Putaway Strategy Part 1
Putaway Strategy Part 1
Scenario 1: Putaway strategies at Storage type level based on putaway control indicator (PACI) and
warehouse process type (WPT) the STSS should trigger
STEP 1. Define Storage Type Search Sequence for Putaway: system search for suitable storage types in
sequential order
SPRO→IMG→SCM Extended Warehouse Management→Extended Warehouse Management→Goods Receipt
Process→Strategies→Storage Type Search→Define Storage Type Search Sequence for Putaway
NEW ENTRIES
Enter the Storage type search sequences (SS1)
Save It
Assign Storage type Search sequence SS2 to Storage type for TS02
Save It
New Entries
Control Parametrs To Triggers The Storage Type Search Sequences (Stss) Stratergy
The Below Two Indicator Will Determine the Combination of Search Sequence for STSS
1. PTWY CTRL
2. WPT
Need To Maintain The Process Type Indicator (F1)& Putaway Control(PAC1) In Product Master
Need To Maintain the Process Type Indicator (Blank)& Putaway Control (PAC2) In Product Master
DO UNLOADING
SAVE IT
You can define storage type search sequences for putaway. Storage type search sequences are required
for the putaway process and for warehouse rearrangement
NEW ENTRIES
SAVE IT
New Entries
In Our Scenario System Should Search Stock Type Has First Priority So Tick The Box of Stock Type in 1st Seq &
2ND Seq Putawy Control Indicator, 3RD WPT & 4TH Combination Of Ptwy Ctrl & Proctyp
Save It
Pack The Hu
Save It
Disclaimer