INTRODUCTION
An important ingredient to NSTP community immersion is the development of
community-based projects. In managing NSTP projects, the universal management
functions as planning, organization, staffing, directingand controlling be given due
consideration to ensure the success of the implementation of the projects.
LEARNING OBJECTIVES
This chapter. will enable the trainees to formulate and conceptualize projects for their community
service areas.
→ Define project proposal as basis for implementation ofthe NSTP activities in the immersion area;
Apply the process of making effective project proposal based on the identified needs of the target
clientele; and
Appreciate the value of making effective project proposal in the NSTP program following the
suggested format.
85
NSTP 2
Scanned with CamScanner
TOWARDS A RESPONSIVE COMMUNITY ACTION
The following procedure will guide the trainees in doing this exercise:
1. Prelude Activity
health,safety and disaster management, environment, morals of citizenry,to do in the community
as an offshoot of your activity in community needs assessment.
2. Activity Proper
a. Using the data provided on the sheet, cut and ready to paste items as the trainer will
define/discuss the parts of the project proposal.
d. Tainees will prepare, refine, and finalize proposal based on the identified need(2 1/2 hours).
e. Trainer will evaluate the proposal output before implementing the project.
DISCUSSION HIGHLIGHTS
PROJECT PLANNING AND IMPLEMENTATION
Project is a time-bound undertaking that is carried out to create a ùnique service.It combines
resources and channeled into a temporary structure in order to accomplish a specific goal.
Project development involves a series of continuous, often overlapping phases. This cyclical
process,launches with survey of felt needs in the locality that:will serve as baseline information in the
formulation of project or set of projects that may be undertaken in an uninterrupted or staggered
manner. As soon as we have identified the project plan, it is prudent that we have an inventory of our
resources. Mobilizing our limited resources (men, money, materials and moment) is a fundamental
thing to do. Then implementation comes with regular monitoring to keep track of the development
of the project. Measuring the success of the project as in impact evaluation will serve purpose in
revisiting the plan of action.Afterward,the cycle goes back to round.
86 NSTP 2
PROJECT PLANNING
This guideline in making a project proposal will facilitate work for the trainees and
trainers in their immersion activities. This will also provide them the proper opportunity
to prepare right data and direction in the implementation of their plans while they will
be actually doing their tasks. A project proposal has several project.
87
NSTP 2
→It makes work easier for it serves as reference for trainees' to give theright information
needed for the project.
There are various formats used in the preparation of a project proposal, Below is one of the
designs followed. It elicits the following information:
1.The Title. The title of the project must capture the need and present the name of clientele to be
served. It must be catchy to the readers. It must be written in all capital letter, bold and centered.
Example:
2. Project Proponents. This part enumerates the names of persons to be involved in the project;
their year level (if trainees), rank (if trainers), contact numbers and address or college. If there are
several activities that require several leaders in every undertaking,names must be specified per
activity.Example:
3. Implementing Units/Implementers. It must be noted thatin writing this part of the proposal,
capital letters must be used to differentiate from the project proponents.
88NSTP 2
Example:
LINE 4 (manpower- for placing trash bins in particular areas and distributing other materials)
Group leader:
Padora, Paolo
Members:
Sarah; Lehayan, Carlo; Rayos, Orly; Roa, Michelle; Robles, Vina; San Jose, Maricel;Samson, Emmanuel
Members:
4. Project Duration. Specify days, weeks and months needed to complete the
project.Specify when the project will commence and when will it be finished.Attach a
Gantt chart of activity based on the length of the project.
Example:
Date of Implementation:
Length of Implementation: 2 day implementation only. For the first day, around
6-7 hours of community work (3 hours in the morning for the preparation of the
place and lecture. Another 4 hours in the afternoon for the distribution/placement
of the waste segregation trash bins). For the second day, monitoring and evaluaton
of the activity project will be done.
5. Objectives of the Project. The objectives of the project must be written in operational
terms on what you intend to do to solve identified problem related to the project. The
characteristics of the objectives must be specific,measurable, attainable, realistic and
time bound (SMART). State properly by using the right verbs that describe what you
want to address in relation to the underlying problems within a certain period of time.
89
NSTP 2
Scanned with CamScanner
TOWARDS A RESPONSIVE COMMUNITY ACTION
Example:
Barangay San Jose.Toward this end, the following objectives are set:
6. Project Description. The following standards must be observed in wrting the project
description in facilitating the drafting of the proposal:
Example:
"We have noticed that, in some areas of the barangay, improper waste
disposal is prevalent. In like manner, the incidence of open-hole drainage
system in the locality may pose a threat on the health condition of the
residents thereat."
Example:
faced with the problem of improper waste disposal especially in the squatters'in setting
in place a system of waste management."
This section should reflect the advantages or benefits that the activity outcomes-or
the long term results that people will teceive.
90NSTP 2
Example:
"The target audience will benefit from the projectin terms of acquisition of with improper waste
disposal and unhygienic surroundings."
d.Coverage
served should be reflected in the proposal. This gives focus to whom the project is for and the
extent of its implementation.
Example:
"The project will cover the 100 families of the Barangay specifically the household help and
unemployed housewives."
7.Methodology. This part cites the activities or strategies that shold be undertaken in
order to achieve the objectives of the project. It should describe the general approach
of the project, agency counterpart in case of partnership,responsibilities and
obligations, manpower requirement and the manner on how the specific acivity will
be undertaken if the project calls for it.
Example:
"The lecture-seminar method will be employed in the project. Setting up of waste segregation
bins will also be done."
Transportation.
.200.00
Communication..
35.00
Contingency.