NA 01-H1AAC-6-3 AH-1W Scheduled Maintenance Requirement Car
NA 01-H1AAC-6-3 AH-1W Scheduled Maintenance Requirement Car
TECHNICAL MANUAL
SPECIAL/CONDITIONAL/PRESERVATION/ASPA
MAINTENANCE REQUIREMENT CARDS
MODEL AH-1W AIRCRAFT
This revision supersedes NAVAIR 01-H1AAC-6-3 dated 1 July 2001 and incorporates IRACs 76 through 83.
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors to
protect publications required for official use or for administrative or operational purposes only, determined on 1
September 1997. Other requests for this document shall be referred to Commanding Officer, Naval Air Technical
Data and Engineering Service Command, Naval Air Station North Island, P.O. Box 357031, Building 90 Distribution,
San Diego, CA 92135-7031
DESTRUCTION NOTICE – For unclassified limited documents, destroy by any method that will prevent disclosure
of contents or reconstruction of the document.
Insert latest changed cards; dispose of superseded cards in accordance with applicable regulations.
NOTE: That portion of text affected by the change is indicated by a vertical line or other change symbol in the
outer margin of the card.
CARD NO. CHANGE NO. CARD NO. CHANGE NO. CARD NO. CHANGE NO.
Title...........................................0 HMWS-11.................................0 ix...............................................0
A ...............................................0 HMWS-12.................................0 x................................................0
B ...............................................0 HMWS-13.................................0 xi ...............................................0
C...............................................0 HMWS-14.................................0 xii ..............................................0
D...............................................0 HMWS-15.................................0 xiii .............................................0
E ...............................................0 HMWS-16.................................0 xiv .............................................0
TPDR-1 ....................................0 HMWS-17.................................0 xv..............................................0
TPDR-2 Blank ..........................0 HMWS-18 ................................0 xvi .............................................0
HMWS-1...................................0 HMWS-19.................................0 xvii ............................................0
HMWS-2...................................0 HMWS-20 Blank.......................0 xviii ...........................................0
HMWS-3...................................0 i.................................................0 xix .............................................0
HMWS-4...................................0 ii ................................................0 xx..............................................0
HMWS-5...................................0 iii ...............................................0 1 ...............................................0
HMWS-6...................................0 iv...............................................0 1.1 Blank ..................................0
HMWS-7...................................0 v................................................0 2 ...............................................0
HMWS-8...................................0 vi ...............................................0 2.1 ............................................0
HMWS-9...................................0 vii ..............................................0 3 ...............................................0
HMWS-10.................................0 viii .............................................0 3.1 ............................................0
B
NAVAIR 01-H1AAC-6-3
LIST OF EFFECTIVE CARDS
CARD NO. CHANGE NO. CARD NO. CHANGE NO. CARD NO. CHANGE NO.
3.2 ............................................0 10 .............................................0 14 .............................................0
3.3 ............................................0 10.1 ..........................................0 14.1 ..........................................0
3.4 ............................................0 10.2 ..........................................0 14.2 ..........................................0
3.5 ............................................0 10.3 ..........................................0 14.3 ..........................................0
4 ...............................................0 11 .............................................0 15 .............................................0
4.1 ............................................0 11.1 ..........................................0 15.1 Blank ................................0
5 ...............................................0 11.2 ..........................................0 16 .............................................0
5.1 Blank ..................................0 11.3 ..........................................0 16.1 ..........................................0
6 ...............................................0 11.4 ..........................................0 17 .............................................0
6.1 ............................................0 11.5 ..........................................0 17.1 Blank ................................0
7 ...............................................0 11.6 ..........................................0 18 .............................................0
7.1 Blank ..................................0 11.7 Blank ................................0 18.1 Blank ................................0
8 ...............................................0 12 .............................................0 19 .............................................0
8.1 ............................................0 12.1 Blank ................................0 19.1 ..........................................0
9 ...............................................0 13 .............................................0 20 .............................................0
9.1 ............................................0 13.1 ..........................................0 20.1 Blank ................................0
9.2 ............................................0 13.2 ..........................................0 21 .............................................0
9.3 Blank ..................................0 13.3 Blank ................................0 21.1 ..........................................0
C
NAVAIR 01-H1AAC-6-3
LIST OF EFFECTIVE CARDS
CARD NO. CHANGE NO. CARD NO. CHANGE NO. CARD NO. CHANGE NO.
22 .............................................0 25.12 ........................................0 30 .............................................0
22.1 Blank ................................0 25.13 ........................................0 30.1 Blank ................................0
23 .............................................0 26 .............................................0 31 .............................................0
23.1 Blank ................................0 26.1 ..........................................0 31.1 Blank ................................0
24 .............................................0 27 .............................................0 32 .............................................0
24.1 ..........................................0 27.1 ..........................................0 32.1 Blank ................................0
25 .............................................0 27.2 ..........................................0 33 .............................................0
25.1 ..........................................0 27.3 ..........................................0 33.1 Blank ................................0
25.2 ..........................................0 27.4 ..........................................0 34 .............................................0
25.3 ..........................................0 27.5 ..........................................0 34.1 Blank ................................0
25.4 ..........................................0 27.6 ..........................................0 35 .............................................0
25.5 ..........................................0 27.7 Blank ................................0 35.1 Blank ................................0
25.6 ..........................................0 28 .............................................0 36 .............................................0
25.7 ..........................................0 28.1 ..........................................0 36.1 Blank ................................0
25.8 ..........................................0 28.2 ..........................................0 37 .............................................0
25.9 ..........................................0 28.3 Blank ................................0 37.1 Blank ................................0
25.10 ........................................0 29 .............................................0 38 .............................................0
25.11 ........................................0 29.1 Blank ................................0 38.1 Blank ................................0
D
NAVAIR 01-H1AAC-6-3
LIST OF EFFECTIVE CARDS
CARD NO. CHANGE NO. CARD NO. CHANGE NO. CARD NO. CHANGE NO.
39 .............................................0 47 .............................................0 52 .............................................0
39.1 ..........................................0 47.1 Blank ................................0 52.1 Blank ................................0
40 .............................................0 48 .............................................0 53 .............................................0
40.1 Blank ................................0 48.1 ..........................................0 53.1 ..........................................0
41 .............................................0 48.2 ..........................................0 53.2 ..........................................0
41.1 Blank ................................0 48.3 ..........................................0 53.3 ..........................................0
42 .............................................0 49 .............................................0 53.4 ..........................................0
42.1 Blank ................................0 49.1 ..........................................0 53.5 ..........................................0
43 .............................................0 49.2 ..........................................0 54 .............................................0
43.1 ..........................................0 49.3 Blank ................................0 54.1 Blank ................................0
44 .............................................0 50 .............................................0 55 .............................................0
44.1 Blank ................................0 50.1 ..........................................0 55.1 Blank ................................0
45 .............................................0 50.2 ..........................................0 56 .............................................0
45.1 Blank ................................0 50.3 ..........................................0 56.1 Blank ................................0
46 .............................................0 50.4 ..........................................0 57 .............................................0
46.1 ..........................................0 50.5 ..........................................0 57.1 ..........................................0
46.2 ..........................................0 51 .............................................0 58 .............................................0
46.3 Blank ................................0 51.1 Blank ................................0 58.1 Blank ................................0
E
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
19 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6324 NTS/TSU INSPECTION, NTS TSU P/N
R COND AIR NA
ZONE N 0.5 NO. NO. 1 RMS40160001, M65 TSU P/N 3234001-110
CONSUMABLES/REPLACEMENT PARTS
Desiccant MIL-D-3716B, Grade H, Type IV
Tissue, Lens Cleaning TX404
Tissue, Lens Cleaning TX500
Gloves, Approved Rubber -
Water, Distilled -
1. TSU:
a. remove left (large) protective cover.
NOTE: If moisture is present or humidity indicator begins to change color, 40% or more, replace TSU
desiccant and purge IAW NA 01-H1AAC-2-12.3, WP 004 00 for M65 TSU or WP 016 00 for
NTS TSU. Desiccant replacement and purging satisfies Special 56 Day requirement.
b. glass for evidence of moisture (fog).
c. humidity indicator for condition.
d. install protective cover.
e. open gunner door (2).
f. lens assembly for cracks and crazing.
g. close gunner door (2).
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
19.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6324 NTS/TSU INSPECTION, NTS TSU P/N
R COND AIR NA
ZONE N NO. NO. 1 RMS40160001, M65 TSU P/N 3234001-110
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
27.6 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 M197 GUN AND M89 FEEDER AND GUN
R COND AIR NA
ZONE N NO. NO. 1 TURRET
NOTE: Gun and feeder may be installed in helicopter using a clean spare as authorized by current
COSAL allowances. Scheduled Removal Component (SRC) cards must reflect the change.
4 4. Perform Elevation and Azimuth Clutch inspection IAW NA 01-H1AAC-2-12.3, WP 003 00,
Table 1. (QA)
End of Card
(Card 27.7 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
28 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 RECOIL ADAPTER, SLIDER
R COND AIR NA
ZONE N 1.5 NO. NO. 1 ASSEMBLY, AND GUN DRIVE ASSEMBLY
NOTE: Perform tasks every 28 days shipboard, 56 days shore based operations.
CONSUMABLES/REPLACEMENT PARTS
Lockwire MS20995C32
Lubricating Oil, Weapons TW-25BCA16EP
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
28.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 RECOIL ADAPTER, SLIDER
R COND AIR NA
ZONE N 1.5 NO. NO. 1 ASSEMBLY, AND GUN DRIVE ASSEMBLY
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
28.2 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 RECOIL ADAPTER, SLIDER
R COND AIR NA
ZONE N 1.5 NO. NO. 1 ASSEMBLY, AND GUN DRIVE ASSEMBLY
CONSUMABLES/REPLACEMENT PARTS
End of Card
(Card 29.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 364 DAY
36 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324 GYROSYN COMPASS SYSTEM
R COND AIR NA
ZONE N 5.0 NO. NO. 1 AN/ASN-75B
NOTE: The AN/ASN-75B Gyrosyn Compass System is not installed on helicopters with ECP
1686/AFC 301 System. The compass swing for this system is not required.
2. Accomplish standby magnetic compass swing on helicopters not modified by ECP 1686/AFC
301, IAW NA 01-H1AAC-2-14.2, WP 008 00.
3. Accomplish standby magnetic compass swing on helicopters modified by ECP 1686/AFC 301,
IAW NA 01-H1AAC-2-14.2, WP 008 01.
End of Card
(Card 36.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
CONDITIONAL
54 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324 PRE-DEPLOYMENT AN/ASN-75B GYROSYN
R COND AIR NA
ZONE N 5.0 NO. NO. 1 COMPASS SYSTEM
NOTE: The AN/ASN-75B Gyrosyn Compass System is not installed on helicopters with ECP
1686/AFC 301 system. The compass swing for this system is not required.
1. Avionics:
a. AN/ASN-75B Gyrosyn Compass System:
(1) Within 90 days prior to shipboard deployment of more than 60 days, accomplish compass
swing procedure on the AN/ASN-75B Gyrosyn Compass System on helicopters not
modified by ECP 1686/AFC 301, IAW NA 01-H1AAC-2-14.2, WP 008 00.
(2) Within 90 days prior to shipboard deployment of more than 60 days, accomplish
standby magnetic compass swing on helicopters not modified by ECP 1686/AFC
301, IAW NA 01-H1AAC-2-14.2, WP 008 00.
(3) Within 90 days prior to shipboard deployment of more than 60 days, accomplish
standby magnetic compass swing on helicopters modified by ECP 1686/AFC 301,
IAW NA 01-H1AAC-2-14.2, WP 008 01.
End of Card
(Card 54.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
55A DATE 1 January 2003 IRAC 84 CONDITIONAL
WORK C TIME RTG MOS 6114 DESERT ENVIRONMENT – ENGINE HOT HYD PWR NA
ZONE R 0.5 NO. NO. 1 SECTION CLEANING COND AIR NA
N
NOTE: This card covers the requirements for engine hot section cleaning after the last flight of the day
when operating in a desert/sandy/dusty environment in order to reduce accumulation of sand and dirt internal
deposits and help maintain engine efficiency. Desert operation generally means operation in a very hot, dry,
dusty, often windy atmosphere. These areas are characterized by dry, barren, sandy regions with sparse
vegetation. Operating in these areas will cause erosion of compressor airfoils, sand/dirt buildup in the gas
generator turbine flow path, and clogging of internal cooling passages, which will result in power
deterioration. Hot section cleaning is required after operating in any of the following conditions: (1) takeoffs
or landings from unprepared surfaces that are sandy/dusty/dirty; (2) takeoffs or landings in brown out type
conditions reported by pilot; (3) acft operations conducted nap of the earth over desert type terrain (TERF or
HET); (4) operating in areas of known suspended sand in the atmosphere; (5) operating in the area of a sand
or dust storm.
Continued
(Enclosure 1)
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
55A.1 DATE 1 January 2003 IRAC 84 CONDITIONAL
WORK C TIME RTG MOS 6114 DESERT ENVIRONMENT – ENGINE HOT HYD PWR NA
ZONE R 0.5 NO. NO. 1 SECTION CLEANING COND AIR NA
N
NOTE: Hot section cleaning shall be performed after the last flight of the day when operating in a
desert/sandy/dusty environment. The rinse portion after performing hot section cleaning meets the
requirements for the desalinization rinse.
End of Card
(Enclosure 1)
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
55B DATE 1 July 2003 IRAC 84 CONDITIONAL
WORK C TIME RTG MOS 6114 DESALINIZATION RINSE (OPERATING HYD PWR OFF
ZONE R 0.5 NO. NO. 1 WITHIN 0.5 MILES OF SALT WATER AFTER COND AIR NA
N LAST FLIGHT OF DAY)
CONSUMABLES/REPLACEMENT PARTS
NOTE: Desalinization rinse shall be performed after last flight of the day when the aircraft has operated
within 0.5 miles of saltwater. The rinse portion after performing compressor or hot section cleaning meets the
requirements for the desalinization rinse.
End of Card
(Enclosure 2)
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. TECHNICAL PUBLICATION
TPDR-1 DATE 1 January 2003 DEFICIENCY REPORTS
THE FOLLOWING TPDR’S ARE INCORPORATED AS PART OF THIS CHANGE. THIS CARD SHALL
REMAIN WITH THIS CHANGE; NEXT CHANGE WILL PROVIDE NEW LISTING PAGE WITH THE LATEST
TPDR INCORPORATED.
End of Card
(Card TPDR-2 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-1 DATE 1 January 2003
Warnings in this manual alert personnel to hazards associated with the use of hazardous materials.
Additional information related to hazardous materials is provided in OPNAVINST 5100.23, Navy
Occupational Safety and Health (NAVOSH) program manual, NAVSUPINST 5100.27, Navy Hazardous
Material Control Program, and the DOD 6050.5, Hazardous Materials Information System (HMIS) series
publications. For each hazardous material used within the Navy, a Material Safety Data Sheet (MSDS) must
be provided and available for review by users. Consult your local safety and health staff concerning any
questions regarding hazardous materials, MSDS, personal protective equipment requirements, appropriate
handling and emergency procedures, and disposal guidance.
Under the heading "HAZARDOUS MATERIALS WARNINGS", complete warnings, including related icon(s)
and a numeric identifier, are provided for hazardous materials used in this manual.
In the text of the manual, the caption "WARNING" is not used for hazardous material warnings. Hazards are
cited with appropriate icon(s), the nomenclature of the hazardous material, and the numeric identifier that
relates to the complete warnings. Users of hazardous materials shall refer to the complete warnings, as
necessary.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-2 DATE 1 January 2003
Biological
The abstract symbol bug shows that a material may contain bacteria or viruses that present
a danger to life or health.
Chemical
The symbol of a liquid dripping onto a hand shows that the material will cause burns or
irritation to human skin or tissue.
Explosion
This rapidly expanding symbol shows that the material may explode if subjected to high
temperature, sources of ignition, or high pressure.
Eye Protection
The symbol of a person wearing goggles shows that the material will injure the eyes.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-3 DATE 1 January 2003
Poison
The symbol of a skull and crossbones shows that the material is poisonous or is a danger to
life.
Radiation
The symbol of three circular wedges shows that a material emits radioactive energy and can
injure human tissue or organs.
Vapor
The symbol of a human figure in a cloud shows that material vapors present a danger to life
or health.
Cryogenic
The symbol of a hand in a block of ice shows that the material is extremely cold and can
injure human skin or tissue.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-4 DATE 1 January 2003
Index
MIL-PRF-680 Drycleaning Solvent may cause eye and skin irritation. Overexposure may cause
dizziness and other central nervous system effects. Wear nitrile gloves and chemical protective
goggles. Consult the applicable Material Safety Data Sheet (MSDS) and local Occupational
Safety and Health (OSH) regulations for additional information.
.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-5 DATE 1 January 2003
MIL-C-81309 Corrosion Preventive Compound may cause eye and skin irritation. Overexposure
may cause dizziness or other nervous system effects. For safety, use: Chemical splash proof
goggles, gloves, and good ventilation. Consult the applicable Material Safety Data Sheet
(MSDS) and local Occupational Safety and Health (OSH) regulations for appropriate safety
precautions.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-6 DATE 1 January 2003
3 Methyl Alcohol
O-M-232
Methyl Alcohol is flammable - do not use near open flames, welding areas, or on hot surfaces. Do
not smoke when using it, and do not use it where others are smoking. Prolonged or repeated
inhalation of vapor can cause eye irritation, drowsiness, and headache. Ingestion may be fatal or
may cause eye damage. If vapor contacts eyes, immediately flush eyes with large amounts of
water. Immediately remove solvent-saturated clothing. If vapors cause drowsiness, go to fresh
air. When handling or applying liquid at air exhausted workbench, wear approved goggles. When
handling or applying liquid at unexhausted work bench, wear approved respirator and goggles.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-7 DATE 1 January 2003
4 Isopropyl Alcohol
TT-I-735
TT-I-735 Isopropyl Alcohol is flammable. Do not use near open flame or other sources of ignition.
May irritate skin and eyes. Inhalation may cause dizziness, headaches and irritation to respiratory
tract. Wear chemical splash proof goggles and gloves. Consult the applicable Material Safety Data
Sheet (MSDS) and local Occupational Safety and Health (OSH) regulations for additional
information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-8 DATE 1 January 2003
MIL-DTL-85054 Corrosion Preventive Compound is a skin, eye and respiratory tract irritant. High
vapor concentration may cause dizziness, headache, or unconsciousness. Do not use in confined
areas. PPE: Chemical splash proof goggles and nitrile gloves. Consult the applicable Material
Safety Data Sheet (MSDS) and local Occupational Safety and Health (OSH) regulations for
additional information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-9 DATE 1 January 2003
6 Aircraft Grease
MIL-PRF-81322
MIL-PRF-81322 General Purpose Aircraft Grease is an eye irritant and, upon prolonged exposure,
a skin irritant. May contain chromates, suspected carcinogens. Keep away from oxidizing agents.
Wear: gloves and safety glasses. Manufacturers' hazards may vary. Always consult proper
MSDS.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-10 DATE 1 January 2003
MIL-PRF-85570 Aircraft Cleaning Compound is irritating to skin and eyes. Prolonged contact may
cause dermatitis. Wear chemical splash proof goggles and gloves. Use only with adequate
ventilation. Consult the applicable Material Safety Data Sheet (MSDS) and local Occupational
Safety and Health (OSH) regulations for additional information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-11 DATE 1 January 2003
8 Lubricating Oil
MIL-PRF-32033
MIL-PRF-32033 (formerly VV-L-800) General purpose lubricatring oil may irritate skin or eyes.
PPE: rubber gloves and saftey goggles. Consult the applicable Material Safety Data Sheet
(MSDS) and local Occupational Safety and Health (OSH) regulations for additional information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-12 DATE 1 January 2003
10 Lubricating Oil
MIL-PRF-7870
Lubricating oil may be mildly irritating to the skin and eyes. Do not inhale mist. Wear nitrile gloves
and appropriate eye protection during use. Consult the applicable Material Safety Data Sheet
(MSDS) and local Occupational Safety and Health (OSH) regulations for additional information.
11 Potassium Hydroxide
Manufacturer's hazards may vary. Always consult proper MSDS.
Potassium Hydroxide is caustic and may cause minor burns to eyes, skin and respiratory tract.
Avoid contact with eyes, skin, and clothing. Do not inhale vapors. Protection: chemical resistance
gloves, goggles, full faceshield, and local ventilation.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-13 DATE 1 January 2003
13 Cleaning Compound
MIL-PRF-29608
Cleaning compound, electrical contact, depending on the type, may be flammable and irritating to
the skin and eyes. PPE: gloves, goggles. Consult the applicable Material Safety Data Sheet
(MSDS) and local Occupation Safety and Health (OSH) regulations for additional information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-14 DATE 1 January 2003
14 Cleaning Compound
MIL-PRF-85704
MIL-PRF-85704 Engine Gas Path Cleaning Compound may cause skin and eye irritation. Use eye
protection and gloves when handling this material. Consult the applicable Material Safety Data
Sheet (MSDS) and local Occupational Safety and Health (OSH) regulations for additional
information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-15 DATE 1 January 2003
17 Lubricating Oil
MIL-PRF-6081, Grade 1010
Manufacturer’s hazards may vary. Always consult proper MSDS.
MIL-PRF-6081 may cause skin and eye irritation. Avoid contact with skin and eyes. Wear nitrile
gloves and safety glasses. Consult the applicable Material Safety Data Sheet (MSDS) and local
Occupational Safety and Health (OSH) regulations for additional information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-16 DATE 1 January 2003
18 Hydraulic Fluid
MIL-PRF-83282
MIL-PRF-83282 Hydraulic fluid may be irritating to the skin and eyes. Keep fluid off skin, eyes and
clothes. Wear eye protection and nitrile gloves. Consult the applicable Material Safety Data Sheet
(MSDS) and local Occupational Safety and Health (OSH) regulations for additional information.
19 Lubricating Oil
SAE J2362, Grade 50
Manufacturer's hazards may vary. Always consult proper MSDS.
Motor Oil, SAE J2362, is a minor eye and skin irritant. Avoid prolonged contact with the skin. Use only
in well ventilated areas. PPE: gloves, goggles; Consult the applicable Material Safety Data Sheet
(MSDS) and local Occupational Safety and Health (OSH) regulations for additional information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-17 DATE 1 January 2003
20 Lubricating Oil
MIL-PRF-46167
Oil is a minor eye and skin irritant. Avoid prolonged contact with the skin. Use only in well
ventilated areas. PPE: gloves, goggles Consult the applicable Material Safety Data Sheet
(MSDS) and local Occupational Safety and Health (OSH) regulations for additional information.
21 Lubricating Oil
MIL-PRF-23699
MIL-PRF-23699 Synthetic Aircraft Turboshaft Lubrication Oil can irritate skin or eyes upon contact.
May contain a neurotoxin that can be absorbed through the intact skin. Symptoms of overexposure
include tingling or numbness in hands or feet. Wear nitrile gloves, chemical protective goggles.
Consult the applicable Material Safety Data Sheet (MSDS) and local Occupational Safety and
Health (OSH) regulations for additional information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-18 DATE 1 January 2003
22 Lubricating Oil
DOD-L-85734
Manufacturer's hazards may vary. Always consult proper MSDS.
Synthetic aircraft lubrication oil, DOD-L-85734, is mildly irritating to the skin and eyes. Avoid
contact. Wear gloves, chemical splash-proof goggles. Consult the applicable Material Safety Data
Sheet (MSDS) and local Occupational Safety and Health (OSH) regulations for additional
information.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HMWS-19 DATE 1 January 2003
23 Lubricating Oil
MIL-PRF-7808
Manufacturer's hazards may vary. Always consult proper MSDS.
MIL-PRF-7808 Lubricating Oil is mildly irritating to skin and eyes. May contain tricresyl phosphate
which is a neurotoxin. Keep away from excessive heat. Wear: Impervious nitrile gloves, chemical
goggles. Consult the applicable Material Safety Data Sheet (MSDS) and local Occupational Safety
and Health (OSH) regulations for additional information.
End of Card
(Card HMWS-20 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
i DATE 1 January 2003
INTRODUCTION
This manual contains the minimum Special/Preservation/Conditional and ASPA requirements necessary
to assure the aircraft is safe for flight. Clearances, pressures, tolerances, illustrations, support equipment
required, and manual references are present where pertinent. These requirements are grouped in the
following order:
SPECIAL Requirements - are developed from task which do not fit in the phased package due to
conflicting interval requirements. Inspection performed during Turnaround or Daily inspections shall not
be duplicated by special inspections.
ASPA Requirements - provide special inspection requirements for preparation of the aircraft for ASPA
evaluation and for restoration to a flight ready condition.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
ii DATE 1 January 2003
APPLICATION
Special, Preservation, Conditional and ASPA requirements shall be accomplished at the interval or
condition specified on the card.
Level I Preservation shall be applied when the aircraft has been idle/nonflyable in excess of 14 days and
less than 90 days. Level II Preservation is required for 90 days or up to one (1) year.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
iii DATE 1 January 2003
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
iv DATE 1 January 2003
TIME - Total elapsed time in hours and minutes required to accomplish tasks listed on the basic and
decimal cards.
RTG/MOS and NO. - Rating/Military occupational specialty assigned to accomplished tasks. Each
specialist with same rating is assigned an identifying number.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
v DATE 1 January 2003
DEFINITIONS
WARNING - Indicates danger to personnel. The warning precedes the item to which it refers.
CAUTION - Indicates danger to the system. The caution precedes the item to which it refers.
EVIDENCE - Indication of existing condition such as hydraulic fluid dripping from lower wing
surface is evidence of leak.
NOTE - An information item. The note precedes or follows the item to which it refers.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
vi DATE 1 January 2003
DEFINITIONS (Cont’d)
VISIBLE OR - The term applied when inspections requires no further disassembly or movement
EXPOSED of equipment and no removal of doors or panels other than that specifically
detailed.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
vii DATE 1 January 2003
The following support equipment is necessary to accomplish the requirements contained in this manual.
1.
Adapter, W3 of AN/AWM-54 178AS320 1
2.
Adapter, W42 of AN/AWM-54 178AS850 1
3.
Air Compressor, Portable PMC0168 1
4.
Cable, BNC to Microdot VM99BM-6 2
5.
Cart, Corrosion Control 65A102-J1-1 1
6.
Compressor, Air 160DP 1
7.
Container (5 Gallon) – 1
8.
Container (10 Quart) – 1
9.
Container, Glass or Polyethelene – 2
(1 Quart)
10. Flaw Detector, Eddy Current TTU-507/E PD214 1
11. Gun, Grease 36251-1034 1
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
viii DATE 1 January 2003
The following consumable maintenance materials are necessary to accomplish the requirements
contained in this manual.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
xii DATE 1 January 2003
NOTES
1. Use MIL-PRF-23699 above -25°F (-30°C). Use MIL-PRF-7808 from -25°F to -65°F (-30°C to -55°C). Do
not start below -65°F (-55°C). DO NOT MIX OILS.
3. Use of DOD-L-85734 at continuous ground temperature above 0 Degrees F. (-18 Degrees C.)
From 0 Degrees F (-18 Degrees C) to -40 Degrees F (-40 Degrees C) use DOD-L-85734 or
MIL-PRF-7808. Use only MIL-PRF-7808 at continuous ground temperatures below -40 Degrees F
(-40 Degrees C). Do not start below -65 Degrees F (-55 Degrees C).
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
xiii DATE 1 January 2003
The following replacement parts are necessary to accomplish the requirements contained in this manual.
1. Elbow MS20762-D12 1
2. Element, Filter AC-9985F-30 2
3. Flange MS20756-D12 1
4. Packing J228P226 4
5. Packing J228P238 2
6. Packing J221P110/M83248/1-110 4
7. Packing J228P113 4
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
WORK AREA CHART
xiv DATE 1 January 2003
WORK AREAS
1. NOSE AREA
2. GUNNER AND PILOT AREA
3. LOWER FORWARD FUSELAGE
AREA
4. TURRET AREA
5. PYLON AREA AND MAIN ROTOR
6. ENGINE AREA
7. CENTER FUSELAGE AREA
8. TAILBOOM AREA
9. TAIL ROTOR DRIVE AREA AND
TAIL ROTOR
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
ACCESS PANELS
xv DATE 1 January 2003
2. GUNNER DOOR
3. TRANSMISSION PYLON FORWARD FAIRING
4. TRANSMISSION PYLON CENTER FAIRING
5. TRANSMISSION PYLON CENTER FAIRING
DOOR (FORWARD)
8. PYLON AFT FAIRING
9. CENTER ENGINE COWL
10. TAILPIPE FAIRING
11. EXTERIOR FAIRING (LEFT)
12. ENGINE UPPER COWL (LEFT)
14. DRIVESHAFT ACCESS PANEL
15. ENGINE LOWER COWL (LEFT)
16. TRANSMISSION COWL
17. EXTERNAL POWER DOOR
18. DOOR ASSEMBLY
21. MAIN BEAM PANEL (LEFT)
22. FWD FUEL CELL OUTER PANEL
24. ROTOR BRAKE AND ECU DOOR
26. BATTERY ACCESS DOOR 32. TURRET REAR PANEL 45. PYLON AFT FAIRING
27. PANEL 33. TURRET FAIRING 46. PYLON OUTBOARD FAIRING
28. PANEL 34. PANEL 47. GROUND SAFTY PIN DOOR
29. AMMUNITION COMPARTMENT 35. TURRET SIDE PANEL 48. COVER
DOOR (LEFT) 37. TURRET FWD PANEL 49. PYLON NOSE FAIRING
30. PANEL 40. CLOSURE
31. DOOR 42. COVER
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
ACCESS PANELS
xvi DATE 1 January 2003
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
ACCESS PANELS
xvii DATE 1 January 2003
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
ACCESS PANELS
xviii DATE 1 January 2003
Continued
SEE IRAC # 85
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ANTENNA LOCATIONS
xx DATE 1 January 2003 (COMM/NAV UPGRADE)
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL/PRIOR ELEC PWR ON
1 DATE 1 January 2003 TO LOADING HYD PWR ON
WORK C TIME RTG MOS 6531 WEAPONS SYSTEM RELEASE AND
R COND AIR NA
ZONE N 2.0 NO. NO. 2 CONTROL CHECK
NOTE: Perform task within the 24 hour period prior to weapon/store loading.
End of Card
(Card 1.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL/END OF ELEC PWR OFF
2 DATE 1 January 2003 FIRING DAY HYD PWR OFF
WORK C TIME RTG MOS 6531
R PYLON EJECTOR RACKS - OUTBOARD COND AIR NA
ZONE N 3.0 NO. NO. 1
NOTE: Perform task at end of the firing day or five firings, whichever comes first.
CONSUMABLES/REPLACEMENT PARTS
Lockwire MS20995C32
1. Remove fairings (45, 46, 49, 86, 94, and 97) and open doors (47 and 96):
a. remove ejector rack IAW NA 01-H1AAC-2-12.3, WP 008 00.
b. route to intermediate level maintenance IAW NA 11-5E-19.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL/EACH ELEC PWR OFF
2.1 DATE 1 January 2003 FIRING DAY HYD PWR OFF
WORK C TIME RTG MOS 6531
R PYLON EJECTOR RACKS - OUTBOARD COND AIR NA
ZONE N NO. NO. 1
7 5. Install fairings (45, 46, 49, 86, 94, and 97) and close and secure doors (47 and 96).
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL/END OF ELEC PWR OFF
3 DATE 1 January 2003 FIRING DAY HYD PWR NA
WORK C TIME RTG MOS 6531
R BRU SERIES EJECTOR RACKS COND AIR NA
ZONE N 1.0 NO. NO. 1
NOTE: Perform task at end of firing day or five firings, whichever comes first.
CONSUMABLES/REPLACEMENT PARTS
WARNING: Breech cannot be removed or installed with weapon installed on BRU-20/A, BRU-21/A,
BRU-22/A and BRU-23/A ejector racks. If breech is removed with the weapon on
SEE
IRAC # 85 ejector rack, weapon will be released.
1. Remove breech and gun from ejector rack (Card 3.4 and 3.5). Disassemble gun.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL/END OF ELEC PWR OFF
3.1 DATE 1 January 2003 FIRING DAY HYD PWR NA
WORK C TIME RTG MOS 6531
R BRU SERIES EJECTOR RACKS COND AIR NA
ZONE N NO. NO. 1
CAUTION: Do not use abrasives on ejector components. Use soft brass of plastic scraper if
particles cannot be removed by the following procedure.
2. Clean breech, gun, and piston assembly with stiff-bristle brush and drycleaning and degreasing
solvent. Reclean with detergent and hot fresh water.
3. Breech, gun, and piston assembly for cracks or breaks. Breech and piston assembly for missing
or broken rings. Piston for straightness.
4. Replace breech, gun or piston assembly if defective. Replace missing or broken bearing ring
and pressure ring on piston and form to proper shape using hardwood blocks. (Rings are
properly formed when spring action of rings will retain piston in gun assembly and piston
operates with no binding).
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL/END OF ELEC PWR OFF
3.2 DATE 1 January 2003 FIRING DAY HYD PWR NA
WORK C TIME RTG MOS 6531
R BRU SERIES EJECTOR RACKS COND AIR NA
ZONE N NO. NO. 1
6. Assemble breech, gun and piston assembly in reverse order of removal. (See card 3.4 thru 3.5).
NOTE: Make certain breech is fully forward and locked. Close hooks and leave latched at all times
ejector unit is not in use.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. BREECH, GUN AND
3.3 DATE 1 January 2003 PISTON REMOVAL
1. PULL MANUAL RELEASE LEVER FORWARD TO DISENGAGE AFT LINK FROM BREECH SLOT.
2. ROTATE BREECH 90° TO ALIGN BREECH LUG WITH GUN SLOT.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. BREECH, GUN AND
3.4 DATE 1 January 2003 PISTON REMOVAL
3. REMOVE BREECH.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. BREECH, GUN AND
3.5 DATE 1 January 2003 PISTON REMOVAL
NOTE: Perform task at end of firing day or 1500 rounds, whichever comes first.
1. Turret gun:
a. remove feeder connector.
WARNING: Assure that gun chambers, declutching feeder and bores are clear of ammunition.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL/END OF ELEC PWR OFF
4.1 DATE 1 January 2003 FIRING DAY
HYD PWR NA
M197 GUN, M89E1 FEEDER, GUN DRIVE
WORK C TIME RTG MOS 6531
R ASSEMBLY, RECOIL ADAPTER, SLIDER ASSEMBLY, COND AIR NA
ZONE N
0.5 NO. NO. 1 and REAR SUPPORT ON SADDLE ASSEMBLY
NOTE: Route recoil adapter to IMA for preload gage check if any damage is visible to the
end plate assembly, coupling clamp, or rear support of the turret saddle assembly.
g. inspect the 12007566 end plate assembly and 7269760 coupling clamp on M197 gun for
any damage due to impact of the gun coupling clamp on the 175F643 rear support of the
turret saddle assembly during gun recoil. If damage is noted, route M197 gun to IMA for
inspection. (QA)
h. inspect rear support on the turret saddle assembly for evidence of contact between the
coupling clamp and the rear support during gun recoil. If damage is visible, route turret
assembly to IMA for inspection. (QA)
i. perform barrel erosion gage inspection IAW NA 11-95M197-1. (QA)
j. perform gun lubrication IAW NA 11-95M197-1. (QA)
k. perform feeder lubrication IAW NA 11-95M89-1. (QA)
l. clear area of foreign objects.
m. install turret panels (35 and 61) and turret fairing (62).
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 7 DAY
5 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6048 CANOPY REMOVAL SYSTEM:
R COND AIR NA
ZONE N 0.5 NO. NO. PILOT SEAT INTERCONNECT LINE
End of Card
(Card 5.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
6 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R APR-39/ALE-39 SYSTEM COND AIR NA
ZONE N 0.5 NO. NO. 1
Methyl Alcohol 3
O-M-232
Isopropyl Alcohol 4
TT-I-735
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
6.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R APR-39/ALE-39 SYSTEM COND AIR NA
ZONE N NO. NO. 1
Methyl Alcohol 3
O-M-232
Isopropyl Alcohol 4
TT-I-735
CAUTION: Avoid using excessive force on the window assemblies to avoid cracking, scratching, or
breaking the windows.
1 C 1. Remove dirt, grease, and moisture from forward AAR-47 Optical Sensor Units; inspect for
cracks, deterioration and corrosion.
9 C 2. Remove dirt, grease, and moisture from aft AAR-47 Optical Sensor Units; inspect for cracks,
deterioration and corrosion. End of Card
(Card 7.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
8 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R HSS COND AIR NA
ZONE N 0.3 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Alcohol, Methyl or Isopropyl O-M-233/TT-I-735
Cloth, Cheesecloth CCC-C-440
Solvent, Drycleaning and Degreasing MIL-PRF-680, Type II or Type III
1. Helmet Sight Subsystem (HSS):
a. open pilot door (55) and gunner door (2).
b. linkage assembly for broken or loose parts.
Methyl Alcohol 3
O-M-232
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
8.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R HSS COND AIR NA
ZONE N 0.3 NO. NO. 1
Isopropyl Alcohol 4
TT-I-735
c. clean rails with lint and dust free cloth soaked in alcohol or drycleaning solvent.
C d. rails for nicks, dents, or corrosion.
2 2. Electronic interface assembly:
a. cabling for wear and fraying.
b. connectors for security.
c. close pilot door (55) and gunner door (2).
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
9 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114
R PREWASH LUBRICATION-TAIL ROTOR COND AIR NA
ZONE N 0.3 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Aircraft Grease 6
MIL-PRF-81322
CAUTION: Apply only two shots of grease to crosshead. Purge other bearings slowly to avoid damage
to bearing seals and retainers.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
9.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114
R PREWASH LUBRICATION-TAIL ROTOR COND AIR NA
ZONE N NO. NO. 1
NOTE: Clean all lubrication points and surfaces prior to application of lubricant: wipe off excess
lubricant upon completion.
1. Crosshead 1 MIL-PRF-81322
2. Lever and idler 4 MIL-PRF-81322
3. Trunnion 2 MIL-PRF-81322
4. Bellcrank 2 MIL-PRF-81322
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. PREWASH LUBRICATION
9.2 DATE 1 January 2003 -TAIL ROTOR
End of Card
(Card 9.3 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
10 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 PREWASH LUBRICATION-MAIN ROTOR
R COND AIR NA
ZONE N 0.5 NO. NO. 1 CONTROLS
CONSUMABLES/REPLACEMENT PARTS
Aircraft Grease 6
MIL-PRF-81322
CAUTION: Purge bearings slowly to avoid damage to bearing seals and retainers.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
10.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 PREWASH LUBRICATION-MAIN ROTOR
R COND AIR NA
ZONE N NO. NO. 1 CONTROLS
NOTE: Clean all lubrication points and surfaces prior to application of lubricant: wipe off excess
lubricant upon completion.
5 1. Lubricate swashplate, scissors, sleeve, and collective lever using general purpose grease:
a. open transmission pylon center fairing (4).
b. rotate M/R, lubricate swashplate assembly (2) bearings at 30 degree intervals through full
360 degrees to assure thorough purging of bearings.
c. rotate main rotor by hand and lubricate collective sleeve bearings (4) at 30 degree intervals
through full 360 degrees to assure thorough purging of bearings.
d. lubricate (purge) bearings (1, 3 and 5 through 8).
e. lubricate (purge) collective lever pins (9).
f. close transmission pylon center fairing (4).
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
10.2 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 PREWASH LUBRICATION-MAIN ROTOR
R COND AIR NA
ZONE N NO. NO. 1 CONTROLS
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. PREWASH LUBRICATION
10.3 DATE 1 January 2003 MAIN ROTOR CONTROLS
NOTE:
….. DASH LINE INDICATES
POINT ON OPPOSITE SIDE
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
11 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R HELICOPTER WASHING/CLEANING COND AIR OFF
ZONE N 4.0 NO. NO. 1
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
11.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R HELICOPTER WASHING/CLEANING COND AIR OFF
ZONE N NO. NO. 1
NOTE: The primary method for cleaning is the water detergent method, the alternates being
limited water detergent and waterless wipedown. Refer to NA 01-1A-509.
1. Prepare helicopter:
a. seal static vents with masking tape.
b. install pitot cover.
c. secure open doors (18, 24, 54, and 77).
d. seal both starter and generator openings with masking tape.
e. cover ends of fire extinguisher discharge tubes with masking tape.
f. cover both fan vents of NTS TSU (upper nose fairing, port and starboard sides) with masking
tape.
g. cover edges of port and starboard ammunition compartment doors (access panels 29 and 66)
with masking tape.
h. cover NTS TSU humidity indicator with masking tape. Do not spray water directly on TSU during
washing or rinsing.
i. cover transmission breather vent with masking tape.
2. Prepare engine:
a. ensure all electrical connectors on the Engine Electrical Control Unit, engine and firewall are
firmly secured per applicable manual. If connectors are loose, remove connector and inspect
for contaminants (moisture, oil, etc.). Perform maintenance as required.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
11.2 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R HELICOPTER WASHING/CLEANING COND AIR OFF
ZONE N NO. NO. 1
NOTE: Mix one part of cleaning compound MIL-PRF-85570, Type II with nine parts of water for
cleaning.
a. clean main rotor blade grip area with cleaning compound MIL-PRF-85570, Type II.
b. wash main rotor blades with cleaning compound MIL-PRF-85570, Type II mixture.
c. dry blades with cleaning cloths.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
11.3 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R HELICOPTER WASHING/CLEANING COND AIR OFF
ZONE N NO. NO. 1
a. clean engine and combining gearbox using cleaning cloth dampened with cleaning
compound MIL-PRF-85570, Type II.
b. clean transmission using cleaning cloth dampened with cleaning compound MIL-PRF-85570,
Type II.
Lubricating Oil 8
MIL-PRF-32033
NOTE: Do not spray lubricating oil directly on the Engine Electrical Control Unit, mating electrical
connectors, or the compressor variable geometry. Wipe off any over spray from these
components.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
11.4 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R HELICOPTER WASHING/CLEANING COND AIR OFF
ZONE N NO. NO. 1
CAUTION: When washing tail rotor avoid spraying tail rotor hub with direct stream of water.
NOTE: Avoid applying cleaning compound to cockpit acrylic plastic surfaces, tail rotor driveshaft
hanger bearings, and main transmission, intermediate, and tail rotor gearbox quills.
NOTE: Assure all drain holes are clear by inserting a probe, such as a pipe cleaner, except where
pressurized flapper valve is located.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
11.5 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R HELICOPTER WASHING/CLEANING COND AIR OFF
ZONE N NO. NO. 1
5,7 7. Close doors (18, 24, 54, and 77) and secure.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HELICOPTER WASHING/CLEANING
11.6 DATE 1 January 2003
1. PITOT TUBE
2. STATIC PORT
3. PITOT SYSTEM DRAIN VALVE
4. STATIC SYSTEM DRAIN VALVE
End of Card
(Card 11.7 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
12 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R BLADE INSPECTION COND AIR OFF
ZONE N 1.0 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Aircraft Grease 6
MIL-PRF-81322
CAUTION: Apply only two shots of grease to crosshead. Purge other bearings slowly to avoid damage
to bearing seals and retainers.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
13.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114
R POSTWASH LUBRICATION-TAIL ROTOR COND AIR NA
ZONE N NO. NO. 1
NOTE: Clean all lubrication points and surfaces prior to application of lubricants: wipe off excess
lubricant upon completion.
1. Crosshead 1 MIL-PRF-81322
2. Lever and Idler 4 MIL-PRF-81322
3. Trunnion 2 MIL-PRF-81322
4. Bellcrank 2 MIL-PRF-81322
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. POSTWASH LUBRICATION -
13.2 DATE 1 January 2003 TAIL ROTOR CONTROLS
End of Card
(Card 13.3 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
14 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 POSTWASH LUBRICATION-MAIN
R COND AIR NA
ZONE N 0.5 NO. NO. 1 ROTOR CONTROLS
CONSUMABLES/REPLACEMENT PARTS
Aircraft Grease 6
MIL-PRF-81322
CAUTION: Purge bearings slowly to avoid damage to bearing seals and retainers.
NOTE: Clean all lubrication points and surfaces prior to application of lubricants. Wipe off excess
lubrication upon completion.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
14.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 POSTWASH LUBRICATION-MAIN
R COND AIR NA
ZONE N NO. NO. 1 ROTOR CONTROLS
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
14.2 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 POSTWASH LUBRICATION-MAIN
R COND AIR NA
ZONE N NO. NO. 1 ROTOR CONTROLS
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO.
HELICOPTER WASHING/CLEANING
14.3 DATE 1 January 2003
NOTE:
….. DASH LINE INDICATES
POINT ON OPPOSITE SIDE.
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 14 DAY
15 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 POSTWASH/CLEANING MAIN
R COND AIR NA
ZONE N 0.5 NO. NO. 1 DRIVESHAFT
CONSUMABLES/REPLACEMENT PARTS
2. Apply MIL-C-81309, Type II corrosion preventive compound, water, displacing (aerosol) to exterior
of female coupling/seal plate interface for main driveshaft couplings.
CONSUMABLES/REPLACEMENT PARTS
3,5,6 C 2. Spray all piano hinges with corrosion preventive compound and wipe clean.
9
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
16.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R POST WASH/LUBRICATION COND AIR NA
ZONE N NO. NO. 1
Lubricating Oil 10
MIL-PRF-7870
3,5,6 3. Lubricate piano hinges with lubricating oil and wipe off excess lubricant.
9
4. Spray pilot and copilots jettison handles and hinges with lubricating oil and wipe off excess
lubricant.
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
17 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6154
R POSTWASH/LUBRICATION COND AIR NA
ZONE N 0.4 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Lubricating Oil 10
MIL-PRF-7870
1. Spray pilot and copilots jettison handles and hinges with lubricating oil and wipe off excess
lubricant.
End of Card
(Card 17.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
18 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6324
R HUD HUMIDITY INSPECTION COND AIR NA
ZONE N 0.3 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
NOTE: If moisture is present or humidity indicator is pink, HUD dehumidifier desiccant replacement is
required, IAW NA 01-H1AAC-2-12.3, WP 011 00.
2 1. HUD:
a. open gunner door (2).
b. glass for evidence of moisture (fog).
c. humidity indicator for condition.
d. close gunner door (2).
End of Card
(Card 18.1 Blank)
This card intentionally left blank.
SEE IRAC # 85
SEE IRAC # 85
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
20 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6531
R TOW/HMS/AIM-9 MISSLE LAUNCHER COND AIR NA
ZONE N 0.5 NO. NO. 1
NOTE: Perform tasks every 7 days shipboard operations, 14 days shore based operations.
1. TOW missile launcher (if installed).
a. remove covers (49 and 94).
b. inspect launcher IAW NA 11-75A-90, WP 004 00, Table 1. (QA)
c. install covers (49 and 94). (QA)
d. area clear of foreign objects. (QA)
2. HMS missile launcher (if installed).
a. remove covers (48 and 95).
C b. launcher for corrosion.
C c. electrical harness and connectors for corrosion.
d. install covers (48 and 95). (QA)
e. area clear of foreign objects. (QA)
3. LAU-7/ADU-299 launcher/adaptor (if installed).
a. LAU-7 launcher inspect and treat launcher IAW NA 11-75A-54.
C b. ADU-299 adaptor for corrosion.
C c. connectors for corrosion.
d. area clear of foreign objects. (QA)
End of Card
(Card 20.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
21 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R NICKEL CADMIUM BATTERY (19 CELL) COND AIR NA
ZONE N 0.3 NO. NO. 1
Potassium Hydroxide 11
WARNING: No attempt shall be made to adjust electrolyte or charge battery while it is installed in
the helicopter.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 14 DAY
21.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R NICKEL CADMIUM BATTERY (19 CELL) COND AIR NA
ZONE N NO. NO. 1
2. Disconnect all connections from battery but do not remove from tray. Refer to NA 01-H1AAC-2-11.3,
WP 003 00.
3. Check battery for voltage (22 to 26 Vdc).
3 4. Perform electrical leak test:
a. Place ammeter between positive terminal and case, then negative terminal and case. If reading is
more than 26.25 milliamps (0.75 milliampere/ampere-hour rated capacity of the battery) route
battery to authorized battery shop for disassembly and cleaning.
5. Battery case for cracks, dents, and bare metal.
6. Vent lines and hoses for crimps, cracks, obstructions, and serviceability.
7. Battery tray for proper operation.
3 8. Reconnect battery. Refer to NA 01-H1AAC-2-11.3, WP 003 00.
9. Perform operational check. Refer to NA 01-H1AAC-2-11.2.1, WP 003 00. (QA)
10. Area free of foreign objects. (QA)
11. Close battery doors (26 and 70). (QA)
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
SPECIAL 28 DAY
22 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531
R BRU SERIES EJECTOR RACKS COND AIR NA
ZONE N 1.0 NO. NO. 1
NOTE: Perform task every 14 days shipboard operations, 28 days shore based operations.
2. Perform the NARCADS rocket firing test and NARCADS jettison system test, stations 2 and 3
IAW NA 01-H1AAC-2-12.2.2. (QA)
End of Card
(Card 22.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
SPECIAL 28 DAY
23 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6531 PYLON AND EJECTOR RACK –
R COND AIR NA
ZONE N NO. NO. 1 OUTBOARD
2. Perform NARCADS rocket firing test and NARCADS jettison system test, stations 1 and 4 IAW
NA 01-H1AAC-2-12.2.2. (QA)
End of Card
(Card 23.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 28 DAY
24 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6531
R PILOT JETTISON PUSH SWITCH COND AIR OFF
ZONE N 1.0 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 28 DAY
24.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6531
R PILOT JETTISON PUSH SWITCH COND AIR OFF
ZONE N NO. NO. 1
NOTE: Do not use any cleaning compounds on the jettison push switch. The push switch is
an unsealed unit. Chemical cleaners may cause damage to switch components.
b. clean pilot jettison push switch with A-A-59323 cleaning cloth or H-B-643 brush.
NOTE: If there is any question as to the serviceability of the pilot jettison push switch or
cracking of the plastic collar/button, replace the jettison push switch.
c. Inspect pilot jettison push switch for damage utilizing a magnifier, four inch diameter,
(NSN 6650-00-514-3531) (located in tool box 12C1-1). Inspect the button and the
plastic collar that retains the button in the switch for any cracks or chipped areas.
If any damage is discovered, replace pilot jettison switch IAW NA 01-H1AAC-2-12.3,
WP 007 00. (QA)
d. install pilot jettison push switch on switch bracket and secure by screwing switch
guard onto pilot jettison push switch.
e. perform jettison system check IAW NA 01-H1AAC-75. (QA)
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N 6.0 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
NOTE: All steps and substeps described below will be inspected for corrosion, nicks, scratches,
gouges, bare metal, chipped paint, mold, missing weather stripping cracks. If any of the above
conditions are present; clean, treat, and repair as required only with approved methods and
materials.
4 C 1. Turret Area:
a. open ammo bay doors (29 and 66).
(1) tow missile control boxes.
(2) ammo bay floor.
(3) ammo bay doors.
b. close ammo bay doors (29 and 66).
c. left, center, and right turret cowling.
2 C 2. Gunner's area:
a. open gunner's canopy door (2)
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.2 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
Lubricating Oil 8
MIL-PRF-32033
(2) latching mechanism. Oil sides and exterior handle and keyway with MIL-PRF-
32033. Wipe excessive oil.
(3) gunner's console and deck
(4) tail rotor pedals.
(5) hand held fire extinguisher.
b. close gunner's door (2).
C 3. Pilot's area:
a. open pilot's door (55).
(1) gas cartridge and rod ends.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.3 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
Lubricating Oil 8
MIL-PRF-32033
(2) latching mechanism. Oil sides and exterior handle and keyway with MIL-PRF-32033.
Wipe excessive oil.
(3) pilot's console and deck.
(4) tail rotor pedals.
b. oil pilot's seat slides.
c. close pilot's door (55).
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.4 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
Potassium Hydroxide 11
a. open LH battery door (26).
(1) terminals and connectors.
(2) battery compartment.
(3) control tubes.
b. close LH battery door (26).
c. open RH battery door (70).
(1) terminals and connectors.
(2) battery compartment.
(3) control tubes.
d. close RH battery door (70).
5 C 6. Main rotor hub and blade assembly:
a. main rotor hub.
b. both blades upper and lower surfaces.
c. rotating controls.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.5 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.7 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
C 8. Top of aircraft:
a. roof of aircraft.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.9 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
C 9. LH and RH stubwings.
a. bottom of stubwing skin.
b. top of stubwing skin and ALE-29 pods.
c. fuel lines and hydraulic lines fittings.
d. remove bucket from pod.
e. install bucket, torque screws to 50 - 60 in. Ibs. in 10 in. lb. increments. (QA)
C 12. LH and RH modex panels (22, 27, 28, 34, 56, 57, 58, and 72).
9 C 14. LH and RH tailboom area, tail rotor, tail rotor hub and blade assembly.
a. driveshaft covers.
b. open driveshaft covers (99, 100, 101, 102, and 103).
Lubricating Oil 8
MIL-PRF-32033
(6) lubricate piano hinges of driveshaft covers with MIL-PRF-32033. Wipe excessive oil.
c. close driveshaft covers (99, 100, 101, 102, and 103).
d. tailboom.
(1) skin.
(2) all antennas and antenna mounts.
e. open equipment/cargo compartment door (112).
f. close equipment/cargo compartment door (112)
g. synchronized elevator.
h. open three tailboom belly panels.
(1) inside tailboom area.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
25.13 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R CORROSION INSPECTION COND AIR NA
ZONE N NO. NO. 1
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
26 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324 CORROSION INSPECTION
R COND AIR NA
ZONE N 1.0 NO. NO. 1 AN/ALQ-144 TRANSMITTER
WARNING: Do not touch ALQ-144 Transmitter until it has cooled. May cause severe burns.
C 3. Open access door on Transmitter and inspect for corrosion. If corrosion is observed route to
IMA.
4. Note times on Scheduled Maintenance Label located on the inside of access door, and compare
them to the elapsed time indicator. If any of the following components are within ± 20 hours of
replacement time, route to IMA for component replacement.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 28 DAY
26.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324 CORROSION INSPECTION
R COND AIR NA
ZONE N NO. 1 NO. 1 AN/ALQ-144 TRANSMITTER
NOTE: If no times are noted on the Scheduled Maintenance Label and the Elapsed Time Indicator
is greater than 180 hours, route transmitter to IMA for scheduled component replacement.
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
27 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 M197 GUN AND M89 FEEDER AND GUN
R COND AIR NA
ZONE N 3.0 NO. NO. 1 TURRET
NOTE: Perform task every 28 days shipboard operations, 56 days shore based operations.
CONSUMABLES/REPLACEMENT PARTS
WARNING: Assure chambers, declutching feeder and bores area clear of ammunition.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
27.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 M197 GUN AND M89 FEEDER AND GUN
R COND AIR NA
ZONE N NO. NO. 1 TURRET
NOTE: Organizational maintenance shall perform the 56 day inspection when intermediate level
maintenance is not available IAW NA 11-95M197-1.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
27.2 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 M197 GUN AND M89 FEEDER AND GUN
R COND AIR NA
ZONE N NO. NO. 1 TURRET
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
27.3 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 M197 GUN AND M89 FEEDER AND GUN
R COND AIR NA
ZONE N NO. NO. 1 TURRET
NOTE: Clean all lubrication points and surfaces prior to application of lubricant. Wipe off
excess lubrication upon completion.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
27.4 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6531 M197 GUN AND M89 FEEDER AND GUN
R COND AIR NA
ZONE N NO. NO. 1 TURRET
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. GTU/1A - GUN TURRET
27.5 DATE 1 January 2003
Continued
SEE IRAC # 85
SEE IRAC # 85
SEE IRAC # 85
SEE IRAC # 85
SEE IRAC # 85
SEE IRAC # 85
SEE IRAC # 85
SEE IRAC # 85
SEE IRAC # 85
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 56 DAY
30 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R NICKEL CADMIUM BATTERY COND AIR NA
ZONE N 0.7 NO. NO. 1
3 1. Battery removal:
a. open battery access doors (26 and 70).
Potassium Hydroxide 11
3 2. Battery installation:
a. install batteries. Refer to NA 01-H1AAC-2-11.3, WP 003 00.
b. area of foreign objects. (QA)
c. close and secure battery access doors (26 and 70).
End of Card
(Card 30.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 56 DAY
31 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG AT MOS 6324
R
NO. UNDERWATER ACOUSTIC LOCATOR COND AIR NA
ZONE N 1.0 NO. 1
CONSUMABLES/REPLACEMENT PARTS
Cleaning Compound 13
MIL-PRF-29608
End of Card
(Card 31.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
SPECIAL 56 DAY
32 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG AT MOS 6324 AN/APX-100
R COND AIR NA
ZONE N 1.0 NO. 1 NO. 2 OPERATIONAL TEST
End of Card
(Card 32.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 91 DAY
33 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R NICKEL CADMIUM BATTERY COND AIR NA
ZONE N 0.7 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Lockwire MS20995C32
3 1. Battery removal:
a. open battery access doors (26 and 70).
b. remove batteries. Refer to NA 01-H1AAC-2-11.3, WP 003 00.
c. route batteries to authorized battery shop for servicing.
3 2. Battery installation:
a. install batteries. Refer to NA 01-H1AAC-2-11.3, WP 003 00.
b. area clear of foreign objects. (QA)
c. close and secure battery access doors (26 and 70).
End of Card
(Card 33.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 182 DAY
34 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6060
R HAND FIRE EXTINGUISHER COND AIR NA
ZONE N 0.1 NO. NO. 1
End of Card
(Card 34.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 364 DAY
35 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6060
R FIRST AID KIT COND AIR NA
ZONE N 0.1 NO. NO. 1
End of Card
(Card 35.1 Blank)
This card intentionally left blank.
SEE IRAC # 85
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 364 DAY
37 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6060
R FIRE EXTINGUISHER CONTAINER, ENGINE COND AIR NA
ZONE N 1.0 NO. NO. 1
End of Card
(Card 37.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 364 DAY
38 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6324
R UNDERWATER ACOUSTIC LOCATOR COND AIR NA
ZONE N 1.0 NO. NO. 1
1. Remove the beacon from mounting bracket if installed in aircraft. If beacon is within 12 months
of its expiration date, replace beacon before performing the following test.
NOTE: Test set PL-1 or PL-3 will be used for the following test, steps 2 through 6 as an
operational check.
3. Place shorting tab assembly from center contact water switch to the case of the beacon.
4. Place end of test set approximately 1 inch from switch end of beacon.
6. Light on test set will flash with each output pulse of beacon indicating that it is operating. If light
does not flash, replace beacon and repeat steps 2 through 6.
7. Reinstall underwater acoustic beacon upon completion of successful test. End of Card
(Card 38.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
4 HOUR
39 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114
R TAIL ROTOR BLADE COND AIR NA
ZONE N 0.3 NO. NO. 1
NOTE: Perform this task on tail rotor blade assemblies with serial number A-1588 and prior, or with
serial number prefix "ATR". Blade assemblies with serial number A-1589 and subsequent or
serial numbers with the suffix "R" do not require this inspection.
CONSUMABLES/REPLACEMENT PARTS
9 1. Clean surfaces of blade using aircraft exterior cleaning compound MIL-PRF-85570, Type II
IAW NA 01-1A-509.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
4 HOUR
39.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114
R TAIL ROTOR BLADE COND AIR NA
ZONE N NO. NO. 1
2. Lightly push the blade tip, by hand, away from the surface being inspected until the hub flapping
stops are contacted. This will enhance the ability to detect a crack.
3. Closely examine the complete surface of the blade for cracks, particularly chordwise from the
bondlines of the spar-to-skin and doubler-to-skin.
a. if no crack is found in the paint, the inspection is complete until next inspection.
b. if a crack is noted in the paint, a depot level inspection is required. Remove the blade from
service and contact NAVAVNDEPOT CHERRY PT H1-ISST.1, TEL: 252-464-8629 or 8630
(DSN451) FAX 252-464-8627 (DSN451), E-MAIL: [email protected] for
disposition instructions.
End of Card
SEE IRAC # 84
NOTE: Perform this card in conjunction with Card 43, Engine Recovery Wash.
Sprayer GE LMT777
1. Perform installed hot section cleaning when engine is operating in a sandy or desert environment.
Refer to NA 01-H1AAC-2-3.3, WP 028 00.
End of Card
(Card 40.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. SPECIAL 36 HOUR ELEC PWR ON
41 DATE 1 January 2003 BEFORE FIRING DAY HYD PWR ON
WORK C TIME RTG MOS 6531 TESTING AND TROUBLESHOOTING
R COND AIR NA
ZONE N 2.0 NO. NO. 2 OF TOW MISSILE SYSTEM
2 1. Perform testing and troubleshooting of Tow Missile System, IAW NA 01-H1AAC-2-12.2.1, WP 005 00,
during the 36 hours before firing of a Tow Missile unless prior Tow Missile launch was successful and
occurred within the previous 36 hours.
NOTE: It is preferred that the system be tested as close in time to missile launch as scheduling permits
to reduce the chance of a problem manifesting itself.
End of Card
(Card 41.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
SPECIAL 50 HOUR
42 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114
R ENGINE FUEL FILTER COND AIR NA
ZONE N 1.5 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
Element, Filter (2) AC-9985F-30
Packing (2) J228P238
Packing (4) J228P226
Packing (4) J228P113
NOTE: For removal, inspection, and installation of fuel bowls and filter elements, refer to NA 01-
H1AAC-2-3.3, WP 025 00.
6 1. Remove filter bowls and filter elements.
2. Inspect for visible filter contamination in filter bowls and on filter elements. Spread the folds of the
filter elements apart and inspect for contamination. (QA)
NOTE: If contamination is present, clean and purge the helicopter fuel system and install new
filter elements, otherwise use original elements. Refer to NA 01-H1AAC-2-3.2 and
NA 01-H1AAC-2-3.3.
3. Clean filter bowls.
4. Install filter elements, filter bowls and new packings. (QA)
5. Pressurize fuel system and perform leak check on filter bowls. (QA) End of Card
(Card 42.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
SPECIAL 50 HOUR
43 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R ENGINE RECOVERY WASH COND AIR NA
ZONE N 2.0 NO. NO. 1
SEE IRAC # 84
Assisted by Pilot (2.0 Hrs)
6114 No. 2 (2.0 Hrs)
6114 No. 3 (2.0 Hrs)
CONSUMABLES/REPLACEMENT PARTS
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
SPECIAL 50 HOUR
43.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R ENGINE RECOVERY WASH COND AIR NA
ZONE N NO. NO. 1
SEE IRAC # 84
SEE IRAC # 84
Isopropyl Alcohol 4
TT-I-735
Methyl Alcohol 3
O-M-232
Cleaning Compound 14
MIL-PRF-85704
b. wash engine. Refer to NA 01-H1AAC-2.3.3, WP 028 00. (QA)
c. area of foreign objects.
d. close lower engine cowlings (12, 15, 81 and 84).
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 50 HOUR
44 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154 LANDING GEAR SADDLES-
R COND AIR NA
ZONE N 2.0 NO. NO. 1 NDI INSPECTION
CONSUMABLES/REPLACEMENT PARTS
End of Card
(Card 44.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 100 HOUR
45 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R NTS BALLAST WEIGHT COND AIR NA
ZONE N 2.0 NO. NO. 1
8 1. NTS Ballast weight channels: refer to NA 01-H1AAC-3.3, WP 039 00, for damage limits.
a. remove the NTS Ballast weights from weight channels.
b. inspect the channels for cracks. Pay particular attention to the upper area of the AFT SPAR
attachment flange and all RADII at the AFT end of the channels.
C c. AFT SPAR for cracks, corrosion, loose, and/or missing fasteners.
d. install the Ballast weights.
End of Card
(Card 45.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 100 HOUR
46 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R TAIL ROTOR CONTROL SYSTEM COND AIR NA
ZONE N 2.0 NO. NO. 2
CONSUMABLES/REPLACEMENT PARTS
8 1. Tail Rotor Control System: Refer to NA 01-H1AAC-2-5, WP 010 00 for damage limits.
C a. remove access panels, 104, 105, 106, 107, 110, 111, 113.
C b. control tubes (2, 5 and 7) for nicks, dents, distortion, wear and security. (QA)
c. clevis and rod end bearings for nicks, wear, corrosion, and security. (QA)
d. nylatron sleeves on control tubes (2, 5 and 7) for wear, looseness, and distortion. (QA)
e. grommets (1, 4 and 8) for nicks, cracks, wear and security. (QA)
C f. bellcrank and support (6) for nicks, cracks, corrosion, security, and excessive play in
bearings. (QA)
C g. idler assembly (3) for nicks, cracks, corrosion, security, and excessive play in bearings. (QA)
C h. bellcrank for nicks, cracks, corrosion, wear and security. (QA)
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR NA
SPECIAL 100 HOUR
46.1 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154
R TAIL ROTOR CONTROL SYSTEM COND AIR NA
ZONE N NO. NO. 2
NOTE: Dip or spray all removable screws and fasteners with corrosion preventive compound prior to
installation.
i. install access panels 104, 105, 106, 107, 110, 111 and 113.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. TAIL ROTOR CONTROL SYSTEM
46.2 DATE 1 January 2003
1. GROMMET (4 REQUIRED)
2. CONTROL TUBE
3. IDLER ASSEMBLY
4. GROMMET (5 REQUIRED)
5. CONTROL TUBE
6. BELLCRANK AND SUPPORT
7. CONTROL TUBE
8. GROMMET (1 REQUIRED)
9. BELLCRANK
End of Card
(Card 46.3 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 100 HOUR
47 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6114 ENGINE EXHAUST DUCT DESWIRLER
R COND AIR NA
ZONE N 1.0 NO. NO. 2 V-BAND CLAMP
NOTE: This task does not apply to V-band couplings P/N 580-0016-1568 or NH1008601-10.
1. Loosen deswirler V-band clamp and remove duct. Refer to NA 01-H1AAC-2-3.3, WP 003 00.
4. Alignment pin and alignment holes in deswirler duct and power turbine module flange for wear and
elongation.
5. Install duct and tighten deswirler V-band clamp. Refer to NA 01-H1AAC-2-3.3, WP 003 00.
End of Card
(Card 47.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 400 HOUR
48 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R NO. 1 AND NO. 2 ENGINE INSPECTION COND AIR NA
ZONE N 1.5 NO. NO. 1
CONSUMABLES/REPLACEMENT PARTS
NOTE: This inspection will be performed based on engine flight hours and may be accomplished in
conjunction with the nearest aircraft phase inspection if desired.
1. Open No. 1 and No. 2 engine access cowling, IAW NA 01-H1AAC-2-1, WP 008 00.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 400 HOUR
48.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R NO. 1 AND NO. 2 ENGINE INSPECTION COND AIR NA
ZONE N NO. NO. 1
3. No. 1 engine turbine case stage 3 turbine nozzle mounting bolts, for loose, broken or missing
bolts (until T700 PPC No. 12 is incorporated). (QA)
b. blower impeller vanes for erosion damage, cracks, nicks, scratches, tip rubs and dents.
c. impeller shroud for erosion damage, nicks, scratches, dents and rubs. (QA)
CAUTION: Do not immerse particle separator blower in drycleaning and degreasing solvent; grease
packed bearings will be damaged.
d. clean particle separator blower by using lint free towel saturated with MIL-PRF-680 to remove
grease, oil and dirt from impeller and shroud.
e. install IPS blower, IAW NA 01-H1AAC-2-3.3, WP 026 00. (QA)
5. No. 1 engine variable geometry actuating system linkage assembly for security, chafing and missing
hardware. Check variable geometry actuating system for binding, IAW NA 01-H1AAC-2-3.2. (QA)
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
SPECIAL 400 HOUR
48.3 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R NO. 1 AND NO. 2 ENGINE INSPECTION COND AIR NA
ZONE N NO. NO. 1
6. No. 1 engine quick disconnect pins in HMU and anti-ice/start bleed valve linkage for full engagement
and security of pins.
9. Engine bay area for FOD. Secure No. 1 and No. 2 engine access cowling, IAW NA 01-H1AAC-2-1,
WP 008 00. (QA)
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
PRESERVATION
49 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
R LEVEL I PRESERVATION COND AIR NA
ZONE N 11.0 NO. NO. 1
NOTE: Level 1 preservation shall be applied if aircraft is expected to be idle in excess of 14 days and
less than 90 days.
CONSUMABLES/REPLACEMENT PARTS
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
PRESERVATION
49.2 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114
ZONE
R
NO. NO. 1
LEVEL I PRESERVATION COND AIR NA
N
1. Compressor Wash Requirements card 43.
4. Comply with Post Wash Lubrication Cards 13, 14, 15 and 16.
NOTE: During Level I preservation, fuel system samples shall be taken each day IAW NAVAIRINST
10340.3, until satisfactory samples are obtained on two consecutive days. The periodic
sampling may then be extended to 3 calendar days. Fuel system sampling is not required
during Level II and Level III preservation.
CONSUMABLES/REPLACEMENT PARTS
1. Power Plant
a. open engine cowls (9, 12, 15, 81 and 84).
b. engine for removed or disconnected parts. Be sure that all discrepancies are recorded in engine
records.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
PRESERVATION
50.1 DATE 1 January 2003 HYD PWR ON
WORK C TIME RTG MOS 6114
R LEVEL II PRESERVATION COND AIR NA
ZONE N NO. NO. 1
C c. be sure that engines, accessories, and inlet area are clean and free from corrosion and from
foreign material.
d. perform compressor cleaning for performance recovery. Refer to NA 01-H1AAC-2-3.3,
WP 028 00.
e. allow engine to cool to prevent automatic ignition; the preserve fuel system as follows:
(1) ensure that ignition switch is OFF.
Lubricating Oil 17
MIL-PRF-6081, Grade 1010
(3) using flange and elbow connect a hose between a clean, vented, 5-gallon container and
engine driven boost pump inlet. Fill container with lubricating oil MIL-PRF-6081, Grade 1010.
Place container above engine fuel inlet.
(4) place throttle lever in EECU lockout position.
CAUTION: Do not exceed starter duty cycle. Motoring time can be broken up into shorter periods.
Observe required starter cooling time intervals between duty cycles.
NOTE: As engine is motored, fuel and oil will be discharged from engine overboard drain.
(5) motor engine at maximum starter speed for one complete duty cycle or until oil is
ejected from exhaust.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
PRESERVATION
50.3 DATE 1 January 2003 HYD PWR ON
WORK C TIME RTG MOS 6114
R LEVEL II PRESERVATION COND AIR NA
ZONE N NO. NO. 1
(6) remove flange, elbow, and hose from boost pump inlet.
(7) reconnect fuel supply inlet hose to engine driven fuel boost pump.
Refer to NA 01-H1AAC-2-3.3, WP 025 00. (QA)
(8) tag engine and cyclic stick with following information: ENGINE FUEL SYSTEM HAS
BEEN PRESERVED WITH LUBRICATING OIL MIL-PRF-6081, Grade 1010.
FLUSHING IS REQUIRED BEFORE OPERATION.
f. install protective covers on engine inlet and exhaust. If covers are not available, seal
openings with barrier material, and secure with masking tape.
g. area of foreign objects.
h. close engine cowls (9, 12, 15, 81, and 84).
i. record date and extent of engine preservation in engine records.
j. preserve engine driven pumps, oil system components, and ignition system.
Refer to NA 15-01-500.
k. clean coolers and heat exchanger air passages. Refer to NA 15-01-500; drain.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
PRESERVATION
50.4 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6531
R LEVEL II PRESERVATION COND AIR NA
ZONE N 1.0 NO. NO. 1
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
PRESERVATION
50.5 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6531
R LEVEL II PRESERVATION COND AIR NA
ZONE N 1.0 NO. NO. 1
Lubricating Oil 17
MIL-PRF-6081, Grade 1010
b. flush system with lubricating oil MIL-PRF-6081, Grade 1010 IAW NA 15-01-500.
c. ensure vents are open.
d. install warning tags on engine and cyclic stick with following information:
ENGINE FUEL SYSTEM HAS BEEN PRESERVED WITH LUBRICATING OIL
MIL-PRF-6081, GRADE 1010. FLUSHING IS REQUIRED BEFORE OPERATION.
e. ensure vents are open.
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
PRESERVATION
51 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6531
R LEVEL I PRESERVATION COND AIR NA
ZONE N 1.0 NO. NO. 1
4,7 1. Armament:
a. remove and dispose of ammunition and pyrotechnics. Refer to applicable ordnance instructions.
b. remove explosive devices from pylons; retain or route to IMA. Refer to NA 11-100-1.
c. guns:
(1) remove guns.
(2) package feed mechanisms using method II. Refer to MIL-STD-2073.
End of Card
(Card 51.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
PRESERVATION
52 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6114 AIRCRAFT MAINTENANCE WHILE
R COND AIR NA
ZONE N 1.5 NO. NO. 1 PRESERVED
End of Card
(Card 52.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
DEPRESERVATION
53 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6154
R DEPRESERVATION COND AIR NA
ZONE N 4.0 NO. NO. 2
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
DEPRESERVATION
53.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6154
R DEPRESERVATION COND AIR NA
ZONE N NO. NO. 2
1. Airframe:
a. remove barrier material and tape.
b. remove warning/caution tags as systems are depreserved.
4,7 2. Armament:
a. install pyrotechnics and explosive devices as required.
b. install gun and feeder mechanism.
3. Electrical/Electronic equipment: perform functional test of all equipment.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
DEPRESERVATION
53.2 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6154
R DEPRESERVATION COND AIR NA
ZONE N NO. NO. 2
Hydraulic Fluid 18
MIL-PRF-83282
a. service. Refer to NA 01-H1AAC-2-8, WP 007 00.
b. for contamination. Refer to NA 01-1A-17.
c. lubricate actuating piston rods with hydraulic fluid.
Lubricating Oil 17
MIL-PRF-6081, Grade 1010
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
DEPRESERVATION
53.3 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6154
R DEPRESERVATION COND AIR NA
ZONE N NO. NO. 2
6 6. Power plant:
a. remove barrier materials and preservations.
C b. treat corrosion. Refer to NA 01-1A-509.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
DEPRESERVATION
53.4 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6154
R DEPRESERVATION COND AIR NA
ZONE N NO. NO. 2
Lubricating Oil 19
SAE J2362, Grade 50
Lubricating Oil 20
MIL-PRF-46167
Lubricating Oil 21
MIL-PRF-23699
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
DEPRESERVATION
53.5 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS 6154
R DEPRESERVATION COND AIR NA
ZONE N NO. NO. 2
e. service engine oil reservoirs and lines. Refer to NA 01-H1AAC-2-1, WP 007 00.
f. flush engine fuel system using procedures in NA 01-H1AAC-2-3.2, WP 008 00.
6,9 7. Gearboxes:
a. remove barrier material, tape, and external preservative coating.
Lubricating Oil 22
DOD-L-85734
Lubricating Oil 23
MIL-PRF-7808
End of Card
SEE IRAC # 85
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
CONDITIONAL
55 DATE 1 January 2003 HYD PWR NA
WORK C TIME RTG MOS 6154 LANDING GEAR SADDLES -
R COND AIR NA
ZONE N 2.0 NO. NO. 1 NDI INSPECTION
CONSUMABLES/REPLACEMENT PARTS
End of Card
(Card 55.1 Blank)
This card intentionally left blank.
SEE IRAC # 84
NOTE: This card covers the requirements for engine hot section cleaning after the last flight of the day
when operating in a desert/sandy/dusty environment in order to reduce accumulation of sand and dirt internal
deposits and help maintain engine efficiency. Desert operation generally means operation in a very hot, dry,
dusty, often windy atmosphere. These areas are characterized by dry, barren, sandy regions with sparse
vegetation. Operating in these areas will cause erosion of compressor airfoils, sand/dirt buildup in the gas
generator turbine flow path, and clogging of internal cooling passages, which will result in power
deterioration. Hot section cleaning is required after operating in any of the following conditions: (1) takeoffs
or landings from unprepared surfaces that are sandy/dusty/dirty; (2) takeoffs or landings in brown out type
conditions reported by pilot; (3) acft operations conducted nap of the earth over desert type terrain (TERF or
HET); (4) operating in areas of known suspended sand in the atmosphere; (5) operating in the area of a sand
or dust storm.
Continued
(Enclosure 1)
SEE IRAC # 84
NOTE: Hot section cleaning shall be performed after the last flight of the day when operating in a
desert/sandy/dusty environment. The rinse portion after performing hot section cleaning meets the
requirements for the desalinization rinse.
End of Card
(Enclosure 1)
SEE IRAC # 84
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
55B DATE 1 July 2003 IRAC 84 CONDITIONAL
WORK C TIME RTG MOS 6114 DESALINIZATION RINSE (OPERATING HYD PWR OFF
ZONE R 0.5 NO. NO. 1 WITHIN 0.5 MILES OF SALT WATER AFTER COND AIR NA
N LAST FLIGHT OF DAY)
CONSUMABLES/REPLACEMENT PARTS
NOTE: Desalinization rinse shall be performed after last flight of the day when the aircraft has operated
within 0.5 miles of saltwater. The rinse portion after performing compressor or hot section cleaning meets the
requirements for the desalinization rinse.
End of Card
(Enclosure 2)
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR ON
CONDITIONAL
56 DATE 1 January 2003 HYD PWR ON
WORK C TIME RTG MOS 6531 PRE-DEPLOYMENT TOW MISSILE
R COND AIR NA
ZONE N 2.0 NO. NO. 2 SYSTEM TESTING
1. Within 30 days prior to shipboard deployment of more than 60 days, perform testing and
troubleshooting of TOW Missile System, IAW NA 01-H1AAC-2-12.2.1, WP 005 00.
End of Card
(Card 56.1 Blank)
This card intentionally left blank.
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
ASPA
57 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS PC
R AIRCRAFT PREPARATION COND AIR NA
ZONE N 3.0 NO. NO. 1
6. Remove/open access panels and doors: 3, 4, 8, 9, 11, 12, 15, 16, 18, 20, 21, 24, 26, 27, 28, 29, 32,
34, 39, 55, 56, 57, 58, 59, 60, 63, 67, 68, 69, 70, 75, 76, 77, 78, 82, 85, 88, 96, 97, 98, 99, 100, 101,
102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 113, 118, 121, 123, 124, 125, 127, 128, 129, 130,
132, and 135.
Continued
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
ASPA
57.1 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS PC
R AIRCRAFT PREPARATION COND AIR NA
ZONE N NO. NO. 1
9. Provide updated Aircraft Log Book and maintenance action forms to evaluation team.
End of Card
CARD NAVAIR 01-H1AAC-6-3 CHANGE NO. ELEC PWR OFF
ASPA
58 DATE 1 January 2003 HYD PWR OFF
WORK C TIME RTG MOS PC
R AIRCRAFT RESTORATION COND AIR NA
ZONE N 3.0 NO. NO. 1
3 Install/close access panels and doors: 3, 4, 8, 9, 11, 12, 15, 16, 18, 20, 21, 24, 26, 27, 28, 29, 32, 34,
39, 55, 56, 57, 58, 59, 60, 63, 67, 68, 69, 70, 75, 76, 77, 78, 82, 85, 88, 96, 97, 98, 99, 100, 101, 102,
103, 104, 105, 106, 107, 108, 109, 110, 111, 113, 118, 121, 123, 124, 125, 127, 128, 129, 130, 132,
and 135.
4. Fuel aircraft.
End of Card
(Card 58.1 Blank)
This card intentionally left blank.