1. to provide you with the recommended preparations for the Pure Storage FlashArray Implementation
Professional Exam, and
2. to help you determine if you are ready to sit for the exam.
This guide outlines the knowledge, skills, and abilities required of a “minimally qualified candidate”
for a specific job role, which will be evaluated in the exam.
3
SECTION 1: EXAM REGISTRATION INSTRUCTIONS
1.1. EXAM REGISTRATION INFORMATION
• Exam name: Pure Storage FlashArray Implementation Professional
• Exam number: FAIP_001
• Exam cost: $200 (US Dollars)
• A stable broadband Internet service with a bandwidth of at least 512 Kbps down and 256 Kbps up
• Chrome or Chromium web browser
• Webcam
• Microphone
To check if your computer meets the minimum requirements of the exam provider, visit
http://www.examslocal.com/ScheduleExam/Home/CompatibilityCheck. Otherwise, no software installations
are required.
We do not install any software on your computer for this exam and, therefore, we do not have any access to
your computer or its contents. The only access the proctor has to your computer is the webcam and desktop
sharing facilitated by your web browser. You will experience a virtual lockdown browser system that utilizes
secure communications and encryption. Upon the completion of the exam, all proctor “view-only access”
is automatically removed. PSI/Innovative Exams is our partner that helps us to proctor and deliver the exam.
4
1.4 DAY OF THE EXAM
Requirements:
• You must provide one form of government-issued photo ID (e.g., driver’s license, passport).
• If you do not provide acceptable proof of identification via webcam to the proctor prior to the exam,
you will not be allowed to take the exam. No refund or rescheduling is provided when an exam cannot
be started due to failure to provide proper identification.
• You must also consent to having your photo taken. The ID will be used for identity verification only
and will not be stored.
• You must be alone in a quiet environment such as a conference room or home office.
• The proctor will ask you to show your desk and surroundings before your exam can start.
• You cannot consult notes or books during the exam. The proctor will not allow use of documents,
materials, or websites during the exam.
NOTE: The timer for your exam does not start until the Innovative Exams’ proctor has launched the exam.
You will have 120 minutes to complete the exam. You may start your exam any time between 15 minutes
before and 15 minutes after your scheduled start time. However, if you do not start your exam within this
30-minute timeframe, the system will automatically mark you as a No-Show and you will not be able to take
your exam.
Special Considerations
5
1.5 EXAM SCORING
• One point is awarded for each correct answer to a single-response or multi-response question.
• No points are awarded for either incorrectly answered or unanswered single- or multi-response
questions.
If You Pass
Your candidate record will have an eCertificate when you achieve a certification, as well as a Pure Storage
certification logo for this exam. A certification is valid for two years. Upon expiration, you must take the exam
again.
If You Fail
Your first time logging in, you will need to create an account. To create an account:
3. You will receive an email with instructions on how to access your account.
Once you have created your account, you will be able to login with your login ID and password.
6
SECTION 2: FLASHARRAY IMPLEMENTATION
PROFESSIONAL EXAM STRUCTURE
• Number of questions: 75
• Question types: Multiple Choice (three or four options, one to two correct answers)
• Time limit: 120 minutes
• Pre-Install
• Install
• Upgrade
• Post-Install/Upgrade
• Pre-Install
∙ Validate site-survey data prior to installation
∙ Determine if best practice requirements for installation/upgrade have been met
• Install
∙ Identify hardware and software installation procedures for the array
• Upgrade
∙ Identify hardware and software upgrade procedures
• Post-Install/Upgrade
∙ Evaluate the array to ensure install/upgrade was successful
∙ Determine when Pure Storage Support should be engaged
∙ Perform GUI walkthrough with the customer
7
3.3 DOMAIN DISTRIBUTION
The questions on the exam are distributed as follows for each domain. (Note: each question carries the same
weight and there is no partial credit for any question.)
The Pure Storage Certified Implementation Professional - FlashArray should be able to perform
the following tasks without any assistance:
The Pure Storage Certified Implementation Professional - FlashArray should be able to participate
in the following task with substantial guidance, mentoring, or instruction:
8
4.2 MQC WORK EXPERIENCE
A minimally qualified Pure Storage Certified Implementation Professional - FlashArray typically has
the following work experience:
I CAN:
Pre-Install
• Check whether host port names and proxy names are valid
• Assess whether the configuration and environment are correct for installation
• Identify whether a support case needs to be opened during pre-installation
9
Install
• Perform both a physical and software installation of the array, including following the install guide,
executing required software changes to the FlashArray, and validating connectivity
• Identify whether a support case needs to be opened during installation
Upgrade
• Follow the install guide to perform hardware upgrades, including consolidating capacity, verifying
cabling, etc.
• Execute required software changes on the FlashArray to configure the environment
• Identify whether a support case needs to be opened during the upgrade
Post-Install/Upgrade
10
SECTION 7: PURE STORAGE FLASHARRAY
IMPLEMENTATION PROFESSIONAL -
EMPLOYEE EXAM SAMPLE QUESTIONS
Review and practice taking exam questions to get a sense for the types of questions on the exam. Please
note that your performance here does not indicate how you will do on the actual exam. To fully prepare
for the exam, closely review the topic areas and objectives in this Exam Guide. The correct answers are at
the end of the exam guide.
What is the maximum number of Ethernet cables that the customer needs to provide for the iSCSI
initiators to be connected utilizing all of the ports on both controllers, including the on-board iSCSI ports?
A. 12
B. 16
C. 20
D. 24
3. A customer has purchased a new //X20R2 array and would like to use existing 1g Ethernet switches.
Which additional components are required to continue using the existing switches and CAT-6 cables on
the new array?
A. 1Gb/s SFP Transceivers
B. Copper 1Gb/s Transceivers
C. OM3 cabling
D. qSFP adapters
11
4. A customer sees a performance impact to their host environment during a shelf evacuation.
Which action should an Implementation Engineer take to identify the cause of this issue?
A. Check if capacity is above 100%
B. Check Pure1 to see if the load percentage is above 80%
C. Check if capacity is above 80%
D. Check Pure1 to see if the load percentage is above 60%
Which step should an Implementation Engineer perform next to complete this upgrade?
A. Call Support and request a step-up transformer
B. Continue with the upgrade as planned, ensuring both power supplies are connected
C. Use the 1600W power supply provided in the NDU kit
D. Advise the client that the FlashArray//X70R2 must use 208VAC
7. Which procedure should an Implementation Engineer follow when a hardware NDU pre-upgrade check
shows SAS chains miscabled?
A. Continue as normal if the array has no other issues
B. Follow the installation guide to re-cable the array
C. Contact Support for a re-cabling procedure
D. Power off the array and re-cable
12
SECTION 8: ANSWER KEY
1. A FlashArray//X has 3 iSCSI cards in each controller.
What is the maximum number of Ethernet cables that the customer needs to provide for the iSCSI
initiators to be connected utilizing all of the ports on both controllers, including the on-board iSCSI ports?
A. 12
B. 16
C. 20
D. 24
3. A customer has purchased a new //X20R2 array and would like to use existing 1g Ethernet switches.
Which additional components are required to continue using the existing switches and CAT-6 cables on
the new array?
A. 1Gb/s SFP Transceivers
B. Copper 1Gb/s Transceivers
C. OM3 cabling
D. qSFP adapters
4. A customer sees a performance impact to their host environment during a shelf evacuation.
Which action should an Implementation Engineer take to identify the cause of this issue?
A. Check if capacity is above 100%
B. Check Pure1 to see if the load percentage is above 80%
C. Check if capacity is above 80%
D. Check Pure1 to see if the load percentage is above 60%
13
5. During the upgrade to a FlashArray//X70R2, power feed is discovered to be 120VAC.
Which step should an Implementation Engineer perform next to complete this upgrade?
A. Call Support and request a step-up transformer
B. Continue with the upgrade as planned, ensuring both power supplies are connected
C. Use the 1600W power supply provided in the NDU kit
D. Advise the client that the FlashArray//X70R2 must use 208VAC
7. Which procedure should an Implementation Engineer follow when a hardware NDU pre-upgrade check
shows SAS chains miscabled?
A. Continue as normal if the array has no other issues
B. Follow the installation guide to re-cable the array
C. Contact Support for a re-cabling procedure
D. Power off the array and re-cable
14
SUPPORT
For information on Pure Storage’s certification programs, visit www.examslocal.com. To contact us,
please send an email to [email protected].
T: 650-290-6088
F: 650-625-9667
Sales: [email protected]
Support: [email protected]
Media: [email protected]
© 2018 Pure Storage, Inc. All rights reserved.
ps_sg_faImplementation-pro-exam2018_12