0% found this document useful (0 votes)
75 views4 pages

CV Waseem

Uploaded by

Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views4 pages

CV Waseem

Uploaded by

Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

E n g r.

W a s e e m U l l a h
MSc. Electrical Engineer
08 Years Experience

Address: Makkah KSA


Email: [email protected]
Mobile No: 0591122601

Skills Major Experience:

Vijeo Citec SCADA/HMI V7.2 Schneider Project Development, Management


computerized designing of logical and manual electric and Reporting
system Monitoring and Evaluation
Desigo Insight V5.1 SIEMENS Presentation and liaison
Quality Focus as per IEC, ISO & SAES-P-101 to SAES-P-123 Negotiation & Communication
Testing & Commissioning Technical competence

PLC & SCADA Logic Designing & Programing Effectively leadership & Teamwork

AutoCade Designing Solutions orientation

EDUCATION & PROFESSIONAL DEVELOPMENT:

 MSc in Electrical Engineering.


 BSc in Electronics Engineering.

EMPLOYMENT HISOTRY & CAREER ACCOMPLISHMENTS:

Harammain High Speed Rail Project November 2017 till Date


CONSULTRANS KSA
Quality Assurance Engineer

 Responsible for Site inspections, Technical Report writing, Audit planning & Work Audits
and quality meetings.
 Ensure that all the railways signalling works, OCS works, Track Works, MEP Works, Steel
Structure Works, Equipment’s Works, Civil Works, Ducting Works are performed as per
approved details design.
 Ensure that all OCS related works which include installation of Poles, messenger & contact
wires, Droppers, counter weight, cantilever and its supporting structure are installed as per
approved details design.
 Ensure that all Signalling Works which include installation of Point Machine(MD-2000),
signals, Track circuit centre feed/end feed tuning unit, fixed data Balise, continuity bond
1|4 CV Engr. Waseem
across the RIJ, Axle counter and its electronic interlocking are performed as per approved
details design.
 Ensure that all track works which include Embedded tracks, PIT tracks, Ballast track, track
alignment, track gauge, ballast profile, aluminothermic welding, RIJ, turnout, level crossing
etc are performed as per approved detail design.
 Ensure that all civil works which include, earth works, foundations and other concrete works
are performed as per approved details design.
 Ensure that all steel structure works which include cladding works, welding, roof works,
crane beam and column of UPN, IPE profile are performed as per approved details design.
 Ensure that all architecture works and MEP works which include painting works, gypsum
board works, Chillers, FCU, AHU, FAHU, Pumps, transformer, MV switchgear, MDB, SMDB,
DP, socket, cablings, cable tray works, conduit works, lighting works are performed as per
approved details design.
 Ensure that all Telecommunication and security system works which include installation of
WiFi , PAS, CCTV , access control system are performed as per approved details design.
 Ensure that Fire detection (Low current) and firefighting (Mechanical) works are performed
as per approved details design.

A.S.AL-Sayed Construction Company September 2015 to November, 2017


SAUDI ARABIA
Electro-Mechanical Engineer

 Under this assignment worked in 9 different projects across the kingdom of Saudi Arabia.
 Worked with SNC-Lavalin Fayez Engineering as a design reviewer in ARAMCO Project
Dhahran Dammam.
 Worked as Electro-Mechanical engineer in NAJRAN University, NAJRAN Hospital , KING
SALMAN airbase Riyadh, Alimam Hospital Riyadh , ahad rufaidah hospital abha, Al Jouf
University Women Colleges in Qurayyat, Mazahimaiya College of business administration
Riyadh and SHAZA hotel in Makkah.
 Responsibilities include installation and works supervision of Chillers, AHU, FAHU, FCU,
Primary & Secondary Pumps and Electrical System.
 Ensure all relevant safety objectives and legal requirements are observed for all work
completed
 Providing advice and consultancy support.
 Perform testing for maintaining and modifying existing systems.
 Follow the drawings and work according to the specifications.
 Designing developed and install control systems for Siemens field devices & access control
system.
 Perform configuration, troubleshooting, testing & commissioning of Lighting, FCU, AHU and
chillers, transformer, switchgear, MDB, SMDB, DDC etc.

2|4 CV Engr. Waseem


Electrical Engineer
Malankand III Hydropower Project June 2012 – June 2015

 Working with a multidiscipline group of engineers and technicians providing technical


services to public and private sector clients including design work, field work and project
management activities.
 Implementation & execution of equipment's/instrument like Lighting arrestor, surge
arrester, CVT, instrument transformer, Bus bar, circuit breaker, isolator, control and
protective relay, earthling system for safety, protection, measurement and control of
substation equipment’s.
 Maintain quality records as per IEC standards.
 Calculate the amount of light required in Halls, conference rooms, Stairs in buildings, room,
offices, and outdoor using Lumens calculating formula.
 Coordinate ordering of material & track the progress /status of material delivery to site.
 Verification of received material vs ordered material.
 Perform testing and commissioning of substation equipment’s.
 Develop Procedure to reduce cost, risk of illness or damage.
 Analyse cost and quality so as to obtain the maximum benefit for the company.
 Check all qualities standard related activities and check it with the given specification.
 Ensure maintenance team's availability and efficiency.
 Record and maintain the calibration of all measuring equipment and resolve any issues
related to calibration.
 Perform routine inspection on machines performance.
 Providing senior electrical engineering support for developing control of PLC & SCADA
systems.
 Lead and manage technical assignments.
 Perform other duties as assigned.

Site Engineer
ZTE Pakistan July 2011 – April 2012

 Prepared reports as required and resolving any unexpected technical difficulties that may
arise.
 All the electrical work (Cabling, wiring, Panel boards, Electrical Tests/commissioning,
Grounding, Interior and Exterior lighting, Electrical Equipment’s installation, Electrical safety
parameters) regarding construction to follow the drawings and to do work according to the
drawings.
 Ensuring that all materials/equipment’s used and work performed are as per specifications.
 Perform testing and commissioning of SDR.
 Replacing of damage sensor on site.
 Checked quality control health and safety matters on site.
 Managed, monitoring and interpreting the contract design.

3|4 CV Engr. Waseem


TRAININGS & RELEVANT PROFESSIONAL KNOWLEDGE:

 PLC and SCADA certified from NUST school of Electrical Engineering and
computer science Islamabad.
 Six-Week internship in National Telecommunication Corporation of Pakistan.
 CCNA certified from NUST school of Electrical Engineering and computer
science Islamabad.
 Desigo CC V2.1 Engineering Fundamentals certified from Siemens Saudi
Arabia.

PROJECT & RESEARCH WORK:

 Published one Research paper in IEEE.


 BSc Final year project on PLC based Sequential Batch Process Control System.

LANGUAGES:

English, Arabic, Urdu/Hindi, Pushto

COMPUTER SKILLS AND PROGRAMING SKILLS:

AutoCAD, WinProladder, Microsoft Project, Microsoft Office, Power Point, MS


FrontPage Exploring internet. C & C++, Visual Programming Tools.

4|4 CV Engr. Waseem

You might also like