0% found this document useful (0 votes)
34 views1 page

ST - Det FT 1& 2, Ramp Details r1 5923@hanumakonda

Uploaded by

Karan Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

ST - Det FT 1& 2, Ramp Details r1 5923@hanumakonda

Uploaded by

Karan Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

5.

50
corporation land
Warangal Municipal
DG SETS HOT AIR
45.98 EXHAUST
CUTOUT @ ROOF LVL
4.40 2.35
3.05
2.60 2.00 2.00

3.02
1.00

1.00

1.00
1.57
1.80

.70
GAS BANK

4.00
CELLAR LINE
101.150 M FFL

7.85
8.06

7.20
4.00 101.450M FFL 7M WIDE DRIVEWAY 100.850 M SSL
LOADING/ 3.00
101.150M SSL UNLOADING 60.30
EXIT BAY
0.2 M Brickwork 0.2 M Brickwork
8.13 FD3
.30

8.32 DN ELECTRICAL

.60
PR. SHAFT

1.20
FIRE LIFT SHAFT
.30.30
DN 1.63 2.67
FD
2.6MX2.23M FLOOR

1.50
2.00 20 Passenger ELECTRICAL UP TO 1ST

.83
14 19 29 FD2 ROOM - 2 FLOOR
FD5

7M WIDE DRIVEWAY
MID 12 11 01
FIRE
LANDING FRD
DN FROM
SDW UP
TOWER-02 101.600M FFL
FRD
1ST FLOOR
101.525M SSL

4.20

PARAPET WALL 1M HEIGHT WITH VERTICAL LOUVERS ON TOP


H
S

GD
S
H

H
S

GD
S
H 9.09 X 8.17M
101.600 M FFL
.98

101.525 M SSL

H
S
.33

HVAC
COMM.
FRD FIRE LIFT LIFT VENTILATION

2.26
.70
PR.SHAFT
-02
2.6MX2.26M 2.6MX2.26M CUTOUT
20 Passenger 20 Passenger 10.96 SQ.M

FD5
4.85

.90
FS-02

101.600M FFL
101.525M SSL
PARAPET WALL
FIRE LIFT CUTOUT FOR 0.2 M Brickwork 1M HEIGHT WITH VERTICAL
VENTILATION 2.3MX2.6M DG SMOKE
EXHAUST PIPES
LOUVERS ON TOP

CUTOUT 20 Passenger

101.450 M FFL 59.961 SQ.M

7.14
FRD 101.300M FFL
EXIT
101.150 M SSL FIRE
TOWER-01
101.225M SSL
FD3
FD

Irrigaon Department Land

41.98
2.00
2.00

0.2 M Brickwork
UP
DN 29 01

ANCHOR SHOP 28

56.41
EXIT 26
4.05
DN 24
FD3
22

20
19 11
15 13 12

28.79
4.01
MID- SDW
MID-
LANDING 101.150 M FFL

CELLAR LINE
LANDING
1.20 1.83 1.20

.75
STP EXH. SPARE
100.850 M SSL

.80

.80

.80
.50
CUTOUT DG-01
.30 FD5

FD1

7M WIDE DRIVEWAY
2.13
101.300M FFL
DN EXIT
101.225M SSL
FD3
UP

CELLAR LINE
2.4 M HEIGHT

Staircase-03
7M WIDE DRIVEWAY
CLEARANCE FOR RAMP

0.2 M Brickwork
2.00

0.2 M Brickwork
RAMP COMING

2.00
UP FROM B-1
R2
MID-
MID- SDW
LANDING
LANDING
1.33 3.00

PHE-2

28.53
(SLOPE - 1:8)

.93
SHAFT
7.20

DWP
SP

DWP
RWP ASP WWP RWP SP

FWP
FWP ASP WWP

DWP
FWP DWP FWP

13.67
TOT-LOT

UP
FD2

100.98M SSL 91.584

RAMP GOING
DN TO B-1
FIRE
CONTROL SQ.MT
ROOM

5.90
4.83X7.00M

.40 6.00 5.1


SECURITY

.50
ROOM

1.30
2.80 .95
1.50
Ramp Drain Cover With M.S Grating
1250KVA
0.2 M Brickwork 29.10 0.2 M Brickwork 7.00 TRANSFORMER

2.10
7.00 WT: 6TONS

101.450M FFL

1.25

8.4
16.672
2.20
4.00

7.00
CELLAR LINE HT VCB

BOUNDARY
PANEL
101.150M SSL 8.90
7M WIDE DRIVEWAY 100.560 M FFL

1.00

.95
H
S
.71 2.20 1.00 1.00

4.00
GR. FLOOR GR. FLOOR 100.260 M SSL HT VCB

1.00
CTPT

.90
PANEL
6.00 .75
MRS & T/F

WALL

1.00

1.00
YARD

ANCHOR SHOP

H
S
5.5

GENERAL NOTE : 101.600M SSL 101.525 M SSL 9


EXIT
48.87
SP
STRUCTURE

# ALL DIMENSIONS ARE IN METERS 7.00 13.669 100.7 MOVED AS PER TRAFFIC REPORT 6

7A
100.4
101.600 M FFL

1.265
14 13 12 11 10 9 8

9.145
7

9.135
# CONTRACTOR HAS TO CHECK & VERIFY ALL LEVELS, DATUM &
DIMENSIONS ON SITE AND SHALL REPORT ANY DISCREPANCIES OR DRIVEWAY
7.00M WIDE DRIVEWAY RCC SLAB
.30 OMISSIONS ON SITE THIS OFFICE PRIOR TO THE START OF WORK &
100.260M SSL

2.598
DURING THE CONSTRUCTION PHASE. AS PER STR.
Compound Wall 1
.78 4.15 2.44 1.36 2.83 .38 1.68 # THIS DRAWING HAS TO BE READ & UNDERSTOOD IN
CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL
100.560M FFL RAMP DN 31.256 100.5
Compound Wall

TO BASE

.300
AND/OR ANY OTHER CONSULTANT/S DOCUMENTATION, AS MAY BE
105.60M FFL 03
105.60M FFL MENT-1

.175

5.160
APPLICABLE TO THE PROJECT PRIOR TO START OF WORK & IT'S
01
105.525M SSL 105.525M SSL FIRST FLOOR DURATION.
R.C.C. COLUMN R.C.C. COLUMN R.C.C. COLUMN

3.895
26
105.525M SSL

4.145
25

Compound Wall
Compound Wall
23
FLOOR HEIGHT 4.30 M
105.60M FFL TECHNICAL NOTE : SLOPE 1: GROUND FLOOR PLAN
1.91 21
FLIGHT WIDTH 2.00 M # PROVIDED AS PER STRUCTURAL DRAWINGS & DETAILS. 8
19
TREAD SIZE 0.300 M
# ANY DISCREPENCY RELATED TO THIS DRAWING SHALL BE 5.400

3.047
17
MID LANDING-2 RISER SIZE 0.1592 M BROUGHT TO THE NOTICE OF THE CONCERNED PROJECT 5.23M WIDE

4.00
RAMP DN

.900
15 NO. OF RISERS 27 ARCHITECTS IMMEDIATELY BEFORE THE EXECUTION OF WORK.
.48

13 F.D DRIVEWAY DRIVEWAY BASEMENT-1


MID LANDING-1 11 # LVLS MENTIONED IN THE DRAWING REFERS TO THE UNFINISHED BASEMENT-1
09 LEVELS ON THE SITE. 96.365M SSL
96.115M SSL
1.91

07
101.60M FFL GR. FLOOR KEYPLAN : RAMP DN 96.465M FFL
KEY PLAN:- GENERAL NOTE : 05 96.215M FFL 2.800
RCC SLAB B1FB TO BASEM
101.30M FFL ENT-2

3.300
12.77
# ALL DIMENSIONS ARE IN METERS 03 29 101.525M SSL 101.525M SSL AS PER STR.

.600
23.20
# CONTRACTOR HAS TO CHECK & VERIFY ALL LEVELS, DATUM & 101.225M SSL 28 01
101.60M FFL 9.834
5.50

corporation land DIMENSIONS ON SITE AND SHALL REPORT ANY DISCREPANCIES OR

.175
100.20
Warangal Municipal 26
45.98 DG SETS HOT AIR
EXHAUST
TOT-LOT
277.519 SQ.MT
7.47
OMISSIONS ON SITE THIS OFFICE PRIOR TO THE START OF WORK &
24
Road Center

CUTOUT @ ROOF LVL


1.41

3.05
4.40 2.35
SECURITY
2.5 X 2.2
DURING THE CONSTRUCTION PHASE. LOBBY HEIGHT 4.195 M
3.80

2.60 2.00 2.00


22.50
3.02

2.00
1.00

1.00

1.00

# THIS DRAWING HAS TO BE READ & UNDERSTOOD IN 22


1.57

1.80 44.61
.70

GAS BANK
CELLAR LINE 4.00 FLIGHT WIDTH 2.00 M
CONJUNCTION WITH STRUCTURAL, MECHANICAL, ELECTRICAL
4.00

CELLAR LINE
20
101.150 M FFL PEDESTRIAN ACCESS
AND/OR ANY OTHER CONSULTANT/S DOCUMENTATION, AS MAY BE TREAD SIZE 0.300 M DRIVEWAY BASEMENT-2
7.85
8.06

12.35

MID LANDING-2
7.00
7.20

101.450M FFL
WARANGAL

4.00 7M WIDE DRIVEWAY 100.850 M SSL


LOADING/ 3.00
18
101.150M SSL UNLOADING APPLICABLE TO THE PROJECT PRIOR TO START OF WORK & IT'S RISER SIZE 0.155 M
.47

60.30
EXIT BAY

93.065 M SSL
Glazing
8.13 0.2 M Brickwork FD3
.30
0.2 M Brickwork 0.2 M Brickwork
12.37 DURATION. 16

4.195
.30

8.32 DN PR. ELECTRICAL


.60

FIRE LIFT
NO. OF RISERS 29
1.20

SHAFT .30
SHAFT 2.67
15
Riser

DN 1.63
FD
2.6MX2.23M FLOOR
1.50

2.00 20 Passenger ELECTRICAL UP TO 1ST


101.600 M FFL 101.150 M FFL
.83

5.160
14 19 29 FD2 ROOM - 2 FLOOR
ENTRANCE LOBBY
14

97.105M FFL
97.030M SSL
FD5

MID LANDING-1
DOUBLE HEIGHT Entry

TILES /
7M WIDE DRIVEWAY

MID 12 11 01
FIRE 101.525 M SSL MD
100.850 M SSL
AREA EFFECTED

93.165M FFL
LANDING FRD
DN FROM
TOWER-02 101.600M FFL
FRD
UNDER ROAD

SDW UP 1ST FLOOR


206.724 S.MT
WIDENING -

101.525M SSL 1.50

TECHNICAL NOTE : 12
H
S

S
H

H
S

S
H

4.20 100.10
12.0 M WIDE

MARBLE
GD GD
DRIVEWAY
PARAPET WALL 1M HEIGHT WITH VERTICAL LOUVERS ON TOP

13.59

H
S
GD

S
H

SHOP SHOP # PROVIDED AS PER STRUCTURAL DRAWINGS & DETAILS. 10


CELLAR LINE

H
S

AS PER
32.60
GD

S
H 9.09 X 8.17M 11.4 X 8.17M
101.600 M FFL

Tread 101.525 M SSL


.98
08
F.D
H
S

Ramp
.33

HVAC

COMM.

SELECTION # ANY DISCREPENCY RELATED TO THIS DRAWING SHALL BE


FRD FIRE LIFT LIFT VENTILATION 1:12
2.26

19.25

PR.SHAFT
.70

-02
2.6MX2.26M 2.6MX2.26M CUTOUT
20 Passenger 20 Passenger 10.96 SQ.M
FD5

.90

FS-02 4.85
06
3.24

BROUGHT TO THE NOTICE OF THE CONCERNED PROJECT


PROPOSED 45 M
101.600M FFL
101.525M SSL

PARAPET WALL
FIRE LIFT CUTOUT FOR 0.2 M Brickwork 1M HEIGHT WITH VERTICAL 31.60 0.2 M Brickwork Glazing 0.2 M Brickwork 12.00
VENTILATION 2.3MX2.6M DG SMOKE
EXHAUST PIPES
LOUVERS ON TOP

CUTOUT 20 Passenger
ARCHITECTS IMMEDIATELY BEFORE THE EXECUTION OF WORK.
ENTRY

ENTRY GATE
101.450 M FFL 59.961 SQ.M 04
WIDE ROAD

CELLAR LINE
OF WIDTH 6.00M &
7.14

FRD 101.300M FFL

101.150 M SSL EXIT HEAD CLEARANCE


7.01

FIRE 101.225M SSL

CEMENT
TOWER-01 FD3

7M WIDE OF 6M
Irrigaon Department Land

FD
101.150 M FFL
DRIVEWAY
41.98

2.00

# LVLS MENTIONED IN THE DRAWING REFERS TO THE UNFINISHED


NOTE : REFER STRUCTURAL DRAWINGS
2.00
0.2 M Brickwork

4.00

DN 29 01
UP
100.850 M SSL
ANCHOR SHOP
28

MORTAR
56.41

4.05
EXIT 26 SECURITY
2.8 X 1.66

LEVELS ON THE SITE. 25

.640
DN 24
FD3
22.50
22

20
32.14
5.95 24
FOR STAIRCASE MID BEAMS
19 11

38.09

96.215M FFL
15 13 12
28.79

4.01
MID- MID-
LANDING
SDW
101.150 M FFL
BASEMENT-1
CELLAR LINE

22
LANDING
1.20 1.83 1.20
B.V.E.A.SHAFT-02
.75

EXHAUST AIR LOUVER OF


STP EXH. SPARE
100.850 M SSL MIN. 1.2 MTR HEIGHT TO BE EXHAUST AIR SHAFT

KEYPLAN :
.80

.80

.80
.50

CUTOUT DG-01
PLANNED ON TWO SIDES SIZE:2.9M(L)x1.0M(W)

96.115M SSL
FD5

AND WAIST SLAB THICKNESS


.30
EXHAUST SHAFT
FD1

20
7M WIDE DRIVEWAY

RELOCATION
2.13

DN 101.300M FFL EXIT

2.00 96.365M SSL


101.225M SSL

WAIST SLAB
FD3
UP
CELLAR LINE

2.4 M HEIGHT
Staircase-03
7M WIDE DRIVEWAY

CLEARANCE FOR RAMP

18
0.2 M Brickwork

2.00

LOBBY HEIGHT 3.79 M


1.05
0.2 M Brickwork

16
96.465M FFL
RAMP COMING

2.00
UP FROM B-1

R2
MID-
MID- LANDING SDW
LANDING

MID LANDING-2
3.00

FLIGHT WIDTH 2.00 M


1.33

3.790
28.53

PHE-2
(SLOPE - 1:8)

.93

SHAFT
7.20
14
DWP
DWP

RWP SP ASP WWP


FWP

RWP SP ASP WWP


DWP

DWP
FWP
13.67

FWP FWP

TOT-LOT
UP

FD2

100.98M SSL 91.584 12 TREAD SIZE 0.300 M


RAMP GOING

FIRE
DN TO B-1

SQ.MT

3.300
CONTROL
ROOM
11
MID LANDING-1
DETAIL AT 'B'
5.90

4.83X7.00M

RISER SIZE 0.1516 M


F.D
RAMP FROM DRIVEWAY TO BASEMENT-1 FLOOR
.40 6.00 5.1

2.020
SECURITY
.50

ROOM
09
1.30

HYDERABAD

2.80 .95

- NO. OF RISERS 25
1.50
Ramp Drain Cover With M.S Grating STRUCTURAL

FIRST FLOOR
1250KVA
WEIGHT:
7.00 0.2 M Brickwork 29.10 0.2 M Brickwork 7.00 TRANSFORMER
2.10

WT: 6TONS 6TONN

07
N.T.S 101.450M FFL
1.25

8.4

2.20
4.00
7.00

CELLAR LINE HT VCB

101.150M SSL 8.90 PANEL STRUCTURAL

05

.175
7M WIDE DRIVEWAY 100.560 M FFL WEIGHT:
1.00

.95

105.525M SSL
H

93.315 M FFL
S
.71 2.20 1.00 1.00
4TONN
4.00

100.260 M SSL
RAMP
HT VCB
1.00
.90

CTPT
6.00 PANEL
MRS & T/F .75
1.00

1.00

YARD
03
H
S

5.5
EXIT
48.87
SP

93.240 M SSL
105.60M FFL
STRUCTURE

100.79 MOVED AS PER TRAFFIC REPORT


100.46 99.94
01
UP BASEMENT-2 REVISIONS :
9.145

9.135

99.92
93.065M SSL NAME DESCRIPTION DATE
Compound Wall Compound Wall
R3 ------- 00/00/2022
100.51
93.165M FFL
R2
Compound Wall
Compound Wall

GROUND FLOOR PLAN FIRE TOWER 1& 2 STAIRCASE


FIRE TOWER-01 STAIRCASE DETAILS DETAIL DRAWING REVISED AS PER

Riser
30/08/2023
GR. FLOOR TILES / MARBLE R1

15A

12A
THE MAIL RECEIVED ON 25.8.23
(BASEMENT-1 TO FIRST FLOOR)

14A
19

18

17
16

15

14
13

12

11
10
101.525M SSL NOTE : REFER STRUCTURAL DRAWINGS FROM APARNA CO.

9
8

7
FOR STAIRCASE MID BEAMS AS PER SELECTION
101.60M FFL AND WAIST SLAB THICKNESS STRUCTURAL CONSULTANT :
J K J K J K Tread
UCON STRUCTURES LLP 3.52 6.73 3.24 1.22 3.97 2.95 3 0.8 2.83 1.67
REVISIONS :
5.18 5.18 5.18 0.87
B C D E F
NAME DESCRIPTION DATE
0.62 0.78 1.2 0.38
R3 CEMENT
6.18 3.64 1.99 .85 93.165 M FFL 96.465 M FFL MORTAR
R2
FIRE TOWER 1& 2 STAIRCASE 93.065 M SSL 96.365 M SSL
R1 DETAIL DRAWING REVISED AS PER 30/08/2023 P.H.E CONSULTANT :
101.150M SSL 101.45M FFL EXIT THE MAIL RECEIVED ON 25.8.23
RAMP

FROM APARNA CO. UP WAIST SLAB SYNERGY CONSULTANTS PVT LTD


UP
2.02
.39

STRUCTURAL CONSULTANT : (An ISO 9001 : 2000 Certified Company)


2.00 6.08 2.12 3.06 1.83
SEC

SEC

SEC
X'

X'

X'
01 #25, Jayabheri Pine Valley
BASEMENT-1 3 FD3 UCON STRUCTURES LLP 02
03
Gachibowli, Hyderabad - 500032
Ph:040-23001518/19, Fax:040-23001520
96.365M SSL 4 .30 .30 .30 .30 4.97 DN PR. 04 NABCB
QM032
[email protected]
1.20

www.synergyinfra.com
96.465M FFL MID FIRE LIFT SHAFT 93.315 M FFL FD4

15A
FIRE
2.00
2.00

2.66

18

17
16

15

14
13
2.11

LANDING DN 1.63
97.105 M FFL
TOWER-02 2.6MX2.23M DETAIL AT 'B' ELECTRICAL CONSULTANT :
93.240 M SSL
96.215 M FFL
1.33

FD 1.33 1.17 .23 1.33 1.17 .23 .20 2.10 1.33 1.17 .23
2.00 2.70 1.70 20 Passenger 97.030 M SSL - SYNERGY CONSULTANTS PVT LTD 6.00 M WIDE DRIVEWAY
.83

19 21 23 25 27 29 P.H.E CONSULTANT :
.98 .98 2.00 .98 N.T.S (An ISO 9001 : 2000 Certified Company)
3.12
6.73 3.24 1.22 4.85
5.06

14
SYNERGY CONSULTANTS PVT LTD
.60

#25, Jayabheri Pine Valley


4.44

H
S

H
S
13
FD5
7 7 7
.33

.33
.33

(An ISO 9001 : 2000 Certified Company) FD Gachibowli, Hyderabad - 500032


HVAC

HVAC
COMM. COMM. COMM.
DG SMOKE

DG SMOKE
12 11 09 07 05 03 01
FS-01 #25, Jayabheri Pine Valley Ph:040-23001518/19, Fax:040-23001520
96.115 M SSL
1.66

1.66
BASEMENT-2 101.60M FFL LOBBY FD
96.115M LVL.
1.68

1.68

1.68
X X' Gachibowli, Hyderabad - 500032 FRD [email protected]
.70

.70

.70
PR.SHAFT PR.SHAFT PR.SHAFT
2.43

2.43

2.43
MID NABCB
2.00

Ph:040-23001518/19, Fax:040-23001520
QM032

93.065M SSL SEC SEC


7A 7A 7A 0.62 0.78
2.00

2.00

www.synergyinfra.com
2.37

LANDING 101.60M FFL [email protected] 2.10 -02 LOBBY -02 -02


W1 UP 101.525M SSL FD1 FD1 NABCB
QM032

www.synergyinfra.com LOBBY
.30

.30

.30
93.165M FFL .30 .30 .30 .30
FD5

FD5

FD5
4.70 LANDSCAPE CONSULTANT :
.90

.90

.90
101.525M SSL FS-02 FS-02 FS-02
ELECTRICAL CONSULTANT : 8 8 8
.38

.38

.38
M/s.ELEMENTS LANDSCAPE ARCHITECTURE
93.315M FFL
93.240M SSL

5 SYNERGY CONSULTANTS PVT LTD


97.105 M FFL
97.030 M SSL

E F
URBAN DESIGN & PLANNING STUDIO LLP

0.84
KEY PLAN:-

101.525M SSL
(An ISO 9001 : 2000 Certified Company)
9 9 9

101.60M FFL
#25, Jayabheri Pine Valley
1.00 1.23 3.30 .55 1.20 4.42 1.20 2.19 FIRE LIFT

100.560 M FFL
Gachibowli, Hyderabad - 500032 FIRE LIFT FIRE LIFT
101.600 M FFL

101.150 M FFL
Ph:040-23001518/19, Fax:040-23001520
DESIGN ARCHITECTS :
2.83

3.06

2.83

3.06

2.83

3.06
[email protected] 2.3MX2.6M 2.3MX2.6M 2.3MX2.6M
2.83

2.83

101.525M SSL 101.60M FFL 2.83


NABCB
QM032

www.synergyinfra.com
20 Passenger 20 Passenger 20 Passenger 12.77 ASLAM ARCHITECTS AND
LANDSCAPE CONSULTANT : INTERIOR DESIGNERS PVT. LTD
corporation land
23.20 0 ASLAM ARCHITECTS AND

101.525 M SSL

5.50
INTERIOR DESIGNERS PVT. LTD

100.2

3.58
Warangal Municipal

FIRE TOWER-02 @ M/s.ELEMENTS LANDSCAPE ARCHITECTURE


URBAN DESIGN & PLANNING STUDIO LLP 10 10 10
45.98 DG SETS HOT AIR
EXHAUST
TOT-LOT
277.519 SQ.MT
7.47
MEZZANINE FLOOR ,
MSB-1,KSCMF BUILDING,
3RD FLOOR
THE MAJESTIC, MUNICIPAL NO.08-2, 277/A

Road Center
CUTOUT @ ROOF LVL

FD
SECURITY
3.05
4.40 2.35 2.5 X 2.2
NO.8, CUNNINGHAM ROAD, ROAD NO.02 BANJARA HILLS

3.80
2.60 2.00 2.00

101.225M SSL
22.50

3.02
BANGALORE - 560 052. HYDERABAD 500034
GROUND FLOOR LVL. PLAN

1.00

1.00

1.00
1.36

1.36

1.36

1.57
44.61

101.30M FFL
1.80

.70
GAS BANK
PH : 080-22253532, 40900726. PHONE : 040-48589555
FD
1.46

CELLAR LINE 4.00

4.00
FRD CELLAR LINE
DESIGN ARCHITECTS : FIRE DN
13.67
101.150 M FFL PEDESTRIAN ACCESS
e-mail : [email protected]

7.85
8.06
FIRE TOWER-01
2.42

7.00

12.35
7.20
101.450M FFL

WARANGAL
4.00 7M WIDE DRIVEWAY 100.850 M SSL

11 11 11 LOADING/ 3.00

ASLAM ARCHITECTS AND 101.150M SSL


Website : www.aslamarchitects.com
FIRE TOWER-01 TOWER-01 UNLOADING

EXIT
FD3 60.30
3.23

3.23

3.23
EXIT BAY
3.46

3.46
INTERIOR DESIGNERS PVT. LTD 0.2 M Brickwork Glazing 0.2 M Brickwork

G
0.2 M Brickwork .30
8.13 FD3 12.37
3.76

3.76

3.76

.30 2.00
8.32 DN ELECTRICAL

.60
ASLAM ARCHITECTS AND PR. SHAFT
FIRE LIFT

1.20
.30.30

FD
INTERIOR DESIGNERS PVT. LTD
SHAFT 2.67
DN 1.63
2.6MX2.23M FLOOR
101.600 M FFL
CLIENT NAME :
FD

1.50
2.00 20 Passenger ELECTRICAL UP TO 1ST
101.150 M FFL

.83
19 29 FD2

93.315 M FFL
14 ROOM - 2 FLOOR
ENTRANCE LOBBY
MEZZANINE FLOOR , 3RD FLOOR FD5
DOUBLE HEIGHT Entry

7M WIDE DRIVEWAY
MD
MID 12 11 01
FIRE 101.525 M SSL 100.850 M SSL

AREA EFFECTED
MSB-1,KSCMF BUILDING, THE MAJESTIC, MUNICIPAL NO.08-2, 277/A LANDING
TOWER-02
FRD FRD DN FROM

APARNA CONSTRUCTIONS PVT LTD.


2.44

2.44

2.00

2.44

101.600M FFL

UNDER ROAD
100.850M SSL
SDW UP 1ST FLOOR

206.724 S.MT
WIDENING -
101.525M SSL 1.50
NO.8, CUNNINGHAM ROAD, ROAD NO.02 BANJARA HILLS 0
B C D E F UP 100.1
31.26

H
S

S
H

H
S

S
H

12.0 M WIDE
4.20
BANGALORE - 560 052. HYDERABAD 500034 GD GD

DRIVEWAY
93.240 M SSL 100.260M LVL.

PARAPET WALL 1M HEIGHT WITH VERTICAL LOUVERS ON TOP

13.59
8th Floor, Astral Heights,
H
S

GD
PH : 080-22253532, 40900726. PHONE : 040-48589555
2.00 S

Ramp Drain Cover With M.S Grating

Ramp Drain Cover With M.S Grating


H

CELLAR LINE
H
S
SHOP SHOP
1.20

D:\AZIZ UDDIN\Hanumakonda Mall & Multiplex\MAIL\LOGO\aparna_newlogo.jpg

32.60
6-3-352, Road No.1, Banjara Hills,

GD
9.09 X 8.17M 11.4 X 8.17M

RAMP GOING UP
S

3.68
H

101.600 M FFL
6.18 3.64 1.99 .85 e-mail : [email protected]

CLEARANCE FOR RAMP


01 UP DN 01 03 04 2.00 01 UP 101.525 M SSL
.98

Ramp
RAMP COMING

H
S
Hyderabad-50003.

.33

HVAC
COMM.

Website : www.aslamarchitects.com FRD FIRE LIFT LIFT VENTILATION 1:12

2.26
.70
PR.SHAFT

19.25
-02
2.6MX2.26M 2.6MX2.26M CUTOUT

DN
.90

.90

.90
12 DN 12 12
10.96 SQ.M

FD5
20 Passenger 20 Passenger
25 4.85

.90
FS-02

UP FROM B-1 TO DRIVEWAY

PROPOSED 45 M
101.600M FFL
101.525M SSL
.30

.30

FIRE LIFT CUTOUT FOR 0.2 M Brickwork


PARAPET WALL
1M HEIGHT WITH VERTICAL
31.60 0.2 M Brickwork Glazing 0.2 M Brickwork 12.00
22 03 24 06 29 03 VENTILATION 2.3MX2.6M DG SMOKE LOUVERS ON TOP

CLIENT NAME :
EXHAUST PIPES

100.260 M SSL
CUTOUT 20 Passenger

2.4 M HEIGHT
ENTRY
ENTRY GATE
.30

.30
101.450 M FFL 59.961 SQ.M
PROJECT NAME :

WIDE ROAD
28 OF WIDTH 6.00M &
APARNA CONSTRUCTIONS PVT LTD. CELLAR LINE

7.14
FRD 101.300M FFL
FIRE EXIT HEAD CLEARANCE

7.01
101.150 M SSL

(SLOPE - 1:8)
101.225M SSL
.30

.30

(SLOPE - 1:8) (SLOPE - 1:8)

6.00
(SLOPE - 1:8)
TOWER-01 FD3

6.00

6.00
FD
7M WIDE OF 6M

Irrigaon Department Land


20 05 22 08 05 101.150 M FFL
8th Floor, Astral Heights, DRIVEWAY

41.98
2.00

15.09
.30

.30

0.2 M Brickwork
2.00

4.00
UP
100.850 M SSL
HANUMAKONDA MALL & MULTIPLEX
X X X
DN 29 01

ANCHOR SHOP
28

26

56.41
D:\AZIZ UDDIN\Hanumakonda Mall & Multiplex\MAIL\LOGO\aparna_newlogo.jpg
EXIT 4.05 SECURITY

6-3-352, Road No.1, Banjara Hills,


26

DN
2.8 X 1.66
.39

24
3.00

3.00

3.00

FD3
22.50
22
32.14
18 07 20 10 07 5.95
2.00 3.23 4.97 3.06 1.83

H
20
2.63

2.63

Hyderabad-50003. 2.63 19 11
.30

.30

15 13 12
38.09

28.79
4.01
MID-

24
SEC SEC SEC
SDW
MID-
LANDING
101.150 M FFL

CELLAR LINE
LANDING
4.15

4.15

4.15

1.20 1.83 1.20 B.V.E.A.SHAFT-02

3
EXHAUST AIR LOUVER OF
.30

.30

.30

.30

.75
EXHAUST AIR SHAFT
STP EXH. SPARE
100.850 M SSL MIN. 1.2 MTR HEIGHT TO BE
DRAWING TITLE :

.80

.80

.80
RAMP GOING

.50
CUTOUT DG-01 SIZE:2.9M(L)x1.0M(W)
16 09 18 12 09 PLANNED ON TWO SIDES

RAMP COMING DN
.30 FD5
EXHAUST SHAFT

PROJECT NAME :
FD1
96.465M FFL
96.365M SSL

7M WIDE DRIVEWAY
RAMP GOING
RELOCATION

2.13
101.300M FFL
EXIT

STAIRCASE DETAILS(B-2 TO 1ST FLOOR)


DN
101.225M SSL

22 FD3

.30 .30 .30 .30 4.97


UP

CELLAR LINE
4 PR.
2.4 M HEIGHT

Staircase-03
7M WIDE DRIVEWAY
CLEARANCE FOR RAMP
14 11 16 14 11
FIRE TOWER -1 DN TO B-1 98.56M LVL. DN TO B-1

2.97
FROM DRIVEWAY
1.20

HANUMAKONDA MALL & MULTIPLEX

0.2 M Brickwork
2.00
.30

.30

.30

.30

.30

.30

MID FIRE LIFT SHAFT 15 20

0.2 M Brickwork
12 12
97.105M FFL
2.00

RAMP COMING
1.97

2.00
UP FROM B-1
R2
MID-
MID- SDW
LANDING
2.66

LANDING

LANDING 1.63
.57

.57

.57

DN 12
.60

14 18 17
.60

19 14
3.00

13
13.67 13.67
1.33

FIRE DRAWING NO :
2.6MX2.23M

28.53
PHE-2

(SLOPE - 1:8)

.93
SHAFT
7.20

DWP
DWP
RWP SP WWP RWP SP WWP
ASP

FWP

FWP
13.67
ASP DWP DWP FWP FWP

97.030M SSL DRAWING TITLE : 2.00 .63 2.00 2.00 .63 2.00 2.00 2.32 TOT-LOT
AA/AC-HAN/2022/ARCH-301/R1

UP
FD2
1.50

2.00 TOWER-02 STAIRCASE DETAILS 100.98M SSL 91.584

RAMP GOING
04
20 Passenger

DN TO B-1
FIRE
SQ.MT
MID- CONTROL
.83

ROOM
15 17 19 21 23 25
UP FIRE TOWER -2(B-2 TO FIRST FLOOR) 13 MID- 13 .30 13 MID- .30 W1

5.90
4.83X7.00M
01 03 MID- MID-
FS-03

FS-03

LANDING .40 6.00 5.1

SHEET NO : 301 SHEET SIZE : A1


5.06

SECURITY
FD5

FD5
.78

.78

.78

.50
LANDING
ROOM
18 02 LANDING
.63

02

1.30
LANDING LANDING

HYDERABAD
2.80 .95
4.44

.80
1.50

FD5

J
.30

Ramp Drain Cover With M.S Grating


STRUCTURAL

DRAWING NO :
1250KVA
WEIGHT:
0.2 M Brickwork 29.10 0.2 M Brickwork 7.00 TRANSFORMER

2.10
7.00
17 03 1.20
6TONN

SCALE
.70

WT: 6TONS

: 1 : 100
AA/AC-HAN/2022/ARCH-302/R1 14 14 14 101.450M FFL

1.25

8.4
2.20

15 14 12 10 08 06 04 4.00

7.00
CELLAR LINE HT VCB

MID 101.150M SSL 8.90


7M WIDE DRIVEWAY 100.560 M FFL
PANEL
STRUCTURAL
WEIGHT:
TEAM : Ar. ANI

1.00
NORTH

.95
H
S
.71 2.20 1.00 1.00 4TONN

X FD1 X'
4.00

FD1
HT VCB
100.260 M SSL

1.00
.90
CTPT

LANDING
PANEL
6.00
2.00

: 302 SHEET SIZE : A1 STP EXH. STP EXH. STP EXH.


.80
.80

.80

.80

2.13
.75

SHEET NO
MRS & T/F

SPARE

1.00

1.00
SEC SEC
2.00

2.00

YARD
2.37

H
S
96.625M FFL
5.5
CUTOUT CUTOUT CUTOUT DG-01 EXIT SP

SCALE 9 48.87
: 1 : 100
STRUCTURE

FRD FD5 100.7 6

DN
MOVED AS PER TRAFFIC REPORT
100.4 99.94
2.00 .30 .30 .30 .30 2.00 TEAM : Ar. ANI 1200 DRAWN : Ar. Aziz
96.550M SSL
9.145

9.135
NORTH 1.20 1.83
4.53 1.00 4.53 1.00 FS-03 99.92
CHECKED : Ar. Ani
5
DRAWN
CHECKED : Ar. Ani
: Ar. Aziz .30 .30
4.53
.30
Compound Wall
100.5
1 Compound Wall DESIGNED : Ar. Aslam
DATE : 02.09.2023
GROUND FLOOR PLAN SHOWING RAMP FROM DRIVEWAY TO BASEMENT-1 FLOOR
SEC

SEC

SEC

1.00 1.23 3.30 .55 1.20 4.42 1.20 2.19


X

DESIGNED : Ar. Aslam


DATE : 02.09.2023 GOOD FOR CONSTRUCTION HEAD CLEARANCE
Compound Wall
Compound Wall
GROUND FLOOR PLAN
GOOD FOR CONSTRUCTION BASEMENT-2 TO BASEMENT-1 BASEMENT-1 TO GROUND FLOOR GROUND TO FIRST FLOOR NOTE :
FIRE TOWER-02 NOTE :
THIS DRAWING IS THE EXCLUSIVE PROPERTY OF
"ASLAM ARCHITECTS AND INTERIOR DESIGNERS (P) LTD". AND THE
THIS DRAWING IS THE EXCLUSIVE PROPERTY OF REPRODUCTION OF ANY PART WITHOUT PRIOR WRITTEN CONSENT
@ BASEMENT - 1 LVL. PLAN "ASLAM ARCHITECTS AND INTERIOR DESIGNERS (P) LTD". AND THE
REPRODUCTION OF ANY PART WITHOUT PRIOR WRITTEN CONSENT
FROM THIS OFFICE IS A VIOLATION OF APPLICABLE LAWS.

FROM THIS OFFICE IS A VIOLATION OF APPLICABLE LAWS.

You might also like