Integration
Cash Management is a subcomponent of Treasury. This
means it is closely linked with Treasury Management (TR-TM)
and Market Risk Management (MRM). Cash Management
offers the functions described above for liquidity analysis
purposes while MRM offers methods and processes for
assessing risks positions. Treasury Management contains the
actual financial translations and the portfolio analysis
functions.
Menu Path : IMG-> Financial Accounting -> Financial Accounting (New) ->
It is activated here
2 Basic Settings
2.1 Define Value Date Default
Here you specify whether the current date is the default value
for the value date when line items are entered. You make this
specification for the company codes in which you implement
Cash Management.
Bank accounting
Subledger accounting
Materials management
Sales and distribution
Normally source symbols provided by the system can be used.
Before you can use Cash Management, you must prepare the
relevant G/L accounts and Sub ledger (Vendor and Customer)
accounts accordingly.
In the next steps you will make settings that affect the:
Display for the cash position and liquidity forecast
Cash concentration
3.3 Define Groupings and Maintain Headers
In this step you define the groupings, and stipulate the main
headings and the line headings that the system displays in the
cash management position or liquidity forecast.
Financial Supply Chain Management -> Cash Management -> Structuring-> Groupings``-> Define G
Transaction: SPRO
3.4 Maintain Structure
BANKS E ++ **
BANKS G 00001131++ CITI
BANKS G 0000113109 X
Example 2: Grouping for subledger account activity
Grouping Type Selection Summ. term
SUBLEDG E ++ **
SUBLEDG G 0000113109 Clearing
In this step you specify for each archiving category how many
months an archived memo record is to remain in the system
before it can be deleted in a reorganization run.
2 = purchase order
3 = scheduling agreement
101 = order
In this step, you can allocate blocked levels for the levels of
the liquidity forecast. When you post with a payment
blocking indicator, the system then takes the blocked level
instead of the standard level of the corresponding planning
group.
Example:
For level F1, you specify that when you post with payment
blocking indicator A, level XA should be displayed
instead.
In this step you can freely choose the planning levels for the
down payment requests you want to use for controlling in
Cash Management. In doing this, you must, however, take
note of specific naming conventions.
Use levels beginning with F, since these are FI
postings. The special G/L indicator is useful for the
second letter, for example, FF for down payment
request.
lockbox
In the following steps you make the settings that affect cash
concentration. These include
specifying
a planning balance
tolerance shortage/excess (related to the planning
balance)
a minimum balance (credit limit or base amount)
a planning minimum
an intermediate account
minimum amount for payment advice creation
clearing accounts
In this step, you make the following settings for each bank
account in regard to
:
Maintain the planned balance
Cust/vend data
Data setup
Data reconciliation
Data correction
Check Customizing
Financial Supply Chain Management -> Cash Management -> Tools -> Pre
Activate company code
When a company code is activated for CM&F, the first effect
is that CM &F data can be updated when CM&F-relevant
funds movements or planning takes place. To update from the
logistical applications MM and SD, there are further indicators
which must be set if data is to get from logistics into cash
management.
During activation, all the necessary table settings are
checked and, made, if necessary.
Date Reconciliation
A report is available with which you can schedule data
reconciliation as a batch job.
.
Data Correction
If an inconsistency should occur between the data in CM&F
and the actual data, this option allows you to circumvent the
need for a complete data reconstruction. Depending on the
origin of the inconsistency, the reconstruction can be limited
to particular areas.
Check Customizing
This function allows you to check the Customizing of the
CM&F.
It is, for example, checked if a level is used in several
applications or if a planning group is used in customer master
records as well as vendor master records. (Both are not
allowed and will produce errors.)
8 Reorganize Cash Management
In this step, you reorganize the tables in Cash Management.
Due to storage reasons and for improving access time,
reorganization must be carried out regularly so that
all expired memo records and summary records are
deleted, and
Copyright 2009-11@SAPTOPJOBS