PROJECT:
ESCALATOR-3
DWG- MP0201.03 THE NEW CAIRO MALL
DWG- MP0201.04
KEY PLAN NORTH
RETAIL SHOP
RETAIL SHOP
R119
R122
RETAIL SHOP
HANDICAP TOILET RETAIL SHOP
R120
106 R121
SERVICE R.
PUBLIC CORRIDOR 107
105
PUBLIC TOILET (F)
108
GENERAL NOTES:
RETAIL SHOP
R118 PUBLIC TOILET (M)
109
RETAIL RETAIL RETAIL RETAIL
R127 R128 R129 R130 RETAIL
R131
ELEVATOR
EL04
STAIRCASE
ST04
ELEVATOR
EL03
SERVICE CORRIDOR
112
STAIRCASE
ST05
NO. DATE MODIFICATIONS
R0 23-MAY-13 ISSUED FOR TENDER
C R1 17-MAR-14 ISSUED FOR CONSTRUCTION
ELECTRIC R.
110
A.H.U ROOM
111
REVISIONS:
B
OWNER:
STAIRCASE CAIRO COMPANY FOR
ST06
HOUSING &DEVELOPMENT
CONCEPT DESIGNER:
A MAIN CONSULTANT:
DRAWING TITLE:
MECHANICAL
FIRST FLOOR PLAN
PART 4
DWG- MP0201.01
DWG- MP0201.04
PLUMBING
DESIGNED BY:
ENG. A. ZAKI
CHECKED BY:
ENG. SAID NASSAR
APPROVED BY:
ENG. NAGUIB ZEIDAN
DATE DRAWN: PLOT DATE: PROJECT NO.
01-APRIL-13 17-MAR-14 998
SCALE: SIZE: REVISION:
1:100 A0 R1
DRAWING NUMBER:
14 15 16 17 17' 18 19 20 21 21' 22 23 24 25
MP0201.04