTY UNIT
PRELIMINARIES
A Allow for preparation of 'As built Drawings' (A3 paper, soft & hard
copies) 3 sets
TOTAL PRELIMINARIES
ITEM DESCRIPTION QTY UNIT
WATER SUPPLY
GROUND FLOOR WATER SUPPLY
WATER PIPING
Supply, install, test and commission PPR pipe (DiZAYN GROUP)
PN20 to BS 4554 with screwed and socketed joints to BS 143 and
126 of approved manufacture.
PIPES
A 15mm diameter 250 m
B 20mm diameter 215 m
C 25mm diameter 215 m
D 32mm diameter 95 m
90 ̊ Elbow
E 20mm 65 nr
F 25mm 52 nr
G 32mm 25 nr
H Tee
I 20mm 45 nr
J 25mm 60 nr
K 32mm 29 nr
Reducer
L 32/25 10 nr
M 25/20 35 nr
N 20/15 42 nr
O 32mm 12 nr
P 25mm 35 nr
Q 20mm 39 nr
S Allow for Supply and install extra pipe fittings and accessories for
the above water supply piping 1 Item
ELBOWS,90
ELBOWS 45
I 50mm diameter,Upvc 67 nr
J 32mm diameter,uPVC 42 nr
K Supply, install, test and commission Floor drain, 50mm diameter outlet,
uPVC 30 nr
TEE-Y
L 100mm diameter,Upvc 30 nr
M 50mm diameter,Upvc 30 nr
Supply, install, test and commission Special Care Unit (Disable toilet);
"armitage shanks" doc-m-plus pack or equal approved delivered complete
C 2 Set
in one box including WC, HWB, grab rails, hinged arm support, mixer tap,
toilet roll holder etc
D Mirrors; overall size 600 x 450mm high, fixed to wall with CP screw and
caps 62 nr
Supply, install, test and commission Hand wash basin Wall hung marbol
E top as specfied in the drawings. equal approved ;complete with Elbow
taps type. Fixing with screws to backgrounds requiring plugging 62 nr
Supply, install, test and commission deep basin for laboratory as specfied
H in the drawings. equal approved ;complete with Elbow taps type. Fixing
with screws to backgrounds requiring plugging 2 nr
K Supply, install, test and commision Brass water tap, well made and
shapely threaded at the back for wall attachment. 30 nr
TOTAL SANITARY GROUND FLOOR
ITEM DESCRIPTION QTY UNIT
FIRE FIGHTING SYSTEM
A
Supply install, test and commission comprising two pumps, one
electrical and other diesel engine pump each of capacity 20L/S -
3bar head at characteristics required to suite the system Grundfos or
equivalent approved . The pump must be self priming and operate in
parralel. Electrical power from the generator must be available to
electrical pump through automatic changeover facility. The pumps
should be installed on a common base complete with all associated
accessories like pannel , With all fittings.
1 set
D ̊ Elbow
32mm diameter 16 nr
100mm diameter 7 nr
F ̊ Tee
100 x 32mm 7 nr
32 x 25mm 9 nr
G Union GI
25mm 8 nr
H Gate valve
25mm diameter 5 nr
Supply, install, test and commission Fire Hose Reel, 30m long,
I 2 nr
65mm diameter to BS 5306, complete with supporting equipment
SUMMARY
TOTAL PRELIMINARIES
WATER SUPPLY
EXTERNAL/ CORE SERVICES
Water Pump
A Supply and install 32mm diameter PPR pipe (DiZAYN GROUP) or
equal approved, complete with fittings and supporting brackets for
transfering water from GROUND WATER TANK to the building. 200 m
B Supply and install 32mm diameter gate valves to support the above
installations 6 nr
D Supply and install 32mm diameter ppr pipe, complete with fittings
and supporting brackets for transfering water from bore hole to
under ground tank 100 m
E Supply and install 32mm diameter gate valves to support the above
installations 1 nr
H
Supply, install, test and commission of drilled bore hole of 4 inch
pipe with pump submersed water pump 3 HP,Variable speed motor.
Permanent magnet motor with high efficiency.Single phase 50 /
60Hz motors.to be protected well
1 set
C Supply and install 75mm uPVC pipe class "B" according to BS 8301
- 1985 complete with associated fittings 120 m
D
Allow for Construction of foul/waste water manholes of internal
dimension 600x600mm with invert level not exceeding 1000mm
comprising 200mm plain concrete grade "C" bed 230mm block wall
plastered internally as per specification and drawings including
heavy duty cast iron cover to match with external paving.
40 nr
F Supply and install Galvanized steel wire ballon set on top of vent
pipe and covered with mosquito gauze, 100mm diameter 3 nr
Allow for construction of septic tank tank of (L*W*D)(5*4*2.5)m AS
G 2 item
aprroved by service engineer
H Allow for construction of Soak away pit 3 diameter and 2.5m depth 2 item
COLLECTION
TOTAL WATER SUPPLY EXTERNAL WORKS
SUMMARY
QUANTITIES
RATE AMOUNT
500,000.00 1,500,000.00
500,000.00 1,500,000.00
3,000,000.00 3,000,000.00
TSH 6,000,000.00
RATE AMOUNT
4,000.00 1,000,000.00
5,000.00 1,075,000.00
5,000.00 1,075,000.00
5,000.00 475,000.00
5,000.00 325,000.00
5,000.00 260,000.00
5,000.00 125,000.00
5,000.00 225,000.00
5,000.00 300,000.00
5,000.00 145,000.00
5,000.00 50,000.00
5,000.00 175,000.00
5,000.00 210,000.00
10,000.00 120,000.00
10,000.00 350,000.00
10,000.00 390,000.00
30,000.00 1,950,000.00
2,000,000.00 2,000,000.00
TSH 10,250,000.00
RATE AMOUNT
5,000 725,000
4,500 450,000
4,500 441,000
4,500 427,500
5,000 175,000
5,000 160,000
5,000 225,000
5,000 325,000
5,000 335,000
5,000 210,000
30,000 900,000
5,000 150,000
5,000 150,000
4,673,500
RATE AMOUNT
650,000.00 19,500,000.00
30,000.00 900,000.00
700,000 1,400,000
50,000 3,100,000
300,000 18,600,000
1,000,000 1,000,000
2,000,000 2,000,000
500,000 1,000,000
100,000.00 2,100,000
100,000.00
3,000,000.00
60,000.00 1,800,000.00
TSH 54,400,000.00
RATE AMOUNT
2,000,000 2,000,000
5,000 225,000
2,000 30,000
5,000 80,000
7,500 52,500
5,000 35,000
5,000 45,000
5,000 40,000
10,000 50,000
200,000 400,000
350,000 3,500,000
350,000 3,500,000
TZS 9,957,500
6,000,000
10,250,000
4,673,500
54,400,000
9,957,500
VAT EXCLUSIVE 85,281,000
RATE AMOUNT
5,000.00 1,000,000.00
10,000.00 60,000.00
10,000.00 10,000.00
5,000.00 500,000.00
10,000.00 10,000.00
10,000.00 10,000.00
1,000,000.00 1,000,000.00
8,000,000.00 8,000,000.00
1,000,000.00 1,000,000.00
7,000,000.00 7,000,000
18,590,000.00
UNIT AMOUNT
10,000.00 2,000,000.00
10,000.00 2,000,000.00
7,000.00 840,000.00
150,000.00 6,000,000.00
100,000.00 3,200,000.00
40,000.00 120,000.00
5,000,000 10,000,000
3,500,000 7,000,000
TZS 31,160,000.00
18,590,000.00
31,160,000.00
TZS 49,750,000.00
PC PS
A PRELIMINARIES 33,500,000
SUB-TOTAL 2,687,316,000
Contingency 180,000,000
2 Excavate pit for column base & strip foundation commencing at m³ 15 30,000 459,000
formation level for any kind of soil and not exceeding 450mm deep.
Disporsal of water.
5 Allow for keeping excavation free from general water. Item 100,000 100,000
Hardcore
6 200mm bed levelled and blinded to recieve concrete. m² 127 7,000 889,000
CONCRETE WORK
Walling
18 1000 Gauge polythene damp proof membrane laid over m² 127 5,000 635,000
blinded hardcore.
2 Various diameter 12mm & 8mm to slab,beam and column kgs 3,535 2,400 8,484,000
WALLING
Sawn formwork to :
Doors of size:
Windows of size:
1 SUBSTRUCTURE 8,712,400
2 SUPERSTRUCTURE 41,984,000
TOTAL 61,696,400