T013514003V0F1

The document provides details for piping construction including notes, material specifications, and piping component details such as elbows, flanges and insulation. It references Saudi Aramco fabrication standards and includes a bill of materials listing pipe sizes, materials, and quantities.

Uploaded by

haseebrazvi1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views1 page

T013514003V0F1

The document provides details for piping construction including notes, material specifications, and piping component details such as elbows, flanges and insulation. It references Saudi Aramco fabrication standards and includes a bill of materials listing pipe sizes, materials, and quantities.

Uploaded by

haseebrazvi1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

UP -------------------- STANDARD DETAIL REFERENCE DRAWINGS

| BILL OF MATERIAL |
DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175
-------------------- CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING AD-036627

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
AWAY AWAY

N PT NPD INSULATION DETAILS FOR HOT PIPING

INSULATION DETAILS FOR COLD PIPING


AA-036911

AA-036913
NO DESCRIPTION (IN) CMDTY CODE QTY INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630
-- PIPE ----------- -- ----- ---- ---
----
TOWARD TOWARD
1 PIPE SCH 80 SEAMLESS, BE API 5L GR.B PSL 2 P_3LE2P021 14.344 M
2, (INTERNAL FBE LINED) (NACE
DOWN
MR-0175/ISO 15156), ASME B36.10M
NOTES
FITTINGS 1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO

-------- FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.

2 90 DEG LR ELBOW SCH 80 SEAMLESS, BW, 2 E_3LE2P021 3 2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

ASTM A234 GR.WPB, (INTERNAL FBE 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

LINED) (NACE MR-0175/ISO 15156), ASME 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C. (C) WELDING ELBOWS ARE LONG RADIUS.
B16.9
5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION
01-SAMSS-10.

FLANGES
6. GASKET ALLOWANCE PER SPEC
-------
7. PIPING MATERIAL IS PER BOM
3 FLANGE CLASS 300, SCH 80, WN, RF ASTM 2 F3_1LE2P021 10
PIPE SIZE SCHEDULE SPECIFICATION
A105N, (INTERNAL FBE LINED) (NACE
MR-0175/ISO 15156), ASME B16.5

GASKETS
-------
4 4.5 MM THK GASKETS SPIRAL-WOUND, SS316 2 G3_5CS9U2 5
WINDINGS, FLEXIBLE GRAPHITE FILLED, 8. WELDING STRESS RELIEF - YES NO
PER SAES-W-011 TABLE 17.6.2.1
WITH SS316 OUTER RING, ASME B16.20, 100% X-RAY SPOT X-RAY 01-SAMSS-10

ASME B16.5, CL 300


9. TESTING SHOP HYDROSTATIC TEST - YES NO

THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS

BOLTS FLANGED. HYDROSTATIC TEST PRESSURE PER HYDROTEST DIAGRAM

----- 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING

5 BOLTING ASTM A193 GR.B7M STUD BOLTS, 5/8 B_9CS9P1 40 SPECIFICATION SAES-L-105 CLASS 3LE2P02 .
ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
SEMI-FINISHED HEAVY PATTERN, ASTM
A194 GR.2HM, W/2 HEAVY HEX NUTS, 11. INSULATION

95.0MM BOLT LENGTH INSULATION TYPE & THK. ON DWG.

12. TIE-IN LOCATIONS AND DETAILS SHALL BE FIELD VERIFIED BEFORE START OF WORK.

PIPE SUPPORTS 13. FOR SMALL BORE LINES (UPTO 1-1/2") DIMENSIONS, ROUTING & SUPPORTING SHALL

------------- BE FIELD ADJUSTED.

6 PIPE SUPPORT 2 GL01-2 1 14. ALL DIMENSIONS AND COORDINATES ARE IN MM. CONTRACTOR TO FIELD VERIFY ALL

DIMENSIONS PRIOR TO CONSTRUCTION.

30
15. FOR INTERNAL LINED PIPE, LINING SHALL BE DONE AFTER SPOOL FABRICATION
7 PIPE SUPPORT 2 REST 1

030 & COMPLETION OF ALL HOT WORKS.

F3 .1 16. FOR GALVANIZED PIPE, GALVANIZING SHALL BE DONE AFTER SPOOL FABRICATION

EL & COMPLETION OF ALL HOT WORKS.

F3 G4 B5 146 SPOOLS TO BE FABRICATED BY VENDOR


NO. WEIGHT NO. WEIGHT
CONT.ON 2 PIECES
MARK NO. SIZE MARK NO. SIZE
REST LBS PIECES LBS

SHT 4
F3 F3 G4 B5
E 203561
F3
N 375787
1 5
21

611
EL.103030

S6 F3 G4 B5

1
F3 146
GL01-2
59
47
S7 REST
F3 56 F3 G4 B5
SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
10 NO. NO.
REST MARK NO. SIZE MARK NO. SIZE
1 CONT. FROM PIECES PIECES

1 2"NS
2" SHT 2
NS 2
E 213536
59 N 371000
47
40 2991 EL.102269
0 146
47 2
87

6
14 F3 G4 B5
REFERENCE DRAWINGS

DWG. CONTROL FOR J.O. 10-12862-0001 TD-718027

PIPING PLAN BA-752286

HYDROTEST DIAGRAM TA-011935001

REVISION VALIDATION

THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


0F1
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-12862-0001-029

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

FAW LAK ASD AHB


06/12/23 06/12/23 06/12/23 06/12/23

REV.NO.DATE REVISION DESCRIPTION

0F1 06/12/23 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-12862-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
STRESS SYSTEM (SYS-) NA

PIPING CLASS 3LE2P02 SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

P & ID No. BA-747596001 ISO 2"-WBD-14613-3LE2P02-B97


ISO
OPER/DESN PRESS.(psig) 424 / 506
INLET & GAS TREATMENT SHAYBAH
OPER/DESN TEMP.( F) 58.7 / 200
INLET FACILITIES
FLUID PHASE LIQUID
MODULE NO: SHAYBAH SAUDI ARABIA
PAINT SPEC (APCS-) 1D
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

LINE ID B97-WBD-14613-B97-01
B97 L TB-013514 003 0F1
Saudi Aramco 5994 ENG. (09/03)

RESTRICTED VECTOR CADD-05

21/03/2024 08:40:35 Wison