0% found this document useful (0 votes)
38 views3 pages

Itp Tank-29jan 07

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views3 pages

Itp Tank-29jan 07

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

PRINT NAME SIGNATURE

Doc No: S-0098-00-QP-0801


Prepared By: MARHADI MUSHAFFA
INSPECTION AND TEST PLAN (ITP)
Approved By: T.S.R.BANGAR RAJU
Revision: F1
OWNER App:
DISCIPLINE TANKAGES - CATHODIC PROTECTION SYSTEM PROJECT: MG3 PROJECT Date: 29-Jan-07
LOCATION MG3 PROJECT SITE , MELAKA CLIENT: PETRONAS PENAPISAN MELAKA SDN BHD

Responsible Inspection Points


Item no. Activity Control Instance Reference Document Frequency of check Acceptance Criteria Verifying Document Remarks
Execution Sub Contractor Contractor PMT

A DRAWING APPROVAL AFC DRAWINGS

B. MATERIAL APPROVAL AFC DRAWINGS & DELIVERY ORDER Mill Test Certificate

C ANODEFLEX, PERMANENT REFRENCE ELECTRODE


C.1 Anodeflex Resistance Test PTS 30.10.73.33-Installation & ONCE FOR EACH ROLL PTS 30.10.73.33-Installation & TEST REPORT SCS/SCI I/R V W
C.2 AnodeFlex Continuity Test Commissioning of CP System ONCE FOR EACH ROLL Commissioning of CP System TEST REPORT SCS/SCI I/R V W
C.3 Inspection of Coke Brezee & RANDOM ONCE INSPECTION REPORT SCS/SCI I/R V W
C.4 Effectiveness of Permanent Reference Electrode TECHNICAL SPECIFICATION ONCE FOR EACH ROLL TEST REPORT SCS/SCI I/R V W
C.5 Anode Installation Inspection-layout arrangement and secure properly ONCE FOR EACH INSTALLATION INSPECTION REPORT SCS/SCI I/R V W
D TRU
D.1 Inspection of TRU PTS 30.10.73.33-Installation & ONCE FOR EACH TRU PTS 30.10.73.33-Installation & INSPECTION REPORT SCS/SCI I/R V W
D.2 Foundation for TRU Commissioning of CP System RANDOM ONCE Commissioning of CP System INSPECTION REPORT SCS/SCI I/R V W
E JUNCTION BOXES
E.1 Inspection of Junction Boxes PTS 30.10.73.33-Installation & ONCE FOR EACH JB PTS 30.10.73.33-Installation & INSPECTION REPORT SCS/SCI I/R V W
E.2 Foundation of Junction Boxes Commissioning of CP System RANDOM ONCE Commissioning of CP System INSPECTION REPORT SCS/SCI I/R V W
F ELECTRICAL AC/DC CABLE
F.1 Cable Drum Insulation Reisistance Test PTS 30.10.73.33-Installation & ONCE FOR EACH DRUM TEST REPORT SCS/SCI I/R V W
F.2 Setting out of cable trench Commissioning of CP System RANDOM PTS 30.10.73.33-Installation & INSPECTION REPORT SCS/SCI I/R V W
Commissioning of CP System
F.3 Survey for U/G facilities ONCE AT ALL LOCATIONS INSPECTION REPORT SCS/SCI I/R V W
G PRE-COMMISSIONING
G.1 TRU Installation Inspection PTS 30.10.73.33-Installation & ONCE FOR EACH TRU INSPECTION REPORT SCS/SCI I/R V W
G.2 Junction Boxes Installation Inspection Commissioning of CP System ONCE FOR EACH JB PTS 30.10.73.33-Installation & INSPECTION REPORT SCS/SCI I/R V W
G.3 All AC/DC Cable Terminations Inspection ONCE EVERY TERMINATION Commissioning of CP System INSPECTION REPORT SCS/SCI I/R V W
G.4 Natural Potential Measurement ONCE FOR EACH TANK TEST REPORT SCS/SCI I/R V W
H COMMISSIONING
H.1 TRU Performance and Workability Check PTS 30.10.73.33-Installation & PTS 30.10.73.33-Installation & TEST REPORT SCS/SCI I/R V W
H.2 On/Off Potential Measurement Commissioning of CP System Commissioning of CP System TEST REPORT SCS/SCI I/R V W
KEY Contractor : I - Responsible for undertaking Inspection / Test, R - Responsible for generating record, V - Verification of record.
PMT : V - Verification of record, W - Witness of Inspection / Test, H - Hold on Inspection / Test (Contractor do not proceed)

SCS- Contractor / Sub contractor Civil Supervisor , SCI - Contractors Quality Inspection , CSR - Client site representative , QS - Contractors Quality Assurance Surveillance

Page 1 of 3
MG3 PROJECT - MELAKA
Format No. LT/PP/C - 15

` Rev No. 0

Date : 08.07.06

Material Receipt Information & Inspection Note


Sub contractor Name : Date of receipt :
Work order No. Area of Operation : UNIT 72 / UNIT 18 / UNIT / 19 / UNIT 75 / LSWR / UNIT 49 / UNIT 51 / UNIT 82 , SS-40 , SCR -8 Date of Report :
unless expressly authorized in writing by Lurgi -L&T - KQKS Consortium. Offenders are liable for damages. All

Date of WO. Others specify : __________________


Description of Work order :

Supplier / Vendor Name & Batch / Lot / Heat Inspection Carried By


Sr No. Item Description Qty P.O. No & Dc No. TC No. Unloaded At Remarks
Any exploitation and/or other utilization, including but not limited to reproduction, dis-
emination and/or distribution, of this document and its contents are strictly prohibited

Location No. & Date


rights, including but not limited to all proprietary rights in relation to patents, utility
models and/or other industrial property rights, are reserved.

Remarks : ( On Physical Condition , Storage , Acceptance / Rejection Etc )

Name :
Date :
Sign :

SUB CONTRACTOR CONTRACTOR's AREA MANAGER CONTRACTOR's QAQC


Note : Original shall be sent to QAQC , copy to planning , Stores & Area Incahrge
MG3 PROJECT - MELAKA
Format No. LT/PP/Q-01

` Rev No. F1

Date : 21-Aug-06

General Inspection Report


Sub contractor / Supplier Name : Area / Activity : Date of Inspection :
Work order No. / P.O.No. : ITP Reference : Date of Report :
Date of WO./ PO : Drawing No & Rev No. :
unless expressly authorized in writing by Lurgi -L&T - KQKS Consortium. Offenders are liable for damages. All

Address :

Nature of Inspections / Test's Carried & The Results , Reference to Internal /


Sr No. Item Description unit Offered / Inspected Qty Accepted Qty Rejected Qty Remarks
External Tests
Any exploitation and/or other utilization, including but not limited to reproduction, dis-
emination and/or distribution, of this document and its contents are strictly prohibited

rights, including but not limited to all proprietary rights in relation to patents, utility
models and/or other industrial property rights, are reserved.

Remarks : ( On Physical Condition , Storage , Acceptance / Rejection Etc )

Name :
Date :
Sign :

SUB CONTRACTOR CONTRACTOR's AREA MANAGER CONTRACTOR's QAQC PMT


Note : Original shall be retained with QAQC, Copy to Supplier / Sub contractor & PMT