NIKE Flex Runner 2 Lil (TDV) Dq0575
NIKE Flex Runner 2 Lil (TDV) Dq0575
RY
RYPFC
PFCFINAL
FINAL
PROCESS FLOW
PROCESS FLOW CHART
CHART
MODEL
MODELSUMMARY
SUMMARY MODEL
MODEL PICTURES
PICTURES IDS
IDS
GRADE
GRADE
TD
TD MM
MM
DATE
DATE 01/03/2022
01/03/2022 MEDIALSIDE
MEDIAL SIDE VIEW
VIEW FRONT VIEW
FRONT VIEW 22
construction so
SEASON
SEASON FA22
FA22 33
up
freeconstruction
set up
DEV-
DEV-STYLE
STYLE NIKE
NIKE FLEX RUNNER22LIL
FLEX RUNNER LIL(TDV)
(TDV) - DQ0575
- DQ0575 44
not set
PRODUCT
PRODUCT CODE
CODE DQ0575-100
DQ0575-100 55
willnot
COLOR
COLORWAY
WAY 66
1114686-SMMT WHT/LTTHSTL-HNYDW-MLCHT
1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
IDSwill
77
It'sfree
SIZE
SIZERANGE
RANGE TD
TD2C-10C
2C-10C 88
IDS
LAST
LASTCODE
CODE YA-11
YA-11 99
It's
TOOL
TOOLCODE
CODE 10
10
MS252596-1/ KDB-1485
MS252596-1/ PCN KDB-1485
MEASURING TOOL
MEASURING TOOL
PATTERN
PATTERN## ZZ
ZZ
FIRST
FIRST SOURCE
SOURCE PC
PC(RY)
(RY)
LATERAL
LATERALSIDE VIEW
SIDE VIEW
MULTI COLORWAY NO
NO
MULTI COLORWAY PFC
PFC
1.1.Make
Make sure following
followingcorrected
correctedheat heatseal
seal
application
application for C/O
C/O Label
Labeltotoensure
ensureQR QRreadability.
readability. HEEL VIEW
HEEL VIEW
KEY 2.Check instep gore length
lengthwith
withpattern
patternafter
after
KEY MANUFACTURING 2.Check instep
MANUFACTURING proceeding
proceedingheat
heat cut.
PROCESSES
PROCESSES 3.Attach
3.Attachheel
heel pull
pull tab on collar
tab on collaraccording
accordingtotomarkmarkline
line
before
before proceeding C/S.
proceeding C/S.
4.Follow
4.Follow PFC
PFC setting with8~9
setting with 8~9SPI.
SPI.
5.Heel
5.Heel skin distance to
skin distance tobite
biteline
lineisis5mm
5mm with
with +/-+/-
1mm BOTTOM
BOTTOM VIEW
1mm for no-sew
for no-sew shifting
shifting and +/-1mm
and +/-1mm for IU sidewall
for IU sidewall height.
height.
6.Check toe gathering gauge after toe gathering
6.Check
stitchingtoe
andgathering gauge afternotch
follow strobel/upper toe gathering
to proceed
stitching and follow strobel/upper notch to proceed
strobel stitching.
SEE
SEEKEY
KEY strobel stitching.
7.Vamp skin distance to bite line is 10mm with +/- 1mm
MANUFACTURING
MANUFACTURING 7.Vamp skin distance to bite line is 10mm with +/-
for no-sew shifting and +/-1mm for IU sidewall height
PROCESSES
PROCESSESDETAIL
DETAIL 1mm for no-sew shifting and +/-1mm for IU sidewall
8.Follow PFC temp./pressure to ensure vamp piece
PAGE
PAGEFOR
FORMORE
MORE height
bond well.
DETAILS
DETAILS 8.Follow PFC temp./pressure to ensure vamp piece
9.Follow PFC to use 256 clean up leather surface before
bond well.
proceeding screen printing.
9.Follow PFC to use 256 clean up leather surface Issued
Issued By
By Upper
UpperManager
Mgr. Bottom
BottomManager Pattern Engr.
Mgr. Pattern Mgr. CCl
C.C.L CED Mgr. M.L PEDManager
M.L Factory PED
Chemical Manager
Mgr. PE
PE
before proceeding screen printing.
Lamination Process 2-1~2-3 Product Test Requirement & Specification Sheet 22-1~22-3
Auto Laser Cut Parts Schedule(YM) M 4 Stockfit Bonding Process Flow Chart M 24-1~24-2
Hairy Edge Treatment ( Trim edge & Heat blowing edge) Instructions 13 QR Code CO Label Application 33
Sockliner Specification 20
Index (1)
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Lamination Process (1)
Page: 2-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
ADHESIVE
COMPONENT MATERIAL DESCRIPTION TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE
NAME NAME:DM-629MD TEMP. MID:120±10℃ Temp.(Mid):
1 NAME:LJ-B1472K, 1TONE, DTY, FDY-TB
VENDOR:Nan Pao LJ-B1472K, TEMP. SIDE:120±10℃ Temp.(Side):
MTRL#:89769 1TONE, DTY,
THICKNESS:N/A FDY-TB & ROLL SIZE:180cm Roll Size:
2 NAME:MEDIUM PU BACKING FOAM, 2 MM
Vamp FOAM
MELT POINT:N/A TIME:200-400 RPM Time:
MTRL#:10422
STORAG
E
3 NAME:(FP) 40D TRICOT 1TONE FDY-SD TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE HOURS
NAME:DM-629MD TEMP. MID:120±10℃ Temp.(Mid):
VENDOR MTRL#:N/A
VENDOR:Nan Pao TEMP. SIDE:120±10℃ Temp.(Side):
FOAM & (FP)
THICKNESS:N/A 40D TRICOT ROLL SIZE:180cm Roll Size:
In-House 1TONE FDY-SD
MELT POINT:N/A TIME:200-400 RPM Time:
ADHESIVE
COMPONENT MATERIAL DESCRIPTION TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE
NAME NAME:DM-629MD TEMP. MID:120±10℃ Temp.(Mid):
1 NAME:\(FP) 2-WAY STRETCH 1 TONE FDY-TB\
VENDOR:Nan Pao \(FP) 2-WAY TEMP. SIDE:120±10℃ Temp.(Side):
MTRL#:182 STRETCH 1
THICKNESS:N/A TONE FDY-TB\ ROLL SIZE:180cm Roll Size:
2 NAME:MEDIUM PU BACKING FOAM, 2 MM
Bootie/Bootie 1 & FOAM
MELT POINT:N/A TIME:200-400 RPM Time:
MTRL#:10422
STORAG
E
3 NAME:(FP) 2-WAY STRETCH 1 TONE FDY-TB TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE HOURS
NAME:DM-629MD TEMP. MID:120±10℃ Temp.(Mid):
VENDOR MTRL#:N/A
VENDOR:Nan Pao TEMP. SIDE:120±10℃ Temp.(Side):
FOAM & (FP) 2-
THICKNESS:N/A WAY STRETCH ROLL SIZE:180cm Roll Size:
In-House 1 TONE FDY-TB
MELT POINT:N/A TIME:200-400 RPM Time:
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Lamination Process (2)
Page: 2-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
ADHESIVE
COMPONENT MATERIAL DESCRIPTION TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE
NAME NAME:DM-629MD TEMP. MID:120±10℃ Temp.(Mid):
1 NAME:\(FP) 2-WAY STRETCH 1 TONE FDY-TB\
VENDOR:Nan Pao \(FP) 2-WAY TEMP. SIDE:120±10℃ Temp.(Side):
MTRL#:182 STRETCH 1
THICKNESS:N/A TONE FDY-TB\ ROLL SIZE:180cm Roll Size:
2 NAME:MEDIUM PU BACKING FOAM, 2 MM
Collar & FOAM
MELT POINT:N/A TIME:200-400 RPM Time:
MTRL#:10422
STORAG
E
3 NAME:(FP) 2-WAY STRETCH 1 TONE FDY-TB TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE HOURS
NAME:DM-629MD TEMP. MID:120±10℃ Temp.(Mid):
VENDOR MTRL#:182
VENDOR:Nan Pao TEMP. SIDE:120±10℃ Temp.(Side):
FOAM & (FP) 2-
THICKNESS:N/A WAY STRETCH ROLL SIZE:180cm Roll Size:
In-House 1 TONE FDY-TB
MELT POINT:N/A TIME:200-400 RPM Time:
ADHESIVE
COMPONENT MATERIAL DESCRIPTION TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE
NAME NAME:DM-629MD TEMP. MID:120±10℃ TEMP. MID:
1 NAME:(FP) 2-WAY STRETCH 1 TONE FDY-TB
VENDOR:Nan Pao (FP) 2-WAY TEMP. SIDE:120±10℃ TEMP. SIDE:
MTRL#:182 STRETCH 1
THICKNESS:N/A TONE FDY-TB & ROLL SIZE:180cm ROLL SIZE:
2 NAME:MEDIUM PU BACKING FOAM, 2 MM
Collar lining FOAM
MELT POINT:N/A TIME:200-400 RPM TIME:
MTRL#:10422
STORAG
E
3 NAME:(FP) 40D TRICOT 1TONE FDY-SD TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE HOURS
NAME:DM-629MD TEMP. MID:120±10℃ TEMP. MID:
VENDOR MTRL#:N/A
VENDOR:Nan Pao TEMP. SIDE:120±10℃ TEMP. SIDE:
FOAM & (FP)
THICKNESS:N/A 40D TRICOT ROLL SIZE:180cm ROLL SIZE:
In-House 1TONE FDY-SD
MELT POINT:N/A TIME:200-400 RPM TIME:
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Lamination Process (3)
Page: 2-3
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
ADHESIVE
COMPONENT MATERIAL DESCRIPTION TYPE: WB Cement 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE
NAME NAME:DM-58T TEMP. MID:110-120℃ TEMP. MID:
1 NAME:RELEASE PAPER
VENDOR:NANPAO TEMP. SIDE:110-120℃ TEMP. SIDE:
MTRL#:N/A RELEASE PAPER
THICKNESS:N/A & foam ROLL SIZE:60cm ROLL SIZE:
2 NAME:10mm\BF/PU 003 foam\
Collar foam
MELT POINT:N/A TIME:60s TIME:
MTRL#:3084
STORAG
E
3 NAME:RELEASE PAPER TYPE: 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE HOURS
NAME:DM-58T TEMP. MID:110-120℃ TEMP. MID:
VENDOR MTRL#:N/A
VENDOR:NANPAO TEMP. SIDE:110-120℃ TEMP. SIDE:
foam &
THICKNESS:N/A RELEASE PAPER ROLL SIZE:60cm ROLL SIZE:
In-House
MELT POINT:N/A TIME:60s TIME:
ADHESIVE
COMPONENT MATERIAL DESCRIPTION TYPE: 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE
NAME Name: Temp.(Mid): Temp.(Mid):
1 NAME:
Vendor: Temp.(Side): Temp.(Side):
MTRL#:
Thickness: Roll Size: Roll Size:
2 NAME:
Melt Point: Time: Time:
MTRL#:
STORAG
E
3 NAME: TYPE: 1st. ROLL 2nd. ROLL WINDING COOLING
ADHESIVE SIDE HOURS
Name: Temp.(Mid): Temp.(Mid):
VENDOR MTRL#:
Vendor: Temp.(Side): Temp.(Side):
Part Aligned-M
First cut
PART LOCATION PART LOCATION
2 3 4 5 6 7 8 9 10 CUTTING DIES : 2 3 4 5 6 7 8 9 10
CUTTING DIES SHARE :
DQ0575-100
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ DJ6039-002 (BLUE/BIRU)
( YELOW / KUNING )
Note: 1st & 2nd cut pattern efficiency total. CUTTING METHOD CUTTING METHOD
L&R Different
First cut Second cut
S - Normal Cut " No Match Mark" Part Aligned - M
2 3 4 5 6 7 8 9 10 2 3 4 5 6 7 8 9 10
CUTTING DIES SHARE : CUTTING DIES SHARE :
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ DJ6039-002 (BLUE/BIRU) ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ DJ6039-002 (BLUE/BIRU)
Part Aligned - M
2 3 4 5 6 7 8 9 10 2 3 4 5 6 7 8 9 10
CUTTING DIES SHARE : CUTTING DIES SHARE :
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ DJ6039-002 (BLUE/BIRU) ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ DJ6039-002 (BLUE/BIRU)
2 3 4 5 6 7 8 9 10
CUTTING DIES SHARE :
DJ6039-002 (BLUE/BIRU)
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
CUTTING METHOD CUTTING METHOD
SINGLE DIE
2 3 4 5 6 7 8 9 10 2 3 4 5 6 7 8 9 10
☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆
40~50 45 ~ 50
3 3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Upper Skiving Instructions (Matrix)
Page: 5
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
KEY
: Skiving inside (medium)
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Perforation Specification(1)
Page: 6-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT: Strobel COMPONENT: Collar
After heat press
A
A. All Holes
PED
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Perforation Specification(2)
Page: 6-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT: Vamp <Second cut> COMPONENT: Vamp skin
A. All Holes
A. All Pinper
A
A. All Holes
B
PED
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Perforation Specification(3)
Page: 6-3
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT: Quarter medial COMPONENT: Bootie
A
A
A. All Holes
PED
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Perforation Specification(4)
Page: 6-4
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT: Collar<Second cut> COMPONENT: Foxing skin
A
A
A. All Holes
B
PED
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Upper Logo Specification(1)
Page: 7-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT NAME Quarter lateral COMPONENT NAME Quarter lateral
1 2
VENDOR IN HOUSE VENDOR IN HOUSE
A
A
B
B
MODEL SIZE A(mm) B(mm)
2 2 45.01 78.03
3 3 46.86 83.10
4 4 48.36 88.27
MODEL SIZE A(mm) B(mm)
5 5 50.69 94.02
6 6 52.36 99.22 2 2 16.87 43.94
7 7 54.27 104.42 3 3-4 17.46 46.97
MATERIAL & APPLICATION 8 8 56.51 109.63 MATERIAL & APPLICATION 5 5-6 19.1 53.5
1.2-1.4mm\(PM) GENERIC PU COATED LEATHER\UM-16 SM 9 9 57.69 114.83 1.2-1.4mm\(PM) GENERIC PU COATED LEATHER\UM-16 SM 7 7-8 19.82 59.11
Printing 10 10 59.14 120.03 Printing 9 9-10 21.00 65.19
A
A
B
B
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Upper Logo Specification(2)
Page: 7-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT NAME Quarter medial COMPONENT NAME
5
VENDOR IN HOUSE VENDOR
2 2 19.35 46.22
3 3-4 20.03 49.41
MATERIAL & APPLICATION 5 5-6 21.4 55.6 MATERIAL & APPLICATION
1.2-1.4mm\(PM) GENERIC PU COATED LEATHER\UM-16 SM 7 7-8 22.73 62.18
Printing 9 9-10 24.09 68.56
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Upper Silk Screen Process - Specification(1)
Page: 8-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
METHOD
SIZE # of Parts
COMPONENT NAME Quarter lateral MCS# PP/L/PUS 0113
VENDOR IN HOUSE
MATERIAL NAME 1.2-1.4mm\(PM) GENERIC PU COATED LEATHER\UM-16 SM MATERIAL # 232823 2 12
MANUAL
* OP: Operation 3-4 12
PROCESS DETAILS 5-6 12
PROCESS HARDENER WIPES DRY TIME MESH #
CHEMICAL WB/SB TEMP.C ROUND 7-8 12
Loading component
1
OP: COLOR/CODE:
Cleaning Component Room
2 256 SB 5~10'
OP: CLEANING COLOR/CODE: temp
Ink for screen. Room
3 2400NC-00-2 7~9%9485 SB 2 1 15~20' 150
OP: BASE COLOR/CODE: clear temp
Ink for screen. Room
4 6400-B53765 3~8%9580 WB 4 2 5~15' 150
OP: BASE COLOR/CODE: clear temp
Ink for screen. Room
5 2400NC-B65691 7~9%9485 SB 6 3 15~20' 200
OP: MAIN COLOR/CODE: 12J temp
Ink for screen. Room
6 2400NC-B66646 7~9%9485 SB 6 3 15~20' 200
OP: MAIN COLOR/CODE: 57I temp
Ink for screen. Room
7 2400NC-B72356 7~9%9485 SB 6 3 15~20' 200
OP: MAIN COLOR/CODE: 31B temp
Ink for screen. Room
8 6400-B45298 3~8%9580 WB 2 1 5~15' 150
OP: FINISHING COLOR/CODE: clear temp
Unload component
9
OP: COLOR/CODE:
Naturally dry Room
10 24H
OP: COLOR/CODE: temp
Move out
11
OP: COLOR/CODE:
Inspection
12
OP: COLOR/CODE:
Packing
13
OP: COLOR/CODE:
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) -
Upper Heat/Cold Press Specification(1)
Page: 9-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS CONDITION
COMPONENT NAME Vamp VENDOR IN HOUSE NOSEW
Diameter of machine cylinder 12.5cm
TEMP SPECIFICATION
PRESS TYPE PAD SPECIFICATION PRESSURE SPECIFICATION (kg/cm2)
M/C or ACTUAL TEMP. TIME
M/C SETTING LOAD CELL
THICKNESS 5mm SIZE
M/C SET TEMP.
160±3℃ 40 SEC
2 21.8±2 2673.91(5.57kg/c㎡)
TOP HARDNESS 30A
3 23.8±2 2919.22(5.56kg/c㎡)
PLATE 4 26±2 3189.06(5.58kg/c㎡)
COLOR WHITE
ACTUAL TEMP. 5 28±2 3434.38(5.54kg/c㎡)
160±3℃ 40 SEC
6 30.5±2 3741.02(5.58kg/c㎡)
CHANGING FREQUENCY N/A
1. HEAT 7 32.5±2 3986.33(5.52kg/c㎡)
8 35±2 4292.97(5.54kg/c㎡)
PRESS
9 37.5±2 4599.61(5.54kg/c㎡)
THICKNESS N/A
M/C SET TEMP. 10 40±2 4906.25(5.53kg/c㎡)
150±3℃ 40 SEC
HARDNESS N/A
BOTTOM
PU Skin
PLATE THERMOCOUPLE
COLOR N/A
ACTUAL TEMP. PROBE LOCATION Mesh Probe Location
150±3℃ 40 SEC
CHANGING FREQUENCY N/A
TEMP SPECIFICATION
PRESS TYPE PAD SPECIFICATION PRESSURE SPECIFICATION (kg/cm2)
M/C or ACTUAL TEMP. TIME
M/C SETTING LOAD CELL
THICKNESS 5mm SIZE
M/C SET TEMP. R/T
15 SEC
2 21.8±2 2673.91(5.57kg/c㎡)
HARDNESS 15A
TOP 3 23.8±2 2919.22(5.56kg/c㎡)
PLATE 4 26±2 3189.06(5.58kg/c㎡)
COLOR WHITE
ACTUAL TEMP. R/T 5 28±2 3434.38(5.54kg/c㎡)
15 SEC
6 30.5±2 3741.02(5.58kg/c㎡)
CHANGING FREQUENCY N/A
7 32.5±2 3986.33(5.52kg/c㎡)
2. COLD
8 35±2 4292.97(5.54kg/c㎡)
PRESS
9 37.5±2 4599.61(5.54kg/c㎡)
THICKNESS N/A
M/C SET TEMP. R/T 10 40±2 4906.25(5.53kg/c㎡)
15 SEC
HARDNESS N/A THERMOCOUPLE PROBE LOCATION
BOTTOM
PLATE
COLOR N/A
ACTUAL TEMP. R/T
CHANGING FREQUENCY N/A
15 SEC N/A
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) -
Upper Heat/Cold Press Specification(2)
Page: 9-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS CONDITION
COMPONENT NAME Collar VENDOR IN HOUSE NOSEW
Diameter of machine cylinder 12.5cm
TEMP SPECIFICATION
PRESS TYPE PAD SPECIFICATION PRESSURE SPECIFICATION (kg/cm2)
M/C or ACTUAL TEMP. TIME
M/C SETTING LOAD CELL
THICKNESS 5mm SIZE
M/C SET TEMP.
130±3℃ 30 SEC
2 15±2 1839.84(4.74kg/c㎡)
TOP HARDNESS 30A
3 16±2 1962.50(4.74kg/c㎡)
PLATE 4 17±2 2085.16(4.74kg/c㎡)
COLOR WHITE
ACTUAL TEMP. 5 18±2 2207.81(4.73kg/c㎡)
130±3℃ 30 SEC
6 19±2 2330.47(4.71kg/c㎡)
CHANGING FREQUENCY N/A
1. HEAT 7 20.2±2 2477.66(4.73kg/c㎡)
8 21.4±2 2624.84(4.74kg/c㎡)
PRESS
9 22.5±2 2759.77(4.73kg/c㎡)
THICKNESS N/A
M/C SET TEMP. 10 23.7±2 2906.95(4.73kg/c㎡)
130±3℃ 30 SEC
HARDNESS N/A
BOTTOM
PU Skin
PLATE THERMOCOUPLE
COLOR N/A
ACTUAL TEMP. PROBE LOCATION Mesh Probe Location
130±3℃ 30 SEC
CHANGING FREQUENCY N/A
TEMP SPECIFICATION
PRESS TYPE PAD SPECIFICATION PRESSURE SPECIFICATION (kg/cm2)
M/C or ACTUAL TEMP. TIME
M/C SETTING LOAD CELL
THICKNESS 5mm SIZE
M/C SET TEMP. R/T
15 SEC
2 15±2 1839.84(4.74kg/c㎡)
HARDNESS 15A
TOP 3 16±2 1962.50(4.74kg/c㎡)
PLATE 4 17±2 2085.16(4.74kg/c㎡)
COLOR WHITE
ACTUAL TEMP. R/T 5 18±2 2207.81(4.73kg/c㎡)
15 SEC
6 19±2 2330.47(4.71kg/c㎡)
CHANGING FREQUENCY N/A
7 20.2±2 2477.66(4.73kg/c㎡)
2. COLD
8 21.4±2 2624.84(4.74kg/c㎡)
PRESS
9 22.5±2 2759.77(4.73kg/c㎡)
THICKNESS 5mm
M/C SET TEMP. R/T 10 23.7±2 2906.95(4.73kg/c㎡)
15 SEC
HARDNESS 15A THERMOCOUPLE PROBE LOCATION
BOTTOM
PLATE
COLOR WHITE
ACTUAL TEMP. R/T
CHANGING FREQUENCY N/A
15 SEC N/A
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Component Stacking Process(1)
Page: 10-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
TOTAL CYCLE TIME CYCLE TIME (sec) 12 # OF PINS HALF PR. 7 CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
TOTAL CYCLE TIME CYCLE TIME (sec) 11 # OF PINS HALF PR. 3 CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Component Stacking Process(2)
Page: 10-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS METHOD NOSEW
TOTAL CYCLE TIME CYCLE TIME (sec) 7 # OF PINS HALF PR. 4 CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
TOTAL CYCLE TIME CYCLE TIME (sec) 11 # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Component Stacking Process(3)
Page: 10-3
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS METHOD NOSEW
TOTAL CYCLE TIME CYCLE TIME (sec) 10 # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. 8 # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL
TOTAL CYCLE TIME CYCLE TIME (sec) 4 # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) -
Upper Component Stacking Process(4)
Page: 10-4
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
TOTAL CYCLE TIME CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. 1. Bersihkan lem yang tersisa di atas/bawah silikon pad
PROCESS DETAIL PROCESS DETAIL setiap 2 jam sekali.
2. Kondisi Press panas : 118±2°C di 10 detik terakhir. Suhu
terakhir antara 122°C-128°C (tidak melebihi 130°C). Perlu
Send to heat press process Send to cold press process
menyesuaikan suhu mesin jika 10 detik terakhir tidak dapat
memenuhi standar.
3. Bersihkan kotoran yang ada di silikon pad sebelum
Kirim ke proses press panas Kirim ke proses press dingin digunakan.
TOTAL CYCLE TIME CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Component Stacking Process(5)
Page: 10-5
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
TOTAL CYCLE TIME CYCLE TIME (sec) 4 # OF PINS HALF PR. 3 CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
TOTAL CYCLE TIME CYCLE TIME (sec) 10 # OF PINS HALF PR. 2 CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - Upper Component Stacking Process(6)
Page: 10-6
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
TOTAL CYCLE TIME CYCLE TIME (sec) 4 # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR.
(sec) # OF HEATING GUN OPERATION HALF PR. 3 # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
PROCESS DETAIL PROCESS DETAIL PROCESS DETAIL
TOTAL CYCLE TIME CYCLE TIME (sec) # OF PINS HALF PR. CYCLE TIME (sec) # OF PINS HALF PR. 1. Bersihkan lem yang tersisa di atas/bawah silikon pad
(sec) # OF HEATING GUN OPERATION HALF PR. # OF HEATING GUN OPERATION HALF PR.
setiap 2 jam sekali.
PROCESS DETAIL PROCESS DETAIL
2. Kondisi pres panas: 118-122°C di 10 detik terakhir. Suhu
terakhir antara 122-128°C (tidak melebihi 130°C). Perlu
Send to heat press process Send to cold press process
menyesuaikan suhu mesin jika 10 detik terakhir tidak dapat
memenuhi standar.
3. Bersihkan kotoran yang ada di silikon pad sebelum
Kirim ke proses press panas Kirim ke proses press dingin
digunakan
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Heat Seal Process Specification
Page: 11
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
REMARKS # of
Component Name Bootie Material (FP) 2-WAY STRETCH 1 TONE FDY-TB
Size A (mm) B (mm) Pin/half
VENDOR (GOLD LONG JOHN TAIWAN) (TR1)
pair
PROCESS DETAILS 2-10 30 33 0
PROCESS PRESSSURE
TEMP. C (ACTUAL MOLD TEMP.) TIME COMMENTS
1 Put bootie
@ Ambil bootie
2 Put C/O label
@ Ambil C/O label
3 Heat seal 180-200℃ 2-4" 4~5kg/cm²
@ Press
4 Finish & inspection
@ Selesai & Periksa
@ B
@ A
@
Supervisor Factory Tech. PED Tech.
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Upper Strap Specification(1)
Page: 12
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
TOTAL C
TOTAL
C
D
D
TOTAL C C
TOTAL
D
D
E
E
A A
PED
RY PFC FINAL Hairy Edge Treatment ( Trim edge & Heat blowing edge) Instructions
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575
Page: 13
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Upper Marking Locations(1)
Page: 14
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT Vamp COMPONENT Collar COMPONENT Bootie 1 COMPONENT Bootie
Ink
PROCESS SCREEN PROCESS SCREEN PROCESS SCREEN PROCESS SCREEN
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Computer Stitching Schedule(1)
Page: 15-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
Attach & stitch collar & heel tab.(First time) (Rolling hot melt *1) Stitch box on collar & heel tab.(Second time)(Stitch across collar lining.)
Tempel & Jahit collar & Heel tab. ( Pertama ) (Lem Rolling hot melt *1) Jahit kotak collar & heel tab (Kedua) (Jahit tembus collar lining)
THREAD TYPE 210D/3 PLY BD (+AB-320) THREAD TYPE 210D/3 PLY BD (+AB-320)
NEEDLE TYPE & SIZE 16# Round point DPX17 NEEDLE TYPE & SIZE 16# Round point DPX17
STITCH LENGTH (SPI) 10-11/1" STITCH LENGTH (SPI) 10-11/1"
RPM 1000-1500 RPM 1000-1500
SIZE SIZE
2-10 2-10
# OF PINS # OF PINS
TYPE TYPE
/ HALF PAIR / HALF PAIR
JIG N/A JIG N/A
# OF PALLET N/A # OF PALLET N/A
LOCKING METHOD/ NUMBER LOCKING METHOD/ NUMBER
N/A N/A N/A N/A
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Computer Stitching Schedule(2)
Page: 15-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
Attach & stitch tongue pull tab/bootie/bootie 1.(First time) (Technomelt m/c*2)(Folding after Rolling cement) Attach & stitch box tongue pull tab & bootie & bootie 1.(Flush with u-throat.)(Second time)
Tempel & Jahit tongue pull tab/bootie/ 1.(Petama)(Lem Technomelt m/c*2) (Lipat sesudah di lem) Tempel & jahit kotak tongue pull tab & bootie & bootie 1. (Kedua) (Sejajar dengan U-throat)
THREAD TYPE 210D/3 PLY BD (+AB-320) THREAD TYPE 210D/3 PLY BD (+AB-320)
NEEDLE TYPE & SIZE 16# Round point DPX17 NEEDLE TYPE & SIZE 16# Round point DPX17
STITCH LENGTH (SPI) 10-11/1" STITCH LENGTH (SPI) 10-11/1"
RPM 1000-1500 RPM 1000-1500
SIZE PROGRAM
2
3
4
5
6 SIZE
7 2-3
8 4-5
9 6-7
10 8-10
SIZE
2-10
# OF PINS # OF PINS
TYPE TYPE
/ HALF PAIR / HALF PAIR
JIG N/A JIG N/A
# OF PALLET N/A # OF PALLET N/A
LOCKING METHOD/ NUMBER LOCKING METHOD/ NUMBER
N/A N/A N/A N/A
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Computer Stitching Schedule(3)
Page: 15-3
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
Stitch quarter medial/lateral & gore.(Stitch box)(Trim threads.)(Trimming) Stitch box on quarter medial/lateral & heel strap.(Trim threads.)(Trimming)
Jahit Quarter medial / lateral & gore. (Jahit kotak) (Potong benang)(Gunting) Jahit Quarter medial / lateral & heel strap. (Jahit kotak) (Potong benang)(Gunting)
THREAD TYPE 210D/3 PLY BD (+AB-320) THREAD TYPE 210D/3 PLY BD (+AB-320)
NEEDLE TYPE & SIZE 16# Round point DPX17 NEEDLE TYPE & SIZE 16# Round point DPX17
STITCH LENGTH (SPI) 10-11/1" STITCH LENGTH (SPI) 10-11/1"
RPM 1000-1500 RPM 1000-1500
M/C TYPE : 15*10 Stitch margin / Jarak Tepi : 1.5mm M/C TYPE : 15*10
SIZE SIZE
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
PICTURE OF JIG/PALLET PICTURE OF JIG/PALLET
# OF PINS # OF PINS
TYPE TYPE
/ HALF PAIR / HALF PAIR
JIG N/A JIG N/A
# OF PALLET N/A # OF PALLET N/A
LOCKING METHOD/ NUMBER LOCKING METHOD/ NUMBER
N/A N/A N/A N/A
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Computer Stitching Schedule(4)
Page: 15-4
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
Stitch vamp with quarter medial/lateral then stitch box.(Front side.) Stitch quarter medial/lateral & collar.(Start & end point backtrack 3 stitches.) (Back side.)
Jahit Vamp dengan Quarter medial/lateral kemudian jahit kotak (Depan pinggir) Jahit quarter medial/lateral & collar. (Awal & akhir kunci bolak balik 3 stikan) (Samping belakang)
THREAD TYPE 210D/3 PLY BD (+AB-320) THREAD TYPE 210D/3 PLY BD (+AB-320)
NEEDLE TYPE & SIZE 16# Round point DPX17 NEEDLE TYPE & SIZE 16# Round point DPX17
STITCH LENGTH (SPI) 10-11/1" STITCH LENGTH (SPI) 10-11/1"
RPM 1000-1500 RPM 1000-1500
SIZE SIZE
2-10 2-10
# OF PINS # OF PINS
TYPE TYPE
/ HALF PAIR / HALF PAIR
JIG N/A JIG N/A
# OF PALLET N/A # OF PALLET N/A
LOCKING METHOD/ NUMBER LOCKING METHOD/ NUMBER
N/A N/A N/A N/A
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Upper Folding Process
Page: 16
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT Tongue pull tab FOLDING LENGTH (cm) COMPONENT Heel tab FOLDING LENGTH (cm)
1 1
FOLDED AREAS FOLDED AREAS
1 1
UPPER FOLDING METHOD UPPER FOLDING METHOD
Manual Folding Manual Folding
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Pre Buffing Instructions
Page: 17
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
KEY: : BUFFING
Pre-Buffing Instructions
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Stitching Overview sketch
Page: 18
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
Upper
1.Vamp skin
2.Vamp
3.Quarter medial
4.Quarter lateral
5.Bootie
6.Bootie 1 4
7.U-throat
8.Gore
9.Tongue pull tab
10.Heel tab 6
11.Heel strap
10
8
2
1 5
7
11
Right shoe
PHOTO
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TDV) Stitching Instructions (1)
Page: 18-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
Stitch vamp & vamp lining. Stitch bootie & bootie 1 with 4needles & 6 threads.(Trimming)
1 2
Jahit vamp & vamp lining Jahit bootie & bootie dengan mesin obras ( Potong benang)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Single needle post #16 R 4 Needles & 6 Threads #14 R 200D/1PLY NYLON 6 ELASTIC TXTURED
DPX5 210D/3 PLY BD 1.5mm 9-10/1" MY1014B 3mm 13-14/1"
YARN
@ Jarum 1 mesin tinggi 100 Bulat Mesin Obras 90 Bulat
STITCHING GUIDELINE STITCHING GUIDELINE
S – Short (<20cm) S – Short (<20cm)
# STITCHING LINES # STITCHING LINES
1 1
# WEBBING LOOP # WEBBING LOOP
N/A N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS # APPARATUS
N/A N/A
RPM : 1000-1200 ATTACHING METHOD STITCHING GUIDE ATTACHING METHOD STITCHING GUIDE
N/A SG-01 N/A N/A
Zig-zag vamp & vamp lining & bootie & bootie 1.(Sent to NO-SEW)(Trimming) Rolling cement hot melt on heel tab then attach collar.(Rolling hot melt*1)
3 4
Jahit zig-zag vamp & vamp lining & bootie & bootie 1.(kirim ke NO-SEW)(Potong benang) Lem Rolling hot melt pada heel tab kemudian tempel collar (Lem Rolling hot melt*1)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
3 Point Zig-zag #16 R 250/3 PLY THREAD LUBRICATED ASTRA Technomelt m/c
DPX17 2.5mm 7-8/1" N/A N/A N/A N/A N/A N/A
Zig-zag 3 titik 100 Bulat SPUN (TKT30) Mesin Techknomelt
@
3 Points Zigzag STITCHING GUIDELINE STITCHING GUIDELINE
Stitch
S – Short (<20cm)
2.5mm
# STITCHING LINES # STITCHING LINES
1 0
2.5mm # WEBBING LOOP # WEBBING LOOP
N/A N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT
10mm # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS # APPARATUS
N/A N/A
ATTACHING METHOD STITCHING GUIDE ATTACHING METHOD STITCHING GUIDE
N/A SG-07 HM-102P N/A
Supervisor Factory Tech. PED Tech.
Stitching Instruction 1
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TDV) Stitching Instructions (2)
Page: 18-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
Stitch collar & heel tab.(First time) Peel off release paper on collar foam then attach collar.(First time)(Sticker*1)
5 6
Jahit collar & heel tab. (Pertama) Lepas kertas pelapis pada collar foam kemudian tempel collar (pertama)(Sticker*1)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Stitching Instruction 2
Nike, Inc. Ver 21.3
PRODUCT CODE:
DEV- STYLE: NIKE FLEX RUNNER 2 (TDV)
Stitching Instructions (3)
Page: 18-3
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
Stitch collar & collar lining with 4 needles & 6 threads.(Trimming) Stitch booti & booti 1 & collar with 4 needles & 6threads.(Trimming)
9 10
Jahit collar & collar lining dengan mesin obras. (Potong benang) jahit booti & booti 1 & collar dengan mesin obras. (Potong benang)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
4 Needles & 6 Threads #14 R 200D/1PLY NYLON 6 ELASTIC TXTURED 4 Needles & 6 Threads #14 R 200D/1PLY NYLON 6 ELASTIC TXTURED
MY1014B 3mm 13-14/1" MY1014B 3mm 13-14/1"
Mesin obras 90 Bulat YARN Mesin obras 90 Bulat YARN
@
STITCHING GUIDELINE STITCHING GUIDELINE
S – Short (<20cm) S – Short (<20cm)
# STITCHING LINES # STITCHING LINES
1 2
# WEBBING LOOP # WEBBING LOOP
N/A N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS # APPARATUS
N/A N/A
ATTACHING METHOD STITCHING GUIDE ATTACHING METHOD STITCHING GUIDE
N/A N/A N/A N/A
Stitch bootie zig-zag binding (Start & end point in front of bootie)(Trimming) Fold in half bootie & binding then stitch obverse side.
11 12
Jahit zig-zag bootie binding. (Awal & akhir jahitan di depan dalam bootie)(Potong benang) Lipat setengah bootie & binding kemudian jahit didepan.
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Zig-zag m/c with
#16 R Single needle post #16 R
binding tube
DPX17 210D/3 PLY BD 6mm 8-9/1" DPX5 210D/3 PLY BD 6mm 10-11/1"
Mesin zig-zag 100 Bulat Jarum 1 mesin tinggi 100 Bulat
@
STITCHING GUIDELINE STITCHING GUIDELINE
6mm M – Medium (20-40cm) S – Short (<20cm)
ZIGZAG : 4mm
# STITCHING LINES # STITCHING LINES
1 1
# WEBBING LOOP # WEBBING LOOP
N/A N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS # APPARATUS
N/A N/A
ATTACHING METHOD STITCHING GUIDE RPM : 1000-1200
ATTACHING METHOD STITCHING GUIDE
N/A N/A N/A N/A
Stitching Instruction 3
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TDV) Stitching Instructions (4)
Page: 18-4
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
Stitch box on collar & heel tab.(Second time)(Stitch across collar lining.) Attach tongue pull tab/bootie/bootie 1.(Rolling hot melt *2)(Folding after hot melt)
13 14
Jahit kotak collar & heel tab (Kedua) (Jahit tembus collar lining) Tempel tongue pull tab/bootie/bootie 1. (Rolling hot melt*2)(Lipat sesudah proses pengeleman)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Follow pattern
Computer stitching #16 R Technomelt m/c
position
DPX17 210D/3 PLY BD(+AB-320) Ikuti posisi pola
10-11/1" N/A N/A N/A N/A N/A N/A
@ Jahit komputer 100 Bulat Mesin Techknomelt
pattren
STITCHING GUIDELINE STITCHING GUIDELINE
S – Short (<20cm)
# STITCHING LINES # STITCHING LINES
1 0
# WEBBING LOOP # WEBBING LOOP
N/A 10mm N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS LEM : 15mm # APPARATUS
LIPAT → 8mm
N/A N/A
ATTACHING METHOD STITCHING GUIDE ATTACHING METHOD STITCHING GUIDE
RPM : 1000-1500
N/A N/A HM-102P N/A
Stitch tongue pull tab & bootie & bootie 1.(First time) Attach & Stitch box tongue pull tab & bootie & bootie 1.(Second time)(Align with u-throat)
15 16
Jahit tongue pull tab & bootie & bootie1. (Pertama) Tempel & jahit kotak tongue pull tab & bootie & bootie 1. (Kedua) (Sejajar dengan U-throat)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Follow pattern
Computer stitching #16 R Computer stitching #16 R
position
DPX17 210D/3 PLY BD(+AB-320) 1.5mm 10-11/1" DPX17 210D/3 PLY BD(+AB-320) 10-11/1"
Ikuti posisi pola
Jahit komputer 100 Bulat Jahit komputer 100 Bulat
@ pattren
STITCHING GUIDELINE STITCHING GUIDELINE
S – Short (<20cm) S – Short (<20cm)
# STITCHING LINES # STITCHING LINES
1 1
# WEBBING LOOP # WEBBING LOOP
N/A N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS # APPARATUS
N/A N/A
ATTACHING METHOD STITCHING GUIDE ATTACHING METHOD STITCHING GUIDE
RPM : 1000-1500 RPM : 1000-1500
N/A N/A N/A N/A
Supervisor Factory Tech. PED Tech.
Stitching Instruction 4
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TDV)
Stitching Instructions (5)
Page: 18-5
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
Stitch quarter medial/lateral & gore.(Stitch box)(Trim threads.)(Trimming) Stitch box on quarter medial & quarter lateral & heel strap (Trimming)
17 18
jahit quarter medial/lateral & gore. (jahit kotak) (gunting benang)(Potong benang) Jahit kotak di quarter medial & quarter lateral & heel strap.(Potong benang)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Follow
Computer stitching #16 R Computer stitching #16 R
pattern
DPX17 210D/3 PLY BD(+AB-320) 1.5mm 10-11/1" DPX17 210D/3 PLY BD(+AB-320) 10-11/1"
Ikuti pola
Jahit Komputer 100 Bulat Mesin komputer 100 Bulat
@ pattren
STITCHING GUIDELINE STITCHING GUIDELINE
S – Short (<20cm) S – Short (<20cm)
# STITCHING LINES # STITCHING LINES
2 2
# WEBBING LOOP # WEBBING LOOP
N/A N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS # APPARATUS
N/A N/A
ATTACHING METHOD STITCHING GUIDE ATTACHING METHOD STITCHING GUIDE
RPM : 1000-1500 RPM : 1000-1500
N/A N/A N/A N/A
Stitch upper edge line. Stitch upper edge line.(V-cut edge for 1mm)
19 20
Jahit pinggir upper Jahit pinggir upper. (1 mm dari V-cut)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Single needle post #16 R Single needle post #16 R V-cut the
DPX5 210D/3 PLY BD 2mm 7-8/1" DPX5 210D/3 PLY BD edge for 9-10/1"
Jarum 1 mesin tinggi 100 Bulat Jarum 1 mesin tinggi 100 Bulat 1mm
@
STITCHING GUIDELINE STITCHING GUIDELINE
M – Medium (20-40cm) S – Short (<20cm)
# STITCHING LINES # STITCHING LINES
1 1
# WEBBING LOOP # WEBBING LOOP
N/A N/A
# WEBBING HOLE # WEBBING HOLE
N/A N/A
# WEBBING SLIT # WEBBING SLIT
N/A N/A
# LACING HOLES # LACING HOLES
N/A N/A
# APPARATUS # APPARATUS
N/A N/A
RPM : 1000-1200 ATTACHING METHOD STITCHING GUIDE ATTACHING METHOD STITCHING GUIDE
RPM : 1000-1200
N/A SG-03 N/A N/A
Supervisor Factory Tech. PED Tech.
Stitching Instruction 5
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TDV) Stitching Instructions (6)
Page: 18-6
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
Stitch vamp with quarter medial/lateral then stitch box.(Front side.) Stitch quarter medial/lateral & collar.(Start & end point backtrack 3 stitches.) (Back side.)
21 22
Jahit vamp dengan quarter medial/lateral kemudian jahit kotak. (Samping depan) Jahit quarter medial/lateral & collar. (Awal & akhir kunci bolak balik 3 stikan) (Samping belakang)
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
Stitching Instruction 6
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TDV) Stitching Instructions (7)
Page: 18-7
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
QC
25
Cek QC
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER NEEDLE NEEDLE NEEDLE STITCHING SPI STICH PER
M/C TYPE THREAD TYPE M/C TYPE THREAD TYPE
SYSTEM SIZE POINT MARGIN INCHE SYSTEM SIZE POINT MARGIN INCHE
@
STITCHING GUIDELINE STITCHING GUIDELINE
# APPARATUS # APPARATUS
Stitching Instruction 7
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Sockliner Specification
Page: 20
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
FRONT SIZE BACK PRORON /AIR BAG ATTACHMENT PROCESS
2 Sockliner lamination process:
3 75% Hot melt EVA foam Sockliner top cloth
4
5 Cementing:S/B 7430WL-2
6 SUR. TEMP:150~170℃
7 Speed:300~500RPM
8
9
10 Attaching
SUR. TEMP:70±10℃,PRESSURE:20kg/c㎡↑
1.Speed:300~500RPM.
2.For each lot no cut a slab of 20*10cm for Physical property test.
Packing
1.25Y in one package, fill in the labels accordingly and attach to the package.
SIZE A B C
N/A N/A N/A N/A
COMPONENT MATERIAL MCS#
SOCKLINER 2MM\GREY SOCKLINER, 32-36C REC S/RFO 004
TOP CLOTH (PM) LINING KNIT MATTE MICRO REC-RYP LU/PP/TF/LN 0408
Sockliner Speficiation
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Sockliner Process
Page: 21
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESSING INFORMATION
No SOCKLINER PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
Sockliner lamination process:
@
1.Speed:300~500RPM.
2 EVA foam & sockliner top cloth attaching 70±10℃ 20kg/c㎡↑ 2.For each lot no cut a slab of 20*10cm for
Physical property test.
Sockliner Process
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Stockfitting Process (1)
Page: 23-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESSING INFORMATION
No STOCKFIT PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
Midsole degreasing & AUTO UV process (The length over 370mm or
below 70mm can't be used AUTO UV):
2 Cleaning by hot water spraying Water WB 45~55℃(Hot water) 10' Min. 2HRS. MAX. TO PRIMING.
@
6 Material collection
@
7 Midsole cleaning for bonding margin area No. 29(CN) SB Use scrubber, clipper width 30mm.
NO.9
@
1.Nozzle calibration:0.2~0.6g/s
UV LIGHT- priming times
12 Midsole AUTO spray priming NP P807W V1 WB 2.Nozzle moving speed:180~200mm/sec 2
(midsole)
3.Toe & Heel Nozzle position Fixed.
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Stockfitting Process (2)
Page: 23-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESSING INFORMATION
No STOCKFIT PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
15 Check priming on Midsole
@
17 Checking Midsole
@
18 Material collection
@
DEGREASING TIMES 0
@
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Stockfitting Process (3)
Page: 23-3
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESSING INFORMATION
No STOCKFIT PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
Midsole degreasing & UV-Light treatment process:
@
2 Cleaning by hot water spraying Water WB 45~55℃(Hot water) 10' Min. 2HRS. MAX. TO PRIMING.
@
6 Material collection
@
8 Midsole cleaning for bonding margin area No. 29(CN) SB Use scrubber, clipper width 30mm.
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Stockfitting Process (4)
Page: 23-4
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESSING INFORMATION
No STOCKFIT PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
16 Date stamping M/D/T
@
17 Checking
@
18 Material collection
@
DEGREASING TIMES 0
@
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Stockfit Bonding Process Flow Chart (1)
Page:24-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LGHT THSTL-HNYDW-MLCH-100-FA22
DPA/TD code: FA22-DQ0575 / F2 FTY CODE: RY
CONFIRMATION FACTORY PREP MODEL SIZE - OK PRODUCTION OK
NAME TOTO QU BEN CHEN DARREN
DATE 2022/01/21 12/30/2021 22/1/2022
M
Parameter setting PCC Offshore manufacturing
Name of primer W/B NP P807W V1 W/B NP P807W V1
Nozzle calibration(g/s) 1~6 Nozzles 0.4~0.45 g/s 1~4 Nozzles 0,45~0,50 g/s
A 7~8 Nozzles 0.3~0.35 g/s
Nozzle moving speed(mm/sec) 180 mm/sec(Down) 180 mm/sec(Down)
B UV power intensity(J/c㎡) 0.99 J/c㎡ 0,7 J/c㎡
Dry chamber temperature(℃) 53~55 ℃ 45~55℃
Cycle time(sec/pairs or piece) 6.9 sec/piece 6.5 sec/piece
HARDENER
TYPE OF PRESS PRESSURE kg./cm2 TIME (sec)
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Stockfit Bonding Process Flow Chart (1)
Page:24-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LGHT THSTL-HNYDW-MLCH-100-FA22
DPA/TD code: FA22-DQ0575 / F2 FTY CODE: RY
CONFIRMATION FACTORY PREP MODEL SIZE - OK PRODUCTION OK
NAME TOTO QU BEN CHEN DARREN
DATE 2022/01/21 12/30/2021 22/1/2022
HARDENER
TYPE OF PRESS PRESSURE kg./cm2 TIME (sec)
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Assembly Process (1)
Page: 25-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS INFORMATION
No ASSEMBLY PROCESS COMMENTS LASTING LACE/CLIP INSTRUCTION
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
1 Feed the uppers in pairs to the front of the assembly line
@ Letakan upper pasangan di depam line assembly
N/A
NO.3
LASTING CLIP SCHEDULE
SIZE A (TOP) B (BOTTOM)
SIZE 5 RIGHT
FA22-DQ0575
N/A
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Assembly Process (2)
Page: 25-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS INFORMATION
No ASSEMBLY PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
4 Vamp activation (with steam) 80~90℃ 8~10" Toe box material:N/A.
NO.5
@ Pemanasan Vamp (dengan uap)
1.Prepare correct lasts (YA-11).
2.Hammering strobel stitching flat.
5 Inserting last
3.Check the strobel center line to be straight.
Pls see the attached NO.5
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Assembly Process (3)
Page: 25-3
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS INFORMATION
No ASSEMBLY PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
1.Apply primer UE-312 on whole strobel.
17 Upper priming for PU skin/mesh UE-312 WB NO.23
2.Use tooth brush, length 25mm.
1. Pemolesan primer UE-312 di stroble 100%. 3
@ priming upper untuk bahan PU skin / mesh
2. Pakai sikat gigi , panjang 25mm.
5
18 Sole unit priming for Midsole 111 GN 1071 4±1% SB Use painting brush, brush width 35mm. 1
@ Primer sole unit untuk midsole Pakai kuas cat, lebar kuas 35mm.
4
Upper:55~60℃, The toe of the midsole to be laid heading to the 2
19 Heat tunnel 3~4' 6
sole unit:50~55℃ operator.
Bagian depan midsole diletakan menuju ke
@ Pengeringan
bagian dari operator.
6 3
4
1.Use tooth brush, length 25mm.
NP-99 CL-01 4±1% WB
2.Cement NP-99+CL-01 4±1% be applied all the 1
20 Upper cementing 5
way from the bite line to 10mm beyond(inside)
the strobel stitch. 2
1. Pakai sikat gigi, panjang 25mm.
@ Pengeleman upper 2. Pemolesan lem NP-99+CL-01 4±1% di stroble
10mm dari pinggir.
21 Sole unit cementing NP-99 CL-01 4±1% WB Use painting brush, brush width 35mm.
@ Pengeleman sole unit Pakai kuas cat, lebar kuas 35mm.
Upper:55~60℃, The toe of the midsole to be laid heading away
22 Heat tunnel 3~4'
sole unit:50~55℃ from the operator.
Bagian depan midsole diletakan menjauh dari
@ Pengeringan
operator.
Attach sole starting from toe.Pls see the
23 Attaching
attached NO.23
@ Penempelan upper & outsole Tempel O/S mulai dari depan .
The temperature of parts should be above 40℃
24 Deep well pressing 30~35kg/c㎡ 10~15"
prior to pressing.
Suhu part harus diatas 40ºC sebelum
@ Press keseluruhan
pengepresan
25 Chilling 4~8' Machine temperature set:0~-5℃
@ Pendingin Pengaturan suhu mesin : 0~-5ºC
26 Overhead conveyor 30' above
@ Conveyor gantung
The temperature is measured on the strobel sock
27 Delasting in the heel of the shoe immediately after de-
lasting below 40℃.
Setelah buka laste ukur suhu di bagian belakang
@ Buka laste
stroble dibawah 40℃.
28 Cleaning last
@ Bersihkan laste
1.Use natural rubber.
29 Cleaning over cement TOTAL W/B PROCESSES 4
2.Use NO.256 for patent (syn.) leather
1. Pakai karet alami.
@ Bersihkan lem yang berlebih
2. Pakai No.256 untuk patent (sintetik) kulit.
1.Checking sockliner.
Machine temperature
30 Sockliner cementing HM 102PF WB 2.75% cementing. TOTAL S/B PROCESSES 1
set:150℃
3.Horizontal cementing.
1. Cek sockliner.
@ Pengeleman sockliner 2. Lem hotmelt 75%.
3. Lem secara mendatar.
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Assembly Process (4)
Page: 25-4
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PROCESS INFORMATION
No ASSEMBLY PROCESS COMMENTS ADDITIONAL INSTRUCTIONS
CHEMICAL HARDENER WB/SB SUR. TEMP PRESSURE TIME
31 Sockliner inserting
@ Masukan sockliner
32 Sockliner pressing (Loading time:1) 1.5~2kg/c㎡ 2~3"
@ Pengepresan sockliner (waktu memuat :1)
34 QC
@ Cek QC
35 Inner box folding up Date stamping (M/D/T).
@ Lipat kertas innerbox Stempel tanggal.
36 Attach box label
@ Tempel label innerbox
37 Packing
@ Pengepakan
38 Metal detector
@ Deteksi logam
39 Deposit in warehouse
@ Kirim ke warehouse
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Assembly Line layout (1)
Page: 26-1
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
Use √
Hot Air
Hot Air
+ NIR √
NIR
SEQUENCE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Feed the
Toe & heel of Upper
uppers in Gauge
Toe & Heel sole unit Upper priming for Sole unit
pairs to the Vamp Upper & Sole marking Upper Upper
template template cleaning for PU priming for
front of the activation Seat lasting unit pair (Front & Rear buffing for priming for
Gathering Strobel Inserting last marking Heat setting marking Dust blowing PU skin 111 skin/mesh Midsole 111
PROCESS assembly line (with steam) Pengepresan matching location) Leather Heat tunnel Leather UE-
stitching stitching Masukan Gambar pola Pemanasan Gambar pola Bersihkan FT Cuci UE-312 GN Primer
DETAILS Letakan Pemanasan upper bagian Upper & Gambar pola Pengasaran Pengeringan 311 Priming
Jahit kerut Jahit stroble laste bagian upper bagian debu upper untuk priming sole unit
upper Vamp belakang Outsole ( Depan & untuk bahan upper untuk
depan & depan & bahan TPU upper untuk untuk
pasangan di (dengan uap) berpasangan area yang kulit bahan kulit
belakang belakang skin bahan PU midsole
depam line sulit)
outsole skin / mesh
assembly
Use √ Use √
NIR NIR
SEQUENCE 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Sockliner
pressing
Upper Sole unit Cleaning Sockliner
Attaching Deep well Overhead Sockliner (Loading Inner box Attach box
cementing cementing Cleaning last over cement cementing Cleaning
PROCESS Heat tunnel Heat tunnel Penempelan pressing Chilling conveyor Delasting inserting time:1) folding up label Tempel
NP-99 NP-99 Bersihkan Bersihkan HM 102PF Bersihkan QC Cek QC
DETAILS Pengeringan Pengeringan upper & Press Pendingin Conveyor Buka laste Masukan Pengepresan Lipat kertas label
Pengeleman Pengeleman laste lem yang Pengeleman sepatu
outsole keseluruhan gantung sockliner sockliner innerbox innerbox
upper sole unit berlebih sockliner
(waktu
memuat :1)
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Assembly Line layout (2)
Page: 26-2
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
SEQUENCE 37 38 39
Metal Deposit in
PROCESS Packing detector warehouse
DETAILS Pengepakan Deteksi Kirim ke
logam warehouse
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Assembly Bonding Process Flow Chart (1)
Page:
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LGHT THSTL-HNYDW-MLCH-100-FA22
DPA/TD code: FA22-DQ0575 / F2 FTY CODE: RY
CONFIRMATION FACTORY PREP MODEL SIZE - OK PRODUCTION OK
NAME TOTO QU BEN CHEN DARREN LU
DATE 2022/01/21 12/30/2021 22/1/2022
0.33mm\ELITE PU (CATCH
\LJ-B1472K 1TONE DTY 1.2-1.4mm\(PM) GENERIC PU
0.2mm)\(UMT2) Midsole MATERIAL 5 MATERIAL 6 MATERIAL 7 MATERIAL 8
FDY-TB (圓編布)\ COATED LEATHER\UM-16 SM
P000WKD
MATERIAL #96647 MATERIAL #89769 MATERIAL #232823 MATERIAL #227408 MATERIAL # MATERIAL # MATERIAL # MATERIAL #
FM/SP 838 LU/PK 2952 PP/L/PUS 0113 M/W-IU 007 MCS# MCS# MCS# MCS#
LU MAT. INFORMATION
TEMP. CHECKING SPOTS
Vamp #89769
Buffing
(Use 40# sandpaper with 10mm
diameter of grinding wheel)
HARDENER
★CL-16 5% ADDITION TYPE OF PRESS PRESSURE kg./cm2 TIME (sec)
★★1071 3-4%ADDITION DEEP WELL PRESS 30~35kg/c㎡ 10''~15''
★★★ CL-01 4±1% ADDITION
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Pressing Pad Specification
Page: 28
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
PHOTOS PAD MATERIAL INFORMATION
PROCESS
TOP VIEW SIDE VIEW
MATERIAL TYPE:
Non-foaming PU
HARDNESS:
Assembling Process (Deep well 70±10A
pressing)
FEATURES:
Pressing pad will help the bonding
test result be satisfactory
MATERIAL TYPE:
HARDNESS:
FEATURES:
MATERIAL TYPE:
HARDNESS:
FEATURES:
IU Spec.
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 Injected Phylon Process
Page: 29
PRODUCT CODE: DQ0575-100 COLOR WAY: 1055262-BLACK/WHITE-PHOTO BLUE-UNV GLD-
ENGINEERING FLASH NO
TRIMMING FLASH/RUNNER YES
BUFFING RUNNER YES
IU Process
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV STYLE NAME:
PRODUCTION CODE:
NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 DP/IP CSS - Volumes Page:
DQ0575-100
DPA/STYLE#: PROCESS CHECK THE SG TOLERANCE SG MIN. SG MAX. MIN. HARDNESS MAX .HARDNESS
SU22-DJ6039 Injection Sole Unit 0.270 0.320 52 58
FINAL PART 17
FACTORY: MCS# MAX SG ADJUSTMENT MAX HARDNESS ADJUSTMENT
RY M/W-IU 007
CSS DATA
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV STYLE NAME:
PRODUCTION CODE:
NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 DP/IP CSS - Weight Page:
DQ0575-100
DPA/STYLE#: PROCESS CHECK THE SG TOLERANCE SG MIN. SG MAX. MIN. HARDNESS MAX .HARDNESS
SU22-DJ6039 Injection Sole Unit 0.270 0.320 52 58
FINAL PART 17
FACTORY: MCS# MAX SG ADJUSTMENT MAX HARDNESS ADJUSTMENT
RY M/W-IU 007 0.000 0
CSS DATA
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV STYLE NAME:
PRODUCTION CODE:
NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 DP/IP CSS - Hardness Page:
DQ0575-100
DPA/STYLE#: PROCESS CHECK THE SG TOLERANCE SG MIN. SG MAX. MIN. HARDNESS MAX .HARDNESS
SU22-DJ6039 Injection Sole Unit 0.270 0.320 52 58
FINAL PART 17
FACTORY: MCS# MAX SG ADJUSTMENT MAX HARDNESS ADJUSTMENT
RY M/W-IU 007 0.000 0
CSS DATA
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV STYLE NAME:
PRODUCTION CODE:
NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 DP/IP CSS - Scribelines Page:
DQ0575-100
DPA/STYLE#: PROCESS CHECK THE SG TOLERANCE SG MIN. SG MAX. MIN. HARDNESS MAX .HARDNESS
SU22-DJ6039 Injection Sole Unit 0.270 0.320 52 58
FINAL PART 17
FACTORY: MCS# MAX SG ADJUSTMENT MAX HARDNESS ADJUSTMENT
RY M/W-IU 007 0.000 0
CSS DATA
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV STYLE NAME:
PRODUCTION CODE:
NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 DP/IP CSS - Analysis Page:
DQ0575-100
DPA/STYLE#: PROCESS CHECK THE SG TOLERANCE SG MIN. SG MAX. MIN. HARDNESS MAX .HARDNESS
SU22-DJ6039 Injection Sole Unit 0.270 0.320 52 58
FINAL PART 17
FACTORY: MCS# MAX SG ADJUSTMENT MAX HARDNESS ADJUSTMENT
RY M/W-IU 007 0.000 0
CSS DATA
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV STYLE NAME: NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575
PRODUCTION CODE: DQ0575-100
DP/IP CSS - Schedules Page:
DPA/STYLE#: PROCESS CHECK THE SG TOLERANCE SG MIN. SG MAX. MIN. HARDNESS MAX .HARDNESS
SU22-DJ6039 Injection Sole Unit 0.270 0.320 52 58
FINAL PART 17
FACTORY: MCS# MAX SG ADJUSTMENT MAX. HARDNESS ADJUSTMENT
RY M/W-IU 007 0.000 0
SLAB CHECK
Hardness checking area
CSS SCHEDULES
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV STYLE NAME:
PRODUCTION CODE:
NIKE FLEX RUNNER 2 LIL (TDV) - DQ0575 DP/IP CSS - Confirmed Scribelines Page:
DQ0575-100
DPA/STYLE#: PROCESS CHECK THE SG TOLERANCE SG MIN. SG MAX. MIN. HARDNESS MAX .HARDNESS
SU22-DJ6039 Injection Sole Unit 0.270 0.320 52 58
FINAL PART 17
FACTORY: MCS# MAX SG ADJUSTMENT MAX. HARDNESS ADJUSTMENT
RY M/W-IU 007 0.000 0
SIZE 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
94 102 110 118 126 134 142 150 158
LENGTH
+/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-2mm +/-2mm
41 42 43 44 45 46 47 48 49
FOREFOOT WIDTH
+/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm
24 25 26 27 28 29 30 31 32
HEEL WIDTH
+/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm +/-1mm
SIZE
LENGTH
FOREFOOT WIDTH
HEEL WIDTH
034/12/IU/RY/2021 F2
REMARKS CE SIGNATURE
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD) Bottom Component Flash Weight
Page: ###
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
COMPONENT NAME BOTTOM COMPONENT FLASH WEIGHT (GRAM PER HALF PAIR)
NO RFC SIZE REMARK
PR GGP SPA RFC EXT FSR
PICTURES
Connected Product team has made adjustments to valid application methods for Heat Seal bootie labels to ensure QR Readability is not compromised during
the application process. The below directives must be followed:
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Upper Measurement Specification
Page: 34
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
Size Color
2 ORANGE / OREN
SIZE 2 3 4 5 6 7 8 9 10
A TIP LENGTH 7 8 9 10 11 12 13 14 15
B FOXING HEIGHT 5 5 5 5 6 6 6 7 7
RY PFC FINAL
N/A
N/A
Production Checklist
Nike, Inc. Ver 21.3
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD) Product Exception Report
Page: 36
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
EXCEPTION DESCRIPTION PICTURE SEASON COUNTERMEASURES
PRODUCT/CODE CODE RISK DETAIL VOLUME/COST NIKE/FACTORY APPROVAL** DATE APPROVED
NIKE
NIKE
NIKE
NIKE
NIKE
**NIKE FDD & FACTORY RESPRESENATIVE NEED TO APPROVE PRODUCT EXCEPTION WITH COUNTERMEASURES PRIOR TO PRODUCTION
KEY MANUFACTURING PROCESS: Check instep gore length with pattern after proceeding heat cut.
DETAIL PICTURE PROCESS DETAIL / KEY CHECK POINT
KEY MANUFACTURING PROCESS: Attach heel pull tab on collar according to mark line before proceeding C/S.
DETAIL PICTURE PROCESS DETAIL / KEY CHECK POINT
KEY MANUFACTURING PROCESS: Heel skin distance to bite line is 5mm with +/- 1mm for no-sew shifting and +/-1mm for IU sidewall height.
DETAIL PICTURE PROCESS DETAIL / KEY CHECK POINT
KEY MANUFACTURING PROCESS: Check toe gathering gauge after toe gathering stitching and follow strobel/upper notch to proceed strobel stitching.
DETAIL PICTURE PROCESS DETAIL / KEY CHECK POINT
KEY MANUFACTURING PROCESS: Vamp skin distance to bite line is 10mm with +/- 1mm for no-sew shifting and +/-1mm for IU sidewall height
DETAIL PICTURE PROCESS DETAIL / KEY CHECK POINT
KEY MANUFACTURING PROCESS: Follow PFC temp./pressure to ensure vamp piece bond well.
DETAIL PICTURE PROCESS DETAIL / KEY CHECK POINT
KEY MANUFACTURING PROCESS: Follow PFC to use 256 clean up leather surface before proceeding screen printing.
DETAIL PICTURE PROCESS DETAIL / KEY CHECK POINT
RY PFC FINAL
DEV- STYLE: NIKE FLEX RUNNER 2 (TD)
Packing Process
Page: 38
PRODUCT CODE: DQ0575-100 COLOR WAY: 1114686-SMMT WHT/LT THSTL-HNYDW-MLCHT
The shoes shown in photographs are for demonstration. Follow for packing instructions.
4
1 2 3
(1) Shoe preparation (2) Labeling on innerbox (3) Innerbox match with wrapping paper (4) Shoe match with innerbox
- Cleaning shoe
6 7 8
5
(5) 0.5 pair right shoe wrapped and placed (6) Covering 0.5 pair of shoe (7) Left foot placed with lateral (8) Covering of shoe
inside innerbox exposed
9 10
Packing Process