0% found this document useful (0 votes)
521 views73 pages

Gtw7 8 9 9s使用维护说明书 英文版-20161026

Uploaded by

Dasna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
521 views73 pages

Gtw7 8 9 9s使用维护说明书 英文版-20161026

Uploaded by

Dasna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 73

GTW7、GTW8 、GTW9/9S Series

Operation And Service Manual


S2016.2

SUZHOU TORIN DRIVE EQUIPMENT

CO.,LTD.
Copyright Announce

SUZHOU TORIN DRIVE EQUIPMENT CO.,LTD. have


the copyright of this instruction manual. Reprinting,
translation or reproduction in any form whether in part or
in full requires the prior written permission of our
company, otherwise our company will reserves the right
to went behind his responsibilities.

SUZHOU TORIN DRIVE EQUIPMENT CO.,LTD.


reserves the right to make changes in the information and
pictures contained in this instruction manual without
prior notice.
GTW7、8、9/9S Series Operation And Service Manual

Table of contents
1 General-usage to intended purpose .......................................4
1.1 Safety declaration......................................................4
1.2 Checking before usage ..............................................6
1.3 Operating conditions .................................................8
1.4 Installation ................................................................8
1.5 Type code ................................................................10
1.6 Nameplate ...............................................................10
1.7 Product description ................................................. 11
1.8 Usage regulation .....................................................12
1.9 Transport and storage ..............................................13
2 Electrical connection...........................................................16
2.1 General ....................................................................16
2.2 Motor connection ....................................................16
2.3 Thermal resistance connection ................................17
2.4 Brake connection ....................................................18
2.5 Microswitch connection ..........................................19
2.6 Jigger switch connection .........................................20
2.7 Encoder connection.................................................21
2.7.1 Pulse encoder ..............................................22
2.7.2 Sin/Cos encoder ..........................................23
2.8 Earthing...................................................................23
3 Operation and maintenance.................................................24
3.1 General ....................................................................24

1
GTW7、8、9/9S Series Operation And Service Manual

3.2 Maintenance intervals .............................................25


3.3 Maintenance regulation ...........................................32
3.4 Lubricating instructions ..........................................32
3.5 Brake operation device ...........................................33
3.6 Emergency escape method ......................................36
3.7 Sheave replace ........................................................39
3.8 Trouble shooting .....................................................40
4 Brake system .......................................................................44
4.1 General ....................................................................44
4.2 Brake system declaration ........................................45
4.3 Brake clearance adjustment ....................................46
4.4 Brake state monitored .............................................49
4.5 Start-up....................................................................53
4.6 Maintenance ............................................................53
4.7 Trouble shooting .....................................................54
5 Commissioning with inverter ..............................................55
5.1 General ....................................................................55
5.2 Checking before usage ............................................56
5.3 Motor parameter setting ..........................................56
5.4 Inverter self-learning condition and method ...........57
6 Encode installation ..............................................................59
6.1 General ....................................................................59
6.2 Installation regulation .............................................60
6.3 Installation method..................................................60
6.3.1 Hollow shaft ................................................60
6.3.2 Cone shaft ...................................................62

2
GTW7、8、9/9S Series Operation And Service Manual

7 Machine’s dimension ..........................................................64


7.1 GTW7 dimension ....................................................64
7.2 GTW8 dimension ....................................................65
7.3 GTW9/9S dimension ..............................................66
8 Technical data .......................................................................67
8.1 GTW7 technical data .........................................................67
8.2 GTW8 technical data .........................................................68
8.3 GTW9 technical data .........................................................69
8.4 GTW9S technical data .......................................................70

3
GTW7、8、9/9S Series Operation And Service Manual

1 General-usage to intended purpose

Thank you for purchasing our GTW7、GTW8 、GTW9/9S

series gearless PMS elevator traction machines. In order to

enable users to make clear about our product’s function,

characteristic most and ensure users’ safety, please read this

operation and service manual carefully. When any problem

beyond this manual is found during using, please contact local

sales agency or our technicians of engineering department. Our

professional technicians delight in service for you.

1.1 Safety declaration

Only qualified personnel are allowed to perform any

planning, installation or maintenance work to GTW7、GTW8 、

GTW9/9S series gearless PMS elevator traction machines. The

personnel must be trained for the job and must be familiar with

the installation, assembly, commissioning and operation of the

4
GTW7、8、9/9S Series Operation And Service Manual

product. Sufficient knowledge in lift construction is essential.

Their commissioning is prohibited until the requirements of the

directive are satisfied by or upon integration of the motor into the

final product.

The regulations concerning operation, maintenance and

inspection in accordance with the applicable safety regulations in

lift construction such as GB 7588-2003 “Safety rules for the

construction and installation of electric lifts” (equal to EN81-1:

1998) and other relevant. Regulations shall be strictly observed.

The operator is responsible for the proper installation of the

gearless PMS elevator traction machines with regard to safety

requirements as well as for its inspection and maintenance as

specified in the applicable regulations. No liability can be

assumed for any damage caused by improper handling or any

other acts, which are not in conformity with these operating

instructions and thus deter from the qualities of the product.

5
GTW7、8、9/9S Series Operation And Service Manual

In this manual, the following pictographs are used to mark

warnings and important notes. These pictographs must be

observed.

Mean that death or serious injury to persons or


serious damage to property will occur unless
the appropriate precautions are taken.

Mean that death or serious injury to persons or


serious damage to property may occur unless
the appropriate precautions are taken.

Mean that injuries to persons or damage to


property may occur unless the appropriate
precautions are taken.

The operator must observe the safety item in this manual


strictly.

1.2 Checking before usage

Before you start to use the machine, you should check the

6
GTW7、8、9/9S Series Operation And Service Manual

following item earnestly first.

a. Check up whether the packages is integrity or not

before opening it, and make sure there is no injured or

affected with damp;

b. Check up whether the machine documents and other

related accessories is well-found or not;

c. Check up the nameplate data seriously, and make sure

the this type of machine is accords with your desires;

d. Check up whether the traction machine structural is

integrated or not, whether the bolt fix tight or not, and

whether the brake system is working agile or not;

e. Measure the insulation resistances of the PMS motor

windings and brake windings. If the insulation

resistances dropped below 3 M the winding needs to

be dried (insulation meter voltage: 500V DC);

f. Check up whether the brake system work effective and

brake manual handle device work agile and effective or

no.

7
GTW7、8、9/9S Series Operation And Service Manual

1.3 Operating conditions

GTW Series Gearless PMS elevator traction machines must

be ensured on following ambient conditions:

a. Altitude: max. 1000 m (If the altitude bigger than

1000m,please connect our technical department);

b. Ambient temperature:+ 5~+40 °C;

c. Max. Relatively humidity: 90% at 25°C (no moisture

condensation);

d. Circumstance air without causticity and combustible

gases or pungent gases;

e. No lubricant and sundries on rope surface;

f. The power supply voltage fluctuation and ratings

deviation should be no more than ±7%;

1.4 Installation

Check the permissible base frame or foundation loads by

8
GTW7、8、9/9S Series Operation And Service Manual

calculation before installing the lift machine.


Place the machine on a plane surface with a permissible deviation
from planeness not exceeding 0.1 mm.。

Fasten the machine on the frame with four


M20 bolts of strength class 8.8.

Traction machines are generally provided with rope slip-off

guards. After putting the ropes in place, adjust them so that the

distance between the rope and the rope slip-off guard :≤2.5 mm.

Install the machine only in an enclosed machine room and take

care to observe the relevant safety precautions.

Traction machines are designed with degree of protection IP 41.

Make sure that the cable entries to the terminal boxes are sealed

properly when making the electrical installation.

The revolving parts must be defend according to GB

7588-2003 “Safety rules for the construction and installation of

electric lifts”.

9
GTW7、8、9/9S Series Operation And Service Manual

1.5 Type code

For example:GTW9-101P0 type means this machine is type

outside rotor gearless PMS elevator traction machine, rated load

is 1000Kg, and rated speed is 1.0m/s.

Customer can chose our gearless PMS elevator traction

machine by rated load, rated speed and series code (you can also

see our gearless PMS elevator traction machine cataloger for

detail).

1.6 Nameplate

The nameplate will be rivet on the machine seat, it include

some necessary parameters in setting frequency inverter.

10
GTW7、8、9/9S Series Operation And Service Manual

Please refer to the given parameters to do the

setting frequency inverter work.

1.7 Product description

1. PMS motor 2. Brake system


3. Protection plate 4. Brake drum
5. Sheave 6. Junction box
7. Encoder(option)

11
GTW7、8、9/9S Series Operation And Service Manual

1.8 Usage regulation

The Gearless PMS elevator traction

machines are not designed for direct

connection to the three-phase system but are

to be operated via an electronic frequency inverter. Direct

connection to the system may destroy the motor.

Due to use high-frequency inverter the surface of machine may

induce some faradism voltages during the operation of

synchronous motors. So the Earthing should be connect at

terminal connection box .

High voltages occur at the terminal connections during the

operation of synchronous motors, so the installation or

maintenance work is forbid when the power is not take off.

Check the proper functioning of the motor and the brake after

installing the machine.

High surface temperatures may occur on

12
GTW7、8、9/9S Series Operation And Service Manual

the external parts of the machine. Therefore, no

temperature-sensitive parts may contact these parts or be attached

to them. Protection against accidental contact should be provided,

if required.

1.9 Transport and storage

The PMS elevator traction machines leave factory in a faultless

condition after being tested. Make a visual check for any external

damage immediately upon their arrival on site. If any damage

incurred in transit is found, make a notice of claim in the

presence of the forwarder. If necessary, do not put these machines

into operation.

The eyebolts are designed for the


specified machine weight, i.e. it is not
permitted to suspend additional loads. And
the machine must be suspend in a right method (see following
picture for detail).

13
GTW7、8、9/9S Series Operation And Service Manual

Store the machine only in closed, dry, dust-free, well ventilated

and vibration-free rooms.

After prolonged storage (>3 months), rotate the motor in both

directions at a low speed (about 20rpm) to allow the grease to

distribute evenly in the bearings.

14
GTW7、8、9/9S Series Operation And Service Manual

MAX 30 cm

Suspend Sketch Map

15
GTW7、8、9/9S Series Operation And Service Manual

2 Electrical connection

2.1 General

The electrical connection of the motor

should be down by qualified electric

technician.

There must be no foreign bodies, dirt or moisture in the

terminal box. In order to keep the connection is safety and

credible, please thought the cable from the water joint in

connection box. Do not forget to cover the connection box cover

after connection, which can keep out to get an electric shock.

2.2 Motor connection

Direct connection to three-phase power is


forbid it may destroy the motor.

16
GTW7、8、9/9S Series Operation And Service Manual

Connect the frequency inverter output and earthing terminal to

motor terminal show in the picture. The connection cable

diameter is decide by motor rated current(can refer to frequency

inverter instruction manual).

Check the short-circuiting between windings and ground after

connection.

2.3 Thermal resistance connection

In order to control the motor temperature rise and avoid the

motor temperature became too high. GTW series gearless PMS

elevator traction machine install a motor thermal protection

17
GTW7、8、9/9S Series Operation And Service Manual

resistance,customer can connect the “R1,R2”terminal to their

control system.. The following table is the specification of the

PTC thermal resistance our factory use:


PTC Technical Characteristics Three in series Unit
Max work voltage U max 25 V
Rated acting temperature TK 120 ºC
Resistance at T=25ºC±1ºC
R 25 ℃ ≤300 Ω
(V≤2.5V)
Resistance at given temperature
T k -5℃ ≤1650 Ω
(V≤2.5V)
Resistance at given temperature
T k +5℃ ≥3990 Ω
(V≤2.5V)
Resistance at given temperature
T k +15℃ ≥12 KΩ
(V≤2.5V)
Tk acting time TD <5 s

2.4 Brake connection

The brake system of GTW series gearless PMS elevator

traction machines is new type, the parameter of the single

brake:

18
GTW7、8、9/9S Series Operation And Service Manual

Brake type Voltage Current Power


FZD12 DC110V 0.88A 97W
FZD12A DC110V 0.88A 97W
FZD10 DC110V 0.84A 92W

Due to release circle installed in the brake

system of PMS elevator traction machine,

user has to differentiate between BK+ and BK- on the connection

end, when connect the power supply of the brake, preventing

release circle burning.

2.5 Microswitch connection

There are two microswitch installed in the brake system used

to feed back the acting of brake. Customers can connect it

according you control system requests. There are 2 different

contacts NC is normal closed contact, NO is normal open

contact.

19
GTW7、8、9/9S Series Operation And Service Manual

2.6 Jigger switch connection

According to correlative standard requests there must have a

jigger switch for the machine room. Following picture is the

jigger switch. When the maintainer want to use the jigger switch,

please loose the M5 screw with Phillips screwdriver and lay

down the board, make sure normal closed contacts disconnect,

that is, cut off safety circuit. Please safekeeping the spares which

laid down, in order to restore the device when the lift runs

normally.

20
GTW7、8、9/9S Series Operation And Service Manual

terminal
screw

Mounting
board card

2.7 Encoder connection

Our PMS elevator traction machine must

work with the special frequency inverter,

which can control the PMS motor. And the inverter it must work

in close-loop mode, so there must be a speed/position feed back

device (we call it encoder in the following page).

The measuring system of the PMS elevator traction machines

is matched to the associated converter.

Our factory can provide some different measuring systems on

request. You can select it according to the inverter request. If you

have other measuring systems please connect our technical

21
GTW7、8、9/9S Series Operation And Service Manual

department. We recommend the use of an appropriate cable set to

connect the measuring system to the converter system. Cable sets

can be supplied as accessories.

Following page is introducing the two types’ encoder we use

now. And you can see the detail in the encoder instruction

manual.

2.7.1 Pulse encoder

You can connect the inverter with the inverter instruction


manual and the cable color/markers in the ending of cable.

TAMAGAWA OIH 100-8192P20-L6-5V

Electric parameter:

●Supply voltage: DC5V±5%

●Current consumption: ≤200mA

● Resolution: 8192 C/T

● Output mode: Line Driver

22
GTW7、8、9/9S Series Operation And Service Manual

2.7.2 Sin/Cos encoder

Alternatively, the machines can be equipped with the

sine-cosine encoder types. It connected with a 15-pole signal

coupling fitted to the frequency inverter.

HEIDENHAIN ERN 1387

Electric parameter:

● Supply voltage: DC5V±5%

● Current consumption: ≤150mA

● Resolution: 2048 C/T

● Output mode: Sin/Cos

2.8 Earthing

For safety reasons, it is very important

that the motor be properly and carefully

23
GTW7、8、9/9S Series Operation And Service Manual

earthed.

Use the earthing screw provided on the housing! In addition,

connect the protective or earthing conductor in the terminal box

as specified respectively.

3 Operation and maintenance

3.1 General

The lift operator is responsible for regular checks of the brake

safety components and the traction main sheave, and must

include these components in his visual inspection schedules.

The regulations concerning operation,

maintenance and inspection in accordance

with the applicable safety regulations in lift construction such as

GB 7588-2003 "Safety rules for the construction and installation

24
GTW7、8、9/9S Series Operation And Service Manual

of electric lifts", and other relevant regulations shall be strictly

observed.

The operator is responsible for the requirements, which are

with regard to applicable safety regulations.

3.2 Maintenance intervals

The following maintenance activities are recommending to be

performed:

Check item Criterion Cycle Remark

Brake dynamic Check brake dynamic and Half a


core clearance static iron core gap. When 0.3 month
mm feeler plug into or 0.45
mm feeler can enter, need to
be adjusted, see the following
section

Micro switch If the micro switch is not Half a


adjustment normal, should be adjusted in month
time. See the following
sections

25
GTW7、8、9/9S Series Operation And Service Manual

Release check Check the brake release on Half a Note 1


both sides of the brake, when month
the brake handle without
stroke, you need to adjust

Brake shoe Check the micro switch Half a Note 2


wear adjustment bolt to the base month
gap or brake dynamic core to
the base of the space whether
it meets the requirements, the
cumulative amount of wear <
1mm

Fastener lock Confirmation of each fastener Half a


state lock month

Bearing noise No abnormal noise Three


months

Load current Lower than the rated current Three


value months

Brake power The traction machine is fully Six months


check loaded, braking traction wheel
has no slip (2-3min)

Sheave fix state No loose、damnification Six months

Rope groove No serious wear Six months Note 3

26
GTW7、8、9/9S Series Operation And Service Manual

Rope stop To maintain the original state Six months


device without displacement

Winding ≥3MΩ Six months


insulation
resistance

Sheave fix state No loose、damnification Six months

Connection No aging Six months

cable

Clean machine No dust Half a


month or
surface
As
required

Note1: Check the brake stroke.


Stop elevator, check the stroke of the brakes for both sides
of the machine (A: about 10mm), as shown, after you release
your finger can automatically reset. If the brakes do not have
stroke, contact the factory processing.
For roomless, in addition to the above tests, must to check
the loose brake line also,still need to pine brake whether blocking
phenomenon are examined. In order to ensure the safety of the
elevator, through the open and remote reset loosen, check the
brake is capable of being opened and closed, once a card

27
GTW7、8、9/9S Series Operation And Service Manual

resistance phenomenon, should immediately adjust or replace the


remote brake releasing.

Push

Push

28
GTW7、8、9/9S Series Operation And Service Manual

Note2: Because the product structure restrictions, the amount of


brake wear is not easy to detect. Shown below, the gap between
movable core and base reduce when the brake lining thickness
worn. When this gap is less than 10mm(GTW7、GTW8) or
9.5mm(GTW9/9S), you need to replace the brake lining.

Movable core Gap

Base

Note3: Sheave rope groove wear and replacement sheave


determination reference.
Our standard groove figure:

29
GTW7、8、9/9S Series Operation And Service Manual

Rope The Incisio Groove Groove Opening


diameter opening n angle Width Depth depth
φd angle β° B H T
γ°
8 30 90 5.66 9.5 1.5
10 30 95 7.37 12.5 1.5
Any of the following three conditions occur, must replace the
sheave:
(1) Sheave groove wear occurs critical situation, details are
as follows:

Rope diameter Distance Important Wear critical


φd began using distance range
h δ
8 2.5 0.5 δ≤0
10 3.5 1 δ≤0.5

30
GTW7、8、9/9S Series Operation And Service Manual

Sheave diameter of the outermost

Rope initial centerline


Critical centerline of rope wor

No wear Worn

(2) Due to uneven wear the rope, the ropes has more than
1mm difference in height:

(3) Rope cracks can be seen, there is significant wear


deviation groove.

31
GTW7、8、9/9S Series Operation And Service Manual

When the elevator moves up and down in the hoistway, if there is


slippage between the ropes and the sheave, need to identify the
cause and resolved then run the elevator properly, otherwise
groove will be greater wear.

3.3 Maintenance regulation

Only qualified personnel are allowed to

perform any maintenance work. The person

who do the maintenance work must take care due to some work

must done when the machine running.

3.4 Lubricating instructions

The main bearing of GTW7、GTW8 or GTW9/9S series PMS


elevator traction machine is self-lubricating, so it will not be
re-lubricating during the working.

32
GTW7、8、9/9S Series Operation And Service Manual

3.5 Brake operation device

Each PMS elevator traction machine has a

manual brake handle device, which is used

to escape the person in emergency states.

And it is forbid to in normal states.

Brakes are safety devices! Only qualified personnel are allowed

to perform any assembly, adjusting or maintenance work!

The brake manual handle just can be used in escapes person in

emergency states and be operating by professional.

The manual brake release of the gearless traction machine

divides two types: with machine room and without machine

room:

1. In the case of with machine room, the traction machine will

be configured the manual brake release, see picture below:

33
GTW7、8、9/9S Series Operation And Service Manual

GTW7 manual brake release

GTW8、9/9S manual brake release

Remove the manual brake release lever when the traction

machine is in normal using conditions, proper arrangements

to prepare for emergency use.

34
GTW7、8、9/9S Series Operation And Service Manual

2. In the case of without machine room, the traction machine

will be configured the remote manual brake release, see

picture below:

GTW7 remote manual brake release

GTW8、9/9Sremote manual brake release

35
GTW7、8、9/9S Series Operation And Service Manual

Brake line bending radius must be greater than 250


millimeters.

3.6 Emergency escape method

If the lift needs to be moved manually in

case of breakdown or power cuts, the person

who must get the maintenance certificate can carry out the rescue

work following the method below.

For machine room customer can use the gear in dustproof

radiator ring and for roomless customer can use the roomless

brake operation device to do the rescue work.

a. Cut off the elevator power to prevent it unintentional

restarting, but must keep the car illumination.

b. Try to make clear the position of car (you may open the

hall door by mechanical key to check it).

c. When the elevator stop at the place where have about

±500mm distance to hall door level, the maintain

person can open the hall door by mechanical key and

36
GTW7、8、9/9S Series Operation And Service Manual

open the car door, then help the passengers out of the

car safety.

d. If the elevators stop at other position, you must move

the car by mechanical method to help the passengers

out of the car safety. You can do the rescue according to

the following steps:

I. Keep the car door closed. If the car door is opened

already, you must let the passengers to close the door

by hand. Notice the passengers in the car that the car

will move to help them out, ask them keep calm in the

car and don’t move away( if the elevator had installed

intercommunication telephone, make the best of it).

II. Take off the protective casing away, and then fix the

jigger wheel.

III. There must be two person to hold the jigger wheel to

prevent the elevator from quickly move unexpected

when the brake is opened. Then the third person to

37
GTW7、8、9/9S Series Operation And Service Manual

open the brake only when the car needs move,

otherwise close brake immediately.

IV. Move the car slowly and stop it at the position where

have about ±150mm distance to hall door level.

Notes: If car is not overstepping level place of top

floor or bottom floor, you may move the car in a

saving labor direction. But if car is overstep level

place of top floor or bottom floor you must move

car to top floor (bottom floor) direction, you can

move car by jigger wheel if needed.

V. Let brake return to normal work state, then open the

hall door outside of correspondence level by special

key, and pull the car door open, then help the

passengers out of the car safety.

38
GTW7、8、9/9S Series Operation And Service Manual

3.7 Sheave replace

The safety precautions to be taken when

working in the lift well are to be strictly

observed for roomless customer.

When removing the old traction sheave, secure it against

falling down. Four M12 holes for forcing screws (GB/T 5783

M12×50-8.8) are provided in the traction sheave to facilitate

disassembly.

When fitting the new traction sheave be sure to assemble all

components of the connection in the same manner as those on the

old traction sheave. And the normal impulse of the

sheave-trough’s surface should be test after assemble, it must

lower than the GB/T24478-2009 standard requests.

Notes: The sheave and the drum is connected use fast

engagement and use the elasticity pin, you can install it

according to following steps:

39
GTW7、8、9/9S Series Operation And Service Manual

a. Tighten a pairs of dowel screw into the thread hole at

opposite direction in brake drum as guide bolt. Use a

lifting device to suspend the heated main sheave and

then cover it by the guide bolt, and to aim at the

pinhole in the brake drum at same time.

b. Install the elasticity pin and connecting bolts.

c. To use a tightening torque of 115 Nm to tighten the 12

connecting bolts between the traction sheave and the

brake drum (M12x50-8.8).

3.8 Trouble shooting

Repairs other than those described in this

operating manual are not permitted to

perform. The proper maintenance of the gearless lift machines

requires adequately trained specialist personnel and specific

devices and auxiliaries.

Following table is presentation and countermeasure of faults:

40
GTW7、8、9/9S Series Operation And Service Manual

Fault Possible cause Remedy

Check whether the


connection cable is connect
a. Power cut credibility
The interlocking device
whether relief
b.Inverter Check the connection

misconnection diagram to correct it


PMS not Brake not open completely
work c. Over load or
Inverter is over max. Limit
brake not open Reduce load

Deal with it according to


d. Inverter fault
inverter instruction

Change the inverter to


e.Wrong inverter
PMSM inverter
Protect a.Wrong inverter
Change the higher capability
after start capability

41
GTW7、8、9/9S Series Operation And Service Manual

b.Inverter Prolong the accelerate and

setting fault decelerate time

Prolong the accelerate and


c. Over load
decelerate time

d.Short-circuit
Check the winding resistance
ing in winding

Take off the connection cable

e.Short-circuit to recheck it, if still

ing to earthing short-circuiting exchange the

machine

f.Short-circuit

ing in control Exchange the fault parts

system

Abnormal
a.Friction
noise or Brake not open complete
noise
vibration

42
GTW7、8、9/9S Series Operation And Service Manual

b.Inverter Change the inverter PI or

setting fault operating frequency value

c.Encoder
output single
interfered Connect the encoder shield

Encoder not Fix it again firm

fixed credibility

d. Bearing fault Replace the broken bearing

a. Not connect Find out the problem and


the earthing correct it
b. Winding
Electricity affected Desiccation the winding
in with damp Repair the broken insulation
machine Insulation parts
seat broken Clean the earthing
Dirt in earthing
connection
connection

43
GTW7、8、9/9S Series Operation And Service Manual

c. Connection
Repair or exchange the
cable
connection cable
insulation
The Aeration,
Remove the obstruction and
temperature. radiator not
the dirt
too high well

4 Brake system

4.1 General

Brakes are safety devices! Only qualified


personnel are allowed to perform any
assembly, adjusting or maintenance work.
The braking torque data listed in our documents are based on

the following operating conditions:

a. Protect the friction surfaces from oil or grease, rain,

splash water, snow and ice;

44
GTW7、8、9/9S Series Operation And Service Manual

b. Ensure that the brake linings do not come into contact

with solvent-containing media;

c. Wire must not be taut, under pressure;

d. Follow the instructions on the label, connect voltage

accurately;

e. Ambient temperature:+5℃~+40℃. If the temperature

is lower or below freezing because the moisture, the brake

torque is severely decreased, must provide appropriate

countermeasures.

f. Brakes normal operating voltage range of the reference

GB/T12325-2008 "Power quality-Deviation of supply

voltage" 4.2 ±7% required.

4.2 Brake system declaration

45
GTW7、8、9/9S Series Operation And Service Manual

Number Name Number Name


1 Friction piece 2 Spacer
3 Movable core 4 Fixed core
5 locknut 6 Adjusting screw A
7 Adjusting screw B 8 Brake handle
9 Junction Box

4.3 Brake clearance adjustment

In the braking system of inspection and


maintenance, make sure that:
a. No inadvertent starting of the motor
is possible;

46
GTW7、8、9/9S Series Operation And Service Manual

b. No load moment is acting on the brake drum or on the motor;


c. After completion of the inspection and maintenance work, the
interlocking preventing inadvertent starting of the motor is
cancelled;
d. All surfaces providing friction are free from oil or grease ,it is

not possible to clean an oily or greasy brake lining.

Gap adjustment method:

a. Detection: Check the break gap at detection 1,2,3,4. The gap

should be <0.45mm, otherwise the gap must be to adjusted.

b. Adjustment: Use allen wrench to loose the adjusting screw B,

47
GTW7、8、9/9S Series Operation And Service Manual

so that the connected sets of brakes and brake plane did not

contact. Repeatedly adjust sleeve, make the gap between

movable core and fixed core is 0.3-0.4mm, (Note: The

detection position as shown, first detection of the position of

No. 1,4, and then No. 2,3.) Tighten the Adjusting screw B on

the cross to 45-55Nm. Recheck the gap between movable

core and fixed core, ensure that it meets the requirements;

c. If the noise of the brake is big. First adjustment and confirm

the gap between movable core and fixed core within the

provisions(0.3-0.4mm), and make sure the brake release

circuit is intact, make sure power off , then adjust the

adjustment screws A(clockwise,Adjust the amount of about

30 degrees per time , The four adjustment screw A

synchronous adjustment , the following figure ) ,Need to

ensure that the brake power condition, delection 1 to 4 in 0.05

mm feeler can't insert ,and locking the locknut.

48
GTW7、8、9/9S Series Operation And Service Manual

4.4 Brake state monitored

The state of the brake can be monitor by micro-switch. The

contact has two types, one is normal closed contract and the other

is normal open contract. Customers can connect it according to

your control system requests.


Before micro-switch adjustment, make sure
that:
Brake is a braking state.

49
GTW7、8、9/9S Series Operation And Service Manual

GTW7 micro-switch adjustment method:

a. Detection: Check the break gap between movable and

fixed core is 0.3-0.4mm. The gap A is between micro

switch contact and lever. When the gap A is 0.65mm,

the switch work; and when the gap A is 0.85mm, the

switch doesn’t work; otherwise, the switch needs

adjustment.

b. Adjustment: Use a wrench (8mm) to loosen screw nut M5.

If the switch work at the gap A <0.65mm, then use

wrench (8mm) loosen the bolt M5; If the switch do not

work at the gap A >0.85mm, then use wrench (8mm)

screw the bolt M5; when the gap A meet the above

requirements, use a wrench (8mm) to lock screw nut

M5. The brake is energized; check the switch lever is

not in contact with the micro switch.

c. Repeatedly turn on and off the brake, confirm micro

switch operation, and ensure the electrical testing is

normal after the adjustment.

50
GTW7、8、9/9S Series Operation And Service Manual

Bolt M5

Screw nut M5 The gap A

Micro switch

GTW8 、GTW9/9S micro-switch adjustment method:

a. Detection: Check the break gap between movable and

fixed core is 0.3-0.4mm.

b. Adjustment: Measure the gap A of the position 1 in

Figure; use a feeler (the thickness is 0.1mm less than

that gap A) to inserted into the position 2 in Figure

(between the bolt M5 and the lever), adjust the bolt M5,

until the micro switch work; use a feeler (the thickness

is 0.15mm less than that gap A) to inserted into the

position 2, the micro switch should not trigger, then

lock the nut M5.

51
GTW7、8、9/9S Series Operation And Service Manual

c. Repeatedly turn on and off the brake, confirm micro

switch operation, and ensure the electrical testing is

normal after the adjustment.

Number Name Number Name


1 Bolt M5 2 Adjust seat

3 Nut M5 4 Lever

Terminal
5 Micro switch 6
block

52
GTW7、8、9/9S Series Operation And Service Manual

4.5 Start-up

Make sure that the functional test of the brake is only carried

out when the motor is at rest, has been disconnected from the

supply and is secured against inadvertent restarting.

Surface temperatures of >80 °C may

occur in the braking system. For this reason,

no temperature-sensitive parts such as normal cables or electronic

components may be routed to or fixed to the braking system.

Provide appropriate protection against accidental contact, if

necessary. If the motor shaft needs to be turned during adjusting

work release the braking system by electric or by means of

manual release, if necessary.

4.6 Maintenance

When doing any inspection or maintenance


work, make sure that:
a. No inadvertent starting of the motor is

53
GTW7、8、9/9S Series Operation And Service Manual

possible;
b. No load moment is acting on the brake drum or on the
motor;
c. After completion of the inspection and maintenance work,
the interlocking preventing inadvertent starting of the motor is
cancelled
All surfaces providing friction are free from oil or grease,
it is not possible to clean an oily or greasy brake lining.

4.7 Trouble shooting

Fault Possible cause Remedy


Brakinga. Braking system voltage Check brake supply
system do applied at excitation voltage electrical
not work winding too low connection
b. Braking torque set too Reduce brake
large torque setting
c. Braking open distance is Readjust the brake
too small open distance
d. Brake winding broke Replace the broken
winding
Brakinga. Oil or grease on brake disk Remove the oil
torqueb. The distance between Change the brake
cannot mobile-core and brake cap lining

54
GTW7、8、9/9S Series Operation And Service Manual

meet setting too big


request
Braking The brake open distance Readjust the brake
noise too setting too big open distance
big
Brakinga. Micro switch broken Replace the broken
system no winding
feed back
b. The position of micro Readjust the micro
switch broken is install not switch install
correct position

5 Commissioning with inverter

5.1 General

The commissioning with the inverter work must be done by


qualified electric technician.

Due to there may be have shake in


running-in work, please fix the PMS elevator traction machine in
a fixed frame.

55
GTW7、8、9/9S Series Operation And Service Manual

5.2 Checking before usage

Before start work make sure that the


traction machine, encoder and brake is
connect correct. And do not forget the
insulation and earthing.
Check the power capability and the earthing cable are correct.
The temporarily support power is not recommend, and it must
have the safe isolation from supply.

5.3 Motor parameter setting

Usually when running in with inverter divided into two parts:

PMS parameters and system position (PG) learning. You may

need same necessary parameters to set into the inverter on this

process.

There are two different methods to set the parameters into the

inverter:

a. Set the factory value in nameplate or in operation manual

to the inverter direct.

56
GTW7、8、9/9S Series Operation And Service Manual

b. Setting the basic parameters then use the inverter motor

learning function to lean the other parameters.

Because there are so many different inverter in the market, and

them have different name, expressive manner or unit to one

parameter. You can see the detail of the motor learning method in

the inverter instruction manual.

5.4 Inverter self-learning condition and


method

Inverter self-learning is a very important part in running in

work, and it will have much matter with the traction machine

running steady and safe in future.

Following condition must be insure before start the

self-learning work:

a. No load in sheave (before hang up the rope);

b. Electrify the brake and the sheave can running free;

57
GTW7、8、9/9S Series Operation And Service Manual

c. Encored mechanical install and signals connection

correct;

d. Familiar with the performance of the inverter you use.

In order to make the commissioning work process successfully,

please do it according to following steps:

a. Electrify the inverter, set the parameter of PMS elevator

traction machine and encoder. Then turning the sheave in

both directions to check whether the inverter speed feed

back is correct. If the inverter court failure, please check

the connection and the setting.

b. Start the self-learning function then read out the

parameter, and do is about 10~15 times the tolerance

must with 10%.

The motor speed abnormal or vibration

too big may happen during this process.

This may be cause by the wrong connection of motor phase. You

can do it again after replace the discretional two phases.

58
GTW7、8、9/9S Series Operation And Service Manual

There may have some difference in different inverter

self-learning process, you can do it according to the inverter

instruction manual requests.

c. Set the motor run at both direction at a low speed to

check whether it running steady. And it can start and stop

under the inverter commands.

d. Set the inverter parameter to final state and let it running

in the rated speed to check the no-load current is normal.

6 Encode installation

6.1 General

Installation, checking and replace of the


encoder must be down by qualified
maintainer at power cut state.
If the customer ordered the encoder when order the PSM elevator
traction machine, the encoder will be installed and tested before it

59
GTW7、8、9/9S Series Operation And Service Manual

leaving factory.
If the customers buy the encoder yourself, you can install it

according to following step:

6.2 Installation regulation

Encoder is a very exact equipment part so


it must be take care during installation.

6.3 Installation method

6.3.1 Hollow shaft

Fit for OIH100/SBH100(Φ30 hollow-shaft、key、reed):

60
GTW7、8、9/9S Series Operation And Service Manual

a. Take off the burr on the connection shaft;

b. Check the shaft jerk value with centesimal meter, the

tolerance should within 0.05mm;

c. Install the key in the shaft, and smear some lubricates oil in

the shaft.

d. Install the encoder in the shaft (reed must in rear);

e. Fix the connection plate in the rear cover, and then fix the

reed in the connection plate.

61
GTW7、8、9/9S Series Operation And Service Manual

6.3.2 Cone shaft

Fit for HEIDENHAIN ERN 1387 (cone shaft, screw, expansion

shell bolt), HENGSTLER S21-8192, RF53 8192 (cone shaft,

screw, reed):

62
GTW7、8、9/9S Series Operation And Service Manual

a. Open the rear cover;

b. Take off the burr in connection cone hole;

c. Open the encoder cover then pull the cone shaft into the cone

hole. Use the fix bolt accessory of encoder thought the

encoder to fix the encoder in the shaft. Finally connect the

signal cable and cover the rear cover;

d. Open the rear cover;

e. Take off the burr in connection cone hole;

f. Open the encoder cover then pull the cone shaft into the cone

hole. Use the fix bolt accessory of encoder thought the

encoder to fix the encoder in the shaft. Finally connect the

signal cable and cover the rear cover;

g. Refer to ERN1387,it have a expansion cover in the rear side,

fix it with expansion shell bolt show in the picture;

h. Refer to S21/RS53, you should fix the reed in the connection

plate.

63
GTW7、8、9/9S Series Operation And Service Manual

7 Machine’s dimension

7.1 GTW7 dimension

64
GTW7、8、9/9S Series Operation And Service Manual

7.2 GTW8 dimension

65
GTW7、8、9/9S Series Operation And Service Manual

7.3 GTW9/9S dimension

66
GTW7、8、9/9S Series Operation And Service Manual

8 Technical data

8.1 GTW7 technical data

67
GTW7、8、9/9S Series Operation And Service Manual

8.2 GTW8 technical data

68
GTW7、8、9/9S Series Operation And Service Manual

8.3 GTW9 technical data

69
GTW7、8、9/9S Series Operation And Service Manual

8.4 GTW9S technical data

70
GTW7、 GTW8、 GTW9/9S Series
Operation And Service Manual
S2016.2

Address:Changshu New & High Tech Industrial Park, CEDZ,


Jiangsu, China
Post No.:215500
Tel :+86-512-52840537/52841532/52841536/52840539
Fax:+86-512-52841915/52845918
E-mail:[email protected]
Website:http://www.torindrive.com

You might also like